About this file
Amendment 0010
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
November 30, 2012
4. REQUISITION/PURCHASE REQ.
SP0600-12-0213
5. PROJECT NO. (If applicable) Port of Salalah, Oman
6. ISSUED BY
SP0600 7. ADMINISTERED BY (If other than Item 6)
SP0600
Trina Wadley DLA Energy - BYB 8725 John J. Kingman Road, Suite 2945 Fort Belvoir, VA 22060-6222 Phone: (703) 767-4962 Fax: (703) 767-9338
8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)
( 9A. AMENDMENT OF SOLICITATION NO.
SP0600-12-R-0518
9B. DATED (SEE ITEM 11)
July 2, 2012
10A. MODIFICATION OF CONTRACT/ORDER
NO.
DUNS: 10B. DATED (SEE ITEM 13)
BIDDER CODE: CAGE CODE:
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended [X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS; IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office appropriation date, etc.) SET FORTH
IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE PAGE 2 of 3
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ALICIA C. WILLIAMS
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C.DATE
SIGNED
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer
16C.DATE SIGNED
NSN: 7540-01-152-8070 30-105 STANDARD FORM 30
(REV. 10-83)
mailto:Shandra.Herrod@dla.mil
COCO Storage Services, Port of Salalah, Oman Solicitation SP0600-12-R-0518
This amendment is hereby issued to reflect the following changes. You are required to acknowledge and submit this revised document as part of your final revision:
1. Contract Provisions F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY OCT 1997) deleted from this solicitation.
2. DLAD 52.211-9072 - GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY)
(NOV 2011) is added to this solicitation to replace Contract Provisions F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY OCT 1997) and reads as follows:
Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.
When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to affect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the quality assurance representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions.
Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government service. Tanks out of service for cleaning shall be governed by the Inspection and Cleaning Of Bulk Petroleum Storage Tanks clause.
Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.
Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.
The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
COCO Storage Services, Port of Salalah, Oman Solicitation SP0600-12-R-0518
The following subparagraphs apply only to barges and tankers.
Scheduled arrival date and basic allowed laytime.
The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date.
The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours’ notice for barges and the 72 hours’ notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, provided –
If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
3. The following Contract Line Items are added to this solicitation:
CONTRACT LINE ITEM 1009 – INJECTION OF ANTI-ICING (FSII) ADDITIVE (IFSI): The Contractor will be reimbursed $ per gallon for injection of anti-icing additive. (See Clause F0005- F45.03)
CONTRACT LINE ITEM 2009 – INJECTION OF ANTI-ICING (FSII) ADDITIVE (IFSI): The Contractor will be reimbursed $ per gallon for injection of anti-icing additive. (See Clause F0005- F45.03)
4. All other terms and conditions remain unchanged.
| SP0600-08-0034 |
| [ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended [X ] is not extended. |
| This amendment is hereby issued to reflect the following changes. You are required to acknowledge and submit this revised document as part of your final revision: |
| 1. Contract Provisions F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY OCT 1997) deleted from this solicitation. |
| 2. DLAD 52.211-9072 - GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY) (NOV 2011) is added to this solicitation to replace Contract Provisions F-0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY OCT 1997) and reads as follows: |
| Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions. |
| The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor. |
| Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities. |