About this file
This is a pricing worksheet template (Enclosure 3) for submitting cost proposals for two cooling tower maintenance and repair project scenarios at Brookhaven National Laboratory. The worksheet requires vendors to provide detailed pricing breakdowns for both a minor cooling tower refurbishment (Scenario 1) and a major cooling tower refurbishment (Scenario 2), with the total proposal price being the sum of both scenarios.
The pricing structure includes four main categories for each scenario: Labor (including Project Manager, Safety Professional, Rigging Technician, Carpenter, HVAC Technician, Electrician, and Welder at regular and overtime rates), Materials (including rigging equipment, manlift, scaffolding, and various hardware), Subcontractor Costs (with space for multiple subcontractor quotes), and Indirect Costs (material and subcontractor markups). Unit rates must be all-inclusive, covering labor, benefits, insurance, equipment, disposal costs, and mobilization/demobilization, and must remain firm for the base period of the Task Order Agreement. The worksheet requires company information, authorized signature, and SAM.gov Unique Entity Identification Number for submission.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Proposal Price
| PROPOSAL PRICING FOR PROJECT SCENARIOS | |
| Enclosure 3 | Revision: 0 |
In accordance with the Section 12 "Basis for Award" described in the Solicitatoin document, award will be based on the lowest priced technially acceptable proposal for the total of the following two scenario projects:
| TOTAL PROPOSAL PRICE OF PROJECT SCENARIOS 1 & 2: | |
| PROJECT | PRICE |
| PROJECT SCENARIO NO. 1 | $0.00 |
| PROJECT SCENARIO NO. 2 | $0.00 |
| TOTAL PROPOSAL PRICE | $0.00 |
| Pricing Assumptions: |
| Unit rates shall be all inclusive, covering all labor (direct hourly wage, fringe benefits, FICA, NY State unemployment insurance, workmen’s compensation), supervision, equipment, legal disposal costs, liability/property insurance, safety equipment, mobilization, and demobilization. Units rates for expendable materials shall be used for the pricing of the projects and includes the labor to supply the material to the job site. All unit rates for dumpsters shall be for the delivery, pickup/ removal/ and disposal costs. Any labor associated with the use of the dumpsters would be captured in the hours required to complete the proposed work. All work must meet all Local, State and Federal requirements. All unit rates and indirect rates shall be firm for the base period of Task Order Agreement term. |
| Attachments: |
| (1) Proposal Sheet 1 |
| (2) Proposal Sheet 2 |
| (3) Subcontractor Quote: <Input name and attached quote, if applicable> |
| (3) Subcontractor Quote: <Input name and attached quote, if applicable> |
| (3) Subcontractor Quote: <Input name and attached quote, if applicable> |
| Company Name: | |
| Authorized Signature |
| Address 1 | |
| Print Name and Title | |
| Address 2: | |
| Date | |
| City, State Zip: |
SAM.gov Unique Entity Identification No.:_______________________
Page &P of 3
(1) Proposal Sheet 1
PROJECT SCENARIO NO.1
Refurbish Cooling Tower - Minor
| ITEM | ROOFING TYPE DESCRIPTION | QUANTITY | UNIT OF MEASUREMENT | UNIT PRICE | EXTENDED PRICE |
| I. Labor for Cooling Tower Maintenance & Repair | |||||
| A. | Project Manager / Supervisor | ||||
| Regular | Hour | $0.00 | $0.00 | ||
| B. | Safety Professional | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| C | Rigging Technician | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| D. | Carpenter | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| E. | HVAC Technician - Cooling Tower | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| F. | Electrician | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| G. | Welder | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $1.00 | $0.00 | ||
| Subtotal Labor Costs | $0.00 | ||||
| II. Materials | |||||
| A. | Rigging equipment | per day | $0.00 | $0.00 | |
| B. | Manlift | per day | $0.00 | $0.00 | |
| C. | Scaffolding | Total | $0.00 | $0.00 | |
| D. | Miscellaneous tooling (ie. consumables, etc.) | Total | $0.00 | $0.00 | |
| E. | Miscellaneous mechanical hardwarer (piping, fitting, repairs) | Total | $0.00 | $0.00 | |
| F. | Miscellaneous electrical hardware (ie. Junction box, wiring, squeeze connectors, conduit, etc.) | Total | $0.00 | $0.00 | |
| G. | Miscellaneous hardware (ie. Self tapping screw, washers, nuts bolts, etc.) | Total | $0.00 | $0.00 | |
| H. | Other Materials (attach material list) | Total | $0.00 | $0.00 |
| Subtotal Expendable Materials Costs | $0.00 | ||||
| III. Subcontractor Costs (attach Subcontractor quote (s) ) | |||||
| A. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| B. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| C. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| D. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| Subtotal Subcontractor Costs | $0.00 | ||||
| IV. Indirect Costs | |||||
| Indirect Cost Description | Subtotal Costs | Percentage | Total Indirect Costs | ||
| A. | Material Markup | $0.00 | 0.00% | $0.00 | |
| B. | Subcontractor Markup | $0.00 | 0.00% | $0.00 | |
| Subtotal Indirect Costs | $0.00 |
Total Price of Scenario Project No. 1 $0.00
Attachment (1)
(2) Proposal Sheet 2
PROJECT SCENARIO NO. 2
Refurbish Cooling Tower - Major
| ITEM | ROOFING TYPE DESCRIPTION | QUANTITY | UNIT OF MEASUREMENT | UNIT PRICE | EXTENDED PRICE |
| I. Labor for Cooling Tower Maintenance & Repair | |||||
| A. | Project Manager / Supervisor | ||||
| Regular | Hour | $0.00 | $0.00 | ||
| B. | Safety Professional | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| C | Rigging Technician | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| D. | Carpenter | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| E. | HVAC Technician - Cooling Tower | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| F. | Electrician | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| G. | Welder | ||||
| Regular Time | Hour | $0.00 | $0.00 | ||
| Overtime | Hour | $0.00 | $0.00 | ||
| Subtotal Labor Costs | $0.00 | ||||
| II. Expendable Materials | |||||
| A. | Rigging equipment | per day | $0.00 | $0.00 | |
| B. | Manlift | per day | $0.00 | $0.00 | |
| C. | Scaffolding | Total | $0.00 | $0.00 | |
| D. | Miscellaneous tooling (ie. consumables, etc.) | Total | $0.00 | $0.00 | |
| E. | Miscellaneous mechanical hardwarer (piping, fitting, repairs) | Total | $0.00 | $0.00 | |
| F. | Miscellaneous electrical hardware (ie. Junction box, wiring, squeeze connectors, conduit, etc.) | Total | $0.00 | $0.00 | |
| G. | Miscellaneous hardware (ie. Self tapping screw, washers, nuts bolts, etc.) | Total | $0.00 | $0.00 | |
| H. | Other Materials (attach material list) | Total | $0.00 | $0.00 | |
| Subtotal Expendable Materials Costs | $0.00 | ||||
| III. Subcontractor Costs (attach Subcontractor quote (s) ) | |||||
| A. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| B. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| C. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| D. | Subcontractor: | 1 | Lump Sum | $0.00 | $0.00 |
| Subtotal Subcontractor Costs | $0.00 | ||||
| IV. Indirect Costs | |||||
| Indirect Cost Description | Subtotal Costs | Percentage | Total Indirect Costs | ||
| A. | Material Markup | $0.00 | 0.00% | $0.00 | |
| B. | Subcontractor Markup | $0.00 | 0.00% | $0.00 | |
| Subtotal Indirect Costs | $0.00 |
Total Price of Scenario Project No. 2 $0.00