SOW_Luster_Heights_Multiple_Bldgs.pdf

PDF 14 MB Posted

Attached to
GAOA - Replace Multipurpose Building, Maintenance Federal contract opportunity
Solicitation number
140FGA24R0003
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document provides details on a federal solicitation opportunity. The solicitation number is 140FGA24R0003 to replace multiple buildings at Luster Heights National Wildlife Refuge. The U.S. Fish and Wildlife Service is seeking to replace a multipurpose building, maintenance shop, cold storage building, and maintenance yard. The Statement of Work document attached provides more specifics on the required construction and maintenance services. Responses are due based on the standard solicitation timeline and award will be made to the responsible bidder whose proposal follows the solicitation instructions and is most advantageous to the government regarding technical approach and pricing.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA - Replace Multipurpose Building, Maintenance, newest first.
File Type Posted
Sol_140FGA24R0003_Amd_0003.pdf PDF
Amendment_3_UMR1145A0_Bid_Item_6_Cold_Storage_Building_Floor_Plan_0003.pdf PDF
Amendment_3_Specification_085200_Wood_Windows_0003.pdf PDF
Amendment_3_Drawing_Sheet_A38_Maintenance_Shop_Door_and_Window_Schedules_and_Details_0003.pdf PDF
Amendment_3_Specification_083613_0003.pdf PDF
Amendment_3_Specification_095113_Acoustical_Panel_Ceilings_0003.pdf PDF
Amendment_3_Questions_and_Answers_0003.pdf PDF
Amendment_3_Drawing_Sheet_A12_Multipurpose_Building_Wall_Sections_and_Details_0003.pdf PDF
Amendment_3_Drawing_Sheet_A39_Maintenance_Shop_Enlarged_Plans_and_Elevations_0003.pdf PDF
Amendment_3_Drawing_Sheet_L8_Site_Details_0003.pdf PDF
Amendment_3_Drawing_Sheet_A13_Multipurpose_Building_Finish_Plan_0003.pdf PDF
Amendment_3_Specification_260519_Low-Voltage_Electrical_Power_Conductors_and_Cables_0003.pdf PDF
Amendment_3_Additional_Project_Information_0003.pdf PDF
Amendment_3_Drawing_Sheet_A17_Multipurpose_Building_Window_Details_0003.pdf PDF
Amendment_3_Drawing_Sheet_A18_Multipurpose_Building_Window_and_Door_Details_0003.pdf PDF
Amendment_3_Specification_281300_Access_Control_Software_and_Database_Management_0003.pdf PDF
Amendment_3_UMR1148E0_Bid_Item_6_Cold_Storage_Building_Electrical_Plan_0003.pdf PDF
Amendment_3_Drawing_Sheet_A16_Multipurpose_Building_Door_Schedules_and_Details_0003.pdf PDF
Questions_and_Answers_Amendment_2_0002.pdf PDF
Additional_Project_Information_Amendment_2_0002.pdf PDF
Sol_140FGA24R0003_Amd_0002.pdf PDF
Luster_Heights_Pre-bid_Site_Visit_0002.pdf PDF
Sol_140FGA24R0003_Amd_0001.pdf PDF
Revised_Notice_to_Offerors_0001.pdf PDF
Price_Schedule.pdf PDF
Wage_Determination.pdf PDF
Sol_140FGA24R0003.pdf PDF
Notice_to_Offerors.pdf PDF
Past_Performance_Questionnaire_(PPQ).pdf PDF
Drawings_Luster_Heights.pdf PDF
Drawings_Cold_Storage.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPPER MISSISSIPPI RIVER

NATIONAL WILDLIFE AND FISH REFUGE

MCGREGOR DISRICT

MULTIPURPOSE BUILDING, MAINTENANCE

SHOP, AND COLD STORAGE BUILDING

Infrastructure Management Division

Page J - 1

PART III, SECTION J

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

INDEX

TECHNICAL PROVISIONS/SPECIFICATIONS

DIVISION 01 – PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 000107 SEALS PAGE

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 011000 SUMMARY OF THE WORK

SECTION 012500 SUBSTITUTION PROCEDURES

SECTION 012600 CONTRACT MODIFICATION PROCEDURES

SECTION 012900 PAYMENT PROCEDURES

SECTION 013000 SUBMITTALS

SECTION 013100 PROJECT COORDINATION

SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013516 ALTERATION PROJECT PROCEDURES

SECTION 014000 QUALITY REQUIREMENTS

SECTION 014200 REFERENCES

SECTION 015000 TEMPORARY FACILITIES AND CONTROLS

SECTION 015639 TEMPORARY TREE AND PLANT PROTECTION

SECTION 016000 PRODUCT REQUIREMENTS

SECTION 017300 EXECUTION

SECTION 017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION 017700 CLOSEOUT PROCEDURES

SECTION 017823 OPERATION AND MAINTENANCE DATA

SECTION 017839 PROJECT RECORD DOCUMENTS

SECTION 017900 DEMONSTRATION AND TRAINING

DIVISION 02 – EXISTING CONDITIONS

NOT APPLICABLE

DIVISION 03 – CONCRETE

SECTION 031000 CONCRETE FORMING AND ACCESSORIES

SECTION 032000 CONCRETE REINFORCING

SECTION 033000 CAST-IN-PLACE CONCRETE

Page J - 2

DIVISION 04 – MASONRY

SECTION 042200 CONCRETE UNIT MASONRY

SECTION 044313.16 ADHERED STONE MASONRY VENEER

DIVISION 05 – METALS

SECTION 051200 STRUCTURAL STEEL FRAMING

SECTION 053100 STEEL DECKING

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

SECTION 060660 TRANSLUCENT RESIN PANEL SYSTEM

SECTION 061000 ROUGH CARPENTRY

SECTION 061600 SHEATHING

SECTION 061800 GLUED-LAMINATED CONSTRUCTION

SECTION 062023 INTERIOR FINISH CARPENTRY

SECTION 064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

SECTION 071113 BITUMINOUS DAMPPROOFING

SECTION 072100 THERMAL INSULATION

SECTION 072500 WEATHER BARRIERS

SECTION 072600 VAPOR RETARDERS

SECTION 074113.16 STANDING SEAM METAL ROOF PANELS

SECTION 074293 SOFFIT PANELS

SECTION 074646 FIBER CEMENT SIDING

SECTION 076200 SHEET METAL FLASHING AND TRIM

SECTION 077253 SNOW GUARDS

SECTION 079200 JOINT SEALANTS

DIVISION 08 – OPENINGS

SECTION 081113 HOLLOW METAL DOORS AND FRAMES

SECTION 081416 FLUSH WOOD DOORS

SECTION 083613 SECTIONAL DOORS

SECTION 084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION 085200 WOOD WINDOWS

SECTION 087111 DOOR HARDWARE (DESCRIPTIVE SPECIFICATION)

SECTION 087113 POWER DOOR OPERATORS

SECTION 088000 GLAZING

SECTION 088100 PROTECTIVE BIRD GLASS GLAZING

Page J - 3

DIVISION 09 - FINISHES

SECTION 092900 GYPSUM BOARD

SECTION 093013 CERAMIC TILING

SECTION 095113 ACOUSTICAL PANEL CEILINGS

SECTION 096513 RESILIENT BASE AND ACCESSORIES

SECTION 096519 RESILIENT TILE FLOORING

SECTION 096543 LINOLEUM FLOORING

SECTION 096723 RESINOUS FLOORING

SECTION 096813 TILE CARPETING

SECTION 098433 SOUND-ABSORBING WALL UNITS

SECTION 099113 EXTERIOR PAINTING

SECTION 099123 INTERIOR PAINTING

SECTION 099300 STAINING AND TRANSPARENT FINISHING

DIVISION 10 - SPECIALTIES

SECTION 101100 VISUAL DISPLAY UNITS

SECTION 101423.16 ROOM-IDENTIFICATION PANEL SIGNAGE

SECTION 102113.19 PLASTIC TOILET COMPARTMENTS

SECTION 102600 WALL AND DOOR PROTECTION

SECTION 102800 TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION 104413 FIRE PROTECTION CABINETS

SECTION 104416 FIRE EXTINGUISHERS

SECTION 107516 GROUND-SET FLAGPOLES

DIVISION 11 - EQUIPMENT

SECTION 113013 RESIDENTIAL APPLIANCES

DIVISION 12 - FURNISHINGS

SECTION 122413 ROLLER WINDOW SHADES

SECTION 123623.13 PLASTIC LAMINATE CLAD COUNTERTOPS

SECTION 123661.19 QUARTZ AGGLOMERATE COUNTERTOPS

DIVISIONS 13 – SPECIAL CONSTRUCTION

SECTION 133419 METAL BUILDING SYSTEMS

DIVISIONS 14 – 21

Page J - 4

DIVISION 22 – PLUMBING

SECTION 220500 BASIC PLUMBING REQUIREMENTS

SECTION 220513 COMMON MOTOR REQUIREMENTS FOR PLUMBING

EQUIPMENT

SECTION 220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

SECTION 220518 ESCUTCHEONS FOR PLUMBING PIPING

SECTION 220523.12 BALL VALVES FOR PLUMBING PIPING

SECTION 220523.14 CHECK VALVES FOR PLUMBING PIPING

SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 220553 IDENTIFICATION FOR PLUMBING PIPING AND

EQUIPMENT

SECTION 220593 TESTING, ADJUSTING, AND BALANCING FOR

PLUMBING

SECTION 220900 INSTRUMENTATION

SECTION 221000 PLUMBING PIPING

SECTION 221023 PROPANE PIPING

SECTION 221030 PLUMBING SPECIALTIES

SECTION 221116 DOMESTIC WATER PIPING

SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES

SECTION 221123.13 DOMESTIC WATER PACKAGED BOOSTER PUMPS

SECTION 221123.21 INLINE, DOMESTIC WATER PUMPS

SECTION 221223.11 FACILITY INDOOR POTABLE WATER STORAGE TANKS

SECTION 221313 FACILITY SANITARY SEWERS

SECTION 221316 SANITARY WASTE AND VENT PIPING

SECTION 221319 SANITARY WASTE PIPING SPECIALTIES

SECTION 221319.13 SANITARY DRAINS

SECTION 221323 SANITARY WASTE INTERCEPTORS

SECTION 221329 SANITARY SEWERAGE PUMPS

SECTION 221353 FACILITY SEPTIC TANKS

SECTION 221513 GENERAL SERVICE COMPRESSED AIR PIPING

SECTION 221519 GENERAL SERVICE PACKAGED AIR COMPRESSORS AND

RECEIVERS

SECTION 223100 DOMESTIC WATER SOFTENERS

SECTION 223300 ELECTRIC DOMESTIC WATER HEATERS

SECTION 224000 PLUMBING FIXTURES

SECTION 224213.13 COMMERCIAL WATER CLOSETS

SECTION 224213.16 COMMERCIAL URINALS

SECTION 224216.13 COMMERCIAL LAVATORIES

SECTION 224216.16 COMMERCIAL SINKS

SECTION 224223 COMMERCIAL SHOWERS

SECTION 224716 PRESSURE WATER COOLERS

Page J - 5

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

SECTION 230500 BASIC HVAC REQUIREMENTS

SECTION 230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

SECTION 230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

SECTION 230523.12 BALL VALVES FOR HVAC PIPING

SECTION 230523.14 CHECK VALVES FOR HVAC PIPING

SECTION 230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND

EQUIPMENT

SECTION 230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 230566 ANTIMICROBIAL ULTRAVIOLET LAMPS SYSTEMS FOR

HVAC

SECTION 230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 230700 PLUMBING AND HVAC INSULATION

SECTION 230900 INSTRUMENTATION AND CONTROL FOR HVAC

SECTION 231126 FACILITY LIQUEFIED-PETROLEUM GAS PIPING

SECTION 232100 HYDRONIC PIPING

SECTION 232116 HYDRONIC PIPING SPECIALTIES

SECTION 232123 HYDRONIC PUMPS

SECTION 232513 WATER TREATMENT FOR CLOSED LOOP HYDRONIC

SYSTEMS

SECTION 233113 METAL DUCTS

SECTION 233300 AIR DUCT ACCESSORIES

SECTION 233346 FLEXIBLE DUCTS

SECTION 233423 HVAC POWER VENTILATORS

SECTION 233439 HIGH-VOLUME, LOW-SPEED FANS

SECTION 233700 AIR INLETS AND OUTLETS

SECTION 235216 CONDENSING BOILERS

SECTION 235416.13 GAS FIRED FURNACES

SECTION 235533.16 GAS FIRED UNIT HEATERS

SECTION 236213 AIR COOLED CONDENSING UNITS

SECTION 237200 AIR TO AIR ENERGY RECOVERY EQUIPMENT

SECTION 237339 INDOOR, DIRECT FIRED HEATING AND VENTILATING

UNITS

SECTION 238126 SPLIT-SYSTEM AIR-CONDITIONERS

SECTION 238216.14 ELECTRIC RESISTANCE AIR COILS

SECTION 238239.19 WALL AND CEILING UNIT HEATERS

SECTION 238300 RADIANT FLOOR HEATING SYSTEMS

DIVISIONS 24 - 25

Page J - 6

DIVISION 26 – ELECTRICAL

SECTION 260500 COMMON WORK RESULTS FOR ELECTRICAL

SECTION 260513 MEDIUM VOLTAGE CABLES

SECTION 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

SECTION 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260548.16 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 260572 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT

STUDY

SECTION 260574 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH

STUDY

SECTION 260923 LIGHTING CONTROL DEVICES

SECTION 261219 PAD MOUNTED, LIQUID FILLED, MEDIUM VOLTAGE

TRANSFORMERS

SECTION 262416 PANELBOARDS

SECTION 262726 WIRING DEVICES

SECTION 262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 263100 PHOTOVOLTAIC COLLECTORS

SECTION 263353 STATIC UNINTERRUPTIBLE POWER SUPPLY

SECTION 263600 TRANSFER SWITCHES

SECTION 265119 LED INTERIOR LIGHTING

SECTION 265219 EMERGENCY AND EXIT LIGHTING

SECTION 265619 LED EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

SECTION 270500 COMMON WORK RESULTS FOR COMMUNICATIONS

SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION 271100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

SECTION 271513 COMMUNICATIONS COPPER HORIZONTAL CABLING

SECTION 275123.20 COMMERCIAL INTERCOMMUNICATIONS SYSTEMS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

SECTION 280500 COMMON WORK RESULTS FOR ELECTRONIC SAFETY

AND SECURITY

SECTION 281300 ACCESS CONTROL SOFTWARE AND DATABASE

MANAGEMENT

SECTION 281500 ACCESS CONTROL HARDWARE DEVICES

SECTION 282300 VIDEO SURVEILLANCE

SECTION 283100 INTRUSION DETECTION

SECTION 284621.11 ADDRESSABLE FIRE-ALARM SYSTEMS

Page J - 7

DIVISIONS 29 – 30

DIVISION 31 - EARTHWORK

SECTION 311000 SITE CLEARING

SECTION 312000 EARTH MOVING

DIVISION 32 – EXTERIOR IMPROVEMENTS

SECTION 321216 ASPHALT PAVING

SECTION 321313 CONCRETE PAVING

SECTION 321316 DECORATIVE CONCRETE PAVING

SECTION 321373 CONCRETE PAVING JOINT SEALANTS

SECTION 321723 PAVEMENT MARKINGS

SECTION 321726 TACTILE WARNING SURFACING

SECTION 323113 CHAIN LINK FENCES AND GATES

SECTION 323119 DECORATIVE METAL FENCES AND GATES

SECTION 323300 SITE FURNISHINGS

SECTION 329115 SOIL PREPARATION (PERFORMANCE SPECIFICATION)

SECTION 329200 TURF AND GRASSES

SECTION 329300 PLANTS

DIVISION 33 - UTILITIES

SECTION 331113 POTABLE WATER SUPPLY WELLS

SECTION 331115 UNDERGROUND POTABLE WATER STORAGE TANKS

SECTION 331415 SITE WATER DISTRIBUTION PIPING

SECTION 334200 STORMWATER CONVEYANCE

DIVISIONS 34 – 48

ATTACHMENTS

PRE-CONSTRUCTION SAFETY CHECKLIST

SUBMITTAL FORM

SUBMITTAL INSTRUCTIONS

GEOTECHNICAL REPORT (dated December 6, 2022)

Page J - 8

DRAWINGS

GENERAL DRAWINGS

3R-IA-93-985 COVER SHEET 1 OF 162

3R-IA-93-986 PROJECT DRAWING INDEX 2 OF 162

3R-IA-93-987 MULTIPURPOSE BUILDING CODE PLAN 3 OF 162

3R-IA-93-988 MULTIPURPOSE BUILDING ASSEMBLY DETAILS 4 OF 162

3R-IA-93-989 MULTIPURPOSE BUILDING ASSEMBLY DETAILS 5 OF 162

3R-IA-93-990 MAINTENANCE SHOP CODE PLAN 6 OF 162

3R-IA-93-991 MAINTENANCE SHOP ASSEMBLY DETAILS 7 OF 162

CIVIL DRAWINGS

3R-IA-93-992 TOPOGRAPHIC SURVEY 8 OF 162

3R-IA-93-993 GENERAL NOTES AND LEGENDS 9 OF 162

3R-IA-93-994 HORIZONTAL CONTROL PLAN AND

ABBREVIATIONS 10 OF 162

3R-IA-93-995 TEMPORARY EROSION AND SEDIMENT

CONTROL SPECIFICATIONS 11 OF 162

3R-IA-93-996 TEMPORARY EROSION AND SEDIMENT

CONTROL – SOUTH 12 OF 162

3R-IA-93-997 TEMPORARY EROSION AND SEDIMENT

CONTROL – NORTH 13 OF 162

3R-IA-93-998 TEMPORARY EROSION AND SEDIMENT

CONTROL DETAILS 14 OF 162

3R-IA-93-999 DEMOLITION PLAN 15 OF 162

3R-IA-93-1000 OVERALL SITE PLAN 16 OF 162

3R-IA-93-1001 SITE PLAN – SOUTH 17 OF 162

3R-IA-93-1001.1 SITE PLAN – EAST 18 OF 162

3R-IA-93-1002 SITE PLAN – NORTH 19 OF 162

3R-IA-93-1003 DIMENSIONING PLAN – SOUTH 20 OF 162

3R-IA-93-1004 DIMENSIONING PLAN – NORTH 21 OF 162

3R-IA-93-1005 OVERALL GRADING AND DRAINAGE PLAN 22 OF 162

3R-IA-93-1006 GRADING AND DRAINAGE PLAN - SOUTH 23 OF 162

3R-IA-93-1006.1 GRADING AND DRAINAGE PLAN – EAST 24 OF 162

3R-IA-93-1007 GRADING AND DRAINAGE PLAN - NORTH 25 OF 162

3R-IA-93-1008 UTILITY PLAN 26 OF 162

3R-IA-93-1009 WATER DETAILS 27 OF 162

3R-IA-93-1010 SEWER DETAILS 28 OF 162

3R-IA-93-1011 SEWER DETAILS 29 OF 162

3R-IA-93-1012 STORMWATER DETAILS 30 OF 162

3R-IA-93-1013 CIVIL DETAILS 31 OF 162

Page J - 9

LANDSCAPE DRAWINGS

3R-IA-93-1014 TREE PROTECTION PLAN 32 OF 162

3R-IA-93-1015 SITE ENLARGEMENTS 33 OF 162

3R-IA-93-1016 SITE ENLARGEMENTS 34 OF 162

3R-IA-93-1017 SITE ENLARGEMENTS 35 OF 162

3R-IA-93-1018 OVERALL LANDSCAPE PLAN 36 OF 162

3R-IA-93-1019 HEADQUARTERS PLANTING PLAN 37 OF 162

3R-IA-93-1020 STAFF PARKING AREA PLANTING PLAN 38 OF 162

3R-IA-93-1021 SITE DETAILS 39 OF 162

3R-IA-93-1022 SITE DETAILS 40 OF 162

3R-IA-93-1023 SITE DETAILS 41 OF 162

3R-IA-93-1024 SITE DETAILS 42 OF 162

3R-IA-93-1025 SITE DETAILS 43 OF 162

3R-IA-93-1026 SITE DETAILS 44 OF 162

3R-IA-93-1027 SITE DETAILS 45 OF 162

3R-IA-93-1028 PLANTING DETAILS 46 OF 162

ARCHITECTURAL DRAWINGS

3R-IA-93-1029 MULTIPURPOSE BUILDING FLOOR PLAN 47 OF 162

3R-IA-93-1030 MULTIPURPOSE BUILDING DIMENSION

FLOOR PLAN 48 OF 162

3R-IA-93-1031 MULTIPURPOSE BUILDING PLAN DETAILS 49 OF 162

3R-IA-93-1032 MULTIPURPOSE BUILDING ROOF PLAN

AND DETAILS 50 OF 162

3R-IA-93-1033 MULTIPURPOSE BUILDING ROOF DETAILS 51 OF 162

3R-IA-93-1034 MULTIPURPOSE BUILDING ROOF DETAILS 52 OF 162

3R-IA-93-1035 MULTIPURPOSE BUILDING EXTERIOR

ELEVATIONS 53 OF 162

3R-IA-93-1036 MULTIPURPOSE BUILDING BUILDING

SECTIONS 54 OF 162

3R-IA-93-1037 MULTIPURPOSE BUILDING BUILDING

SECTIONS 55 OF 162

3R-IA-93-1038 MULTIPURPOSE BUILDING WALL SECTIONS 56 OF 162

3R-IA-93-1039 MULTIPURPOSE BUILDING WALL SECTIONS 57 OF 162

3R-IA-93-1040 MULTIPURPOSE BUILDING WALL SECTIONS

AND DETAILS 58 OF 162

3R-IA-93-1041 MULTIPURPOSE BUILDING FINISH PLAN 59 OF 162

3R-IA-93-1042 MULTIPURPOSE BUILDING MATERIALS LIST 60 OF 162

3R-IA-93-1043 MULTIPURPOSE BUILDING SIGNAGE PLAN 61 OF 162

3R-IA-93-1044 MULTIPURPOSE BUILDING DOOR SCHEDULES

AND DETAILS 62 OF 162

3R-IA-93-1045 MULTIPURPOSE BUILDING WINDOW

ELEVATIONS 63 OF 162

Page J - 10

3R-IA-93-1046 MULTIPURPOSE BUILDING WINDOW AND

DOOR DETAILS 64 OF 162

3R-IA-93-1047 MULTIPURPOSE BUILDING ENLARGED PLANS

AND ELEVATIONS 65 OF 162

3R-IA-93-1048 MULTIPURPOSE BUILDING ENLARGED PLANS

AND ELEVATIONS 66 OF 162

3R-IA-93-1049 MULTIPURPOSE BUILDING ENLARGED PLANS

AND ELEVATIONS 67 OF 162

3R-IA-93-1050 MULTIPURPOSE BUILDING ENLARGED PLANS

AND ELEVATIONS 68 OF 162

3R-IA-93-1051 MULTIPURPOSE BUILDING INTERIOR

DETAILS 69 OF 162

3R-IA-93-1052 MULTIPURPOSE BUILDING REFLECTED

CEILING PLAN 70 OF 162

3R-IA-93-1053 MULTIPURPOSE BUILDING CEILING DETAILS 71 OF 162

3R-IA-93-1054 MULTIPURPOSE BUILDING RADON SYSTEM

PLAN 72 OF 162

3R-IA-93-1055 MAINTENANCE SHOP FLOOR PLAN 73 OF 162

3R-IA-93-1056 MAINTENANCE SHOP DIMENSION FLOOR PLAN 74 OF 162

3R-IA-93-1057 MAINTENANCE SHOP ROOF PLAN AND DETAILS 75 OF 162

3R-IA-93-1058 MAINTENANCE SHOP ROOF DETAILS 76 OF 162

3R-IA-93-1059 MAINTENANCE SHOP EXTERIOR ELEVATIONS 77 OF 162

3R-IA-93-1060 MAINTENANCE SHOP BUILDING SECTIONS 78 OF 162

3R-IA-93-1061 MAINTENANCE SHOP WALL SECTIONS AND

DETAILS 79 OF 162

3R-IA-93-1062 MAINTENANCE SHOP WALL SECTIONS AND

DETAILS 80 OF 162

3R-IA-93-1063 MAINTENANCE SHOP FINISH PLAN 81 OF 162

3R-IA-93-1064 MAINTENANCE SHOP STAIRS AND RAILING 82 OF 162

3R-IA-93-1065 MAINTENANCE SHOP SIGNAGE PLAN 83 OF 162

3R-IA-93-1066 MAINTENANCE SHOP DOOR AND WINDOW

SCHEDULES AND DETAILS 84 OF 162

3R-IA-93-1067 MAINTENANCE SHOP ENLARGED PLANS AND

ELEVATIONS 85 OF 162

3R-IA-93-1068 MAINTENANCE SHOP REFLECTED CEILING

PLAN 86 OF 162

3R-IA-93-1069 MAINTENANCE SHOP RADON SYSTEM PLAN 87 OF 162

STRUCTURAL DRAWINGS

3R-IA-93-1070 STRUCTURAL GENERAL NOTES 88 OF 162

3R-IA-93-1071 STRUCTURAL GENERAL NOTES 89 OF 162

3R-IA-93-1072 STRUCTURAL GENERAL NOTES 90 OF 162

3R-IA-93-1073 STRUCTURAL GENERAL NOTES 91 OF 162

3R-IA-93-1074 STRUCTURAL GENERAL NOTES 92 OF 162

Page J - 11

3R-IA-93-1075 STRUCTURAL SPECIAL INSPECTIONS AND

TESTING REQUIREMENTS 93 OF 162

3R-IA-93-1076 STRUCTURAL SPECIAL INSPECTIONS AND

TESTING REQUIREMENTS 94 OF 162

3R-IA-93-1077 MULIPURPOSE BUILDING ROOF WIND UPLIFT

PLAN 95 OF 162

3R-IA-93-1078 STRUCTURAL SCHEDULES 96 OF 162

3R-IA-93-1079 STRUCTURAL SCHEDULES 97 OF 162

3R-IA-93-1080 STRUCTURAL SCHEDULES 98 OF 162

3R-IA-93-1081 STRUCTURAL SCHEDULES 99 OF 162

3R-IA-93-1082 MAINTENANCE SHOP FOUNDATION AND

MEZZANINE FRAMING PLANS 100 OF 162

3R-IA-93-1083 MULTIPURPOSE BUILDING FOUNDATION PLAN 101 OF 162

3R-IA-93-1084 MULTIPURPOSE BUILDING MAIN LEVEL

LATERAL PLAN 102 OF 162

3R-IA-93-1085 MULTIPURPOSE BUILDING ROOF FRAMING

PLAN 103 OF 162

3R-IA-93-1086 MULTIPURPOSE BUILDING ISOMETRIC STEEL

FRAMING VIEWS 104 OF 162

3R-IA-93-1087 STRUCTURAL FOUNDATION DETAILS 105 OF 162

3R-IA-93-1088 STRUCTURAL FOUNDATION DETAILS 106 OF 162

3R-IA-93-1089 STRUCTURAL FOUNDATION DETAILS 107 OF 162

3R-IA-93-1090 STRUCTURAL FOUNDATION DETAILS 108 OF 162

3R-IA-93-1091 STRUCTURAL STEEL FRAMING DETAILS 109 OF 162

3R-IA-93-1092 STRUCTURAL STEEL FRAMING DETAILS 110 OF 162

3R-IA-93-1093 STRUCTURAL STEEL FRAMING DETAILS 111 OF 162

3R-IA-93-1094 STRUCTURAL WOOD FRAMING DETAILS 112 OF 162

3R-IA-93-1095 STRUCTURAL WOOD FRAMING DETAILS 113 OF 162

3R-IA-93-1096 MULTIPURPOSE BUILDING ISOMETRIC VIEWS 114 OF 162

PLUMBING DRAWINGS

3R-IA-93-1097 PLUMBING SCHEDULES AND LEGENDS 115 OF 162

3R-IA-93-1098 PLUMBING SCHEDULES 116 OF 162

3R-IA-93-1099 MULTIPURPOSE BUILDING DWV PLAN 117 OF 162

3R-IA-93-1100 MULTIPURPOSE BUILDING PLUMBING PLAN 118 OF 162

3R-IA-93-1101 MULTIPURPOSE BUILDING ENLARGED DWV

PLANS 119 OF 162

3R-IA-93-1102 MULTIPURPOSE BUILDING ENLARGED

PLUMBING PLANS 120 OF 162

3R-IA-93-1103 PLUMBING DETAILS 121 OF 162

3R-IA-93-1104 PLUMBING DETAILS 122 OF 162

3R-IA-93-1105 PLUMBING DETAILS 123 OF 162

3R-IA-93-1106 MAINTENANCE SHOP DWV PLANS 124 OF 162

3R-IA-93-1107 MAINTENANCE SHOP PLUMBING PLANS 125 OF 160

Page J - 12

3R-IA-93-1108 MAINTENANCE SHOP ENLARGED PLUMBING

PLANS 126 OF 162

MECHANICAL DRAWINGS

3R-IA-93-1109 MECHANICAL NOTES, LEGENDS, AND

SCHEDULES 127 OF 162

3R-IA-93-1110 MECHANICAL SCHEDULES 128 OF 162

3R-IA-93-1111 MECHANICAL SCHEDULES 129 OF 162

3R-IA-93-1112 MECHANICAL SCHEDULES 130 OF 162

3R-IA-93-1113 MULTIPURPOSE BUILDING HVAC PLAN 131 OF 162

3R-IA-93-1114 MULTIPURPOSE BUILDING ENLARGED HVAC

PLANS 132 OF 162

3R-IA-93-1115 MULTIPURPOSE BUILDING HVAC ISOMETRIC 133 OF 162

3R-IA-93-1116 MAINTENANCE SHOP HVAC PLANS 134 OF 162

3R-IA-93-1117 MAINTENANCE SHOP HYDRONIC PLANS 135 OF 162

3R-IA-93-1118 MECHANICAL DETAILS 136 OF 162

3R-IA-93-1119 MECHANICAL DETAILS 137 OF 162

3R-IA-93-1120 MECHANICAL DETAIL 138 OF 162

3R-IA-93-1121 TC DIAGRAMS 139 OF 162

ELECTRICAL DRAWINGS

3R-IA-93-1122 MULTIPURPOSE BUILDING ELECTRICAL

LEGENDS 140 OF 162

3R-IA-93-1123 MULTIPURPOSE BUILDING ONE LINE

DIAGRAM 141 OF 162

3R-IA-93-1124 MULTIPURPOSE BUILDING PANEL

SCHEDULES 142 OF 162

3R-IA-93-1125 MULTIPURPOSE BUILDING ELECTRICAL

SCHEDULES 143 OF 162

3R-IA-93-1126 MULTIPURPOSE BUILDING SITE PLAN 144 OF 162

3R-IA-93-1127 MULTIPURPOSE BUILDING LIGHTING PLAN 145 OF 162

3R-IA-93-1128 MULTIPURPOSE BUILDING POWER PLAN 146 OF 162

3R-IA-93-1129 MULTIPURPOSE BUILDING ROOF POWER AND

PV ARRAY PLAN 147 OF 162

3R-IA-93-1129.1 MULTIPURPOSE BUILDING PV ARRAY

RACKING PLAN 148 OF 162

3R-IA-93-1129.2 MULTIPURPOSE BUILDING PV RACKING

DETAILS 149 OF 162

3R-IA-93-1130 MULTIPURPOSE BUILDING MECHANICAL

POWER PLAN 150 OF 162

3R-IA-93-1131 MULTIPURPOSE BUILDING SPECIAL

SYSTEMS PLANS 151 OF 162

3R-IA-93-1132 MULTIPURPOSE BUILDING LIGHTNING

PROTECTION PLAN 152 OF 162

Page J - 13

3R-IA-93-1133 LIGHTNING PROTECTION DETAILS 153 OF 162

3R-IA-93-1134 MAINTENANCE SHOP ELECTRICAL LEGENDS 154 OF 162

3R-IA-93-1135 MAINTENANCE SHOP ELECTRICAL SCHEDULES 155 OF 162

3R-IA-93-1136 MAINTENANCE SHOP SITE PLAN 156 OF 162

3R-IA-93-1137 MAINTENANCE SHOP LIGHTING PLAN 157 OF 162

3R-IA-93-1138 MAINTENANCE SHOP POWER PLAN 158 OF 162

3R-IA-93-1139 MAINTENANCE SHOP MECHANICAL EQUIPMENT

POWER PLAN 159 OF 162

3R-IA-93-1140 MAINTENANCE SHOP SPECIAL SYSTEMS PLAN 160 OF 162

FIRE ALARM DRAWINGS

3R-IA-93-1141 GENERAL FIRE ALARM SYSTEM INFORMATION 161 OF 162

3R-IA-93-1142 MULTIPURPOSE BUILDING FIRE ALARM PLAN 162 OF 162

BID ITEM #6 COLD STORAGE BUILDING

SEE ATTACHED DRAWING PACKET SHEETS 1-6 FOR COLD STORAGE BUILDING

UPPER MISSISSIPPI RIVER NATIONAL FISH AND WILDLIFE REFUGE

– MCGREGOR DISTRICT

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

DOCUMENT 000107 - SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect:

1. Responsible for Divisions 01-49 Sections except where indicated as prepared by other design professionals of record.

B. Civil Engineer:

1. Responsible for sections in divisions 31 and 32.

C. Landscape Architect:

1. Responsible for sections in divisions 31 and 32.

D. Structural Engineer:

1. Responsible for sections in divisions 03, 04 and 05.

E. Plumbing Engineer:

1. Responsible for sections in division 22.

F. HVAC Engineer:

1. Responsible for sections in division 23.

G. Electrical Engineer:

1. Responsible for sections in division 26.

END OF DOCUMENT 000107

SEALS PAGE 000107 - 1

PROJECT MANUAL CERTIFICATION

Upper Mississippi River National Fish and Wildlife Refuge – McGregor District Multipurpose Building and Maintenance Shop Luster Heights, Iowa

15 March 2023

Name Angela Hansen Landscape Architect Reg. No.: LA00809 Expiration Date: 6/30/2024 Landscape Portions of Divisions 31 and 32

Name Adam Schlegel Civil Engineer Reg. No.: P27727 Expiration Date: 12/31/2023 Civil Portions of Divisions 31 thru 33

Name Joel Anderson Architect Reg. No.: ARC79696 Expiration Date: 6/30/2024 Divisions 0 thru Division 12

Name Dane Jorgensen Structural Engineer Reg. No.: 24044 Expiration Date: 12/31/2024 Structural Portions of Divisions 3, 4, 5 and 31

Name Roger Wheat Mechanical and Plumbing Engineer Reg. No.: 15110 Expiration Date: 12/31/2023 Divisions 22, 23

Name Gary Glassing Electrical Engineer Reg. No.: 16968 Expiration Date: 12/31/2023 Divisions 26, 27, 28

Gary

Glassing

16968

L I

CE

NS

ED

PROFESS IONAL ENGINEER

I O W A

R. ROGER

WHEAT

15110

L

IC

E N

S E D

PROFESS IONA L

EN

G I N

E E

R

I O W A

- MCGREGOR DISTRICT

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

USFWSR3_UMRLH

3.15.2023

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

THIS PAGE INTENTIONALLY LEFT BLANK

UPPER MISSISSIPPI RIVER NATIONAL FISH AND WILDLIFE REFUGE USFWSR3_UMRLH

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

3.15.2023

SUMMARY OF THE WORK 011000 - 1

SECTION 011000 - SUMMARY OF THE WORK

PART 1 - GENERAL

1.1 PROJECT TITLE: UPPER MISSISSIPPI RIVER NATIONAL FISH AND WILDLIFE REFUGE –

MCGREGOR DISTRICT – MULTIPURPOSE BUILDING, MAINTENANCE SHOP, AND COLD

STORAGE BUILDING.

1.2 WORK UNDER THESE SPECIFICATIONS

The Contractor shall furnish all materials, labor, equipment, and superintendence for the work described below and within the construction documents. The work includes but is not limited to;

project mobilization and demobilization, project management and oversite, demolition and construction of items described below, quality control, cleanup, and removal of all debris and waste generated during performance of the work.

Item #1: Multipurpose Building:

The work includes but is not limited to construction of a one story multipurpose building and exterior observation deck. The work also includes demolition, and construction of all temporary erosion and sediment control measures, water well, treatment, storage, and distribution systems, sanitary sewerage and septic system, underground electrical and telecommunications conduits and associated wiring, propane storage and distribution systems, landscaping including all trees, plants, grasses, and boulder retaining walls, gravel pathways and stone stairs, bike racks and bike parking area, flagpole, and site furniture.

This bid item also includes any and all items not identified or accounted for in the other bid items but shown in the construction documents.

All work items that are not specifically called out are considered incidental and no direct compensation will be provided. This work shall be performed on a firm fixed price lump sum basis.

Bid Item #2: Entrance Road and Maintenance Road:

The work includes but is not limited to construction of the asphalt entrance road, gravel maintenance road, and all associated improvements required to construct these roads. The work also includes constructing the refuge entry monument sign, electronic swing access gates, trailhead parking lot and sidewalk, and adjacent gravel shoulders, curbs and gutters, stormwater management systems, signage, and overhead lighting.

Bid Item #3: Visitor Parking Area:

The work includes but is not limited to construction of the asphalt visitor parking area and all associated improvements required to construct the parking area. The work also includes constructing the headquarters sign, and the adjacent concrete ADA parking stalls, curbs

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SUMMARY OF THE WORK 011000 - 2

and gutters, stormwater management systems, sidewalks, signage, overhead lighting, and an electric vehicle charging station.

Bid Item #4: Staff Parking Area and Overflow Grass Parking Area:

The work includes but is not limited to construction of the asphalt staff parking area, overflow grass parking area, and all associated improvements required to construct these parking areas. The work also includes constructing the adjacent concrete ADA parking stalls, curbs and gutters, stormwater management systems, sidewalks, signage, overhead lighting, and an electric vehicle charging station.

Bid Item #5: Maintenance Shop and Gravel Maintenance Yard:

The work includes but is not limited to construction of a rigid steel framed maintenance shop, gravel maintenance yard, and all associated improvements required to construct the maintenance shop and gravel yard. The work also includes constructing a chain link fence with electric and manual gates, aboveground fuel tanks, dumpster pad, concrete wash pad, concrete curb and gutter, floor drain holding tank, stormwater management systems, and boulder retaining wall.

Bid Item #6: Cold Storage Building:

The work includes but is not limited to construction of a rigid steel framed cold storage building and all associated improvements required to construction the cold storage building.

All work items that are not specifically called out are considered incidental and no direct

Bid Additive #1: Gravel Pathway

The work includes but is not limited to construction of a crushed gravel pathway.

1.3 LOCATION AND INSPECTION OF SITE

A. The work site is located at the Upper Mississippi National Fish and Wildlife Refuge – McGregor District. See cover sheet for project location. The address for the refuge headquarters is: 481 Luster Heights Rd, Harpers Ferry, IA 52146. The Refuge Manager may be contacted for further information concerning the project location by telephone at (608) 326-0515 ext. 112.

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SUMMARY OF THE WORK 011000 - 3

B. All prospective bidders, contractors, subcontractors, and related persons are encouraged to visit the site of the proposed Work and to assess the location and extent of the Work prior to submitting bids/quotes. Persons may inspect the site by contacting the Refuge Manager for an appointment.

1.4 DRAWINGS AND SPECIFICATIONS FOR CONSTRUCTION

A. The successful bidder will be provided, upon request, one digital copy of the construction drawings and specifications in .pdf format via email. These files will be provided at no additional cost to the successful bidder.

B. Construction drawings are drawn on a 22” x 34” standard “D” size sheet at 100%. When plotting drawings at different percentages bar scales on drawings shall be used for measuring.

C. Exact location of all affected utilities will be the responsibility of the contractor. Drawings may not completely show all utilities. Site verification is required in addition to contacting any local authorities and utility companies to determine exact locations of utilities.

1.5 WORK NOT INCLUDED IN THIS CONTRACT

A. All items indicated “NIC” on the drawings or in the specifications are items not included in this contract.

B. Work to be performed under other contracts and not included as a part of this contract is generally shown as “By Others” on the Contract Documents.

1.6 ITEMS PROVIDED BY THE GOVERNMENT

A. Work to be accomplished by the Government or manufactured items to be provided by the Government are generally shown as “By Government” on the Contract Documents.

1.7 TEMPORARY FACILITIES

A. Maintain and restore all government roads, service areas, landscaping, and utilities used to pre-construction condition.

1.8 SITE ACCESS AND RIGHT OF WAY

A. The construction access limits on Government property will be established by the Government and provided to the Contractor at the preconstruction meeting. The Contractor shall be responsible for complying with these limits and governing all work accordingly.

1. Partial Government Occupancy: Government will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government’s operations. Maintain existing exits unless otherwise indicated.

B. The Contractor is reminded all materials, items, and equipment stored on Government property for the duration of the work is at the Contractors own risk. The Government is not responsible

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SUMMARY OF THE WORK 011000 - 4

for lost, stolen, or damaged property.

C. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to insure bidders are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed.

D. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved in advance by the Government.

1.9 SAFETY - IN ADDITION TO FAR 52.236-13 ACCIDENT PREVENTION

A. The Contractor shall fill out and submit the “Preconstruction Safety Checklist” to the Government prior to beginning construction. A copy of this document is included as an attachment.

B. The Contractor shall designate a safety officer to ensure a safe work site. The safety officer shall perform daily work site inspections to assure compliance with all safety regulations and standards.

C. The Contractor’s Safety Plan shall be available on-site. The Contractor shall provide Safety

Data Sheets (SDS) for all hazardous materials brought on-site. SDS shall be made available in a conspicuous location.

D. All equipment and work activities shall comply with OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements. Additionally a copy of the accident report shall be provided to the Government.

E. The Contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area.

F. Provide at least one non-freezing type fire extinguisher of the appropriate class for each group of workers performing flammable procedures on the construction site.

G. Provide and maintain on the construction site a basic first aid kit for the workers to use.

1. Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. The first aid kit shall include items identified on SDS (see paragraph C of this section) in applicable locations.

2. Advise all workers of the location of first aid supplies.

3. Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.

H. Provide necessary Personnel Protective Equipment (PPE) as identified by SDS and OSHA regulations.

I. Provide documentation workers have been trained in the use of PPE prior to individual use.

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SUMMARY OF THE WORK 011000 - 5

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011000

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SUMMARY OF THE WORK 011000 - 6

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements:

1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

1.3 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Government that are not required to meet other Project requirements but may offer advantage to Contractor or Government.

1.4 ACTION SUBMITTALS

A. Substitution Requests: Submit documentation identifying product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use form acceptable to Government.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

SUBSTITUTION PROCEDURES 012500 - 1

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Government and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of Contracting Officer and Government.

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES.

j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Government's Action: If necessary, Goverment will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Government will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Contracting Officer's Supplemental Instructions for minor changes in the Work.

b. Use product specified if Government does not issue a decision on use of a proposed substitution within time allocated.

SUBSTITUTION PROCEDURES 012500 - 2

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

1.5 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.6 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.7 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Government will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Government will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Requested substitution provides sustainable design characteristics that specified product provided for compliance with Government requirements.

c. Substitution request is fully documented and properly submitted.

d. Requested substitution will not adversely affect Contractor's construction schedule.

e. Requested substitution has received necessary approvals of authorities having jurisdiction.

f. Requested substitution is compatible with other portions of the Work.

g. Requested substitution has been coordinated with other portions of the

Work.

h. Requested substitution provides specified warranty.

i. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Government will consider requests for substitution if received within 60 days after commencement of the Work. Requests received after that time may be considered or rejected at discretion of Architect.

SUBSTITUTION PROCEDURES 012500 - 3

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

1. Conditions: Government will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Government will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution offers Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Government must assume. Government's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Government, and similar considerations.

b. Requested substitution does not require extensive revisions to the Contract Documents.

c. Requested substitution is consistent with the Contract Documents and will produce indicated results.

d. Requested substitution provides sustainable design characteristics that specified product provided for compliance with Goverment requirements.

e. Substitution request is fully documented and properly submitted.

f. Requested substitution will not adversely affect Contractor's construction schedule.

g. Requested substitution has received necessary approvals of authorities having jurisdiction.

h. Requested substitution is compatible with other portions of the Work.

i. Requested substitution has been coordinated with other portions of the

Work.

j. Requested substitution provides specified warranty.

k. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012500

SUBSTITUTION PROCEDURES 012500 - 4

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

SECTION 012600 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

B. Related Requirements:

1. Section 012500 "Substitution Procedures" for administrative procedures for handling requests for substitutions made after the Contract award.

2. Section 013100 "Project Coordination" for requirements for forms for contract modifications provided as part of web-based Project management software.

1.3 MINOR CHANGES IN THE WORK

A. Government will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.

1.4 PROPOSAL REQUESTS

A. Government-Initiated Proposal Requests: Government will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Work Change Proposal Requests issued by Government are not instructions either to stop work in progress or to execute the proposed change.

2. Within 15 days, when not otherwise specified, after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

CONTRACT MODIFICATION PROCEDURES 012600 - 1

USFWSR3_UMRLH

3.15.2023

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

1.5 CHANGE ORDER PROCEDURES

A. On Governments's approval of a Work Change Proposal Request, Government will issue a contract modification.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Government may issue a Construction Change Directive. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012600

CONTRACT MODIFICATION PROCEDURES 012600 - 2

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

PAYMENT PROCEDURES 012900 - 1

SECTION 012900 - PAYMENT PROCEDURES

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

B. Related Requirements:

1. Section 012600 "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.

2. Section 013200 "Construction Progress Documentation" for administrative requirements governing the preparation and submittal of the Contractor's construction schedule.

1.3 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.

1.4 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Coordinate line items in the schedule of values with items required to be indicated as separate activities in Contractor's construction schedule.

2. Submit the schedule of values to Government at earliest possible date, but no later than fourteen days before the date scheduled for submittal of initial Applications for Payment.

3. Subschedules for Separate Elements of Work: Where the Contractor's construction schedule defines separate elements of the Work, provide subschedules showing values coordinated with each element.

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

PAYMENT PROCEDURES 012900 - 2

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location.

b. Owner's name.

c. Owner's Project number.

d. Contractor's name and address.

e. Date of submittal.

2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Provide multiple line items for principal subcontract amounts in excess of five percent of the Contract Sum.

3. Provide a separate line item in the schedule of values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored on-site but not yet installed.

4. Overhead Costs, Proportional Distribution: Include total cost and proportionate share of general overhead and profit for each line item.

5. Overhead Costs, Separate Line Items: Show cost of temporary facilities and other major cost items that are not direct cost of actual work-in-place as separate line items.

6. Temporary Facilities: Show cost of temporary facilities and other major cost items that are not direct cost of actual work-in-place as separate line items.

7. Closeout Costs: Include separate line items under Contractor and principal subcontracts for Project closeout requirements in an amount totaling five percent of the Contract Sum and subcontract amount.

8. Schedule of Values Revisions: Revise the schedule of values when Change Orders or Construction Change Directives result in a change in the Contract Sum. Include at least one separate line item for each Change Order and Construction Change Directive.

1.5 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments, as certified by Government and paid for by Government.

B. Payment Application Times: Submit Application for Payment to Government monthly.

C. Application for Payment Forms: Use form approved by Government as form for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Government will

MULTIPURPOSE BUILDING AND MAINTENANCE SHOP

100% CONSTRUCTION DOCUMENT SUBMISSION

LUSTER HEIGHTS, IOWA

PAYMENT PROCEDURES 012900 - 3

E. return incomplete applications without action.

1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.

2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.

3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

F. Transmittal: Submit signed and notarized original copies of each Application for Payment to Government by a method ensuring receipt. One copy shall include waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.

2. Schedule of values.

3. Contractor's construction schedule (preliminary if not final).

4. Sustainable design action plans, including preliminary project materials cost data.

5. Schedule of unit prices.

6. Submittal schedule (preliminary if not final).

7. List of Contractor's staff assignments.

8. List of Contractor's principal consultants.

9. Copies of permits.

10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.

11. Initial progress report.

12. Report of preconstruction conference.

H. Application for Payment at Substantial Completion: After Contracting Officer issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificate(s) of Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

I. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Certification of completion of final punch list items.

MULTIPURP…