Solicitation Attachment EXHIBIT C - Calculation of Self-Performed Expand Lab.pdf
PDF 146 KB Posted
- Solicitation number
- 36C24421R0018
About this file
This solicitation seeks proposals for a minor construction project to renovate and expand an existing laboratory facility for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4. The scope of work includes renovating 4,750 square feet of an existing main laboratory in Building 1 and constructing a new 6,900 square foot addition on the south side of the building. Exterior work will construct a single-story addition, while interior work consists of construction of floors, walls, ceilings, lighting, alarm systems, fire suppression, plumbing, cameras, IT cabling, electrical systems, HVAC, medical gases, and associated components as defined in the drawings and specifications. The project requires providing all labor, materials, tools, equipment, permits, testing and reports to complete the renovations and addition in phases according to specifications.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal:
36C24420R0084 Expand Laboratory Construction, Project 595-667
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self-performed) $ __________________________
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)
B.4 Remainder is “Total amount of work to be performed under the Contract”
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %
File details come from the government source that posted it. Updated .