IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
FA488721R0014
Section A - Solicitation/Contract Form
Section B - Supplies or Services and Prices/Cost
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Luke AFB M&R IDIQ - 5 Yr Ordering Period: Year One through Year Five (date of award through 60 months) Contractor to provide personnel, labor, tools, materials, and equipment necessary to perform Maintenance & Repair (M&R) task orders through an Indefinite-Delivery Indefinite- Quantity (IDIQ) Contract with a 5 year ordering period. All work will be performed primarily at Luke AFB, Gila Bend Air Force Auxiliary Field, Fort Tuthill, Flagstaff, Arizona in accordance with attached specifications and bid schedule. Contractor to propose a coefficient for the entire 5 year period.
Product Service Code: Z2JZ Firm Fixed Price
1 Lot
Section C - Description/Specifications/Statement of Work
Requirements Contractor to provide personnel, labor, tools, materials, and equipment necessary to perform Maintenance and Repair task orders through an Indefinite-Delivery Indefinite-Quantity (IDIQ) Contract with a 5 year ordering period. All work will be performed primarily at Luke AFB, Gila Bend Air Force Auxiliary Field (to include the Barry M. Goldwater Range), Fort Tuthill Recreation Area, Flagstaff, Arizona.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08
0001 Inspection and Acceptance Location Both Destination Instructions: Inspect and accept IAW SOW
DoDAAC: F2U308 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
F2U308 56 CIVIL ENG CECS
AF NO MILSBILLS PROC CP
6238563866
13970 W LIGHTNING ST
LUKE AFB, AZ 85309 1149
UNITED STATES
OfficeCode:
Sean Sussman Telephone: 6238564710 Email: sean.sussman.2@us.af.mil
Section F - Deliveries or Performance
Delivery Schedule Ship To Address
Delivery Schedule From date of lead time event to completion of performance 1,825 Calendar Days Date of Award
Place of Performance DoDAAC: F2U308 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
F2U308 56 CIVIL ENG CECS
AF NO MILSBILLS PROC CP 6238563866
13970 W LIGHTNING ST
LUKE AFB, AZ 85309 1149
UNITED STATES
OfficeCode:
Sean Sussman Telephone: 6238564710 Email: sean.sussman.2@us.af.mil
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.247-34 F.o.b. Destination. 1991-11
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.201-7000 Contracting Officer's Representative 1991-12 252.204-7006 Billing Instructions. 2005-10 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12 252.236-7000 Modification Proposals--Price Breakdown 1991-12
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2 in 1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA4887 Admin DoDAAC FA4887 Inspect By DoDAAC F2U308 Ship To Code F2U308 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) FA4887/F2U308 Service Acceptor (DoDAAC) FA4887/F2U308 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
To Be Determined at the Task Order Level
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
FAR Clauses Incorporated by Reference 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.246-21 Warranty of Construction (Mar 1994) 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021)
FAR Clauses Incorporated by Full Text 52.232-19 Availability of Funds for the Next Fiscal Year.
As prescribed in 32.706-1(b), insert the following clause:
Availability of Funds for the Next Fiscal Year (Apr 1984)
Funds are not presently available for performance under this contract beyond the minimum guarantee. The Government's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond the minimum guarantee, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.
(End of clause)
DFARS Clauses Incorporated by Reference 252.204-7004 Antiterrorism Awareness Training for Contractors.
As prescribed in 204.7203 , use the following clause:
Level I Antiterrorism Awareness Training for Contractors (FEB 2019)
(a) Definition. As used in this clause--
"Military installation" means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department or, in the case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense (see 10 U.S.C. 2801(c)(4)).
(b) Training. Contractor personnel who require routine physical access to a Federally-controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter. In accordance with Department of Defense Instruction O-2000.16 Volume 1, DoD Antiterrorism (AT) Program Implementation: DoD AT Standards, Level I antiterrorism awareness training shall be completed--
(1) Through a DoD-sponsored and certified computer or web-based distance learning instruction for Level I antiterrorism awareness; or
(2) Under the instruction of a Level I antiterrorism awareness instructor.
(c) Additional information. Information and guidance pertaining to DoD antiterrorism awareness training is available at https://jko.jten.mil/ or as otherwise identified in the performance work statement.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts, including subcontracts for commercial items, when subcontractor performance requires routine physical access to a Federally-controlled facility or military installation.
252.236-7005 Airfield Safety Precautions.
As prescribed in 236.570 (b)(3), use the following clause. At some airfields, the width of the primary surface is 1,500 feet (750 feet on each side of the runway centerline). In such instances, substitute the proper width in the clause.
AIRFIELD SAFETY PRECAUTIONS (DEC 1991)
(a) Definitions. As used in this clause--
(1) "Landing areas" means--
(i) The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 2,000 feet (1,000 feet on each side of the runway centerline);
(ii) The "clear zone" beyond the ends of each runway, i.e., the extension of the primary surface for a distance of 1,000 feet beyond each end of each runway;
(iii) All taxiways, plus the lateral clearance zones along each side for the length of the taxiways (the outer edge of each lateral clearance zone is laterally 250 feet from the far or opposite edge of the taxiway, e.g., a 75-foot-wide taxiway would have a combined width of taxiway and lateral clearance zones of 425 feet); and
(iv) All aircraft parking aprons, plus the area 125 feet in width extending beyond each edge all around the aprons.
(2) "Safety precaution areas" means those portions of approach-departure clearance zones and transitional zones where placement of objects incident to contract performance might result in vertical projections at or above the approach-departure clearance, or the transitional surface.
(i) The "approach-departure clearance surface" is an extension of the primary surface and the clear zone at each end of each runway, for a distance of 50,000 feet, first along an inclined (glide angle) and then along a horizontal plane, both flaring symmetrically about the runway centerline extended.
(A) The inclined plane (glide angle) begins in the clear zone 200 feet past the end of the runway (and primary surface) at the same elevation as the end of the runway. It continues upward at a slope of 50:1 (1 foot vertically for each 50 feet horizontally) to an elevation of 500 feet above the established airfield elevation. At that point the plane becomes horizontal, continuing at that same uniform elevation to a point 50,000 feet longitudinally from the beginning of the inclined plane (glide angle) and ending there.
(B) The width of the surface at the beginning of the inclined plane (glide angle) is the same as the width of the clear zone. It then flares uniformly, reaching the maximum width of 16,000 feet at the end.
(ii) The "approach-departure clearance zone" is the ground area under the approach-departure clearance surface.
(iii) The "transitional surface" is a sideways extension of all primary surfaces, clear zones, and approach-departure clearance surfaces along inclined planes.
(A) The inclined plane in each case begins at the edge of the surface.
(B) The slope of the incline plane is 7:1 (1 foot vertically for each 7 feet horizontally). It continues to the point of intersection with the--
(1) Inner horizontal surface (which is the horizontal plane 150 feet above the established airfield elevation); or
(2) Outer horizontal surface (which is the horizontal plane 500 feet above the established airfield elevation), whichever is applicable.
(iv) The "transitional zone" is the ground area under the transitional surface. (It adjoins the primary surface, clear zone, and approach-departure clearance zone.)
(b) General.
(1) The Contractor shall comply with the requirements of this clause while--
(i) Operating all ground equipment (mobile or stationary);
(ii) Placing all materials; and
(iii) Performing all work, upon and around all airfields.
(2) The requirements of this clause are in addition to any other safety requirements of this contract.
(c) The Contractor shall--
(1) Report to the Contracting Officer before initiating any work;
(2) Notify the Contracting Officer of proposed changes to locations and operations;
(3) Not permit either its equipment or personnel to use any runway for purposes other than aircraft operation without permission of the Contracting Officer, unless the runway is--
(i) Closed by order of the Contracting Officer; and
(ii) Marked as provided in paragraph (d)(2) of this clause;
(4) Keep all paved surfaces, such as runways, taxiways, and hardstands, clean at all times and, specifically, free from small stones which might damage aircraft propellers or jet aircraft;
(5) Operate mobile equipment according to the safety provisions of this clause, while actually performing work on the airfield. At all other times, the Contractor shall remove all mobile equipment to locations--
(i) Approved by the Contracting Officer;
(ii) At a distance of at least 750 feet from the runway centerline, plus any additional distance; and
(iii) Necessary to ensure compliance with the other provisions of this clause; and
(6) Not open a trench unless material is on hand and ready for placing in the trench. As soon as practicable after material has been placed and work approved, the Contractor shall backfill and compact trenches as required by the contract. Meanwhile, all hazardous conditions shall be marked and lighted in accordance with the other provisions of this clause.
(d) Landing areas. The Contractor shall--
(1) Place nothing upon the landing areas without the authorization of the Contracting Officer;
(2) Outline those landing areas hazardous to aircraft, using (unless otherwise authorized by the Contracting Officer) red flags by day, and electric, battery-operated low-intensity red flasher lights by night;
(3) Obtain, at an airfield where flying is controlled, additional permission from the control tower operator every time before entering any landing area, unless the landing area is marked as hazardous in accordance with paragraph (d)(2) of this clause;
(4) Identify all vehicles it operates in landing areas by means of a flag on a staff attached to, and flying above, the vehicle. The flag shall be three feet square, and consist of a checkered pattern of international orange and white squares of 1 foot on each side (except that the flag may vary up to ten percent from each of these dimensions);
(5) Mark all other equipment and materials in the landing areas, using the same marking devices as in paragraph (d)(2) of this clause; and
(6) Perform work so as to leave that portion of the landing area which is available to aircraft free from hazards, holes, piles of material, and projecting shoulders that might damage an airplane tire.
(e) Safety precaution areas. The Contractor shall--
(1) Place nothing upon the safety precaution areas without authorization of the Contracting Officer;
(2) Mark all equipment and materials in safety precaution areas, using (unless otherwise authorized by the Contracting Officer) red flags by day, and electric, battery-operated, low-intensity red flasher lights by night; and
(3) Provide all objects placed in safety precaution areas with a red light or red lantern at night, if the objects project above the approach-departure clearance surface or above the transitional surface.
(End of clause)
252.246-7008 Sources of Electronic Parts.
As prescribed in 246.870-3 (b), use the following clause:
SOURCES OF ELECTRONIC PARTS (MAY 2018)
(a) Definitions. As used in this clause--
"Authorized aftermarket manufacturer" means an organization that fabricates a part under a contract with, or with the express written authority of, the original component manufacturer based on the original component manufacturer's designs, formulas, and/or specifications.
"Authorized supplier" means a supplier, distributor, or an aftermarket manufacturer with a contractual arrangement with, or the express written authority of, the original manufacturer or current design activity to buy, stock, repackage, sell, or distribute the part.
"Contract manufacturer" means a company that produces goods under contract for another company under the label or brand name of that company.
"Contractor-approved supplier" means a supplier that does not have a contractual agreement with the original component manufacturer for a transaction, but has been identified as trustworthy by a contractor or subcontractor.
"Electronic part" means an integrated circuit, a discrete electronic component (including, but not limited to, a transistor, capacitor, resistor, or diode), or a circuit assembly (section 818(f)(2) of Pub. L. 112-81).
"Original component manufacturer" means an organization that designs and/or engineers a part and is entitled to any intellectual property rights to that part.
"Original equipment manufacturer" means a company that manufactures products that it has designed from purchased components and sells those products under the company's brand name.
"Original manufacturer" means the original component manufacturer, the original equipment manufacturer, or the contract manufacturer.
(b) Selecting suppliers. In accordance with section 818(c)(3) of the National Defense Authorization Act for Fiscal Year 2012 (Pub. L. 112-81), as amended by section 817 of the National Defense Authorization Act for Fiscal Year 2015 (Pub. L. 113-291) and section 885 of the National Defense Authorization Act for Fiscal Year 2016 (Pub. L. 114-92), the Contractor shall--
(1) First obtain electronic parts that are in production by the original manufacturer or an authorized aftermarket manufacturer or currently available in stock from--
(i) The original manufacturers of the parts;
(ii) Their authorized suppliers; or
(iii) Suppliers that obtain such parts exclusively from the original manufacturers of the parts or their authorized suppliers;
(2) If electronic parts are not available as provided in paragraph (b)(1) of this clause, obtain electronic parts that are not in production by the original manufacturer or an authorized aftermarket manufacturer, and that are not currently available in stock from a source listed in paragraph (b)(1) of this clause, from suppliers identified by the Contractor as contractor-approved suppliers, provided that--
(i) For identifying and approving such contractor-approved suppliers, the Contractor uses established counterfeit prevention industry standards and processes (including inspection, testing, and authentication), such as the DoD-adopted standards at https://assist.dla.mil;
(ii) The Contractor assumes responsibility for the authenticity of parts provided by such contractor-approved suppliers; and
(iii) The Contractor's selection of such contractor-approved suppliers is subject to review, audit, and approval by the Government, generally in conjunction with a contractor purchasing system review or other surveillance of purchasing practices by the contract administration office, or if the Government obtains credible evidence that a contractor-approved supplier has provided counterfeit parts. The Contractor may proceed with the acquisition of electronic parts from a contractor-approved supplier unless otherwise notified by DoD; or
(3)(i) Take the actions in paragraph (b)(3)(ii) of this clause if the Contractor--
(A) Obtains an electronic part from--
(1) A source other than any of the sources identified in paragraph (b)(1) or (b)(2) of this clause, due to nonavailability from such sources; or
(2) A subcontractor (other than the original manufacturer) that refuses to accept flowdown of this clause; or
(B) Cannot confirm that an electronic part is new or previously unused and that it has not been comingled in supplier new production or stock with used, refurbished, reclaimed, or returned parts.
(ii) If the contractor obtains an electronic part or cannot confirm an electronic part pursuant to paragraph (b)(3)
(i) of this clause--
(A) Promptly notify the Contracting Officer in writing. If such notification is required for an electronic part to be used in a designated lot of assemblies to be acquired under a single contract, the Contractor may submit one notification for the lot, providing identification of the assemblies containing the parts (e.g., serial numbers);
(B) Be responsible for inspection, testing, and authentication, in accordance with existing applicable industry standards; and
(C) Make documentation of inspection, testing, and authentication of such electronic parts available to the Government upon request.
(c) Traceability.If the Contractor is not the original manufacturer of, or authorized supplier for, an electronic part, the Contractor shall--
(1) Have risk-based processes (taking into consideration the consequences of failure of an electronic part) that enable tracking of electronic parts from the original manufacturer to product acceptance by the Government, whether the electronic part is supplied as a discrete electronic part or is contained in an assembly;
(2) If the Contractor cannot establish this traceability from the original manufacturer for a specific electronic part, be responsible for inspection, testing, and authentication, in accordance with existing applicable industry standards; and
(3)(i) Maintain documentation of traceability (paragraph (c)(1) of this clause) or the inspection, testing, and authentication required when traceability cannot be established (paragraph (c)(2) of this clause) in accordance with FAR subpart 4.7; and
(ii) Make such documentation available to the Government upon request.
(d) Government sources. Contractors and subcontractors are still required to comply with the requirements of paragraphs (b) and (c) of this clause, as applicable, if--
(1) Authorized to purchase electronic parts from the Federal Supply Schedule;
(2) Purchasing electronic parts from suppliers accredited by the Defense Microelectronics Activity; or
(3) Requisitioning electronic parts from Government inventory/stock under the authority of 252.251-7000 , Ordering from Government Supply Sources.
(i) The cost of any required inspection, testing, and authentication of such parts may be charged as a direct cost.
(ii) The Government is responsible for the authenticity of the requisitioned parts. If any such part is subsequently found to be counterfeit or suspect counterfeit, the Government will--
(A) Promptly replace such part at no charge; and
(B) Consider an adjustment in the contract schedule to the extent that replacement of the counterfeit or suspect counterfeit electronic parts caused a delay in performance.
(e) Subcontracts.The Contractor shall include the substance of this clause, including this paragraph (e), in subcontracts, including subcontracts for commercial items, that are for electronic parts or assemblies containing electronic parts, unless the subcontractor is the original manufacturer.
(End of clause)
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements.
As prescribed in 204.7304(d), use the following provision:
NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)
(a) Definitions.
"Basic Assessment", "Medium Assessment", and "High Assessment" have the meaning given in the clause 252.204-7020, NIST SP 800-171 DoD Assessments.
"Covered contractor information system" has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this solicitation.
(b) Requirement. In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at https://www.acq.osd.mil/dpap/pdi /cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html.
(c) Procedures.
(1) The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.
(2) If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to mailto:webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.
(d) Summary level scores. Summary level scores for all assessments will be posted 30 days post-assessment in SPRS to provide DoD Components visibility into the summary level scores of strategic assessments.
(1) Basic Assessments. An Offeror may follow the procedures in paragraph (c)(2) of this provision for posting Basic Assessments to SPRS.
(i) The email shall include the following information:
(A) Cybersecurity standard assessed (e.g., NIST SP 800-171 Rev 1).
(B) Organization conducting the assessment (e.g., Contractor self-assessment).
(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--
(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and
(2) A brief description of the system security plan architecture, if more than one plan exists.
(D) Date the assessment was completed.
(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).
(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report:
System Security Plan CAGE Codes supported by this plan Brief description of the plan architecture Date of assessment Total Score Date score of 110 will achieved
(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system assessed:
(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).
(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).
(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.
(iv) A brief description of the system security plan architecture, if more than one system security plan exists.
(v) Date and level of the assessment, i.e., medium or high.
(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).
(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(3) Accessibility.
(i) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).
(ii) Authorized representatives of the Offeror for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.
(iii) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this section. DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).
(End of provision)
252.204-7020 NIST SP 800-171 DoD Assessment Requirements.
As prescribed in 204.7304 (e), use the following clause:
NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)
(a) Definitions.
Basic Assessment" means a contractor's self-assessment of the contractor's implementation of NIST SP 800-171 that--
(1) Is based on the Contractor's review of their system security plan(s) associated with covered contractor information system(s);
(2) Is conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology; and
(3) Results in a confidence level of "Low" in the resulting score, because it is a self-generated score.
"Covered contractor information system" has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.
"High Assessment" means an assessment that is conducted by Government personnel using NIST SP 800-171A, Assessing Security Requirements for Controlled Unclassified Information that--
(1) Consists of--
(i) A review of a contractor's Basic Assessment;
(ii) A thorough document review;
(iii) Verification, examination, and demonstration of a Contractor's system security plan to validate that NIST SP 800-171 security requirements have been implemented as described in the contractor's system security plan;
and
(iv) Discussions with the contractor to obtain additional information or clarification, as needed; and
(2) Results in a confidence level of "High" in the resulting score.
"Medium Assessment" means an assessment conducted by the Government that--
(1) Consists of--
(i) A review of a contractor's Basic Assessment;
(ii) A thorough document review; and
(iii) Discussions with the contractor to obtain additional information or clarification, as needed; and
(2) Results in a confidence level of "Medium" in the resulting score.
(b) Applicability. This clause applies to covered contractor information systems that are required to comply with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, in accordance with Defense Federal Acquisition Regulation System (DFARS) clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this contract.
(c) Requirements. The Contractor shall provide access to its facilities, systems, and personnel necessary for the Government to conduct a Medium or High NIST SP 800-171 DoD Assessment, as described in NIST SP 800- 171 DoD Assessment Methodology at https://www.acq.osd.mil/dpap/pdi/cyber /strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html, if necessary.
(d) Procedures. Summary level scores for all assessments will be posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) to provide DoD Components visibility into the summary level scores of strategic assessments.
(1) Basic Assessments. A contractor may submit, via encrypted email, summary level scores of Basic Assessments conducted in accordance with the NIST SP 800-171 DoD Assessment Methodology to mailto:
webptsmh@navy.mil for posting to SPRS.
(i) The email shall include the following information:
(A) Version of NIST SP 800-171 against which the assessment was conducted.
(B) Organization conducting the assessment (e.g., Contractor self-assessment).
(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--
(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and
(2) A brief description of the system security plan architecture, if more than one plan exists.
(D) Date the assessment was completed.
(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).
(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(ii) If multiple system security plans are addressed in the email described at paragraph (b)(1)(i) of this section, the Contractor shall use the following format for the report:
System Security Plan CAGE Codes supported by this plan Brief description of the plan architecture Date of assessment Total Score Date score of 110 will achieved
(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system security plan assessed:
(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).
(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).
(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.
(iv) A brief description of the system security plan architecture, if more than one system security plan exists.
(v) Date and level of the assessment, i.e., medium or high.
(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).
(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(e) Rebuttals.
(1) DoD will provide Medium and High Assessment summary level scores to the Contractor and offer the opportunity for rebuttal and adjudication of assessment summary level scores prior to posting the summary level scores to SPRS (see SPRS User's Guide https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf).
(2) Upon completion of each assessment, the contractor has 14 business days to provide additional information to demonstrate that they meet any security requirements not observed by the assessment team or to rebut the findings that may be of question.
(f) Accessibility.
(1) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).
(2) Authorized representatives of the Contractor for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees /Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.
(3) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this clause. DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).
(g) Subcontracts.
(1) The Contractor shall insert the substance of this clause, including this paragraph (g), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items (excluding COTS items).
(2) The Contractor shall not award a subcontract or other contractual instrument, that is subject to the implementation of NIST SP 800-171 security requirements, in accordance with DFARS clause 252.204-7012 of this contract, unless the subcontractor has completed, within the last 3 years, at least a Basic NIST SP 800-171 DoD Assessment, as described in https://www.acq.osd.mil/dpap/pdi/cyber /strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html, for all covered contractor information systems relevant to its offer that are not part of an information technology service or system operated on behalf of the Government.
(3) If a subcontractor does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the subcontractor may conduct and submit a Basic Assessment, in accordance with the NIST SP 800-171 DoD Assessment Methodology, to mailto:webptsmh@navy.mil for posting to SPRS along with the information required by paragraph (d) of this clause.
252.223-7001 Hazard Warning Labels.
As prescribed in 223.303 , use the following clause:
HAZARD WARNING LABELS (DEC 1991)
(a) "Hazardous material," as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.
(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:
(1) Federal Insecticide, Fungicide and Rodenticide Act;
(2) Federal Food, Drug and Cosmetics Act;
(3) Consumer Product Safety Act;
(4) Federal Hazardous Substances Act; or
(5) Federal Alcohol Administration Act.
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL (If None, Insert "None.")
ACT
(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph (c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.
(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).
(End of clause)
252.247-7023 Transportation of Supplies by Sea.
Basic. As prescribed in 247.574 (b) and (b)(1), use the following clause:
TRANSPORTATION OF SUPPLIES BY SEA--BASIC (FEB 2019)
(a) Definitions. As used in this clause--
"Components" means articles, materials, and supplies incorporated directly into end products at any level of manufacture, fabrication, or assembly by the Contractor or any subcontractor.
"Department of Defense" (DoD) means the Army, Navy, Air Force, Marine Corps, and defense agencies.
"Foreign-flag vessel" means any vessel that is not a U.S.-flag vessel.
"Ocean transportation" means any transportation aboard a ship, vessel, boat, barge, or ferry through international waters.
"Subcontractor" means a supplier, materialman, distributor, or vendor at any level below the prime contractor whose contractual obligation to perform results from, or is conditioned upon, award of the prime contract and who is performing any part of the work or other requirement of the prime contract.
"Supplies" means all property, except land and interests in land, that is clearly identifiable for eventual use by or owned by the DoD at the time of transportation by sea.
(i) An item is clearly identifiable for eventual use by the DoD if, for example, the contract documentation contains a reference to a DoD contract number or a military destination.
(ii) "Supplies" includes (but is not limited to) public works; buildings and facilities; ships; floating equipment and vessels of every character, type, and description, with parts, subassemblies, accessories, and equipment;
machine tools; material; equipment; stores of all kinds; end items; construction materials; and components of the foregoing.
"U.S.-flag vessel" means a vessel of the United States or belonging to the United States, including any vessel registered or having national status under the laws of the United States.
(b)(1) The Contractor shall use U.S.-flag vessels when transporting any supplies by sea under this contract.
(2) A subcontractor transporting supplies by sea under this contract shall use U.S.-flag vessels if--
(i) This contract is a construction contract; or
(ii) The supplies being transported are--
(A) Noncommercial items; or
(B) Commercial items that--
(1)The Contractor is reselling or distributing to the Government without adding value (generally, the Contractor does not add value to items that it subcontracts for f.o.b. destination shipment);
(2)Are shipped in direct support of U.S. military contingency operations, exercises, or forces deployed in humanitarian or peacekeeping operations; or
(3)Are commissary or exchange cargoes transported outside of the Defense Transportation System in accordance with 10 U.S.C. 2643.
(c) The Contractor and its subcontractors may request that the Contracting Officer authorize shipment in foreign-flag vessels, or designate available U.S.-flag vessels, if the Contractor or a subcontractor believes that--
(1) U.S.-flag vessels are not available for timely shipment;
(2) The freight charges are inordinately excessive or unreasonable; or
(3) Freight charges are higher than charges to private persons for transportation of like goods.
(d) The Contractor must submit any request for use of foreign-flag vessels in writing to the Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules. The Contracting Officer will process requests submitted after such date(s) as expeditiously as possible, but the Contracting Officer's failure to grant approvals to meet the shipper's sailing date will not of itself constitute a compensable delay under this or any other clause of this contract. Requests shall contain at a minimum--
(1) Type, weight, and cube of cargo;
(2) Required shipping date;
(3) Special handling and discharge requirements;
(4) Loading and discharge points;
(5) Name of shipper and consignee;
(6) Prime contract number; and
(7) A documented description of efforts made to secure U.S.-flag vessels, including points of contact (with names and telephone numbers) with at least two U.S.-flag carriers contacted. Copies of telephone notes, telegraphic and facsimile message or letters will be sufficient for this purpose.
(e) The Contractor shall, within 30 days after each shipment covered by this clause, provide the Contracting Officer and the Maritime Administration, Office of Cargo Preference, U.S. Department of Transportation, 400 Seventh Street SW, Washington, DC 20590, one copy of the rated on board vessel operating carrier's ocean bill of lading, which shall contain the following information:
(1) Prime contract number;
(2)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .