FA488721R0014 Consolidated RFI Responses.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Maintenance & Repair (M&R) IDIQ, Luke AFB, AZ
Solicitation number
FA488721R0014
Issued by

View the file

Other files

File Type Posted
Attachment 8 Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 9 LUKE Design and Construction Standards.pdf PDF
Attachment 16 NAF Construction Clauses Definitions.pdf PDF
Attachment 2 Wage Determination AZ20210031 Maricopa County 26 Feb 2021.pdf PDF
Attachment 5 Ordering Procedures 26 Feb 2021.pdf PDF
Attachment 17 Joint Venture Teaming Partner Consent Letter 17 Dec 20.pdf PDF
Attachment 1 M and R SOW 5 Mar 2021.pdf PDF
Attachment 12 Luke Specification for Fire Protection and Life Safety 6 Jun 15.pdf PDF
Attachment 3 Wage Determination AZ20210030 Coconio County 26 Feb 2021.pdf PDF
Attachment 14 Basic Project Design Requirements 23 Oct 20.pdf PDF
Attachment 11 Fire System Criteria 10 Dec 18.pdf PDF
Attachment 4 PPQ and Cover Letter 17 Dec 2020.pdf PDF
Attachment 6 Luke Master Specifications 9 Sep2020.pdf PDF
Attachment 13 Renovation Project Sustainment and Restoration 23 Oct 20.pdf PDF
Pre- Proposal Conference.pptx PPTX presentation
Attachment 18 Sections L and M Instructions to Offerors and Evaluation Factors 9 Mar 2021.pdf PDF
Solicitation - FA488721R0014.pdf PDF
Attachment 19 Price Evaluation Worksheet 8 Mar 2021.xlsx XLSX spreadsheet
Attachment 10 AETC First 400 Feet Standard Guidance with Luke Supplemental 5 May15 v4.pdf PDF
Attachment 7 AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Attachment 15 NAF Standard Clauses.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Log

REQUEST FOR INFORMATION LOG
CONTRACT #:PROJECT # / TITLE:
TBDM&R
TO BE COMPLETED BY CONTRACTORTO BE COMPLETED BY GOVERNMENT
RFI #DATEDOCUMENTSHEET / PAGE / PARADISCIPLINEQUESTION / ISSUERESPONSE DATERESPONSEPOC
OFFICE SYMNAME
00117-Mar-21Attachment 18Section L, Paragraph 3, subparagraph g)GeneralOfferors are directed to submit all Volumes of their proposal electronically via DoD Secure Access File Exchange Service (DoD SAFE) at the link indicated, with each Volume included as a separate file. However, Attachment 8 of the solicitation, entitled Luke AFB Disk Submittal Guidance, is directing Offerors to submit their proposals “Solicitation Volumes I, II, III, and IV, on a CD with a printed label”.17-Mar-21Attachment 18 outlines instructions to offerrors in regards to solicitation submission. Attachment 8 outlines instructions and guidance for disk submittals. Attachment 8 guidance would be pertaining to post award actions and will have no affect on current soliciation submissions.PKBGrimes, Bailey
00217-Mar-21Attachment 19Section L, Paragraph 2GeneralSection L , Paragraph 2, indicates that the Offeror’s proposal will consist of three (3) parts or Volumes, not four (4), i.e., Price Proposal, Technical Execution Plan, and Past Performance Information, respectively.17-Mar-21Attachment 18 outlines instructions to offerrors in regards to solicitation submission. Attachment 8 outlines instructions and guidance for disk submittals. Attachment 8 guidance would be pertaining to post award actions and will have no affect on current soliciation submissions.PKBGrimes, Bailey
00317-Mar-21Attachment 8GeneralAttachment 8 is directing the submittal of “Project As-Builts, O&M Manuals and Warranty Documents” via a CD. Are these documents considered post-award and associated with the completion of specific Task Orders or projects? Please clarify.17-Mar-21Attachment 18 outlines instructions to offerrors in regards to solicitation submission. Attachment 8 outlines instructions and guidance for disk submittals. Attachment 8 guidance would be pertaining to post award actions and will have no affect on current soliciation submissions.PKBGrimes, Bailey
00417-Mar-21GeneralThis is an M&R Contract, but the solicitation is also requesting as-builts which are usually only necessary for a design build contract. Will the winning contractor also be expected to provide design services?17-Mar-21In accordance with section 7 of the Statement of work, Attachment 1, As-built drawings are included in the scope of work. The SOW also allows for small renovations and as such those changes would need to be captured through as-built drawings. As-built drawings are not exclusive to design-build efforts.PKBGrimes, Bailey
00517-Mar-21GeneralIf maintenance is performed on a building, and that building currently doesn’t have as-builts drawings, is the contractor to provide new as-built drawings for the building?19-Mar-21Maintenance work should not require as-built as maintained work is not changing anything. If the scope of work changes such that the facilities infrastructure/architecture becomes altered, updated as-built drawings will be required for archive.CESSean Sussman
00617-Mar-21Statement of WorkGeneralIn the SOW it states that the contractor shall provide drawings using AutoCAD 2017. Will the government always provide the existing as-built in AutoCAD 2017 for the contractor to change? Or, does the government intend to provide PDF’s of old drawings and expect the contractor to convert all the governments existing drawings into AutoCAD 2017?19-Mar-21All available DWG/PDF files will be provided if the scope of work depicts that as-built will require updating.CESSean Sussman
00717-Mar-21GeneralIf the government will provide existing as-built in AutoCAD 2017, will they already comply to the Tri-Service Center’s A/E/C and Spatial Data Standard?
19-Mar-21NoCESSean Sussman
00817-Mar-21GeneralWill the contractor be expected to convert the governments existing drawings to the Tri-Service Center’s A/E/C and Spatial Data Standard?19-Mar-21No. Any as-built that meet the Tri-Service Center’s A/E/C and Spatial Data standard will be expected to be corrected and returned in Tri-Service Center’s A/E/C and Spatial Data standard. Any provided as-built that does not meet the Tri-Service Center’s A/E/C and Spatial Data standard will be expected to be corrected and returned in the same standard that was provided.CESSean Sussman

Solicitation: FA488720REC01 Attachment 5: RFI Log Date: 15 June 2020