23 October 2020
RENOVATION PROJECTS
Sustainment and Restoration……. UFC 3-600-01
1-3.2.4.1 When any portion of a building is modified from its current use to that of a mission essential building for one year or more, the building must meet the requirements for new construction.
Facilities in which alteration, modernization, rehabilitation, and renovation work is less than 50% of the replacement value of the building, the building must comply with the criteria in this UFC for new construction, to the maximum extent practical. All new work accomplished as part of alteration, modernization, modification, rehabilitation, and renovation actions/projects must meet the requirements for new construction.
Renovation to Existing Systems.
Existing Control Panels
Replace existing non-addressable fire alarm panels with a new analog/addressable panel when a project includes fire alarm work.
5-5.1.1 New devices and circuits must be addressable.
5-5.1.2 The existing devices can remain, but must be connected to the new panel via a monitor addressable module or control module.
Complete Replacement
If the existing system is to be completely replaced all conductors must be replaced with new.
Partial Renovation
If the work involves only partial renovation of a facility and is providing a new fire alarm control panel for the renovated areas, demolish the existing FACP. The existing circuits in the areas of the building that is not being renovated may be retained, if not replaced, and connected to the new fire alarm control panel via monitor modules or control modules.
Manual Pull Station
Provide addressable double action type manual pull stations with mechanical reset features. If the manual alarm station requires a key for reset, it must be the same key as required for the fire alarm control panel. 5-6.3
Attachment 21 – FA488721R0003 Renovation Projects – Sustainment and Restoration
23 October 2020
2-1.20…Major Project
A project that includes any one of the following:
a. Addition to an existing Facility.
b. Renovation, Reconstruction or Alteration of 50 percent or more of the total floor area of an existing Facility.
c. Design or construction of a new Facility.
d. New installation or Modification of an area of construction greater than 5,000 ft2 of floor area that involves existing or new fire barriers or fire-rated construction; Life Safety Systems; fire alarm or detection systems; fire suppression systems.
Note: Modification of 20 or more existing sprinklers is considered a Major Project.
New installation or Modification of existing HVAC systems that remove or install the ductwork passing through fire-rated or smoke partitions/barriers or interconnected plenum areas serving an area greater than 5,000 ft2 of floor area.