This solicitation is for a minor construction project to renovate and expand an existing laboratory facility at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The project involves renovating 4,750 square feet of the existing main laboratory in Building 1 and constructing a new 6,900 square foot addition on the south side of the building. Exterior work includes constructing the single-story addition, while interior work consists of construction of floors, walls, ceilings, lighting, alarm systems, fire suppression, plumbing, cameras, IT cabling, electrical systems, HVAC, medical gases, and associated work as defined in the drawings and specifications. All work will be completed in phases according to the specifications and drawings. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4.

View the file

Other files

File Type Posted
36C24421R0018 0007_1.docx DOCX document
SITE-01.pdf PDF
Section 221100 - Facility Water Distribution.pdf PDF
SITE-02.pdf PDF
Addendum 01 with Attachments to Specifications and Drawings.pdf PDF
RFI document for Amendment 0007.pdf PDF
36C24421R0018 0006_1.docx DOCX document
36C24421R0018 0005_1.docx DOCX document
36C24421R0018 0004_1.docx DOCX document
RFI Questions and Answers.pdf PDF
36C24421R0018 0003.pdf PDF
Pre-proposal Roster of Attendees for 12-14 and 12-30 Visits.pdf PDF
36C24421R0018 0003_1.docx DOCX document
36C24421R0018 0002_1.docx DOCX document
Sign In Roster from Pre-Bid 12-14-2020 595-667- Construct New Lab.pdf PDF
36C24421R0018 0001_1.docx DOCX document
100 Specifications - Full Set.pdf PDF
Solicitation Attachment EXHIBIT B - Subcontractor Information and Consent Form Expand Lab 595-667.pdf PDF
Solicitation Attachment Specification 100 Vol.2.pdf PDF
36C24421R0018_2.docx DOCX document
Solicitation Attachment JA - Fire Alarms Signed.pdf PDF
Solcitation Attachment JA - Security System Signed.pdf PDF
Solicitation Attachment EXHIBIT D -Transmittal Letter for Past Performance Evaluation Questionnaire 595-667 Expand Lab.pdf PDF
Solicitation Attachment EXHIBIT C - Calculation of Self-Performed Expand Lab.pdf PDF
Solicitation Attachment EXHIBIT E - Past Performance Questionnaire Expand Lab.pdf PDF
36C24421R0018.pdf PDF
Solicitation Attachment EXHIBIT A - Past Performance Relevancy Questionnaire Expand Lab.pdf PDF
Solcitation Attachment JA - HVAC Controls Signed.pdf PDF
Solicitation Attachment JA - Locksets Signed.pdf PDF
Solcitation Attachment Drawings 595-667 FULL SET.pdf PDF
Solicitation Attachment Wage Determination.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs (VACO)

LEBANON VA MEDICAL CENTER

RENOVATION OF

MAIN LABORATORY – B1

VA Project No: #595 -667

Project Manual – Volume 1 of 2

100% SUBMISSION

MARCH 6, 2020

VA PROJECT NO. #595-667 VACO – LEBANON VA MEDICAL CENTER

RENOVATION OF MAIN LABORATORY – B1

09-10

TABLE OF CONTENTS 00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

100% CD SUBMISSION

FEBRUARY 3, 2012

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 00 01 Project Manual Cover Page – Volume 1 of 2 N/A

00 01 10 Table of Contents 08/19

00 01 15 List of Drawing Sheets 08/19

00 31 32 Report - Geotechnical Engineering Investigation –

GAI – VA Hospital – August 30, 2011

N/A

00 31 32.1 C40 Geotech Survey

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18

01 31 00.1 Request for Information (RFI) Form

01 01 10 Medical Center Requirements N/A

01 32 16.15 Project Schedules 04-13

01 33 00.1 Submittal ID Sheet Fillable Form

01 33 00.2 Contractor’s Certification Letter

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 09-19

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 62 01 Limited Source Justification

Use of Brand Name Specifications

N/A

01 74 19 Construction Waste Management 09-13

01 81 19 Indoor Air Quality Requirement N/A

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 04-19

02 82 13.13 Glovebag Asbestos Abatement 09-15

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15

02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 07-19

03 36 00 Concrete Floor Sealer N/A

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 02-16

04 20 00 Unit Masonry 08-17

04 43 00 Stone Masonry N/A

09-10

TABLE OF CONTENTS 00 01 10-2

09-10

TABLE OF CONTENTS 00 01 10-3

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 36 00 Composite Metal Decking 10-15

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 10-15

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 40 23 Interior Architectural Woodwork N/A

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 52 Modified Bituminous Sheet Waterproofing 08-16

07 19 20 Moisture Vapor Control System N/A

07 21 13 Thermal Insulation 10-17

07 22 00 Roof and Deck Insulation 02-16

07 42 65 Thermal and Air Barrier Wall System N/A

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02/16

07 60 00 Flashing and Sheet Metal 07-14

07 71 00 Roof Specialties 10-15

07 72 00 Roof Accessories 10-15

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 31 13 Access Doors and Frames 02-16

08 41 13 Aluminum Framed Entrances and Storefronts 08-16

08 44 13 Glazed Aluminum Curtain Walls 03-17

08 71 00 Door Hardware 08-19

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 09-18

09 30 13 Ceramic/Porcelain Tiling 10-15

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 05-18

09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14

09 68 00 Carpeting 10-15

09 91 00 Painting 01-16

09-10

TABLE OF CONTENTS 00 01 10-4

DIVISION 10 – SPECIALTIES

10 11 23 Tackboards 10-15

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

10 57 13 Hat and Coat Racks N/A

DIVISION 11 - EQUIPMENT

11 53 63 Cleanroom Pass-Throughs N/A

DIVISION 12 – FURNISHINGS

12 24 01 Roller Shades N/A

12 34 00 Manufactured Plastic Casework 05-15

12 34 50 Laboratory Casework N/A

09-10

TABLE OF CONTENTS 00 01 10-5

DIVISION 21- FIRE SUPPRESSION

21 00 01 Project Manual Cover Page – Volume 2 of 2 N/A

21 05 11 Common Work Results for Fire Suppression 04-04M

21 13 13 Wet Pipe Sprinkler Systems N/A

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 04-04M

22 05 23 General-Duty Valves for Plumbing Piping 11-04M

22 11 00 Facility Water Distribution 10-06M

22 13 00 Facility Sanitary Sewerage 11-04M

22 13 36 Packaged, Wastewater Pump Units N/A

22 14 00 Facility Storm Drainage 11-04M

22 14 36 Packaged, Submersible, Drainage Pump Units N/A

22 40 00 Plumbing Fixtures 10-06M

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING

23 05 11 Common Work Results for HVAC and Steam Generation 08-17

23 05 12 General Motor Requirements for HVAC 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 41 Selection Guide for Vibration Isolators

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 12-06M

23 08 00 Commissioning of HVAC Systems 11-16

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 00 Steam Humidifiers N/A

23 21 13 Hydronic Piping 08-17

23 21 23 Hydronic Pumps 08-17

23 22 13 Steam and Condensate Heating Piping 08-17

23 22 23 Steam Condensate Pumps 08-17

23 23 00 Refrigerant Piping 02-15

23 25 00 HVAC Water Treatment 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 40 00 HVAC Air Cleaning Devices 02-12

23 57 00 Heat Exchangers for HVAC N/A

23 64 00 Packaged Water Chillers 04-11

23 72 00 Air to Air Energy Recovery Equipment 05-11

23 73 00 Indoor Central-Station Air-Handling Units 04-11

23 81 00 Decentralized Unitary HVAC Equipment 02-11

23 82 16 Air Coils 04-11

09-10

TABLE OF CONTENTS 00 01 10-6

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 05-05M

26 05 21 Low-Voltage Electrical Power Conductors and Cables

(600 Volts and Below)

12-05M

26 05 26 Grounding and Bonding for Electrical Systems 10-06M

26 05 33 Raceway and Boxes for Electrical Systems 12-05M

26 05 41 Underground Electrical Construction 05-07M

26 08 00 Commissioning of Electrical Systems N/A

26 09 23 Lighting Control Devices N/A

26 22 00 Low-Voltage Transformers 06-05M

26 24 16 Panelboards 10-06M

26 27 26 Wiring Devices 03-03M

26 29 11 Motor Starters 07-04M

26 29 21 Disconnect Switches 12-05M

26 36 23 Automatic Transfer Switches

26 41 00 Facility Lightning Protection 03-03M

26 43 13 Transient - Voltage Surge Suppression N/A

26 51 00 Interior Lighting 03-03M

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 02-07M

27 05 33 Raceways and Boxes for Communications Systems 12-05M

27 10 00 Structured Cabling 12-05M

27 15 00 Communications Horizontal Cabling 10-06M

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 11 Requirements for Electrical Safety and Security

Installations

N/A

28 05 33 Raceways and Boxes for Electronic Safety and Security 12-05M

28 31 00 Fire Detection and Alarm 09-05M

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 23 19 Dewatering 12-05M

31 23 23.33 Flowable Fill 04-05M

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 31 53 Perimeter Security Fences and Gates N/A

32 90 00 Planting 09-08M

32 95 00 Vegetated Roof Assemblies N/A

DIVISION 33 – UTILITIES

33 46 13 Foundation Drainage 10-06M

07-01-15

00 01 15 - 1

VAMC (NAME) (SPEC No.)

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI 000 COVER SHEET

GI 001 PHASING PLAN

GI 002 GROUND FLOOR LIFE SAFETY PLAN

GI 003 BUILDING GROSS & PROGRAM AREA PLANS

CIVIL

CS4-000 SITE GRADING AND LANDSCAPE PLAN

STRUCTURAL

S1-100 MECHANICAL BASEMENT FOUNDATION PLAN

S1-101 GROUND FLOOR FOUNDATION PLAN

S1-102 ROOF FRAMING PLAN

S5-001 TYPICAL FOUNDATION DETAILS

S5-002 TYPICAL FOUNDATION DETAILS

S5-003 TYPICAL STEEL FRAMED DETAILS

S5-004 TYPICAL STEEL DECK DETAILS

S5-005 DETAILS AND SECTIONS

S8-000 GENERAL NOTES AND SCHEDULES

S8-001 COLUMN SCHEDULE

ARCHITECTURAL

AD200 AD 200 DEMOLITION FLOOR PLANS

AS 001 ABBREVIATIONS, SYMBOLS, NOTES AND MOUNTING

HEIGHTS

AS 10B PIPE BASEMENT AND MECHANICAL BASEMENT

AS 101 GROUND FLOOR PLAN

AS 102 ROOF PLAN

AS 103 PORCH PLAN AND DETAILS

AS 201 ENLARGED PLANS AND ELEVATIONS

AS 202 LAB PLANS AND ELEVATIONS

07-01-15

00 01 15 - 2

AS 203 LAB PLANS AND ELEVATIONS

AS 204LAB PLAN AND ELEVATIONS

AS 205 LAB PLAN AND ELEVATIONS

AS 301 BUILDING ELEVATIONS

AS 331 BUILDING SECTIONS

AS 401 WALL SECTIONS

AS 402 WALL SECTIONS AND DETAILS

AS 421 DETAILS

AS 501 STAIR PLANS, SECTIONS AND DETAILS

AS 701 REFLECTED CEILING PLAN

AS 801 INTERIOR DETAILS

AS 802 INTERIOR DETAILS

AS 911 CASEWORK DETAILS

AS 1001 PARTITION TYPES

AS 1005 DOOR AND WINDOW SCHEDULE AND DETAILS

AS 1006 EXTERIOR GLAZING PLAN AND ELEVATION

AS 1721 FINISH SCHEDULE AND DETAILS

QL 100 EQUIPMENT PLAN

QL 101 EQUIPMENT PLANS

MECHANICAL

MD1-101 HVAC Demolition Ground Floor Plan

MH1-001 HVAC Symbols, Abbreviations, and Notes

MH1-101 HVAC Ductwork Basement Plan

MH1-102 HVAC Ductwork Ground Floor Plan

MH1-103 HVAC Roof Plan

MH1-201 HVAC Piping Basement Plan

MH1-202 HVAC Piping Ground Floor Plan

MH5-101 HVAC Isometric Ductwork Plan

MH5-201 HVAC Isometric Piping Plan

MH6-101 HVAC Equipment Schedules

MH7-100 HVAC Riser Diagrams & Details

MH7-101 HVAC Details

MH7-102 HVAC Details

MH7-103 HVAC Details

MH7-104 HVAC Details

MH7-105 HVAC Sequence of Operations

07-01-15

00 01 15 - 3

PLUMBING

PD0-101 Plumbing Pipe Basement Demolition Plan

PD0-102 Plumbing Ground Floor Demolition Plan

PD0-103 Plumbing Roof Demolition Plan

PL1-001 Plumbing Legend and General Notes

PL1-101 Plumbing Pipe Basement Plan - Domestic Water

PL1-102 Plumbing Ground Floor Plan

PL2-100 Plumbing Underground Plan - Drainage and Vent

PL2-101 Plumbing Pipe Basement Plan - Drainage and Vent

PL2-102 Plumbing Ground Floor Plan - Drainage and Vent

PL2-103 Plumbing Roof Plan

PL5-101 Plumbing Riser Diagram

PL7-101 Plumbing Details

FIRE PROTECTION

FP1-001 Fire Protection Symbols and General Notes

FP1-101 Fire Protection Basement

FP1-102 Fire Protection Ground Floor

FP7-101 Fire Protection Details

FPD-102 Fire Protection Ground Floor Demolition Plan

ELECTRICAL AND TELECOM

E00-001 Electrical Symbols

ED1-102 Electrical Demolition Plan Ground Floor

EL1-101 Basement Floor Lighting Plan

EL1-102 Ground Floor Lighting Plan

EP1-101 Basement Floor Power Plan

EP1-102 Ground Floor Power Plan

EP1-103 Roof Power Plan

EP5-201 Electrical Riser Diagram

EP6-101 Electrical Schedules

EP6-102 Electrical Schedules

EP7-101 Electrical Details

ES0-101 Electrical Site Plan

ET1-101 Basement Systems Plan

ET1-102 Ground Floor Systems Plan

- - - E N D - - -

REPORT

Geotechnical Engineering Investigation

Veterans Administration Hospital

GAI No: F091285.00

August 30, 2011

Presented To: Astorino

227 Fort Pitt Boulevard

Pittsburgh, Pennsylvania 15222

Presented By: GAI Consultants, Inc

1055 Westlakes Drive, Suite 200

Berwyn, Pennsylvania 19312

August 30, 2011 F091285.00

Astorino 227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222

Attn: Mr. John Whitmire

Re: Veterans Administration Hospital Lebanon, Pennsylvania

Geotechnical Engineering Investigation

Dear Mr. Whitmire:

In accordance with your request, GAI Consultants, Inc. (GAI) performed a Geotechnical Engineering Investigation in conjunction with the proposed Laboratory Addition to Building 1 at the Lebanon VA Hospital. This investigation was performed in accordance with our Proposal of October 27, 2009, the supplemental proposal of February 3, 2011, the written acceptances and the subsequent discussions. As this investigation progressed, we coordinated with the VA facilities management and discussed the findings and preliminary evaluations with the project design team.

A preliminary report of this investigation was presented on June 3, 2011, and since then additional data pertinent to this project was obtained. The findings from this investigation and our conclusions and recommendations for the design and construction of the foundations and other geotechnical related elements of the proposed Laboratory Addition are summarized and presented in this report.

We appreciate the opportunity to perform this geotechnical investigation for the proposed Laboratory Addition to Building 1 at the Lebanon VA Hospital. If you have any questions or require additional information, please contact Richard Mabry, P.E. at 610.640.7456 ext.

2802 or r.mabry@gaiconsultants.com.

Sincerely, GAI Consultants, Inc.

Richard E. Mabry, P.E.

Geotechnical Engineering Manager

Attachments

REM/arm mailto:r.mabry@gaiconsultants.com�

Page - 1

Table of Contents

SECTION 1.0 INTRODUCTION

SECTION 2.0 PROJECT DESCRIPTION

SECTION 3.0 SITE AND SUBSURFACE CONDITIONS

SECTION 4.0 GEOTECHNICAL EVALUATIONS

SECTION 5.0 CONCLUSIONS AND RECOMMENDATIONS

SECTION 6.0 LIMITATIONS

Appendix A

Figure 1. Site Location Map Figure 2. Boring Location Plan Figure 3. Subsurface Profile A-A

Appendix B

Subsurface Exploration Key to Soil Symbols and Terms Test Boring Logs (4) Table B1. Summary of Index Testing on Soil

Page - 2

SECTION 1.0 INTRODUCTION

The Geotechnical Investigation reported herein was performed by GAI for the proposed Laboratory Addition to Building 1 at the Lebanon VA. This investigation was performed in accordance with our Proposal of October 27, 2009, the supplemental proposal of February 3, 2011, and the written acceptances and subsequent discussions. As this investigation progressed, site activities were coordinated with the VA facilities management and the findings and preliminary evaluations were discussed with the project design team.

The purpose of this investigation was to explore and evaluate the geotechnical conditions of the site and to formulate conclusions and recommendations pertaining to the design and construction of the foundations and other geotechnical related elements of the proposed Laboratory Addition. This investigation included planning and performing a program of additional test borings, laboratory testing of representative soil samples, engineering analy-sis of the data obtained, and the preparation of this report.

This report presents the pertinent data obtained in the course of this investigation, evaluations and discussion of the geotechnical conditions and their relationship to the proposed project, and conclusions and recommendations for the design and construction of the Addition. Pertinent plans and design parameters about the proposed Laboratory Addition were provided from Astorino, the Designer for this project. Figures showing the site location plan, the geotechnical exploration plan, and the subsurface conditions are presented in Appendix A. A description of the subsurface exploration and generalized logs of the test borings that were performed for this investigation are presented in Appendix B.

The results from the laboratory testing program are presented in Appendix C, together with a description of the testing program.

Page - 3

SECTION 2.0 PROJECT DESCRIPTION

Building 1, where the Laboratory Addition is located, is the original main building and is immediately visible as one enters the Lebanon VA Hospital campus from Lincoln Avenue, as shown on Figure 1. The Laboratory Addition will occupy the present court area on the south (project orientation) side of Building 1, and project slightly beyond the south line of the building, as shown on Figure 2.

A single story steel framed structure with a full basement is to be constructed for the proposed Laboratory Addition. This Addition will have overall footprint dimensions of about 70 by 120 feet and a finished floor at the same level as the ground floor of Building 1, Elevation 552.5 feet. The existing site topography and the finished adjacent grades are several feet above this finished floor level. Column loadings within the addition are reported to be in the range of about 50 to 190 kips.

There are two floor levels in the basement. A pipe basement and a mechanical basement are beneath the northern and southern portions, respectively, of the addition. The respective basement floor levels are seven and 14 feet below the ground floor level. An access stairway with a doorway into the mechanical basement will be constructed in the existing building immediately to the west of the addition.

Page - 4

SECTION 3.0 SITE AND SUBSURFACE CONDITIONS

The Laboratory Addition site located between the two wings of the former main entrance court to Building 1 is a nearly level lawn area with a few moderate to large size trees. Two drain inlets are near the ends of the wings, and it is expected that there are underground drainage pipes. There were no reports or indications of other underground utilities in the Addition area.

The existing ground surface elevation ranges from about 554 feet in the southern portion of the Addition to slightly higher than 555 feet near the former building entrance area.

As previously noted, the ground floor of Building 1 is at about elevation 552.5, which is to be the finished floor of the Addition. There is an existing pipe basement beneath much of the adjacent areas of the existing building. This pipe basement has an exposed soil subgrade and about six feet of vertical clearance to the underside of the ground floor structural slab. The tops of some of the existing column footings are visible in this pipe basement. A structural drawing of the existing building shows the column footings adjacent to the Addition location bearing on rock at elevations ranging from 536 to 542 feet. These bearing elevations are slightly below to several feet above the expected subgrade excavation for the Addition mechanical basement.

This drawing also indicates walls or grade beams between the footings.

Four borings were drilled for this investigation at the locations shown on Figure 2 in Appendix A. A description of the field exploration program and generalized logs of the borings is presented in Appendix B. The laboratory testing program description and the testing results are presented in Appendix C. Most of these borings encountered about two to six inches of topsoil that generally appeared as brown sandy clay with grass roots and other organic material. Beneath the topsoil, the borings encountered strata of clay and silt, weathered rock, and relatively intact rock. These strata are described below and are illustrated on Subsurface Profiles presented on Figure 3 in Appendix A.

3.1 Clay and Silt

All of the borings encountered layers of brown, and dark brown sandy clay, silty clay, and sandy silt, all with occasional pieces of limestone gravel. Overall, these materials were found by the borings extending to depths of 5.5 feet to 16.0 feet, which correspond to elevations of 539.0 to 548.6 feet and with an average elevation of about 546.3 feet. The Standard Penetration Test (SPT) N60-Values of the samples taken within these soils are in the overall range of 2 to 17 blows per foot (bpf) and average about 10 bpf. Consistent with the configuration of the existing building, it is believed that some these soils may be fill materials were placed in conjunction with the construction of Building 1. These materials at the greater depths appear to be natural soils.

In three of the borings, the clay and silt soils extend to depths of 5.5 to 7.2 feet, or to elevations of 547 to 549 feet, which are above the level of the proposed pile basement.

Based upon the SPT N-Values and visual observations of the samples, these soils are generally of a medium stiff to very stiff consistency. Below the pipe basement level, Boring

Page - 5

B-1 encountered a layer of sandy silt with SPT N-Values of about 3 bpf and a generally soft consistency.

Laboratory testing of selected representative samples shows the water content of these soils to range from 16.0 to 29.5 percent, and to average about 22 percent. The samples from above the pipe basement level were found to have water contents ranging from 16.0 to

21.2 percent and averaging about 18 percent. Determinations of the liquid and plastic limits of two of these samples indicate a classification of CL – low plastic clay. It is noted that the water contents of these soils are less than the plastic limit of about 22 percent. The tested samples from below the pipe basement level have water contents ranging from 25.2 to 29.5 percent.

3.2 Weathered Rock

Underlying the clay and silt soils, three of the borings encountered a maximum of four feet of brown and gray sand, gravel and clayey gravel. The gravel was observed to consist of limestone fragments. SPT N-Values in these soils range from 8 to greater than 50 bpf, and are generally greater than 50 bpf, indicating a generally very dense condition. Considering the overlying clay and silt soils and the underlying limestone rock, these soils appear to constitute a zone of weathered rock in a typical limestone weathering profile.

3.3 Relatively Intact Rock

At depths of 7.2 to 10.0 feet, three of the borings encountered gray limestone. These depths correspond to elevations of 545 to 547 feet. A possible pinnacled or highly irregular rock surface was encountered in one of these borings. Boring B-1 encountered the limestone at a depth of 16.5 feet, which corresponds to an elevation of 538.5. Coring of the rock was performed in all of the borings and the core recoveries range from 40 to 100 percent. Based upon the core, the rock is medium hard to hard and in a very broken to massive condition. RQD values, a modified core recovery based on naturally separated intact core pieces greater than four inches in length, range from 0 to 100 percent. These values indicate a variable rock mass condition ranging from very poor to excellent.

Published geologic mapping indicates the VA Hospital campus to be underlain by several rock formations, and some mapped formation contacts are indicated to be in the vicinity Building 1. These formations, the Richland, the Millbach and Schaefferstown, and the Snitz Creek, are typically comprised of limestone and dolomite, and are characterized as possibly containing solution openings and having a pinnacled interface with the overlying soil.

3.4 Groundwater Conditions

There was no evidence of groundwater encountered as the borings were drilled through the soil strata and drill water circulation was lost while coring the rock in several of the borings.

After the borings were completed, the drill holes were generally dry. Accordingly, it is

Page - 6 believed that the groundwater level is at an elevation below the bottoms of the borings, the deepest of which was at elevation 534 feet.

Page - 7

SECTION 4.0 GEOTECHNICAL EVALUATIONS

As shown on the Subsurface Profile, Figure 3, rock materials are expected to be encountered throughout most of the Addition area while excavating to the proposed basement levels. Boring B-1 encountered soft sandy silt extending down to about the level of the mechanical basement. Accordingly, the subsurface conditions of rock and possible soil materials become considerations in evaluating the site for appropriate foundations and other geotechnical related elements of the Addition, as discussed in the following sections.

4.1 Building Foundations

Based upon the test boring results and the reported column loadings, shallow foundations bearing on the rock materials appear to be appropriate for the laboratory Addition. It is noted that a similar foundation system is supporting the existing Building 1.

The foundation supporting capability of rock is more a function of the physical condition of the rock mass rather than the strength of the intact rock, and any expectations of foundation settlement. As noted, the rock cores show a broken to rock massive condition and very poor to excellent rock mass conditions. It is expected that excavating into the rock to the basement subgrades and for foundations will cause additional breakage. With these considerations, and consistent with the reported column loadings, a nominal design bearing pressure of 10,000 pounds is appropriate. Accordingly, footings in the range of about 3.0 to 4.5 feet square are anticipated.

Any settlement of these footings is expected to occur primarily as elastic compression of the rock mass and would occur almost concurrent with the loading application as the Addition is constructed. Even considering a reduction in the rock properties consistent with the variable rock condition as indicated by the cores, any such settlement is expected to be of a small magnitude, and only a portion of the total settlement is expected to occur after the architectural finishes are applied. Accordingly, footings bearing on the rock materials are considered to be appropriate for the Laboratory Addition.

As shown by Boring B-1 and the variable elevations of the existing Building 1 foundations, there is a possibility that limited zones of soil may be encountered in the course of excavating to a “usual” footing depth below the basement grades. If there are any such occurrences, it is believed that deepening the excavation to encounter the rock materials will appropriate.

However, an engineering evaluation would be appropriate confirm any additional excavation.

4.2 Existing Building

The foundations and other elements of the existing building are expected to require consideration in the design and in planning the construction of the Addition. These elements may include grade beams and/or walls between the existing building foundations, a soil supported ground floor slab on grade, and the existing foundations that are bearing at

Page - 8 elevations above the construction excavation grades for the Addition. Where these building elements are supported on soil, underpinning or other support means may be needed.

However, underpinning is not expected to be feasible where existing building elements are supported on rock and different techniques to maintain the support for the existing building may be needed. There may be additional considerations depending upon the geometric relationship between the Addition basement walls and the extents of the existing footings.

Constructing the new stairway within the existing building for access from the ground level to the mechanical basement may also present several conditions for the Addition design and/or construction. Temporary support of the stairway excavation may be needed to limit the disturbance to the existing building. Also, support provisions may be needed for the doorway opening from the stairwell into the mechanical basement.

Page - 9

SECTION 5.0 CONCLUSIONS AND RECOMMENDATIONS

It is concluded that a shallow foundation system is appropriate for supporting the proposed Laboratory Addition. Criteria for the design and construction of foundations, related building elements, and site facilities that would be affected by the site and geotechnical conditions are presented below.

5.1 Seismic Parameters

Depending upon the governing building code for this facility, seismic considerations may be included within the structural design. As discussed above, the foundations and some of the structural elements of the Addition will be based on or within rock. The intact rocks of the formations associated with this site are generally considered to be “hard” rock, but these formations are known to be characterized with bedding, joints, fractures and other structural features. Accordingly, and following the procedures and criteria of the International Building Code (IBC), a seismic site class of B is believed to be appropriate for the design of the Addition.

5.2 Shallow Foundations

Shallow based footings bearing on the rock are recommended for supporting the columns and walls of the Addition. Criteria for the design and construction of these foundations are presented below.

5.2.1 Bearing Value

The limestone rock, as disclosed by the borings, is expected to be encountered at the basement levels throughout most of the Addition area. Considering the potential for variations in the rock and possible disturbance during excavation, footings supported on this rock should be proportioned for a net bearing pressure of 10,000 pounds per square foot. In addition, column and wall footings should be constructed to minimum widths of 3.0 and 1.5 feet, respectively, regardless of the developed bearing pressure.

With the possibility of soil zones being within the rock, Geotechnical Engineering evaluations should be made of all footing excavations to assess the specific foundation supporting conditions that are encountered. If soil materials are encountered, modifications could be developed and implemented so that appropriate foundation support is obtained.

5.2.2 Footing Depth

With the expectation that the basement spaces will not be exposed to freezing conditions, the footing bearing levels should be at least 2.0 feet below the lowest adjacent floor or finished grades. Footings that are adjacent to grade separations, such as subfloor pits or the wall between the two basement levels, should be constructed to bear at elevations below a 1:1.5 (H to V) plane projected upward from the area of lower elevation.

balesius Highlight balesius Highlight balesius Highlight balesius Highlight balesius Highlight

Page - 10

5.2.3 Footing Construction

All footing excavations shall be inspected prior to the placement of reinforcing steel and concrete to verify the quality and condition of the bearing materials. Any localized zones of excessively disturbed bearing materials shall be removed and replaced with concrete.

Excavations shall be protected from freezing conditions and ponded water and shall be backfilled as soon as practical.

5.3 Basement and Retaining Walls

Parameters for the design of the basement and retaining walls include lateral earth pressure and lateral resistance. Also, the construction methods may also affect the design of these walls. Recommended design and construction parameters are presented below.

5.3.1 Earth Pressure

With the present building design, retaining walls are expected to be required at the stairway to the mechanical basement, around the basements and along the south side of the ground floor level. Retaining walls would also be at any subfloor sump, equipment, or elevator pits.

These walls are expected to function as structurally restrained retaining walls and should be designed for the at-rest lateral pressure condition. Accordingly, the design earth pressure from ”generic” soil backfill should be determined as the hydrostatic pressure from an equivalent fluid weight of 60 pounds per cubic foot In addition, the wall pressure loading should include a uniform surcharge pressure equal to one-half of the distributed live loading on the backfill surface. The design of these walls should also consider the construction sequence relationship between backfilling the walls and the placement of the restraining structural elements.

5.3.2 Lateral Resistance

Where restraint is not provided by slabs or other structural elements, lateral resistance shall be developed through passive earth pressure and friction. Passive pressure against vertical faces of a wall footing backfilled with structural fill may be computed from an equivalent fluid weight of 300 pounds per cubic foot. Considering the possibility for structural planes of weakness in the rock, this value should also be used for footings that are poured into rock or soil excavations. Coefficients of 1/3 and 1/2 are recommended for friction between a footing bottom and supporting soil or rock, respectively. Alternately, corrosion protected reinforcing bars could be drilled and grouted for their development lengths into the rock to provide lateral resistance.

5.3.3 Construction Parameters

Prior to backfilling retaining walls, any accumulated trash, sediment, or debris should be re-moved. In areas of limited access, predominantly granular, readily compactable soils are recommended for backfill. All backfill should be compacted in accordance with the recommendations for structural fill.

balesius Highlight balesius Highlight balesius Highlight

Page - 11

There may be other considerations for the basement walls that relate to the rock excavation for the mechanical basement and the adjacent existing building foundations. Depending upon the excavation techniques used, some alternate designs for the basement wall support could be considered. Underpinning of adjacent footings with bearing levels on rock above the mechanical basement may not be easily accomplished, but alternate means for supporting these footings may be utilized. Otherwise, there may be additional lateral loadings onto the basement walls from these existing footings.

5.4 Floor Slabs on Grade

To preclude dampness, a gravel base course and vapor barrier shall be placed beneath the floor slabs on grade. The base course, serving as a capillary break, shall consist of at least four inches of PA DOT No. 57 or 67 coarse aggregate. The vapor barrier placed on top of the compacted base course shall be of 10 mil, minimum, polyethylene or equivalent material. Prior to placing the base course materials, the exposed subgrade shall be carefully examined for any areas that may have been disturbed by the previous construc-tion. Any excessively loose or soft areas shall be undercut to firm materials and replaced with structural fill.

5.5 Existing Building

As described previously, the column footings of the existing building have bearing elevations ranging from 536 to 542 feet adjacent to the Addition and the stairway location. These bearing elevations are slightly below to several feet above the expected subgrade excavation for the mechanical basement. This drawing also shows walls or grade beams between the footings.

With these conditions, temporary and/or permanent stabilizing support for these footings and walls/beams may be required and should be a design consideration. However, conventional underpinning is not expected to be practical considering the rock that would be encountered.

One possible alternate may be to drill and grout in reinforcing bars to stabilize the rock support for the existing building foundation elements.

Temporary excavation shoring and foundation support is usually performed by the contractors as their construction means and methods. However, some of these systems may also remain as the permanent support for the existing building. In such a case, all shoring design should be designed, reviewed, and constructed consistent with criteria for permanent building foundation and support elements. All cases such applications or systems should be designed by a Professional Engineer who is registered in Pennsylvania and is experienced with such systems.

5.6 Structural Fill and Backfill

All structural fill and backfill for the support of floor slabs on grade and pavements shall be compacted to at least 95 percent of the maximum dry density as determined in the laboratory by the modified compaction test (ASTM D 1557). Fill and backfill that is placed

Page - 12 for site grading in non-structural landscape areas may be compacted to at least 90 percent of the D 1557 maximum dry density. These criteria should be incorporated, as appropriate, into the project drawings and specifications for utility installation and trench backfill.

It is expected that suitable on-site materials that will be excavated could be utilized in the fill construction. Materials that are used for the fill construction should be mineral soils that are free of organic, trash, or other deleterious inclusions. On-site and imported soils should have a maximum particle size of four inches, preferably a maximum plasticity index of six percent, and shall be at moisture contents that are consistent with the optimum(s) for compaction. Otherwise, wetting or drying should be performed as needed.

All structural fill and backfill placement and compaction shall be performed under the observation and technical supervision of a qualified Geotechnical Engineer or soil technician. Field and laboratory tests shall be performed as appropriate to document the quality of the fill materials and compaction, and to determine if the specified degree of compaction is being obtained. Experience has shown that the full time presence of a knowledgeable engineer or technician is the most effective means to assure the quality of fill construction.

Page - 13

SECTION 6.0 LIMITATIONS

The services described in this report were provided in accordance with reasonable and ac-cepted engineering practice. No warranty or guarantee, expressed or implied, is intended.

The conclusions and recommendations are based on the assumptions that the subsurface conditions do not deviate appreciably from those encountered in the test borings and that the loads and related project parameters are similar to these given in the project description.

If the structure is moved or the loads have changed, GAI should be given the opportunity to modify the recommendations accordingly. The conclusions and recommendations are also based on competent field engineering, monitoring, and testing during construction. These conclusions and recommendations are subject to revision should the plans and specifications for this project be submitted to GAI for review before construction.

The recommendations presented in this report are solely for the use of our client for the design and construction of this particular project. Any re-use of this document by others, particularly by third parties, without the express written permission of GAI is solely at their own risk.

VA Hospital Laboratory Addition

APPENDIX A

Figure 1. Site Location Map Figure 2. Boring Location Plan

Figure 3. Subsurface Profile A-A

SITE

South Lebanon Twp., Pennsylvania

Lebanon VA Hospital - Laboratory

SCALE: 1"= 2,000’

FIGURE

1 0

1 .5 0

1/2

1000 1000 2000 3000 4000 5000 6000

1 MILE

1 KILOMETER

7000 FEET

Site Location Map

T 610.640.7456 F 610.640.7459

1055 Westlakes Drive, Suite 200 Berwyn, PA 19312 www.gaiconsultants.com

0’

Legend

B-1 and Designation

- Test Boring Location

B -3

B -2

30’ 60’

B -4

B -1

SCALE:

DWN. CHKD. APPD. DATE

PROJECT NO.

JWJ JWR REM

As ShownF091285.00

8/29/11

Lebanon, PA

Veterans Administration Hospital

Laboratory Addition

A A

MECHANICAL BASEMENT

PIPE BASEMENT

TEST BORING LOCATION PLAN

FIGURE 2

SCALE:

DWN. CHKD. APPD. DATE

PROJECT NO.

JWJ JWR REM

As Shown

FIGURE 3SUBSURFACE PROFILE A-A

F091285.00

8/29/11

Lebanon, PA

Veterans Administration Hospital

Laboratory Addition

SUBSURFACE PROFILE A-A

20.0’ [100,28]

[82,0]

16.6’ 50/0.1 16.0’

3 15.0’ 15.0’

[100,94] [50,33]

4[87,0]

[83,27]

[100,54]

50/0.010.0’ 10.0’[100,67]

50/0.5[90,61] 8.0’

17 87.0’ 50/0.2

6.0’

10 10

4.0’ 4.0’

14 15

7 4

0.5’ 0.5’

0.2’

E L E

V A

T

IO

N

F

E E

T

FFE= 552.49

Ground Floor

FFE= 545.49

Pipe Basement

FFE= 538.49

Mechanical Basement

Building

Existing

Vary 542.0 - 536.0

Bearing Elevations

Existing Foundation

Clay and Silt

Weathered Rock

Rock

[Rec, RQD] [Rec, RQD] [Rec, RQD]

N-Value N-Value N-Value

ELEV. 555.0’ ELEV. 555.0’

ELEV. 554.2’

B-1 B-2B-3

APPENDIX B

Subsurface Exploration Key to Soil Symbols and Terms

Test Boring Logs (4) Table B1. Results of Index Testing on Soil

APPENDIX B

Subsurface Exploration and Laboratory Testing

The subsurface conditions at the site for the proposed Laboratory Addition at Building 1 of the VA Hospital in Lebanon, PA were explored for this investigation through four test borings at the locations shown on Figure 2 in Appendix A. GAI personnel located the test borings on the site and provided full-time technical supervision during the field exploration. The as-drilled boring and elevations were determined by GAI with respect to reference points that are shown on the plans. Generalized logs of the test borings as well as a "Key to Soil Symbols and Terms" are presented in Appendix B.

The borings were performed by Connelly Drilling, Co. of West Chester, PA using a small track-mounted drilling rig with hollow-stem augers. Samples of the subsurface materials were taken from the test borings by means of a 2-inch O.D. split-barrel sampler driven by blows from a 140-pound hammer freely falling 30 inches (the Standard Penetration Test, ASTM D 1586). This sampling was performed using a safety hammer that was actuated by a rope being pulled over a cathead winch. The number of hammer blows required for the sampler penetration increment from 6 to 18 inches, or fraction thereof, is reported on the test boring logs for each of the sam-ples that were taken.

Rock coring was also performed in all of the borings (B-12) using a NQ series coring barrel equipped with a diamond bit, according to ASTM D 2113. For the core runs, the percent recovery and Rock Quality Designation (RQD) were recorded and are presented on the boring logs. RQD is a modified core recovery and is defined as the percentage of the summed length of naturally separated core pieces longer than four inches divided by the length of the core run.

Laboratory tests were performed on selected samples to characterize the index and classifica-tion properties of the subsurface soils. The tests performed included determinations of the water content (ASTM D 2216) and Atterberg limits (ASTM D 4318) of selected samples. The numerical results from the index tests are summarized on Table B1 and are presented on the boring logs adjacent to the samples tested.

Key to Soil Symbols and Terms

C O

A R

S E

-G R

A

IN

E D

S O

IL

S

M o r e t h a n h a lf o f m a te r ia l is l a r g e r t h a n

N o s ie v e s iz e

F

IN

E -G

R A

IN

E

D S

O

IL

S

M o r e t h a n h a lf o f m a te r ia l is s m a ll e r t h a n

N o s ie v e s iz e

Well-graded gravels, gravel-sand mixtures, little or no fines

Poorly graded gravels, gravel-sand mixtures, little or no fines

Silty gravels, gravel-sand-silt

Clayey gravels, gravel-sand-clay mixtures

Well-graded sands, gravelly sands, little or no fines

Poorly graded sands, gravelly sands, little or no fines

Silty sands, sand-silt mixtures

Clayey sands, sand-clay mixtures

Inorganic silts and very fine sands, rock flour, silty or clayey fine sands or clayey silts with slight plasticity

Inorganic clay of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays

Organic silty, and organic silty clays of low plasticity

Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts

GRAVELS

(More than half of coarse fraction is larger than No. 4 sieve size)

SANDS

larger than No. 4 coarse fraction is

(More than half of sieve size)

CLEAN GRAVELS

(Little or no fines)

GRAVELS WITH FINES

(Appreciable amount of fines)

CLEAN SANDS

(little or no fines)

SANDS WITH FINES

(Appreciable amount of fines)

SILTS AND CLAYS

(Liquid limit less than 50)

(Liquid limit greater than 50)

SILTS AND CLAYS

HIGHLY ORGANIC SOILS

Inorganic clays of high plasticity, fat clays

Organic clays of medium to high plasticity, organic silts

Peat and other highly organic soils

MAJOR DIVISIONS SYMBOL TYPICAL NAMES

GW

GP

GM

GC

SW

SP

SM

SC

ML

CL

OL

MH

CH

OH

PT

Very Soft

Soft

Stiff

Very Stiff

Hard

N - The Standard Penetration Test value of the soil, determined in accordance with the methods of ASTM D1586.

Reported in blows per ft and normalized to standard drilling equipment and an effective overburden pressure of 2 ksf., the n’ value equals the number of hammer blows received by the sampler in advancing over the interval from 6 to 18

in. within a given sampling run.

Below 500

500-1000

1000-2000

2000-4000

4000-8000

8000-16000

0-2

2-4

4-8

8-15

15-30

Very loose

Loose

Dense

Very Dense

0-15

16-35

36-65

66-85

86-100

0-4

5-10

11-30

31-50

Over 50

Boulders

Cobbles

Gravel- Coarse

Fine

Sand - Coarse

Medium

Fine

Silt

Clay

->305mm

-76.2mm to 305mm

-19.05mm to 76.2mm

-4.75mm to 19.05mm

-2.00mm to 4.75mm

-0.425mm to 2.00mm

-0.074mm to 0.425mm

-0.005mm to 0.074mm

-<0.005mm

PARTICLE SIZES

COHESIVE SOILS COHESIONLESS SOILS

Consistency Unconfined Compressive

Strength (psf)

Approximate

Range of N Density

Classification

Relative

Density % Range of N

Approximate

UNIFIED SOIL CLASSIFICATION SYSTEM

Medium Stiff Medium Dense

Over 30

1. 1.

Reference: Soil Mechanics, NA VFAC DM-7.11.

21.2

18.5

25.2

25.4

29.4

29.5

Topsoil Sandy Clay (cl), Brn., Moist, Med. Stiff to Stiff

Clay (cl), Brn., Moist, Med. Stiff to V. Stiff

Sandy Silt (ml), Brn., Moist, Soft [Tr. Gvl @ 12-14'] [Tr. Mica @ 14-16']

Micaceous Fine to Medium Sand (sm), Brn. & Gy., Moist, V. Dns [Limestone Frag. in spoon tip] Limestone, Gy & Dk. Gy., Med. Hd. to Hd., WM to WS, Ex. Cl. to Cl. Frac. V. Brok. to Sl. Brok., V. Poor to Poor [No Water Return] [Possibly broke casing @ 20.0 feet during coring]

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

S-9

R-1

R-2

2-3-4-4

4-6-8-10

2-5-5-9

5-8-9-10

2-2-2-2

1-1-1-1

1-2-2-2

2-1-2-1

5-50/0.1

34/23

DRILLING METHOD:

South Lebanon Township

GROUND ELEVATION:

R. Nagle / Connelly DrillingDRILLER/COMPANY:

TIME:FT.

Pennsylvania

5/24/11-5/24/11

Dry 0

TOWNSHIP:

HSA

STATE:COUNTY:

DRILL RIG TYPE:

555.0'

FIELD ENGINEER: CHECKED BY:J. Brink

HR.

Track

D. Mabry

DATE(S) DRILLED:

GROUNDWATER DEPTH:

Lebanon

S A

M P

LE

T

Y P

E

P E

R

I N

R E

C

R Q

D

S A

M P

LE

N

O

C O

R E

R U

N N

O

B

LO

W C

O U

N T

S qu /P en e

(T S

F

LL

/P

L

U S

C S

S T

R A

T A

S

Y M

B O

L

MATERIAL DESCRIPTION

E

LE

V A

T

IO

N

F T

W C

D E

P T

H

F T

BORING NO.: B-1

G A

I S E

LP

B O

R

IN

G L

O G

S .G

P J

/2

9/

1055 Westlakes Drive, Suite 200, Berwyn, PA 19312(610) 640-7456

F091285.00

ROCK CORE

PROJECT NO.:

Lebanon VA Hospital Laboratory Addition

SHELBY TUBE

SPT SAMPLE

SHEET 1 OF 1

GENERAL NOTES

PROJECT NAME:

SAMPLE LEGEND

FAX (610) 640-7459

TEST BORING LOG

19.8

16.4

15.5

Topsoil Sandy Clay (cl), Dk. Brn., Moist, Med. Stiff to Stiff

Clay (cl), Brn., Moist, Stiff [Clay w/ Gvl. @ 5.2-6.0] [Limestone Frags.]

Poorly Graded Gravel with Clay (gp), Dk. Gy. & Brn., Dry, Loose

Well Graded Gravel (gw), Dk. Gy., Dry, V. Dns

Limestone, Gy., Hd., WS, V. Cl. to Cl. Frac. V.

Brok. to Sl. Brok., V. Poor to Poor

S-1

S-2

S-3

S-4

S-5

S-6

R-1

R-2

2-2-2-6

4-7-8-13

4-4-6-6

4-4-4-8

50/0.5

50/0.0

34/22

DRILLING METHOD:

South Lebanon Township

GROUND ELEVATION:

R. Nagle / Connelly DrillingDRILLER/COMPANY:

TIME:FT.

Pennsylvania

5/23/11-5/23/11

Dry 0

TOWNSHIP:

HSA

STATE:COUNTY:

DRILL RIG TYPE:

555.0'

FIELD ENGINEER: CHECKED BY:J. Brink

HR.

Track

D. Mabry

DATE(S) DRILLED:

GROUNDWATER DEPTH:

Lebanon

S A

M P

LE

T

Y P

E

P E

R

I N

R E

C

R Q

D

S A

M P

LE

N

O

C O

R E

R U

N N

O

B

LO

W C

O U

N T

S qu /P en e

(T S

F

LL

/P

L

U S

C S

S T

R A

M

B O

L

MATERIAL DESCRIPTION

E

LE

V A

T

IO

N

F T

W C

D E

P T

H

F T

BORING NO.: B-2

G A

I S E

LP

B O

R

IN

G L

O G

S .G

P J

/2

9/

1055 Westlakes Drive, Suite 200, Berwyn, PA 19312(610) 640-7456

F091285.00

ROCK CORE

PROJECT NO.:

Lebanon VA Hospital Laboratory Addition

SHELBY TUBE

SPT SAMPLE

SHEET 1 OF 1

GENERAL NOTES

PROJECT NAME:

SAMPLE LEGEND

20.7

16.0

Topsoil Sandy Clay (cl), Brn., Dry to Moist, Stiff [Tr. Gvl. @ 4-6 feet] [Auger Refusal @ 7.0']

Limestone, Gy. & Dk. Gy., Hd. WS, V. Close to Med. Frac., V. Brok. to Massive, V. Poor to Excellent [Dual Sample from 7-7.7']

S-1

S-2

S-3

S-4

R-1

R-2

R-3

R-4

R-5

1-4-10-9

7-7-8-8

2-4-7-8

6-7-8-50/0.2

DRILLING METHOD:

South Lebanon Township

GROUND ELEVATION:

R. Nagle / Connelly DrillingDRILLER/COMPANY:

TIME:FT.

Pennsylvania

5/24/11-5/24/11

Dry 0

TOWNSHIP:

HSA

STATE:COUNTY:

DRILL RIG TYPE:

554.2'

FIELD ENGINEER: CHECKED BY:J. Brink

HR.

Track

D. Mabry

DATE(S) DRILLED:

GROUNDWATER DEPTH:

Lebanon

S A

M P

LE

T

Y P

E

P E

R

I N

R E

C

R Q

D

S A

M P

LE

N

O

C O

R E

R U

N N

O

B

LO

W C

O U

N T

S qu /P en e

(T S

F

LL

/P

L

U S

C S

S T

R A

M

B O

L

MATERIAL DESCRIPTION

E

LE

V A

T

IO

N

F T

W C

D E

P T

H

F T

BORING NO.: B-3

G A

I S E

LP

B O

R

IN

G L

O G

S .G

P J

/2

9/

1055 Westlakes Drive, Suite 200, Berwyn, PA 19312(610) 640-7456

F091285.00

ROCK CORE

PROJECT NO.:

Lebanon VA Hospital Laboratory Addition

SHELBY TUBE

SPT SAMPLE

SHEET 1 OF 1

GENERAL NOTES

PROJECT NAME:

SAMPLE LEGEND

Topsoil Well Graded Gravel (gw), Dk. Gy., Moist, Med.

Dns.

Sandy Clay (cl), Brn., Dry, Stiff [Tr. Gvl. @ 2-5.5 feet] [Limestone Frags.] [Grinding @ 4.3' , Spoon Deflected and Bent @ 5.5'] [Auger Refusal @ 6.0']

Well Graded Gravel (gw), Gy., Dry, Med. Dns.

[Spoon deflection @ 5.5' & Auger Refusal @ 6.0'] [Possible Pinnacle @ 5.5-7.5'] [Tried to wash out by coring, but core barrel kicked off and started rubbing HSA] [Offset 1.0' NE, Towards building balcony]

S-1

S-2

S-3

S-4

3-3-6-8

6-6-9-10

25/Deflection

13-13-12-9

DRILLING METHOD:

South Lebanon Township

GROUND ELEVATION:

R. Nagle / Connelly DrillingDRILLER/COMPANY:

TIME:FT.

Pennsylvania

5/23/11-5/23/11

Dry 0

TOWNSHIP:

HSA

STATE:COUNTY:

DRILL RIG TYPE:

554.1'

FIELD ENGINEER: CHECKED BY:J. Brink

HR.

Track

D. Mabry

DATE(S) DRILLED:

GROUNDWATER DEPTH:

Lebanon

S A

M P

LE

T

Y P

E

P E

R

I N

R E

C

R Q

D

S A

M P

LE

N

O

C O

R E

R U

N N

O

B

LO

W C

O U

N T

S qu /P en e

(T S

F

LL

/P

L

U S

C S

S T

R A

M

B O

L

MATERIAL DESCRIPTION

E

LE

V A

T

IO

N

F T

W C

D E

P T

H

F T

BORING NO.: B-4

G A

I S E

LP

B O

R

IN

G L

O G

S .G

P J

/2

9/

1055 Westlakes Drive, Suite 200, Berwyn, PA 19312(610) 640-7456

F091285.00

ROCK CORE

PROJECT NO.:

Lebanon VA Hospital Laboratory Addition

SHELBY TUBE

SPT SAMPLE

SHEET 1 OF 1

GENERAL NOTES

PROJECT NAME:

SAMPLE LEGEND

Augered down to 4.0'. See boring log B-4 for soil description

Sandy Clay (cl), Dk. Brn., Moist to Dry, V. Stiff [Limestone Frag. in Spoon Tip]

Poorly Graded Gravel with Clay (gp), Brn. & Dk.

Gy., Moist to Dry, Loose [Limestone Frags.] [Hard Auger past 6.0'] [Spoon Bounced @ 8.0'] Limestone, Gy., Hd., WS, V. Cl. to Cl. Frac., Brok. to Massive, Poor to Good.

S-1

S-2

S-3

R-1

R-2

R-3

R-4

R-5

R-6

4-7-10-13

6-4-4-3

50/0

DRILLING METHOD:

South Lebanon Township

GROUND ELEVATION:

R. Nagle / Connelly DrillingDRILLER/COMPANY:

TIME:FT.

Pennsylvania

5/23/11-5/24/11

Dry 0

TOWNSHIP:

HSA

STATE:COUNTY:

DRILL RIG TYPE:

554.1'

FIELD ENGINEER: CHECKED BY:J. Brink

HR.

Track

D. Mabry

DATE(S) DRILLED:

GROUNDWATER DEPTH:

Lebanon

S A

M P

LE

T

Y P

E

P E

R

I N

R E

C

R Q

D

S A

M P

LE

N

O

C O

R E

R U

N N

O

B

LO

W C

O U

N T

S qu /P en e

(T S

F

LL

/P

L

U S

C S

S T

R A

M

B O

L

MATERIAL DESCRIPTION

E

LE

V A

T

IO

N

F T

W C

D E

P T

H

F T

BORING NO.: B-4A

G A

I S E

LP

B O

R

IN

G L

O G

S .G

P J

/2

9/

1055 Westlakes Drive, Suite 200, Berwyn, PA 19312(610) 640-7456

F091285.00

ROCK CORE

PROJECT NO.:

Lebanon VA Hospital Laboratory Addition

SHELBY TUBE

SPT SAMPLE

SHEET 1 OF 1

GENERAL NOTES

PROJECT NAME:

SAMPLE LEGEND

Table B1. Summary of Index Testing on Soil

Sample ID Depth (ft) Water

Content

Liquid Limit

Plastic Limit

Plasticity Index

USCS

B-1 / S-2 2.0–4.0 21.2 - - -

B-1 / S-4 6.0-8.0 18.5 34 23 11 CL

B-1 / S-5 8.0–10.0 25.2 - - -

B-1 / S-6 10.0–12.0 25.4 - - -

B-1 / S-7 12.0-14.0 29.4 - - -

B-1 / S-8 14.0-16.0 29.5 - - -

B-2/ S-2 2.0–4.0 19.8 34 22 12 CL

B-2/ S-3 4.0-6.0 16.4 - - -

B-2/ S-4 6.0-8.0 15.5 - - -

B-3 / S-2 2.0–4.0 20.7 - - -

B-3 / S-3 4.0-6.0 16.0 - - -

VA PROJECT NO. #595-667 VACO - LEBANON VA MEDICAL CENTER

12-01-18 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10…