Attachment 6 Luke Master Specifications 9 Sep2020.pdf

PDF 9 MB Posted

Attached to
Maintenance & Repair (M&R) IDIQ, Luke AFB, AZ
Solicitation number
FA488721R0014
Issued by

View the file

Other files

File Type Posted
FA488721R0014 Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 8 Luke AFB Disc Submittal Guidelines.pdf PDF
Attachment 9 LUKE Design and Construction Standards.pdf PDF
Attachment 16 NAF Construction Clauses Definitions.pdf PDF
Attachment 2 Wage Determination AZ20210031 Maricopa County 26 Feb 2021.pdf PDF
Attachment 5 Ordering Procedures 26 Feb 2021.pdf PDF
Attachment 17 Joint Venture Teaming Partner Consent Letter 17 Dec 20.pdf PDF
Attachment 1 M and R SOW 5 Mar 2021.pdf PDF
Attachment 12 Luke Specification for Fire Protection and Life Safety 6 Jun 15.pdf PDF
Attachment 3 Wage Determination AZ20210030 Coconio County 26 Feb 2021.pdf PDF
Attachment 14 Basic Project Design Requirements 23 Oct 20.pdf PDF
Attachment 11 Fire System Criteria 10 Dec 18.pdf PDF
Attachment 4 PPQ and Cover Letter 17 Dec 2020.pdf PDF
Attachment 13 Renovation Project Sustainment and Restoration 23 Oct 20.pdf PDF
Pre- Proposal Conference.pptx PPTX presentation
Attachment 18 Sections L and M Instructions to Offerors and Evaluation Factors 9 Mar 2021.pdf PDF
Solicitation - FA488721R0014.pdf PDF
Attachment 19 Price Evaluation Worksheet 8 Mar 2021.xlsx XLSX spreadsheet
Attachment 10 AETC First 400 Feet Standard Guidance with Luke Supplemental 5 May15 v4.pdf PDF
Attachment 7 AFI 33-118 Electromagnetic Spectrum Management.pdf PDF
Attachment 15 NAF Standard Clauses.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 010100 Page 1

GENERAL CONDITIONS

SECTION GC

GENERAL CONDITIONS

PART 1 GENERAL

1.01 DEFINITIONS:

A. C.O. - Where the term “Contracting Officer” or “C.O.” appears in the Contract Documents, it shall be understood to mean “Contracting Officer or his/her Authorized Representative”.

B. USER - Where the term “USER” appears in the Contract Documents, it shall be understood to mean the occupant of the building. All changes, deviations, or deletions shall be made by the Contracting Officer or his/her Authorized Representative NOT the USER.

1.02 EXECUTION, CORRELATION AND INTENT:

A. In cases of discrepancy concerning quality and application of materials and non-technical requirements over materials, the Specifications shall take precedence over the Drawings.

B. Work shall be executed per the Contract Documents. No changes shall be made therein without first having received written permission from the C.O.

C. If the Contractor observes any errors, discrepancies or omissions in the Contract Documents, he shall promptly notify the C.O. requesting clarification. If the Contractor proceeds with work affected by such errors, discrepancies or omissions, without having received such clarification, he does so at his own risk. Any adjustments involving such circumstances made by the Contractor, prior to approval by the C.O., shall be at the Contractor’s risk and the settlement of any complications or disputes arising there from shall be at the Contractor’s sole expense.

D. All work and material shall be the best of the respective kinds specified or indicated. Should any workmanship or materials be required which are not directly or indirectly called for in the Specifications and/or shown on the Drawings but which are necessary for proper fulfillment of the obvious intent thereof, said workmanship or materials shall be the same or similar parts that are detailed, indicated or specified, and the Contractor shall understand the same to be implied and provide for it in his tender as fully as if it were particularly described or delineated.

Attachment 6 - FA488721R0014 Luke Master Specifications 2 September 2020

SECTION 010100 Page 2

1.03 LABOR AND MATERIALS:

A. When requested by the C.O., the Contractor shall deliver to the C.O., prior to final acceptance of the work as a whole, signed certificates from suppliers of materials and manufactured items stating that such items conform to the Contract Documents.

B. The Contractor, immediately upon Notice to Proceed (or where shop drawings, samples, etc., are required, immediately upon receipt of approval thereof) shall place orders for all materials, work fabrication, and/or equipment to be employed by him in that portion of the work contracted for. The Contractor shall keep all materials, work fabrications and/or equipment specified and to advise the C.O.

promptly, in writing, of all orders placed and of such materials, work fabrications and/or equipment which may not be available for the purposes of the Contract.

C. Mechanics whose work is unsatisfactory to the C.O. to be careless, incompetent, unskilled or otherwise objectionable shall be dismissed from work under the Contract upon written notice from C.O.

1.04 SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND COLOR BOARDS:

A. Submission of Shop Drawings, Samples and Color Boards to the C.O. is required of only those items specifically mentioned in the Specification Sections. If Contractor submits Shop Drawings for items other than the above the C.O. will not be obliged to review them.

Contractor shall be responsible for the procuring of Shop Drawings for his own use as he may require for the progress of the Work.

B. The term “Shop Drawings” as used herein also includes but is not limited to fabrication, erection, layout and setting drawings, manufacturer’s standard drawings, descriptive literature, catalogs, brochures, performance and test data, wiring and control diagrams, all other drawings and descriptive data pertaining to materials, equipment, piping, duct and conduit systems and methods of construction as may be required to show that the materials equipment or systems and the positions and layout of each conform to the Contract requirements. As used herein the term “manufactured” applies to standard units usually mass-produced and “fabricated” means items specifically assembled or made out of selected materials to meet individual design requirements.

Shop Drawings shall establish the actual detail of all manufactured or fabricated items; indicate proper relation to adjoining Work; amplify design details of mechanical and electrical equipment in proper relation to physical spaces in the structure; and incorporate minor changes of design or construction to suit actual condition.

C. Samples: Following Contractor’s review and approval, he shall submit to the C.O. samples of all materials in quantities and sizes determined by the C.O. If a sample is rejected, one sample noted so will be returned to the Contractor. If a sample is marked “Approved except as Noted”, one sample so noted will be returned. Corrected samples shall be resubmitted for approval as per the original submittal.

SECTION 010100 Page 3

D. Color Boards: Following Contractor’s review and approval, he shall submit to the C.O. Color Boards consisting of all interior and exterior finish material samples, a finish schedule, floor plan, and interior elevations if needed to explain finishes. Consolidated Color Boards should be submitted within 30 days of Notice to Proceed. Piecemeal submittals are not acceptable. All Color Boards should be submitted in 8 ½” by 11” card stock in a three-ring binder. Contractor must certify availability of items at this time. Color Boards shall be submitted in accordance with Section 1300 - Submittals.

E. Brochures: Following Contractor’s review and approval, he shall submit to the C.O. four (4) copies of all manufacturer’s catalogs or brochures as required by the C.O. If a brochure is stamped “Approved Except As Noted”, one (1) copy will be returned. If stamped “Rejected as Noted”, one (1) marked copy will be returned. Corrected copies shall be resubmitted for approval as per the original submittal.

F. Equipment Lists: Following Contractor’s review and approval, he shall submit to the C.O. four (4) complete lists of all major items of mech-anical, plumbing, and electrical equipment and materials as defined in the specification sections. Submit all items at one time in a neat and orderly manner. Partial lists will not be acceptable. Submittals shall include the manufacturer’s specifications weights space requirements, physical dimensions, ratings of all equipment and supple-mental information requested by the C.O. Performance curves for all pumps and fans shall be furnished. Where a submittal sheet described items in addition to that item being submitted, the submitted item shall be clearly marked on the sheet and superfluous information shall be crossed out.

G. Manufacturer’s Instructions: Where any item or work is required by

Specification to be furnished, installed or performed in accordance with a specified product manufacturer’s instructions, Contractor shall procure and distribute the necessary copies as specified on the Schedule of Material Submittal to the C.O.

1.05 CUTTING AND PATCHING OF WORK:

A. In all cases exercise extreme care in cutting operations, and perform such operations under adequate supervision by competent mechanics skilled in the applicable trade. Openings shall be neatly cut and shall be kept as small as possible to avoid unnecessary damage.

Careless and/or avoidable cutting damage, etc., will not be tolerated, and the Contractor will be held responsible for such avoidable or willful damage.

B. All replacing, patching and repairing of all materials and surfaces cut or damaged in the execution of the Work shall be performed by experienced mechanics of the several traders involved. Such replacing, repairing or patching shall be done with the applicable materials, in such a manner that all surfaces so replaced, etc., will, upon completion of the Work, match the surrounding similar surfaces.

SECTION 010100 Page 4

1.06 SCAFFOLD, STAGING, PROTECTION, ETC:

A. The Work under each Section of these Specifications shall include providing, installing, and maintaining all scaffold, staging, trestles, and planking necessary for the work under each Section in strict conformity with all applicable laws and ordinances, and maintenance of same so as not to interfere with or obstruct the work of other trades.

B. All Scaffolding shall comply with OSHA Safety and Health Standards (29

CFR 1910), paragraph 1910.28.

C. Additionally, the work under each section of these Specifications shall include providing all forms of protection necessary to preserve the work of other trades free from damage.

D. These provisions shall be considered as though repeated under each separate Section of these Specifications.

1.07 SPECIFICATIONS:

A. In the preparation of these Specifications, an effort has been made to segregate the various branches of the Work under headings by trades.

This is done only for convenience and shall not relieve the Contractor of the responsibility of furnishing each item indicated or specified whether properly segregated or not.

B. Specification arrangement is in accordance with the “Construction

Specifications Institute (CSI), Manual of Practice, and Specification Writing Techniques, Chapter one, Section Format Outline.”

C. No responsibility will be assumed by the Government or the C.O. for omissions or duplications by the Contractor in the completion of the Contract due to any alleged error in the arrangement of the material in these Specifications nor shall any such segregation or work and materials operate to make the C.O. an arbiter in defining limits to the agreements between the Contractor and his subcontractors or suppliers.

D. The misplacement, addition or omission of any letter, word or punctuation mark shall in no way damage the true spirit, intent or meaning of these Specifications.

E. The words “shown”, “indicated”, “noted”, “scheduled” or words of that effect shall be understood to mean that reference is made to the Drawings accompanying these Specifications.

F. Where reference herein is made to colors or finishes “as selected”, the reference is to the C.O.

1.08 APPROVED APPLICATORS:

A. Where specific instruction in these Specifications requires that a particular product and/or materials be installed and/ or applied by an “approved applicator” of the manufacturer, it shall be the Contractor’s responsibility to insure that any subcontractors used for such work be approved applicators.

SECTION 010100 Page 5

1.09 WATERTIGHT - WEATHERTIGHT:

A. Anything in the Contract Drawings notwithstanding, the Contractor accepts the responsibility of construction of a watertight, weather tight project.

1.10 DELIVERY AND STRORAGE OF MATERIALS:

A. Deliver all manufactured materials in the original packages, containers or bundles (with the seals unbroken) bearing the name or identification mark of the manufacturer.

B. Deliver fabrication in as large assemblies as practicable and where specified to be shop-primed or shop-finished; they shall be packaged or crated as required to preserve such priming or finish intact and free from abrasion.

C. Store all materials in such manner as necessary to properly protect same from damage, as materials or equipment damage by handling weather, dirt or from any other cause will not be acceptable.

D. Store materials so as to cause no obstructions, stored off sidewalks, roadways, and underground services. The Contractor shall be responsible for protecting all material and equipment furnished under the Contract.

1.11 WORKMANSHIP:

A. Where not more specifically described in any of the various Sections of these Specifications, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construc-tion, or installation regularly furnished or required for completion (including any finish), and for successful operation as intended.

B. All work shall be executed by mechanics skilled in their respective lines of work.

C. When completed, all parts shall have been durably and substantially built and shall present a neat, workmanlike appearance.

1.12 EARTH MOVING PERMIT:

A. Contractor shall apply for and obtain an Earth Moving Permit from:

Maricopa County Department of Health services Bureau of Air Pollution Control P.O. Box 2111 1845 East Roosevelt Phoenix, Arizona 85001.

B. Contractor shall pay for all fees for Earth Moving Permit and Applica-tion.

SECTION 010100 Page 6

C. Permit is required for all Earth Moving, Soil Disturbance, and Dust Generation.

1.13 EXCAVATION:

A. Contractor shall apply for and obtain a Government Excavation Permit (AF Form 103, Base Civil Engineer Work Clearance Request) prior to any excavation.

B. There is no charge for the permit.

C. The following are the procedures for initiating and obtaining an AF

Form 103 clearance by the Contractor:

1. The Contractor takes the government furnished AF Form 103 and the working Site Plan to the Communications Squadron building 176, Plans Flight Office. The Communications Plans Flight will perform their own clearance review of the construction area and will comment on the AF Form 103 as to when the Government communications lines will be marked. A maximum of three (3) duty days will be allowed for the marking.

2. The Communications Squadron notifies the Contractor to pick up the coordinated AF Form 103, and bring it to building 343, Civil Engineer Customer Service desk. At this point the person behind the desk will either direct you to the person in charge of the digging permit program or they will take your permit and put it in their IN box. Add an estimated time of 10 working days for the Civil Engineering Shops to complete this process.

3. The Contractor shall notify Blue Staking for Commercial

Communications lines. Blue staking will issue a control number that will be annotated on the AF Form 103. The Contractor shall refer to this number for any further communications with Blue Staking.

4. It is the Contractor's responsibility to maintain the markings on the construction site, i.e., only approved markings, such as "rooster tails" in landscaped areas will be allowed for Contractor marking of construction.

5. The below listed telephone numbers have been included to assist you in the AF Form 103 processing procedure:

a. Communication Squadron, Building 176, Plans Flight, SCX, phone number (623) 856-3558/7010

b. Base Civil Engineering Squadron, Building 343, Operations

Flight, CEOI, Infrastructure, phone number (623)856-6394

1.14 MILITARY MISSION:

A. Luke AFB has a military mission and has restricted areas. DO NOT cross any red lines.

SECTION 010100 Page 7

B. Training exercises are periodically conducted and include gate closures, vehicle searches, and identification verifications. The exercises are required for the military mission. Please cooperate during these exercises.

C. High-ranking officers, foreign dignitaries, or DOD employees may approach you. Only the Contracting Officer can make changes to the contract.

1.15 GOVERNMENT INSPECTION:

A. The Government is not obligated to inspect a Contractor’s work or to protect a contractor from the consequences of such work.

B. Government inspection is a general examination of the Contractor’s conduct and work is solely for the purpose of the Government.

C. Government inspection is not to be construed as conclusive.

D. Information that may be offered to the Contractor does not change the Contract. Only the Contracting Officer can change the Contract.

1.16 CONTRACTOR INSPECTION:

A. Contractor inspection is a careful investigation of all work to assure that it conforms to the Contract, and to detect variances and to act to correct them in time to prevent reworking of the Contract.

B. This includes detailed, skillful examination and testing with immediate comparison to the requirements of the Contract.

C. On discovery of a variance the Contractor shall immediately institute corrective action to eliminate the variance and to ensure that all future work conforms to the requirements of the Contract.

1.17 ENVIRONMENTAL REQUIREMENTS:

A. AIR: Excavation - When disturbing more than a tenth of an acre, a dust Control permit will be obtained from Maricopa County Environmental Services Department. Equipment (generators, abrasive blasting, and solvent/degreaser tanks) that remains located on the base for more than 30 days will be listed and provided to the Air Program Manager.

B. ASBESTOS: No asbestos containing materials will be used on any government installation, Luke AFB, Gila Bend AFAF, or Fort Tuthill. A Material Safety Data Sheet (MSDS) is required for all building materials except for wood, glass, or steel. The MSDS will be submitted to the C.O. within seven (7) calendar days after the NOTICE TO PROCEED (N.T.P.)

C. HAZARDOUS MATERIALS MANAGEMENT: Contractor will provide the Contracting

Officer (CO) the Material Safety Data Sheets (MSDS) for chemical

SECTION 010100 Page 8 materials to be used during the project prior to the contract award in accordance with FAR Clause 52.223-3. The CO will provide MSDSs to 56 CES/CEAN for review prior to the contractor bringing products on base.

The contractor must inventory all chemical materials, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils, brought on base. A chemical material inventory must be maintained when used containing the nomenclature, manufacturer, part number, quantity, storage location, and the process in which the material is used. All chemical materials stored at Luke AFB will be managed in accordance with federal, state, local, and Air Force regulations. Long-term contracts (6 months or longer) will be managed in accordance with the installation’s approved hazardous materials (HAZMAT) tracking system. Short-term contracts (6 months or less) will report monthly HAZMAT inventories/usage to the CO.

D. LEAD-BASED PAINT: Paint containing lead will not be used during any painting process. A MSDS will be submitted for all paint products used.

E. PLUMBING FIXTURES TRIM: No plumbing fixture trim will be installed at Luke AFB unless they conform to the voluntary standard NSF/ANSI Standards 24 and 61. Products certified under these standards are tested to ensure no leaching from the fixtures exceeds 11 parts per billion of lead.

F. POTABLE WATER: The contractor is responsible to insure that all potable water connections have an ASSE approved anti-siphon device attached to the hose bibb prior to mixing chemicals, etc. Any anti-siphon device or backflow prevention device installed by the contractor as part of his work will be identified to the Backflow Prevention Manager, 56 CES/CEOIU, for addition to the base inventory. The type of device selected for installation and the installation location will be approved by the Backflow Prevention Program Manager prior to installation.

G. WASTE WATER: Absolutely no chemical products will be allowed to be dumped in any drainage system, storm drain, wash rack, septic system or sanitary sewer. All remaining and residual chemicals will be taken away by the contractor. If there are questions concerning specific waste water products, contact 56 CES/CEAN.

H. Solid Waste: Report monthly the amount of construction and Demolition

(C&D) material generated and recycled to 56 CES/CEAN. C&D debris is defined as material produced during the construction, renovation, demolition or deconstruction of residential and commercial buildings and their infrastructure. C&D debris typically includes concrete, wood, metals, gypsum wallboard, asphalt, and roofing material. If the contractor generates a potential waste or hazardous waste during the contract period, the contractor will contact the base Hazardous Waste Manager at (623) 856-6501 for proper reporting and disposal procedures.

I. Environmental, Safety and Occupational Health Management System (ESOHMS): Per Executive Order 13101 and the installations Environmental, Safety and Occupational Health Management System (ESOHMS) policy, contractors must be aware of all significant aspects

SECTION 010100 Page 9 that fall within the installations ESOHMS. Contractors must complete ESOHMS awareness training prior to commencement of any activities. The training is provided on the Luke external webpage for review by the public and all contractors at http://www.luke.af.mil/CommunityInterests/EnvironmentalExcellence.asp

J. PESTICIDES: The prospective contractor and or subcontractor must operate in compliance with all state and local regulations. The contractor shall comply with all applicable parts of Title 29, Code of Federal Regulations (CFR), Occupational Safety and Health Standards, Part 1910; Title 29, CFR, Safety and Health Standards for Federal Service Contracts, Part 1925; Title 40, CFR, Parts 150-189, and Title 49, CFR, Hazardous Material Regulations, Part 171, while on an Air Force installation, to ensure safe working conditions for contract personnel and a safe environment for the occupants of Air Force Facilities.

a. The contractor shall furnish labels and MSDSs for all pesticide materials 25 days prior to intended use. All pesticides must be approved by AETC. Proposed pesticides must be on the Armed Forces Pest Management Board (AFPMB) standard pesticides list available at the following link.

http://www.afpmb.org/pubs/sdandardlists/dod%20pestic ides%20list.pdf

b. No pesticide shall be used without approval from 56 CES/CEOHE Entomology.

c. Contractor must report any pesticide use for the moth 7 calendar days prior to the end-of-month to 56 CES/CEOHE Entomology for submittal of monthly Pest Management Report.

d. This information is in addition to any hazardous material report submitted.

1.18 COMPUTER SOFTWARE REQUIREMENTS: The contractor shall

obtain licensed copies of the following standards.

A. The government standard for word processing, spreadsheets, presentations, and database is Microsoft Office.

B. The government standard for projects management is Microsoft Project or

Primavera Shuretrack.

C. The government standard for drawings is AutoCAD.

D. The government standard for cost estimates for IDIQ is 4-clicks.

1.19 COMPLIANCE WITH UNIFIED FACILITIES CRITERIA (UFC 3-260-01,

Attachment 15 – Maximum Equipment Height and Notification of Construction Activity)

A. Contractor shall provide the maximum height of construction equipment to be used during construction, this data to be incorporated into the contract documents.

SECTION 010100 Page 10

B. The maximum height of construction equipment must also be included on the Notice of Proposed Construction or Alteration (FAA Form 7460-1) to be submitted to the Federal Aviation Administration (FAA) by the project contractor.

C. If the maximum equipment height penetrates any airspace, it shall be noted in the contract documents and Notice of Proposed Construction or Alteration.

D. The FAA Notice of Proposed Construction or Alteration must be submitted at least 30 days prior to start of construction.

E. Notice of Proposed Construction or Alteration (FAA Form 7460-1) should be filed with the FAA using the FAA Public website at www.oeaaa.faa.gov. The site will guide you through the steps to file the automated FAA 7460-1

F. The FAA Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) office now provides the capability on their website (www.oeaaa.faa.gov) to electronically file the FAA 7460-1 Notice of Proposed Construction.

If you have any questions, please contact Terri Johnson, USAF OE/AAA Program Manager, AJR-01 Dodd Liaison, and Eastern Service Area at (404) 305-6920 or DSN: 797-5481.

1.20 ASBESTOS AWARENESS: The following information is provided for asbestos awareness, not for abatement. The Contractor shall ensure all employees have received Asbestos Awareness Training. Information can be found at www.maricopa.gov/aq and http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARD S&p_id=9995, 29 CFR 1910.1001 (j) (3) (v) and (j) (7) (IV).

Arizona is committed to protecting the public from exposure to regulated asbestos-containing material during activities involving the handling of asbestos. The Air Quality Division closely monitors these activities for proper notification and asbestos emissions control.

o About the Program o Notification Requirements o Additional Asbestos Resources

About the Program

The purpose of the Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP) Program is to protect public health from exposure to regulated asbestos-containing material (RACM) during NESHAP facility renovation/demolition activities, asbestos removal, transport and disposal, closely monitoring those activities for proper notification and asbestos emissions control. Asbestos is known to cause cancer and other respiratory diseases in humans.

SECTION 010100 Page 11

Under Section 112 of the Clean Air Act (CAA), Congress gave the U.S.

Environmental Protection Agency (EPA) the responsibility for enforcing regulations relating to asbestos renovations and demolitions activities. The CAA allows the EPA to delegate this authority to state and local agencies. Even after the EPA delegate’s responsibility to a state or local agency, the EPA retains authority to oversee agency performance and to enforce the Asbestos NESHAP regulations as necessary.

The Asbestos NESHAP program in Arizona is enforced by federal, state, and county Asbestos NESHAP agencies.

Federa l Level:

Tribal Lands

The federal Asbestos NESHAP coordinator who is based in the EPA Region 9 office in San Francisco has sole jurisdiction over all 25 tribal lands in Arizona.

State Level:

ADOT · Apache · Cochise · Coconino · Gila · Graham · Greenlee · La Paz · Mohave · Navajo · Santa Cruz · Yavapai · Yuma

The Arizona Department of Environmental Quality (ADEQ) Asbestos NESHAP coordinator has jurisdiction in the above counties. ADEQ Asbestos NESHAP Program does not have any additional requirements from the federal standard for the Asbestos NESHAP.

However, ADEQ maintains Asbestos NESHAP notification forms for renovation and demolition activities for jurisdictional counties.

http://www.azdeq.gov/environ/air/asbestos/download/coconino.pdf

County Level:

Maricopa County · Pima County · Pinal County

These counties have delegated authority from the EPA to enforce the Asbestos NESHAP within their respective jurisdictional boundaries, excluding tribal lands. These counties within Arizona have additional requirements above and beyond the federal Asbestos NESHAP Standard.

http://www.maricopa.gov/aq/divisions/compliance/air/asbestos_neshap/Default.a spx

Each of the Asbestos program coordinators and inspectors listed above conducts inspections, investigates complaints, and collects renovation and demolition activities data. Then data are submitted quarterly to EPA through the Asbestos Contractor Tracking Systems (ACTS) and then complied into the National Asbestos Registry Systems (NARS). The NARS system manages this information generated by Statewide Asbestos Programs. Note: The National Asbestos Registry System (NARS) has been

SECTION 010100 Page 12 suspended by EPA. Therefore, a valid link on EPA website is not available. Further information should be available by the end of this month.

State of Arizona Asbestos Neshap Program Map Arizona Asbestos-NESHAP Regulatory Agency Contacts

What is Asbestos?

"Asbestos" is a term used to describe six naturally occurring incombustible minerals. Three of the most common types are chrysotile, amosite, and crocidolite. Asbestos is a mineral compound of silicon, oxygen, hydrogen, and various metals. Asbestos minerals formed millions of years ago when heat, pressure, or chemical activity changed the physical and chemical characteristics of pre-existing rock. Unlike other minerals, which consist of tightly bound crystals, asbestos minerals are characterized by the presence of densely packed bundles of fibers.

Asbestos was a popular component in commercial products from the early 1900s to the 1970s. Asbestos is durable, fire retardant, resists corrosion, and insulates very well. Asbestos products use in America was greatest from the 1940s until the late 1970s when the health hazards associated with asbestos exposure became widely recognized.

By this time asbestos had become an integral component of approximately 3,600 commercial products. During World War II, enormous quantities of asbestos were used in shipbuilding and other industries. Following the war and until the late 1970s, asbestos was widely used in buildings for fireproofing, thermal and acoustical insulation, condensation control, and decoration. It has been estimated that approximately 30 million tons of asbestos have been used in the construction and manufacturing industries since the early 1900s.

What are the Health Effects of Asbestos Exposure?

Asbestos fibers can cause serious health problems. If asbestos fibers are inhaled, these tiny microscopic fibers can cause normal functions of the lungs to be disturbed. Exposure increases the risk of developing lung cancer, mesothelioma, or asbestosis, which is a scaring of the lungs that leads to breathing problems. It could take anywhere from 15 to 30 years after the first exposure for symptoms to occur. Medical investigations have shown that inhalation and ingestion are the principal routes of entry that leads to asbestos-related diseases. There is no known safe exposure level to asbestos.

The greater the exposure, the greater the risk of developing an asbestos-related disease.

Asbestos Products Ban and Phase Out

SECTION 010100 Page 13

On July 12, 1989, EPA issued a final rule banning some, but not all, asbestos-containing products. For additional documents that provide more detail on the status of EPA's ban on asbestos-containing products, please visit the EPA website .

Regulations Governing Asbestos

Pursuant to the Clean Air Act of 1970, EPA established the Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP). It is intended to minimize the release of asbestos fibers during activities involving the handling of asbestos. It specifies work practices to be followed during renovation, demolition, and other abatement activities when friable asbestos is involved. On March 31, 1971, EPA identified asbestos as a hazardous pollutant. On April 6, 1973, EPA first enforced the asbestos NESHAP Regulation in Title 40, Code of Federal Regulations, Part 61. On Nov. 20, 1990, EPA re-promulgated the entire Asbestos NESHAP regulation to enhance enforcement and compliance, Title 40, Code of Federal Regulations, Part 61, Subpart M, and Asbestos. This is the current edition. On June 17, 1994, EPA added Appendix A to clarify the Asbestos NESHAP as it affects roof removal operations involving asbestos. Please visit TAI Info to download regulations.

What sources are covered by the Asbestos NESHAP?

Among others, the following activities and facilities are regulated:

Milling of asbestos Commercial manufacturing of products that contain commercial asbestos Demolition of all facilities, even though it may not contain asbestos Renovation of facilities that contain friable asbestos-containing materials Spraying of asbestos-containing materials Processing (fabricating) of any manufactured products that contain asbestos Use of insulating materials that contain commercial asbestos Disposal of asbestos-containing waste generated during milling, manufacturing, renovation, demolition, spraying, and fabricating operations

Active waste disposal sites Closure and maintenance of inactive waste disposal sites Operation of and reporting on facilities that convert asbestos-containing waste material into non-asbestos material Design and operation of air cleaning devices Reporting of information pertaining to process control equipment, filter devices, asbestos generating process, etc.

Asbestos NESHAP Program and Notification Requirements

SECTION 010100 Page 14

Applicability

Any facility undergoing renovation or demolition. "Facility" means any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units); any ship;

and any active or inactive waste disposal site.

Requirements

Prior to beginning renovation or demolition activities of a facility, a certified Asbestos AHERA (Hazard Emergency Response Act) building inspector must thoroughly inspect the facility or part of the facility where the renovation or demolition operation will occur for the presence of asbestos, including friable and non-friable asbestos-containing materials.

For all demolitions (even when no asbestos is present) and renovations activities involving threshold amounts of regulated asbestos-containing material (RACM), provide the Asbestos NESHAP agency overseeing the project site with a NESHAP notification at least 10 working days prior to the demolition or renovation activity.

Threshold amounts of RACM are:

260 linear feet or more on pipes 160 square feet or more on other facility components 35 cubic feet or more off facility components

Fees

There is no state (ADEQ) notification or permitting fees involved with this program for jurisdictional counties. The Region 9 Asbestos Program charges no fees for work on Tribal Lands. Maricopa, Pinal, and Pima counties have fees for their notification process. Some cities may have separate permit fees, and AHERA inspectors may charge a fee for their inspection.

Written Notification Requirement

Under section 61.145(b) of the Asbestos NESHAP, a written notification is required for renovation and demolition operations. Only completed notification forms are accepted. For NESHAP activities for the jurisdictional 12 counties that ADEQ regulates, the notification should be hand or typewritten and postmarked or delivered to ADEQ no later than 10 working days (Monday through Friday) prior to the beginning of the asbestos activity or demolition. The address is as follows:

SECTION 010100 Page 15

Arizona Department of Environmental Quality Air Quality Compliance Section, Field Services Unit Attn: Bill Hunt, Asbestos NESHAP Outreach Coordinator 1110 West Washington Street Phoenix, AZ 85007

(602) 771-2333 or, toll free in-state, (800) 234-5677

Additional Asbestos Resources

Asbestos in Your Home - EPA Asbestos NESHAP Regulations for Renovation and Demolition

Activities Asbestos NESHAP Waste Shipment Record Guide for Building Service Departments and Owners/Operators of

NESHAP Facilities State of Arizona Asbestos Contact Directory What Small Communities Need to Know about Asbestos Demolition and

Renovation Practices

Statutory Citations

Title 40, Code of Federal Regulations, Subpart M, Part 61, Asbestos NESHAP; Arizona Revised Statutes § 49-421 et. Seq. and § 49-471 et.

seq.; Arizona Administrative Code R18-2-1101 (A)(8)

Asbestos Related Links

Arizona Division of Occupational Safety and Health (state) EPA Applicability Determination Index Systems EPA Region 9 Air Quality EPA Region 9 Asbestos OSHA Regulations and Compliance Links (federal)

Internet sites www.ica.state.azus/Divisions/osha cfpub.epa.gov/adi www.epa.gov/region09/air/asbestos www.osha.gov/comp-links.html

1.21 DEVICES CONTAINING RADIOACTIVE SOURCES: Requirements

A. Civilian contractors bringing RAM or devices containing radioactive sources onto Luke AFB must have prior approval by the Installation RSO. The Servicing Contracting Office will ensure that all contractors are aware of this requirement.

The Servicing Contracting Office will also place a standardized statement in bid solicitations requiring bidders to identify any planned use (including subcontractor use) of

SECTION 010100 Page 16

RAM or devices. The contractor must submit the following documentation to the Installation RSO for review, preferably as attachments to a cover letter on company letterhead:

B. Copy of the Nuclear Regulatory Commission (NRC) License or Agreement State License, along with any amendments, covering the radioactive material to be used. The license must be current as shown by the expiration date. Of note, the Installation RSO is specifically prohibited from approving use for more than 180 calendar days per calendar year if the contractor submits an agreement state license.

C. Copy of the users’ qualifications and radiation safety training guidance.

D. Radiation dosimetry results for the operator for the prior calendar year (if the contractor monitors his personnel with dosimetry).

E. A brief description of the proposed activities, including a copy of the part of the Air Force contract describing the work to be done at the base and the inclusive dates of the work.

F. Statement of storage and security requirements or other particular needs of the contractor.

G. Copies of the last two leak checks if required by license, permit, or State Agreement.

H. The name, local address, and telephone number for the responsible local representative and the name, address, and telephone number of the RSO named on the license.

I. Under no circumstances will an unlicensed radioactive source/device be used on Luke AFB. Any questions on contractor responsibility regarding this issue should be directed to the Installation RSO prior to the contractor starting any work.

K. Written Installation RSO approval must be granted prior to the contractor bringing the RAM on the installation. Any questions concerning contractor responsibilities should be directed to the Installation RSO at least 30 days prior to anticipated use.

SECTION 010100 Page 17

L. Immediately notify the Installation RSO concerning any incident or accident, loss, theft, or damage to the device or any alleged radiation exposures. Outside normal duty hours, contact the Installation RSO through the 56 FW Command Post (6-5600) and request assistance from the on-call BE representative (623-580-2948).

END GENERAL CONDITIONS

Luke AFB Master CSI 48 Divisions 3/09

010110-1

SECTION 010110

SUMMARY OF WORK

PART 1 GENERAL

1.01 REQUIREMENTS INCLUDED:

A. Definitions

B. Work covered by contract documents

C. Use of premises.

D. Record drawings

1.02 DEFINITIONS:

A. Any reference throughout this specification to “Architect -Engineer” should be understood as a reference to “Contracting Officer.”

B. Any reference throughout this specification to “Owner” should be under-stood as a reference to “The Government.”

C. Payment provision contained in any portion of the referenced specifica-tions and standards are to be disregarded.

1.03 WORK COVERED BY CONTRACT DOCUMENTS:

A. The following is a summary of work for work located at Luke AFB, Arizona. The project shall include but is not limited to:

1. See Statement of work for the contract project.

B. The above description of work is for the purpose of general information only and is not intended to include and describe every feature or item of work or to define the scope of work.

1.04 USE OF PREMISES:

A. During the entire contract performance period, the facility will/will not be occupied.

B. Coordinate and cooperate with the using personnel in scheduling operations to minimize conflict and to facilitate government usage.

1.05 UTILITIES:

A. Water, gas, and electricity will be furnished to the Contractor by the

Government from the Government’s existing system outlets.

B. Utilities will be furnished at no cost to the Contractor, except for telephone.

1.06 “AS-BUILT” DRAWINGS

A. Maintain at the jobsite two sets of full size contract drawings, marking in red to show all variations between the construction actually provided and the requirements indicated or specified in the contract documents, including buried or concealed construction.

B. Where a choice of materials or methods is permitted or where variations in scope from that of the original contract are authorized, mark the drawings to define the construction actually provided.

C. Use standard drafting practices to represent such changes and include supplementary notes, legend, and detail as necessary to clearly portray the as-built construction.

D. Upon completion of the work, provide as-built drawings and incorporating any departures from the original contract documents.

E. Electronic As-built Drawings: provide electronic drawing files in a format compatible with AutoCAD 2010 including all external references required to view and print the drawing files properly. Include all necessary *.ctb, *.pc3 or similar files needed to properly set line weights for printing. Drawing files should be organized in general accordance with the Department of

Defense A/E/C CAD Standard (ERDC/ITL TR-12-X) available in PDF format on many federal websites. In addition, provide drawings in PDF format for on-screen viewing and reproduction. Provide final project specifications in PDF and Microsoft WORD *.doc or

*.rtf format.

F. Hardcopy As-built Drawings and Specifications: Provide two (2) full size and two (2) half size printed copies of the as-built drawings and two (2) copies of the final specifications.

1.07 DISPOSAL OF HIGH INTENSITY LIGHT BALLAST AND TUBES

A. Disposal: The Contractor is responsible for the proper disposal of high intensity lighting ballast and tubes.

1. High Intensity lighting ballasts are considered to contain

“PCB” (Poly Chlorinated Biphenol) unless otherwise stated on the unit.

2. Tubes are considered to contain mercury.

1.08 DISPOSAL OF THERMOSTATS CONTAINING MERCURY

A. Disposal: The Contractor is responsible for the proper disposal of thermostats containing mercury.

1. All thermostats containing mercury shall be removed prior to demolition activities beginning.

1. Unscrew the thermostat from the wall, cut thermostat wires, put entire thermostat into a split ring, open top, steel drum and deliver to building 374 for proper disposal.

2. The mercury bulb must not be broken.

PART 2 PRODUCT: NOT USED

PART 3 EXECUTION: NOT USED

END OF SECTION

Luke AFB Master CSI 48 Division 3/09

010300-1

SECTION 010300

OPTIONAL BIDS

A. Contract General Requirements.

B. All optional bid items for which contractors are required to submit bid proposals.

1.02 OPTIONAL BIDS:

A. Each optional bid is to include its respective proportion amount of labor burden, overhead, profit, taxes and bonding cost.

B. For this contract the following optional bid items and additional performance periods are:

1. Optional Bid Item No. 1:

2. Optional Bid Item No. 2:

3. Optional Bid Item No. 3:

4. Optional Bid Item No. 4:

PART 2 PRODUCTS: NOT USED

Luke AFB NUEX 08-1601 RAPCON 48 CSI Divisions 6/09

010310-1

SECTION 010310

INTERFACING OF NEW AND EXISTING WORK

A. Work items shall be scheduled to avoid or minimize interference between the various trades involved.

B. In addition to demolition specified on drawings, and that specifically shown, the Contractor shall cut, move, or remove items as necessary to provide access or to allow alterations and new work to proceed. This includes:

1. Repair or removal of hazardous or unsanitary conditions.

2. Removal of items and items serving no useful purpose, such as abandoned piping, conduit and wiring, unless otherwise indicated.

3. Removal of unsuitable or extraneous materials not marked for salvage, such as abandoned furnishings and equipment, and debris such as rotted wood, rusted metals and deteriorated concrete.

4. Cleaning of surfaces and removal of surface finish as needed to install new work and finishes.

C. Patch, repair, and refinish existing items to remain to the specified condition for each material with a workmanlike transition to adjacent new items of construction.

1.02 RELATED REQUIREMENTS:

A. Section 010100: Summary of Work.

B. Section 010450: Cutting and Patching.

C. Section 013000: Submittals.

D. Section 015000: Construction Facilities and Temporary Controls.

E. Section 017000: Contract Close Out.

F. Section 024000 02050: Demolition.

1.03 ALTERATIONS, CUTTING, AND PROTECTION:

A. Assign the work of moving, removal, cutting, and patching to trades qualified to perform the work in a manner to cause least damage to each type of work, and provide means of returning surfaces to appearance of new work.

010310-2

B. Perform cutting and removal work to remove minimum material necessary and in a manner to avoid damage to adjacent work. Cut finish surfaces such as concrete, tile, gypsum wallboard, plaster, wood rails, or metal surfaces in a straight line or at a natural point of division.

C. Perform cutting and patching as specified in Section 010450.

D. Protect from damage by adjacent work all existing structural members, finishes, facility systems and equipment that are to remain. Also provide temporary enclosures, waterproofing, heating, or other means to protect remaining existing work and new work from damage by weather or temperature/humidity extremes.

E. Provide temporary enclosures as specified in Section 01500 to separate work areas from existing building, areas occupied by Government, and to provide weather protection.

PART 2 PRODUCTS

2.01 SALVAGED MATERIALS:

A. Do not incorporate salvaged or used material in new construction except as indicated or with approval of Contracting Officer.

2.02 PRODUCTS FOR PATCHING, EXTENDING, AND MATCHING:

A. Contractor work shall:

1. Provide same products or types of construction as that in existing structure, as needed to patch, extend, or match existing work.

a. Generally, Contract Documents will not define products or standards of workmanship present in existing construction.

Contractor shall determine products by inspection and any necessary testing. Workmanship standard shall be determined by use of the existing as a sample for comparison.

2. Require that patching, extending, or matching be performed as to the extent necessary to make work complete and consistent with identical standards of quality.

PART 3 EXECUTION

3.01 PERFORMANCE:

A. Patch and extend existing work using skilled mechanics that are capable of matching existing quality of workmanship.

B. Quality of patched or extended work shall be not less than that specified for new work.

3.02 ADJUSTMENTS:

010310-3

A. Where partitions are removed, patch floors, walls, and ceilings with finish materials to match existing.

1. Where removal of partitions results in adjacent spaces becoming one, rework floors and ceilings to provide smooth planes without breaks, steps, or bulkheads.

2. Where extreme change of plane of two inches or more occurs, request instructions from Contracting Officer as to method of making transi-tion.

B. Trim and refinish relocated or existing doors as necessary to clear new floors.

3.03 DAMAGED SURFACES:

A. Patch and replace any portion of an existing finished surface which is found to be damaged, lifted, discolored, or shows other imperfections with matching material.

1. Provide adequate support of substrate prior to patching the finish.

2. Refinish patched portions of painted or coated surfaces in a manner to produce uniform color and texture over entire surface.

3. When existing surface finish cannot be matched, refinish entire surface to nearest intersections.

3.04 TRANSITION FROM EXISTING TO NEW WORK:

A. When new work abuts or finishes flush with existing work, make a smooth and workmanlike transition. Patched work shall match existing adjacent work in texture, color, and appearance so that the patch or transition is invisible at a distance of five feet.

1. When finished surfaces are cut in such a way that a smooth transition with new work is not possible, terminate existing surface in a neat manner along a straight line at a natural line of division, and provide trim appropriate to finished surface.

010450-1

SECTION 010450

CUTTING AND PATCHING

A. Requirements and limitations for cutting and patching of work.

A. All required safety and fire permits shall be completed prior to construction start.

1.03 DESCRIPTION:

A. Execute cutting, fitting, and patching to complete work and to:

1. Fit the several parts together, to integrate with other work.

2. Uncover existing work to install new work.

3. Remove and replace defective and nonconforming work.

4. Remove samples of installed work for testing.

5. Provide openings in nonstructural elements for penetrations of mechanical and electrical work.

1.04 SUBMITTALS:

A. Submit written request in advance of cutting or alteration which affects:

1. Structural integrity of any element of project.

2. Integrity of weather-exposed or moisture-resistant element.

3. Efficiency, maintenance, or safety of any operational element.

4. Visual qualities of sight-exposed elements.

5. Work of Government.

B. Shop Drawings: Submit Shop drawings showing intent of cutting and above information.

C. Include in request:

1. Identification of project.

2. Location and description of affected work.

3. Necessity for cutting or alteration.

4. Description of proposed work, tools, equipment, and shoring to be used.

010450-2

PART 2 PRODUCTS

2.01 MATERIALS:

A. Same material as original installation, unless specifically indicated otherwise in the drawings and technical sections of specifications.

B. For any change in materials, submit request for substitution in accord-ance with Section 013000.

PART 3 EXECUTION

3.01 INSPECTION:

A. Inspect existing conditions, including elements subject to damage or movement during cutting and patching.

B. After uncovering, inspect conditions affecting performance of work.

C. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION:

A. Provide supports to assure structural integrity of surroundings. Also provide devices and methods to protect other portions of project from damage.

B. Provide protection from elements for areas which may be exposed by work.

3.03 PERFORMANCE:

A. Execute work by methods to avoid damage to other work, and which will provide proper surfaces to receive patching and finishing.

B. Restore damages with new products in accordance with contract require-ments.

C. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersections.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .