Attachment 12 Luke Specification for Fire Protection and Life Safety 6 Jun 15.pdf

PDF 229 KB Posted

Attached to
Maintenance & Repair (M&R) IDIQ, Luke AFB, AZ
Solicitation number
FA488721R0014
Issued by

View the file

Other files

File Type Posted
FA488721R0014 Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 8 Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 9 LUKE Design and Construction Standards.pdf PDF
Attachment 16 NAF Construction Clauses Definitions.pdf PDF
Attachment 2 Wage Determination AZ20210031 Maricopa County 26 Feb 2021.pdf PDF
Attachment 5 Ordering Procedures 26 Feb 2021.pdf PDF
Attachment 17 Joint Venture Teaming Partner Consent Letter 17 Dec 20.pdf PDF
Attachment 1 M and R SOW 5 Mar 2021.pdf PDF
Attachment 3 Wage Determination AZ20210030 Coconio County 26 Feb 2021.pdf PDF
Attachment 14 Basic Project Design Requirements 23 Oct 20.pdf PDF
Attachment 11 Fire System Criteria 10 Dec 18.pdf PDF
Attachment 4 PPQ and Cover Letter 17 Dec 2020.pdf PDF
Attachment 6 Luke Master Specifications 9 Sep2020.pdf PDF
Attachment 13 Renovation Project Sustainment and Restoration 23 Oct 20.pdf PDF
Pre- Proposal Conference.pptx PPTX presentation
Attachment 18 Sections L and M Instructions to Offerors and Evaluation Factors 9 Mar 2021.pdf PDF
Solicitation - FA488721R0014.pdf PDF
Attachment 19 Price Evaluation Worksheet 8 Mar 2021.xlsx XLSX spreadsheet
Attachment 10 AETC First 400 Feet Standard Guidance with Luke Supplemental 5 May15 v4.pdf PDF
Attachment 7 AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Attachment 15 NAF Standard Clauses.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12 – FA488721R0014 Luke Specification – Fire Protection & Life Safety

Luke Specification update for Fire Protection & Life Safety

06 Jun 2015

1.01 INDUSTRY STANDARDS

Codes: [use most current] The following codes shall apply to all work:

• NFPA 1: Uniform Fire Code

• NFPA 10: Standard for Portable Fire Extinguishers

• NFPA 13: Standard for the Installation of Sprinkler Systems

• NFPA 16: Standard for the Installation of Foam-Water Sprinkler and

Foam-Water Spray Systems

• NFPA 24: Standard for the Installation of Private Fire Service

Mains and Their Appurtenances

• NFPA 70: National Electrical Code (NEC)

• NFPA 72: National Fire Alarm Code

• NFPA 90A: Standard for Installation of Air Conditioning and

Ventilating Systems

• NFPA 101: Life Safety Code

• NFPA 291: Fire Flow Testing

• NFPA 409: Aircraft Maintenance Hangars

• UFC 3-600-01: Fire Protection Engineering for Facilities

• UFC 4-010-01: DoD Minimum Antiterrorism Standards for Buildings

• UFC 4-021-01: Mass Notification Systems

• UFC 4-211-01: Aircraft Maintenance Hangars

• IBC: International Building Code

• IFC: International Fire Code

• ETL’s 02-15, 98-8,

• MilStd 5007

• AFI’s 91-203

• MIL-F-24385

DIVISION 21-FIRE SUPPRESSION

WET-PIPE SPRINKLER SYSTEMS/ DRY-PIPE SPRINKLER SYSTEMS/AQUEOUS FILM-

FORMING FOAM (AFFF):

• Minimum wall thickness for piping used for welding or roll grooving shall be as follows:

• Schedule 10 for sizes up to 5 inches, 0.134 for 6 inches, 0.188 for 8-inches and 10-inches

• Minimum wall thickness for piping used for threaded connections or cut grooves shall be as follows: Schedule 40 for sizes up to 8 inches; Schedule 30 for 8 inches and larger

Attachment 13 – FA488721R0009

• Requires an Inspectors Test Valve at the furthest point of the system… [WET]

• Heads shall be quick release type.

• Spare sprinkler heads shall be furnished in accordance with the requirements of NFPA 13 except that a minimum of 12 sprinklers of each type and temperature rating shall be provided.

• Sprinklers shall be packed in metal or plastic containers, which shall include one sprinkler head wrench for each 12 heads

• Pipes penetrating concrete or masonry walls or concrete floors shall be provided with pipe sleeves through its respective wall or floor, and be cut flush with each surface.

• Sleeves shall be installed so as to provide a minimum of 7 mm all-around clearance between the pipe and sleeve.

• Where pipes pass through fire walls, fire partitions, or floors, a fire seal shall be placed between the pipe and sleeve.

• AFFF concentrate shall be 3 percent conforming to MS MIL-F-24385.

• All AFFF concentrate shall be the product of one manufacturer.

• Mixing of non-identical AFFF brands or products will not be permitted.

• Pipe shall be painted red and shall be provided with plastic labels of standard manufacturer to identify piping as FIRE PROT WATER, AFFF CONCENTRATE, AFFF SPRINKLER, and AFFF NOZZLES.

• Labels shall have red letters minimum 1” high, ¼” brush stroke, on white background. Labels shall be affixed at maximum intervals of 20’ to all fire protection system piping larger than 2” diameter.

Arrow with direction flow.

• Automatic sprinkler heads shall be suitable for use intended, including proper temperature rating as required by NFPA Standards for Installations of Sprinkler Systems Pamphlet No. 13.

• Heads in finished areas to be chrome plated and heads in unfinished areas to be rough brass. Furnish 23 spare heads of jack type with same ratings and wrench in suitable cabinet or receptacle.

• Provide chrome plated escutcheon plates wherever pipes pass through finished walls, floors, or ceiling.

• Provide 20 gauge galvanized sleeves around all pipes passing through walls and floors sealed with fire stop.

• Welding: On-site welding of sprinkler piping will not be permitted.

• Test for a period of two hours at hydrostatic pressure of 200 lbs.

All piping, valves, heads, etc. shall be watertight.

• Conduct full quarterly inspection before acceptance.

• A full test shall be conducted and observed by Base maintenance personnel.

• Notify the Contracting Officer one week in advance regarding time and date of all tests.

• Deliver one set of reproducible and six copies, within 14 calendar days after successful completion of all required testing.

Inspector’s Test Valve Location

• Inspector’s test valves should be located in the farthest most hydraulically remote area of the sprinkler system. The exact location shall be approved at plan review by AHJ.

• Exception: Inspector’s test valves may be supplied from pipe adjacent to the riser in multi-story buildings.

FDCs:

• Locate Fire Department Connection with unobstructed pathway & sufficient clearance of 3’ from walls, obstructions, or adjacent Siamese connectors to allow 15’ radius of fire department hose.

• Facilities with fire department connections for sprinkler or standpipe systems must be provided with suitable all-weather ground access surface for pumper apparatus within 150 ft (45 m) of such fire department connections.

• Minimum height of 18”; maximum of 36”

• At least one hydrant must be located within 150 ft of the fire department connection.

• Wall-mounted FDC should be positioned to the street at least 10 feet away from windows, doors, or vents. This will minimize the chance that fire, heat, or smoke that will make it difficult to connect hose lines.

• Avoid locations where the FDC may be blocked by area use, e.g., merchandise, storage, equipment, vehicles, etc.

• Avoid areas adjacent to hazardous materials.

• Can be a stand-alone or connected to the Back Flow Preventer; both, facing the street.

• Provide suitable all-weather ground access surface for pumper apparatus within 150 ft.

• Small sign with one-inch raised letters must be provided on each

FDC to identify the type of system (such as sprinkler, standpipe, or combined).

PIVs:

• Must be a minimum of 40’ from building or approval must be given by the AHJ.

Fire Hydrants: (wet barrel)

• Hydrants in parking or traffic areas shall have bollards

• Hydrants must be installed adjacent to paved areas, accessible to fire department apparatus with large connection facing street.

• Hydrants must not be closer than 3 ft. or farther than 7 ft. from the roadway shoulder or curb line.

• Hydrants must be installed with not less than 6-inch connection to the supply main, and valve at the connection.

• Suction connection should be perpendicular to the street to allow straight lined connection to the pumper with approved 4” STORZ connection attached; blanks should be available.

• Water mains and fire hydrants will not be shut off, nor will any maintenance be performed that will interfere with the water supply on the Base without first notifying the Base Fire Department.

Welding:

• Welding, cutting, or brazing other than in approved welding shops, will require permission from the Base Fire Prevention Office and the issuance of a Welding Permit for any hot work.

• All welding, torch cutting operations and any hot work will be performed IAW AFI 91-203 by qualified personnel and whenever possible, in booths or rooms constructed for that purpose.

• Welding will not be permitted in the vicinity of flammable or explosive material until all possibility of fire or explosion has been eliminated. Where the removal of combustible material is impractical, a suitable fire resistant shield and/or welding blanket will be placed between the material and the hot work operation.

DIVISION 28-ELECTRONIC SAFETY AND SECURITY

Fire Alarms:

Luke AFB Fire Alarm/Mass Notification System installations: Basic standards

• Any facility over 300sf requires a fire alarm system as specified by the AHJ.

• Provide a complete intelligent, initiating addressable, electrically supervised fire alarm and detector system (NFPA 72, Style D, and Class A.) as specified by the AHJ.

• System design and wiring must meet UFC 3-600-01, NFPA 72, IBC, and UFC 4-021-01 (Design and O&M for Mass Notification Systems).

• The design is engineered by qualified NICET level IV personnel.

• Factory trained personnel to perform system installation, testing, training, and maintenance.

• Mass Notification System (MNS) will provide a Common

Intelligibility Scale (CIS) for indoor sound at 0.08 CIS minimum value. An intelligibility voice signal being broadcast will be determined at a distance of no more than 33 ft within the same area.

• Fire alarm initiation devices (manual pull stations) at all primary exits [protected with a UL listed transparent protective cover in public assembly areas, lodging, warehouses and hangers or as required by the AHJ], monitor all flow switches, smoke detectors, CO detectors, duct smoke detectors, heat detectors, flame detectors, and monitoring modules.

• Fire Alarm Indication will be by the MNS speaker system (voice) and clear strobes.

• The MNS sound system will override any fire signals and provide indication of ALERT through MNS speaker system (voice) and amber strobes.

• Voice messages will be per UFC Air Force requirements/Luke Air Force Base specific and have Local Operators Console(s) with microphone located within a distance determined by the Base AHJ, but, no further that 200’.

• Monaco Alarm Transmitters (BTX-M) will be installed (with LVN audio card & relay modules) in all facilities with a FACP and transmit to the (ECC) Emergency Communication Center.

Penetrations:

• Apply fire stopping material in sufficient thickness to achieve rating required, and to uniform density and texture.

Electrical:

• Emergency Lights: Install per code as a minimum and add as needed in complex areas per the AHJ.

Egress:

Egress capacity:

• High hazard; 0.7 in/person for stairs… 0.4 in/person for level components/ ramps.

• Ordinary hazard; 0.3 in/person for stairs… 0.2 in/person for level components/ ramps.

BUILDING ALLOWABLE TRAVEL DISTANCE (NFPA 101)

• Maximum Travel Distance = 75 ft. (Table 40.2.6)

• Common Path of Travel High Hazard Industrial = 75 ft. (Table 40.2.5, 7.11.4): Common Path of Travel (38.2.5.3.3): Mechanical Room = 100

ft. (7.12.1) Dead End Corridors (Table 40.2.5) Prohibited except as permitted by 7.11.4.

Fire Alarm Testing: Tests and Reports

• Provide acceptance testing for the fire alarm and fire suppression systems I.A.W. UFC 3-600-01, 4-021-01; NFPA 11, 13, 16, 20, 24, 72, 409 & 410 as applicable.

Preliminary Testing

• Prior to any testing; alarm/suppression technician must contact the

(ECC) Emergency Communication Center to setup device nomenclature and zoning with Alarm Center Supervisor Dave Demers. Ext: x6641

• Coordinate with the ECC to perform preliminary test required by UFC & NFPA Standards and annotated on NFPA 72 inspection/test form.

• Test report results shall be submitted to the contracting officer and fire prevention office.

Final Acceptance Test

• Final acceptance test can be requested by CoE or CE project manager with the fire prevention office five days after preliminary test report has been submitted.

• The Fire Prevention Office will provide a five to ten day window for Final Testing; depending on personnel availability.

• Final Acceptance test will be 100%.

• If the fire alarm/suppression technician appears not to be prepared at requested time; test will be stopped and rescheduled.

Luke Specification update for
WET-PIPE SPRINKLER SYSTEMS/ DRY-PIPE SPRINKLER SYSTEMS/AQUEOUS FILM-FORMING FOAM (AFFF):
Requires an Inspectors Test Valve at the furthest point of the system… [WET]