Price_Schedule.pdf

PDF 175 KB Posted

Attached to
GAOA - Replace Multipurpose Building, Maintenance Federal contract opportunity
Solicitation number
140FGA24R0003
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This price schedule outlines costs for construction services required by the Department of the Interior Fish and Wildlife Service. The solicitation seeks pricing to replace a multipurpose building, maintenance shop, cold storage building, and maintenance yard at the Luster Heights National Wildlife Refuge. Offerors must provide unit pricing for six base construction items including the buildings and parking areas, as well as an optional gravel pathway. The total proposed cost for base items and options must be included. Evaluation will consider all optional items priced. Liquidated damages of $899 per day will be assessed for delays beyond the period of performance. Incomplete submissions without itemized pricing will be deemed non-responsive.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA - Replace Multipurpose Building, Maintenance, newest first.
File Type Posted
Amendment_3_Specification_260519_Low-Voltage_Electrical_Power_Conductors_and_Cables_0003.pdf PDF
Amendment_3_Additional_Project_Information_0003.pdf PDF
Amendment_3_Drawing_Sheet_A17_Multipurpose_Building_Window_Details_0003.pdf PDF
Amendment_3_Drawing_Sheet_A18_Multipurpose_Building_Window_and_Door_Details_0003.pdf PDF
Sol_140FGA24R0003_Amd_0003.pdf PDF
Amendment_3_UMR1145A0_Bid_Item_6_Cold_Storage_Building_Floor_Plan_0003.pdf PDF
Amendment_3_Specification_085200_Wood_Windows_0003.pdf PDF
Amendment_3_Drawing_Sheet_A38_Maintenance_Shop_Door_and_Window_Schedules_and_Details_0003.pdf PDF
Amendment_3_Specification_083613_0003.pdf PDF
Amendment_3_Specification_281300_Access_Control_Software_and_Database_Management_0003.pdf PDF
Amendment_3_UMR1148E0_Bid_Item_6_Cold_Storage_Building_Electrical_Plan_0003.pdf PDF
Amendment_3_Drawing_Sheet_A16_Multipurpose_Building_Door_Schedules_and_Details_0003.pdf PDF
Amendment_3_Specification_095113_Acoustical_Panel_Ceilings_0003.pdf PDF
Amendment_3_Questions_and_Answers_0003.pdf PDF
Amendment_3_Drawing_Sheet_A12_Multipurpose_Building_Wall_Sections_and_Details_0003.pdf PDF
Amendment_3_Drawing_Sheet_A39_Maintenance_Shop_Enlarged_Plans_and_Elevations_0003.pdf PDF
Amendment_3_Drawing_Sheet_L8_Site_Details_0003.pdf PDF
Amendment_3_Drawing_Sheet_A13_Multipurpose_Building_Finish_Plan_0003.pdf PDF
Questions_and_Answers_Amendment_2_0002.pdf PDF
Sol_140FGA24R0003_Amd_0002.pdf PDF
Luster_Heights_Pre-bid_Site_Visit_0002.pdf PDF
Additional_Project_Information_Amendment_2_0002.pdf PDF
Revised_Notice_to_Offerors_0001.pdf PDF
Sol_140FGA24R0003_Amd_0001.pdf PDF
Drawings_Luster_Heights.pdf PDF
Wage_Determination.pdf PDF
Drawings_Cold_Storage.pdf PDF
Sol_140FGA24R0003.pdf PDF
Notice_to_Offerors.pdf PDF
SOW_Luster_Heights_Multiple_Bldgs.pdf PDF
Past_Performance_Questionnaire_(PPQ).pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Multipurpose Building, Maintenance Shop, Cold Storage Building, and Maintenance Yard McGregor District Luster Heights National Wildlife Refuge

140FGA24R0003

Each Task item shall include all cost for materials, labor, expenses, fees, permitting costs, overhead and profit associated with each item in accordance with the solicitation documents. Award will be made based on Best Value – Trade-Off.

Item

Description Estimated Quantity

Unit Unit Price Total Cost

1 Base: Multipurpose Building 1 LS

2 Base: Entrance Road and Maintenance Road

1 LS

3 Base: Maintenance Shop and Gravel Maintenance Yard

1 LS

4 Base: Cold Storage Building 1 LS

5 Base: Visitor Parking Area 1 LS

6 Base: Staff Parking Area and Overflow Grass Parking Area

1 LS

Total Proposed Cost of Base Items

Option Item: Include Overhead, Insurance, Bonds, and Profit

7 Option: Gravel Pathway 1 LS

Total Proposed Cost of Option Item w/

Overhead, Insurance, Bonds, and Profit

TOTAL COST WITH BASE ITEMS AND OPTION ITEM: $_____________________

Evaluation of Option Items:

The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the base requirement. Evaluation of option items will be completed at the time of award. Evaluation of option items will not obligate the Government to award the options. The Government may award any number of option items at its discretion or may not award any option items at all.

This solicitation and ultimately the contract will also include liquidated damages in the amount of $899.00 per day that goes beyond the Period of Performance dates established at the time of award.

**Incomplete Price Schedules will not be considered: Offerors MUST provide pricing for each item.

Company Name Unique Entity ID Quote Prepared By Title Signature Address Date Phone Number Email