This solicitation seeks proposals for a minor construction project to renovate and expand an existing laboratory facility. The project includes renovating 4,750 square feet of an existing main laboratory and constructing a new 6,900 square foot addition. Exterior work will construct a single-story addition while interior work focuses on construction of floors, walls, ceilings, lighting, alarm systems, fire suppression, plumbing, security cameras and IT cabling, electrical work, HVAC installation, medical gases, and associated elements as defined in the drawings and specifications. All work will be completed in phases according to the specifications and drawings. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
Architects / Engineers
CANNONDESIGN
606 Liberty Avenue, Suite 500A Pittsburgh, PA 15222 (412)765-1700
VAMC Lebanon -
Renovation of Laboratory
B1
04/13/2020
GI 000
595-667
BYAB
COVER SHEET
VAMC Lebanon Renovation of Laboratory B1
1700 South Lincoln Avenue Lebanon PA 17042
VA Project Number 595-667
Lebanon, PA
Vicinity Map
Asbestos Consultant Sci-Tek Consultants, Inc.
220 W. High Street Bellefonte PA 16823 (814)335-5612
Owner / Developer Nicholas K. Bierman, Project Manager 1700 South Lincoln Avenue Lebanon, PA 17042
(717) 272-6621 x3935
Location Map
Civil Engineer Langan 200 Ansys Drive, Suite 403 CAnonsburg, PA 15317 (724)514-5100
General Drawing List
GI 000 COVER SHEET
GI 001 PHASING PLAN
GI 002 GROUND FLOOR LIFE SAFETY PLAN
GI 003 BULDING GROSS & PROGRAM AREA PLANS
Civil / Landscape Drawing List
CS4-000 Site Grading and Landscape Plan
Mechanical Drawing List
MD1-101 HVAC Demolition Ground Floor Plan
MH1-001 HVAC Symbols, Abbreviations, and Notes
MH1-101 HVAC Ductwork Basement Plan
MH1-102 HVAC Ductwork Ground Floor Plan
MH1-103 HVAC Roof Plan
MH1-201 HVAC Piping Basement Plan
MH1-202 HVAC Piping Ground Floor Plan
MH5-101 HVAC Isometric Ductwork Plan
MH5-201 HVAC Isometric Piping Plan
MH6-101 HVAC Equipment Schedules
MH7-100 HVAC Riser Diagrams & Details
MH7-101 HVAC Details
MH7-102 HVAC Details
MH7-103 HVAC Details
MH7-104 HVAC Details
MH7-105 HVAC Sequence of Operations
Plumbing Drawing List
PD0-101 Plumbing Pipe Basement Demolition Plan
PD0-102 Plumbing Ground Floor Demolition Plan
PD0-103 Plumbing Roof Demolition Plan
PL1-001 Plumbing Legend and General Notes
PL1-101 Plumbing Pipe Basement Plan - Domestic Water
PL1-102 Plumbing Ground Floor Plan - Domestic Water
PL2-100 Plumbing Underground Plan - Drainage and Vent
PL2-101 Plumbing Pipe Basement Plan - Drainage and Vent
PL2-102 Plumbing Ground Floor Plan - Drainage and Vent
PL2-103 Plumbing Roof Plan
PL5-101 Plumbing Riser Diagram
PL7-101 Plumbing Details
Fire Protection Drawing List
FP1-001 Fire Protection Symbols and General Notes
FP1-101 Fire Protection Basement
FP1-102 Fire Protection Ground Floor
FP7-101 Fire Protection Details
FPD-102 Fire Protection Ground Floor Demolition Plan
Electrical Drawing List
E00-001 Electrical Symbols
ED1-102 Electrical Demolition Plan Ground Floor
EL1-101 Basement Floor Lighting Plan
EL1-102 Ground Floor Lighting Plan
EP1-101 Basement Floor Power Plan
EP1-102 Ground Floor Power Plan
EP1-103 Roof Power Plan
EP5-201 Electrical Riser Diagram
EP6-101 Electrical Schedules
EP6-102 Electrical Schedules
EP7-101 Electrical Details
ES0-101 Electrical Site Plan
ET1-101 Basement Systems Plan
ET1-102 Ground Floor Systems Plan
Structural Drawing List
S1-100 MECHANICAL BASEMENT FOUNDATION PLAN
S1-101 GROUND FLOOR FOUNDATION PLAN
S1-102 ROOF FRAMING PLAN
S5-001 TYPICAL FOUNDATION DETAILS
S5-002 TYPICAL FOUNDATION DETAILS
S5-003 TYPICAL STEEL FRAMED DETAILS
S5-004 TYPICAL STEEL DECK DETAILS
S5-005 DETAILS AND SECTIONS
S8-000 GENERAL NOTES AND SCHEDULES
S8-001 COLUMN SCHEDULE
Architectural Drawing List
AD200 DEMOLITION FLOOR PLANS
AS 001 ABBREVIATIONS, SYMBOLS, NOTES AND MOUNTING
HEIGHTS
AS 10B PIPE BASEMENT AND MECHANICAL BASEMENT
AS 101 GROUND FLOOR PLAN
AS 102 ROOF PLAN
AS 103 PORCH PLAN AND DETAILS
AS 201 ENLARGED PLANS AND ELEVATIONS
AS 202 LAB PLANS AND ELEVATIONS
AS 203 LAB PLANS AND ELEVATIONS
AS 204 LAB PLAN AND ELEVATIONS
AS 205 LAB PLAN AND ELEVATIONS
AS 301 BUILDING ELEVATIONS
AS 331 BUILDING SECTIONS
AS 401 WALL SECTIONS AND DETAILS
AS 402 WALL SECTIONS AND DETAILS
AS 421 DETAILS
AS 501 STAIR PLANS, SECTIONS AND DETAILS
AS 701 REFLECTED CEILING PLAN
AS 801 INTERIOR DETAILS
AS 802 INTERIOR DETAILS
AS 911 CASEWORK DETAILS
AS 1001 PARTITION TYPES
AS 1005 DOOR AND WINDOW SCHEDULE AND DETAILS
AS 1006 EXTERIOR GLAZING PLAN AND ELEVATION
AS 1201 FINISH PLAN
AS 1721 FINISH SCHEDULE AND DETAILS
QL 100 EQUIPMENT PLAN
QL 101 EQUIPMENT PLANS
Revision Schedule
Number Description Date
Phasing Plan Notes
-East Side Renovations
Notes:
-Exit from Lab Addition will be created.
-Conduits are being provided from the Addition side for installing power on east side so temporary service may be needed.
-Tie-ins to Phase 2 work needs to be ongoing.
-Coordination of Corridor Project construction with this project needs to be ongoing.
Phase 2
-New Mechanical Basement - including areaway.
-New Lab Addition
Notes:
-Contractor to design, provide, and maintain temporary exit from south curtain wall;
Contractor to design exit, VA to approve.
-All work to be done from outside of the hospital; Coordinate with COTR -Microbiology and Molecular Lab to be used for temporary Break Room/ Locker Room.
-Coordination of Corridor Project construction with this project needs to be ongoing.
-There is some engineering work that ties into the Radiology Project.
-Opening of exterior wall into new Lab Addition could happen at end of Addition construction.
Phase 1
-West Side Renovations
Note:
-Coordination of Corridor Project construction with this project needs to be ongoing.
Phase 3
A B C D
Phase 1 Phase 2Phase 3
E
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC Lebanon -
Renovation of Laboratory
B1
04/13/2020
GI 001
595-667
BYAB
PHASING PLAN
3/16" = 1'-0"1
GROUND FLOOR PLAN
BENCH
SLOPE
FECFEC
FEC
FEC
FEC
12" OVER 68'-0"
1.47%
TREATMENT 4
EX-157
TREATMENT 3
EX-156
SOILED
UTILITY
EX-155
TREATMENT 5
EX-158
TREATMENT 6
EX-159
FAST TRACK
TREATMENT 7
EX-160
TOILET
EX-162
FAST TRACK
TREATMENT 8
EX-161
DECON.
CHANGING
EX-163
DECON.
SHOWER
EX-163A
DECON.
EX-163B
EMERG. RESP.
CLOSET
EX-164A
VESTIBULE
EX-164
GURNEY
STORAGE
EX-165
STAFF
TOILET
EX-154
TREATMENT 2
EX-153
DATA/
PHONE
EX-141
OBSERV.
EX-144CORRIDOR
EX-100C10
NURSE
STATION
EX-145
CORRIDOR
EX-100C11
SINK
ALCOVE
EX-152
TREATMENT 1
EX-151
H.A.C.
EX-143
TRIAGE
EX-166
RECEPTION
EX-167
POLICE
CHANGING
EX-142A
CORRIDOR
EX-100C8
CONF./
LUNCH
EX-142
LINEN
AREA
EX-145A
CLEAN
STORAGE
EX-145B
CHIEF
E.R.
EX-150
CORRIDOR
EX-100C6
WAITING
EX-140
CORRIDOR
EX-100C5
GURNEY
ALCOVE
EX-126
CORRIDOR
EX-100C4
RESP.
THERAPY
EX-139
NURSE
MANAGER
EX-138
ROLL-IN
SHOWER
EX-130
EQUIPMENT
STORAGE
EX-131A
TELE. ROOM
EX-131B
ELEC.
EX-136
NOURISHMENT
EX-135
SOILED
UTILITY
EX-134
CORRIDOR
EX-100C3
TOILET
EX-105
STAFF
TOILET
EX-106
LINEN
EX-107
PATIENT
ROOM
EX-125
PATIENT
ROOM
EX-124
PATIENT
ROOM
EX-123
PATIENT
ROOM
EX-122
H.A.C.
EX-121
NURSE
STATION
EX-131
CLEAN
SUPPLY
EX-132
PATIENT
ROOM
EX-120
ISOL.
ANTI-ROOM
EX-119
PATIENT
ROOM
EX-118
MED
ALCOVE
EX-133
SINK
ALCOVE
EX-117
CORRIDOR
EX-100C2
PATIENT
ROOM
EX-116
NURSE
STATION
EX-108
PATIENT
ROOM
EX-115
CORRIDOR
EX-100C1
ALCOVE
EX-112
PATIENT
ROOM
EX-114
PATIENT
ROOM
EX-113
PATIENT
ROOM
EX-111
WAITING
EX-102
VESTIBULE
EX-101
UP
DN
DN
DN
EX-107
PHYSIATRIST
OFFICE/EXAM
EX-108
PHYSIATRIST
OFFICE/EXAM
EX-114
ADL
KITCHEN
EX-57
STAIR
EX-123
STAFF
TOILET
EX-122
STAFF
TOILET
EX-104D
PREP
AREA
EX-100C4
CORRIDOR
EX-100C2
CORRIDOR
EX-126A
BREAKDOWN
ROOM
EX-120
P.T.
SUPERVISOR
EX-127
SOILED/
RED
BAG
STORAGE
EX-104I
TOILET
EX-104H
TOILET EX-124
STAFF
BREAK
ROOM
EX-124A
CHANGING
ROOM
EX-100C1
CORRIDOR
EX-100C3
CORRIDOR
EX-116
OXY.
STOR.
ROOM
EX-100C5
CORRIDOR
EX-121
VOICE/
DATA
CLOSET
EX-110A
ELEC.
CLOSET
EX-105
JANITOR
CLOSET
EX-101
RECEPTION
EX-104J
STAFF
CHARTING
EX-125
PT/OT
EQUIPMENT
STORAGE
EX-103
TOILET
EX-106
TOILET
EX-100
WAITING
ROOM
EX-126
CLEAN
RECEIVING
EX-109
HYDROTHERAPY
ROOM
EX-117
PHYSIATRIST
OFFICE/
EXAM
EX-112
ADL
TRAINING
TOIL.
EX-119
SUPERVISOR
OF
PROSTHETICS
EX-110B
PROSTHETIC
RECEIVING
STORAGE
ROOM EX-110
PROSTHETICS
WORK
AREA
EX-115
PHYSIATRIST
OFFICE/
EXAM
EX-113
PHYSIATRIST
OFFICE/
EXAM
EX-111
PHYSIATRIST
OFFICE/
EXAM
EX-118
SOILED
HOLDING
EX-104A
TREATMENT
EX-104B
TREATMENT
EX-104C
TREATMENT
EX-104E
TREATMENT
EX-104
THERAPY
GYM
EX-56
J.C.
TREATMENT
EX-104G
TREATMENT
EX-104F
DN
DN
S S
S S
S S
S
S SS S
SS
SS
SS
S SS
SS
SS
SS
S SS S
S S
S S
S S
S
S S
S
SS
SSS S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
SSSS
SS
SS
SSSS
SS
SS
SS
S SS
S S
S SS S
SS
SS
SS S SS S S S S S S S S S S S S
SS
S
S
S
S
S
S
S
S
S
S
SS
S S
SS S SS S S S S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S SS S S S S
S SS S S
BENCH
S L O P E
FECFEC
FEC
FEC
FEC
12" OVER 68'-0"
1. 47%
TREATMENT 4
EX-157
TREATMENT 3
EX-156
SOILED
UTILITY
EX-155
TREATMENT 5
EX-158
TREATMENT 6
EX-159
FAST TRACK
TREATMENT 7
EX-160
TOILET
EX-162
FAST TRACK
TREATMENT 8
EX-161
DECON.
CHANGING
EX-163
DECON.
SHOWER
EX-163A
DECON.
EX-163B
EMERG. RESP.
CLOSET
EX-164A
VESTIBULE
EX-164
GURNEY
STORAGE
EX-165
STAFF
TOILET
EX-154
TREATMENT 2
EX-153 DATA/
PHONE
EX-141
OBSERV.
EX-144CORRIDOR
EX-100C10
NURSE
STATION
EX-145
CORRIDOR
EX-100C11
SINK
ALCOVE
EX-152
TREATMENT 1
EX-151
H.A.C.
EX-143
TRIAGE
EX-166
RECEPTION
EX-167
POLICE
CHANGING
EX-142A
CORRIDOR
EX-100C8
CONF./
LUNCH
EX-142
LINEN
AREA
EX-145A
CLEAN
STORAGE
EX-145B
CHIEF
E.R.
EX-150
CORRIDOR
EX-100C6
WAITING
EX-140
CORRIDOR
EX-100C5
GURNEY
ALCOVE
EX-126
CORRIDOR
EX-100C4
RESP.
THERAPY
EX-139
NURSE
MANAGER
EX-138
ROLL-IN
SHOWER
EX-130
EQUIPMENT
STORAGE
EX-131A
TELE. ROOM
EX-131B
ELEC.
EX-136
NOURISHMENT
EX-135
SOILED
UTILITY
EX-134
CORRIDOR
EX-100C3
TOILET
EX-105
STAFF
TOILET
EX-106
LINEN
EX-107
PATIENT
ROOM
EX-125
PATIENT
ROOM
EX-124
PATIENT
ROOM
EX-123
PATIENT
ROOM
EX-122
H.A.C.
EX-121
NURSE
STATION
EX-131
CLEAN
SUPPLY
EX-132
PATIENT
ROOM
EX-120
ISOL.
ANTI-ROOM
EX-119
PATIENT
ROOM
EX-118
MED
ALCOVE
EX-133
SINK
ALCOVE
EX-117
CORRIDOR
EX-100C2
PATIENT
ROOM
EX-116
NURSE
STATION
EX-108
PATIENT
ROOM
EX-115
CORRIDOR
EX-100C1
ALCOVE
EX-112
PATIENT
ROOM
EX-114
PATIENT
ROOM
EX-113
PATIENT
ROOM
EX-111
WAITING
EX-102
VESTIBULE
EX-101
EX-107
PHYSIATRIST
OFFICE/EXAM
EX-108
PHYSIATRIST
OFFICE/EXAM
EX-114
ADL
KITCHEN
EX-57
STAIR
EX-123
STAFF
TOILET
EX-122
STAFF
TOILET
EX-104D
PREP
AREA
EX-100C4
CORRIDOR
EX-100C2
CORRIDOR
EX-126A
BREAKDOWN
ROOM
EX-120
P.T.
SUPERVISOR
EX-127
SOILED/
RED
BAG
STORAGE
EX-104I
TOILET
EX-104H
TOILET EX-124
STAFF
BREAK
ROOM
EX-124A
CHANGING
ROOM
EX-100C1
CORRIDOR
EX-100C3
CORRIDOR
EX-116
OXY.
STOR.
ROOM
EX-100C5
CORRIDOR
EX-121
VOICE/
DATA
CLOSET
EX-110A
ELEC.
CLOSET
EX-105
JANITOR
CLOSET
EX-101
RECEPTION
EX-104J
STAFF
CHARTING
EX-125
PT/OT
EQUIPMENT
STORAGE
EX-103
TOILET
EX-106
TOILET
EX-100
WAITING
ROOM
EX-126
CLEAN
RECEIVING
EX-109
HYDROTHERAPY
ROOM
EX-117
PHYSIATRIST
OFFICE/
EXAM
EX-112
ADL
TRAINING
TOIL.
EX-119
SUPERVISOR
OF
PROSTHETICS
EX-110B
PROSTHETIC
RECEIVING
STORAGE
ROOM EX-110
PROSTHETICS
WORK
AREA
EX-115
PHYSIATRIST
OFFICE/
EXAM
EX-113
PHYSIATRIST
OFFICE/
EXAM
EX-111
PHYSIATRIST
OFFICE/
EXAM
EX-118
SOILED
HOLDING
EX-104A
TREATMENT
EX-104B
TREATMENT
EX-104C
TREATMENT
EX-104E
TREATMENT
EX-104
THERAPY
GYM
EX-56
J.C.
TREATMENT
EX-104G
TREATMENT
EX-104F
A B C D
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
17072 SF
SMOKE
COMPARTMENT
EXIT
EXIT
EXIT
2 HR BARRIER
(ETR)
1 HR
SMOKE/FIRE
(ETR)
SMOKE
COMPARTMENT
1 HR BARRIER
2 HR
SMOKE/FIRE
(ETR)
SMOKE
COMPARTMENT
2 HR RATED
EXIT PASSAGELIMIT OF WORK
2 HR
SMOKE/FIRE
BARRIER
1 HR
SMOKE/FIRE
BARRIER (ETR)
1 HR FIRE
BARRIER (ETR)
2 HR FIRE
BARRIER
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
2 HR
SMOKE/FIRE
1 HR
SMOKE/FIRE
BARRIER (ETR)
1 HR
SMOKE/FIRE
BARRIER (ETR)
OPEN
LABORATORY
CORRIDOR
SUPPLY
ROOM
STAFF
LOUNGE
HOUSEKEEPING
FROZEN
AND GROSS
SECTION
ROOM
CONFERENCE
ROOM
(NOT IN
CONTRACT)
LIMIT OF WORK
LIMIT OF WORK
Mech.
Room
Oxygen Storage
Room
Stair #1
Fire Alarm
Elevator Lobby
Stair #3
Toilet
ToiletJCElec
Vending Office
Concourse
Toilet
Future SPD
Chest X-Ray
Waiting Room
General X-Ray
Toilet/ Changing
Patient Corridor
Break Room
Nuclear Med Chief
IT
Room
Camera
Nuclear Medicine Corridor
Stress Lab Dexascan
Dosing
Hot Lab
Thyroid Uptake
Soiled Utility
Blood Bank Toilet
HAC
Staf f
TLT
Clean Utility
Files
Elevator Elev.
Equip.
Reception
Stair #
General X-Ray
General X-Ray
Fluoroscopy
Fluoroscopy Reading Room
Toilet
Change
Elec Room
Change
Change
Toilet
Exit Stair
Nuclear Med Tech Office
Toilet
Toilet
Water Service Entry
North Corridor
Camera Camera
Contro l Room
Closet
Stair
Elevator
Elevator
Elevator
MRI Entry
Storage
Concourse
AS 701
PATH B
STAFF
LOCKERS
SHARED
OFFICE
STAFF
TOILET 2
STAFF
TOILET 1
FUTURE
MOLECULAR/MICROBIOLOGY
LAB
E
PATH BPATH A
57' - 1 7/16"
/1
/8
48' - 0"
11' - 8 3/4" 18' - 1"
123' - 3 31/32"
THE PROJECT WAS DESIGNED IN ACCORDANCE WITH THE FOLLOWING GUIDELINES
AND THE LATEST EDITION OF THE FOLLOWING CODES:
FIRE RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON SEPARATION
DISTANCE
FIRE SEPARATION DISTANCE
< 5 ALL
TYPE OF CONSTRUCTION GROUP A, B, E, F-2, I, R, S-2, U
> 5 IA 1
< 10 OTHERS 1
< 30
> 10
11B, VB
IA, IB
OTHERS 1
> 30 ALL 0
MINIMUM FIRE RESISTANCE RATING OF ENCLOSURES
MAIN ELECTRICAL SWITCHGEAR ROOM 1
HOURS
EMERGENCY GENERATOR 2
TELEPHONE, ELECTRICAL CLOSETS AND MECHANICAL EQUIPMENT
ROOMS
STORAGE ROOMS GREATER THAN 100 SQ.FT.
BOILER AND FURNACE ROOMS
OCCUPANCY FIRE SEPARATION ASSEMBLIES
SHAFTS AND ELEVATOR HOISTWAYS
EXIT ACCESS CORRIDORS
CONNECTING 3 OR FEWER STORIES
ENCLOSURES OF EXIT CORRIDORS, STAIRWAYS AND
ASSOCIATED EXIT CORRIDORS
CONNECTING 3 OR FEWER STORIES 2
OCCUPANCY LOAD FACTORS (LSC)
BUSINESS AREAS 100 SQUARE FEET
300 SQUARE FEETSTORAGE, MECHANICAL ROOMS
INTERIOR NON-BEARING WALLS
EXTERIOR NON-BEARING WALLS NON-COMBUSTIBLE
TRAVEL DISTANCE
COMMON PATH OF EGRESS TRAVEL
200'
100'
30'DEAD END CORRIDOR
ASSEMBLY, TABLES AND CHAIRS 15 SQUARE FEET NET
7 SQUARE FEET NETASSEMBLY, CHAIRS ONLY
EGRESS CAPACITY (LSC)
STAIRS 0.3 INCHES PER PERSON
0.2 INCHES PER PERSONLEVEL COMPONENTS & RAMPS
CORRIDOR WIDTHS (LSC)
44 INCHES
OFFICES OR OTHER AREAS NOT SUBJECT TO
HOUSING, TREATMENT OR USE OF INPATIENTS
MINIMUM CLEAR WIDTH OF DOORS (LSC)
36 INCHES CLEAR WIDTHALL AREAS
CONSTRUCTION TYPE
USE GROUP(S)
STORIES
BEARING WALLS-
SPRINKLERS
STRUCTURAL FRAME
EXTERIOR
INTERIOR
NON-BEARING WALLS & PARTITIONS
EXTERIOR
INTERIOR
FLOOR CONSTRUCTION
INCLUDING SUPPORTING BEAMS,
TRUSSES AND FRAMING.
INCLUDING COLUMNS, BEAMS,
GIRDERS, TRUSSES
INCLUDING SUPPORTING BEAMS,
TRUSSES AND FRAMING
ROOF CONSTRUCTION
NFPA 101 2018 (LSC)
HEALTHCARE, MAINTENANCE (SPECIAL
PURPOSE INDUSTRICAL OCCUPANCY)
II (2,2,2)
PROVIDED
HOURS
2 HOURS
NON-COMBUSTIBLE
2 HOURS
2 HOURS
NON-COMBUSTIBLE
NON-COMBUSTIBLE
NON-COMBUSTIBLE
NON-COMBUSTIBLE
Code Data
- National Fire Protection Association (NFPA) except NFPA 5000 - 2018
- NFPA 101 Life Safety Code
- NFPA 99 Standards of Healthcare Facilities Chapter 11 Laboratories
- NFPA 45 Fire Protection for Laboratories Using Chemicals
- Uniform Federal Accessibility Standards (UFAS)
- Department of Veterans Affairs - Design Manuals and Standards
- National Standard Plumbing Code (NSPC)
- National Electric Code (NEC)
- International Mechanical Code 2015 (as applicable)
- Occupational, Safety and Health Administration (OSHA)
- International Plumbing Code 2015 (as applicable)
- International Building Code 2015 (as applicable)
NOTE: A MINIMUN OF 36" CLEAR AISLE SPACE SHALL BE MAINTAINED AROUND LABORATORY
BENCHES & FURNITURE.
EXISTING I (3,3,2)
Occupancy Table
Floor Occupancy Description Total Area
(in SF) Area per Occupant
Total Occupancy
Basement 4,174 Use Maximum Probable Population
Ground Floor Business 11,359 1/100 114
Roof - - 100 15
Special Purpose Industrial
Egress Table
Floor Basement Ground
Total Occupancts and Direction of Travel
14 up
Stair Width Required/Drawn (total cumulative occupant load <2000)
114 at grade + 14 from below = 128 <2000
44"/48" at grade
Egress Options at each level
2 2
Re-Entry Allowed no yes
# Egress Points Required 2 2
Egress Capactiy Stairs (min. width 44")
14/2*.3 =2.1 "
# Egress Capcity Level (min 36")
128/2*.2 = 12.8" horizontal exit
Rated Partition Legend
SMOKE PARTITION
1 HOUR RATED FIRE PARTITION
1 HOUR RATED SMOKE/PARTITION
2 HOUR RATED FIRE PARTITION
2 HOUR RATED SMOKE/FIRE PARTITION
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
LIMIT OF WORK
SMOKE
COMPARTMENT
GB.1
GB.2
G.3
G.1 G.2
G.4
SMOKE
COMPARTMENT
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC Lebanon -
Renovation of Laboratory
B1
04/13/2020
GI 002
595-667
BYAB
GROUND FLOOR LIFE
SAFETY PLAN
1/16" = 1'-0"1
GROUND FLOOR LIFE SAFETY
1/64" = 1'-0"2
SMOKE COMPARTMENT PLAN
Code Compliance -...
Path Egress Distance
PATH A 260' - 6"
PATH B 178' - 8"
DN
DN
DN
DN
UP
UP
UP
A B C D
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORK
E
7698 SF
ADDITION
45 SF
Staff TLT
433 SF
Staff Lounge
397 SF
Corridor
46 SF
HSKP
1085 SF
Chemistry
503 SF
Future Microbiology and Molecular
Lab
107 SF
HVAC
Shaft
37 SF
Electrical
36 SF
Telecom
131 SF
HVAC
Shaft
350 SF
Frozen and Gross
Section Room
210 SF
Shared Office
269 SF
Conference Room
A B C D
607 SF
Blood Bank
228 SF
Slide Block
Storage
291 SF
Supply Room
563 SF
Specimen Processing
465 SF
Urinalysis
364 SF
Send Outs
266 SF
Specimen Receiving
778 SF
Hematology
1230 SF
Histology
381 SF
Cytology
388 SF
Corridor
207 SF
Administration Assistant/ Waiting
211 SF
Pathology Office
117 SF
Pathology Office
138 SF
Pathology Office
130 SF
Lab Managers
114 SF
QA/QC
Office
30 SF
Storage50 SF
Staff TLT
E
60 SF
Staff Toilet
4405 SF
Pipe Basement
3545 SF
ADDITION
A B C D
E
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC Lebanon -
Renovation of Laboratory
B1
04/13/2020
GI 003
595-667
BYAB
BULDING GROSS &
PROGRAM AREA PLANS
1/16" = 1'-0"2
GROUND FLOOR GROSS AREA
TOTAL PROGRAM AREA 11784 SF
Note:
Does not include Pipe Basement, Areaway, Electrical and Telecom Rooms, HVAC Shafts listed above or exterior wall.
1/8" = 1'-0"3
GROUND FLOOR PROGRAM AREA PLAN
1/16" = 1'-0"1
MECHANICAL BASEMENT GROSS AREA
ROOM AREA SCHEDULE
ROOM
NO. ROOM NAME AREA
B10 MECHANICAL ROOM 2903 SF
B11 AREAWAY 186 SF
G01 ENTRY VESTIBULE 65 SF
G02 ADMINISTRATION VESTIBULE 35 SF
G10 CORRIDOR 386 SF
G11 STAFF TOILET 2 60 SF
G12 SUPPLY ROOM 289 SF
G13 HOUSEKEEPING 60 SF
G14 STAFF TOILET 1 45 SF
G15 SHARED OFFICE 210 SF
G16 STAFF LOCKERS 196 SF
G17 STAFF LOUNGE 434 SF
G18 OPEN LABORATORY 5142 SF
G19 BLOOD BANK 604 SF
G20 FUTURE MOLECULAR/MICROBIOLOGY LAB 531 SF
G21 ELECTRICAL 37 SF
G22 HVAC 108 SF
G23 TELECOM 37 SF
G24 HVAC 108 SF
G25 FROZEN AND GROSS SECTION ROOM 336 SF
G26 SLIDE/BLOCK STORAGE 220 SF
G42 CONFERENCE ROOM 270 SF
S1 STAIR 1 21 SF
S2 STAIR 2 6 SF
S3 STAIR 3 6 SF
TOTAL (BGSF) 13,480 SF
Includes interior spaces, MEP spaces and new exterior wall.
Does not include 4405 sf New Pipe Basement.
DN
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. __ of __
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management o n e e ig h th i n c h o n e f o o t
B
A
C
D
E
F th re e i n c h e s o n e f o o t 6 o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t 4 o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
FULLY SPRINKLERED
VAMC Lebanon - Renovation of Laboratory B1 595-667
Revision Schedule
Number Description Date
2400 Ansys Drive, Suite 403, Canonsburg, PA 15317
T: 724.514.5100 F: 724.514.5101 www.langan.com
Lebanon, PA.
CS4-000
04/13/2020 RMC BDH
Site Grading and Landscape Plan
Department of
Veterans Affairs
227 Fort Pitt Boulevard
Pittsburgh, Pennsylvania 15222
T: 412.765.1700
F: 412.765.1711
PROJECT
NORTH
TRUE
NORTH
B DA E
C
S5-005
5" THICK CONCRETE SLAB ON GRADE
ONE LAYER W.W.R. 6 X 6 - W2.1 X W2.1
MECHANICAL BASEMENT EL. -14'-0"
F4 (-15'-0")
F5 (-15'-0") F4 (-15'-0")
F5 (-15'-0") F5 (-15'-0") F5 (-10'-6")
F4 (-15'-0")
F4 (-15'-0") F5 (-15'-0")
F4 (-11'-8")
F4 (-10'-4") F4 (-13'-0")
F4 (-12'-0")
F4 (-13'-0")
F4 (-8'-9")F4 (-10'-4") F4 (-11'-0")F4 (-10'-4")
7'-9 1/2" 16'-2 1/2"
[536'] (-15'-0")
[536'] (-15'-0")
[538'] (-12'-10")
[538'] (-12'-4")
[540'] (-10'-10")
[540'] (-10'-4")
[540'] (-10'-10")
[540'] (-10'-9")
[540'] (-10'-2")
[540'] (-10'-4")
[540'] (-11'-0")
[540'] (-10'-4")
[540'] (-10'-4")
[540'] (-10'-4")
[540'] (-11'-0")
[541'] (-9'-2")
[542'] (-8'-9")
[542'] (-8'-4")
[542'] (-8'-4")
[542'] (-9'-0")
[543'] (-7'-10")
[543'] (-7'-10")
[543'] (-7'-10")
[542'] (-9'-0")
PIPE BASEMENT EL. -7'-0"
PIPE BASEMENT EL. 546'-0" 1944 DRAWINGS
F4 (-8'-4")
1'-3" 1'-3"
SEE DEMOLITION PLAN
A0-101-TYPICAL
SEE DEMOLITION PLAN
A0-101-TYPICAL
1'-0" 74'-11"
1'-0"
8'-1 1/2" 14'-11 1/2"
S5-005
1'-3" 1'-3"
23'-4 11/16"
VIF
6'-5 1/2"
VIF
6'-5 1/2"
6'-0 1/4"
S5-005
S5-005
S5-005
WF3 (-15'-0")
WF5 (-15'-0") W
F
W F
WF5 (-15'-0")
W F
W F
W F
-1
WF3' (-15'-0")
P24 P24
P24
P24
P24
P24
P24
P24
P24
P24
P24
P24P24
UP
S5-002 F3 (-7'-0")
F3 (-7'-0")
NEW
OPENING
NEW
OPENING
SEE
NEW
OPENING
NEW
OPENING
NEW OPENING
27'-0" 25'-11" 25'-11" 27'-0"
V
IF
/1
S5-002
EX F4 (-10'-10")
(-13'-0")
STEP FOOTING TO MATCH EXISTING
CJ TYP
V
IF
/8
WF3 (-16'-0")
W F
WF3' (-16'-0")
WF3' (-16'-0")
WF3 (-15'-0")
WF3 (-16'-0")
SEE PLUMBING
DWGS
SEE PLUMBING
DWGS
SEE PLUMBING
DWGS
SEE
PLUMBING
DWGS
EQUAL EQUAL
WF3 (-9'-0")
WF3
S5-005
FOOTING SCHEDULE NOTES:
1. SEE PLANS AND DETAILS FOR TOP OF FOOTING ELEVATIONS.
2. FOOTINGS ARE TO BEAR ON ROCK WITH A NET ALLOWABLE BEARING VALUE OF 10,000 PSF.
NOTE:
CONTRACTOR SHALL HAVE A LICENSED SURVEYOR VERIFY
EXISTING DIMENSIONS, FLOOR ELEVATIONS, OPENINGS,
EXISTING MEMBER SIZES AND FLOOR-TO-FLOOR HEIGHTS
BEFORE ORDERING, DETAILING OR FABRICATING STEEL.
INFORMATION INDICATED ON THESE DRAWINGS IS BASED
ON LIMITED INFORMATION FROM THE RECORD DRAWINGS
AND MUST BE CONFIRMED AT LOCATIONS WHERE NEW
CONSTRUCTION MEETS EXISTING AND INDICATED ON
SUBMITTED SHOP DRAWINGS.
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC-Lebanon-Renovation of Laboratory B1
04/13/2020
S1-100
595-667
JPLMGB
MECHANICAL BASEMENT
FOUNDATION PLAN
1/8" = 1'-0"
MECHANICAL BASEMENT FOUNDATION PLAN
FINISHED FLOOR EL. -14'-0" U.N.O.
(00'-0") = TOP OF FOOTING ELEVATION
[000'-0"] = EXISTING BOTTOM OF FOOTING BASED ON 1944 DRAWINGS
Wall Footing Schedule
Mark Width Thickness Cont. Reinforcing Prime Reinforcing
WF3 1'-3" (3) #5 CONT. #5 X 2'-6" AT 12"
WF5 5'-0" 1'-3" (5) #5 CONT. #5 X 4'-9" AT 12"6' - 0"
FOOTING SCHEDULE
Mark Length Width Thickness Reinforcing
(EW BOTTOM UNO)
F3 3'-0" 3'-0" 1'-0" 8-#5
F4 4'-0" 4'-0" 1'-6" 8-#5
F5 5'-0" 5'-0" 1'-9" 10-#5
3' - 0"
B DA E
C
S5-005
S5-005
VIF
5'-3 1/2"
W24x62 30
W21x44 30 W21x44 30
W24x62 30
W21x44 27 W21x44 30 W21x44 30 W21x44 27
W21x44 26 W21x44 30 W21x44 30 W21x44 26
W21x44 22 W21x44 22
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W
W14x22
W
W
W10x12 W10x12
W
W
W
W
W
W
W
COMPOSITE SLAB "A"
21'-6"
W 8W
W 8 W
A
A
A A
A
W
A A
W-19-4 (1 1/2" X 1/4")
GALV. GRATING
(REMOVABLE)
W10x12
W10x12
W
VIF
4'-0 3/8"
VIF
4'-0 9/16"
REMOVABLE
(TYPICAL)
W10x12
W10x12
W
18'-1 1/2" 1'-3"
S5-005
W18x35 W18x35
S5-005
W x
W x
W14x22
UP
E O
S
M=82kft M=82kft
M k ft
M k ft
M k ft
M=115kft M=100kftM=115kft
M k ft
M k ft
M k ft
M=82kftM=82kft
EXIST T/SLAB
EL. 553.0' ±
VIF
EXIST T/SLAB
EL. 553.0' ±
VIF
9'-6"
9'-6" 9'-6" 8'-0"
A
W x
52k 38k 38k 38k 38k 38k 38k
52k
25k 25k 25k 25k
50k 34k
36k 30k 30k 36k
34k 50k k k k k k k 2 k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k16k 25k 25k 16k k k k k k k k k
W10x12 14k W16x26
W x k k k k
HSS4x4x1/4 COORD
LOCATION WITH
EQUIPMENT.
S5-005
27'-0" 25'-11" 25'-11" 27'-0"
V
IF
/1
A A
M=100kft
W16x26 W18x35
W14x22
W21x44
W14x22
W18x35 W16x26
W24x62
W21x44
W24x62
W21x44
VIF
4'-8"
VIF
3'-10 1/2"
VIF
17'-4 1/2"
VIF
17'-4 1/2"
VIF
3'-10 1/2"
VIF
4'-8"
V
IF
/1
V
IF
/1
V
IF
/1
V
IF
/1
"M k ft
M k ft
M=20kft M=20kft M=20kft M=20kft
M k ft
M k ft
M=72kft
M=68kftM=68kft
M k ft
M k ft
M k ft
M k ft
M k ft
M=72kft
M=68kftM=68kft
M=72kftM=72kft
S5-003
A
W14x22 W14x22
A11
S5-003
SIM, TYP AT INTERIOR
CONCRETE WALLS
S5-002 A
A A
EQUAL EQUAL
W 8 W10x12
W
S5-005
W
W
TYP
2" EJ
COMPOSITE SLAB "A"
5 1/2" THICK WITH 2" X 18 GA. COMPOSITE STEEL DECK AND
3 1/2" NORMAL WEIGHT CONCRETE FILL. ONE LAYER OF
W.W.R. 6 X 6 - W2.1 X W2.1 MINIMUM 3 SPANS UNSHORED.
CONCRETE F'C = 3500 PSI.
LEGEND
12W16X31 < 3/4" >
XX (KIPS)
BEAM SIZE
NUMBER OF HEADED SHEAR STUDS
BEAM CAMBER
SHEAR REACTION
(IF VALUE EXCEEDS
SHEAR TABLE ON DWG.
S8-000)
MOMENT CONN.
(FULL MOMENT)
SHORE ALL COMPOSITE SLABS AS REQ'D. BY DECK MFR.
= NUMBER OF SHEAR STUDS REQUIRED. (SEE PLAN)
SHEAR STUDS TO BE NELSON 3/4"Ø X 4 1/2" LONG.
STUDS BASED ON A (q) ALLOWABLE = 11.5 KIPS.
DECK MFR. MUST ADJUST NUMBER OF STUDS TO CONFORM
TO THEIR DECK PROFILE.
CANTILEVER MOMENT
CONN.
NOTES:
1. M = DESIGN MOMENT. PROVIDE FULL ELASTIC CAPACITY IF
NONE IS LISTED.
2. DESIGN SHEAR REACTION EQUALS 10 KIPS IF NONE IS
LISTED.
3. W8 INDICATES W8x10
4. INDICATES BEAM CONNECTION PLATE TO CONCRETE
M =
M =
W
FULL DEPTH STIFFENER CONN.
NOTE:
CONTRACTOR SHALL HAVE A LICENSED SURVEYOR VERIFY
EXISTING DIMENSIONS, FLOOR ELEVATIONS, OPENINGS,
EXISTING MEMBER SIZES AND FLOOR-TO-FLOOR HEIGHTS
BEFORE ORDERING, DETAILING OR FABRICATING STEEL.
INFORMATION INDICATED ON THESE DRAWINGS IS BASED
ON LIMITED INFORMATION FROM THE RECORD DRAWINGS
AND MUST BE CONFIRMED AT LOCATIONS WHERE NEW
CONSTRUCTION MEETS EXISTING AND INDICATED ON
SUBMITTED SHOP DRAWINGS.
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC-Lebanon-Renovation of Laboratory B1
04/13/2020
S1-101
595-667
JPLMGB
GROUND FLOOR
FOUNDATION PLAN
1/8" = 1'-0"
GROUND FLOOR FRAMING PLAN
FINISHED FLOOR EL. 0'-0" ± TO MATCH EXISTING
TOP OF STEEL -5 1/2" U.N.O.
FRAMING LEGEND
SLOPE
DOWN
SLOPE
DOWN
B DA E
C
W21x62
W21x62
W21x44
W21x62
W21x44 W21x44
W21x44 W21x44 W21x62
W18x35 W18x35 W21x44
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W
W 8 W
W10x12W10x12
W
W
W
W
W
W
W
W 8 W
8 W
SEATED
CONNECTION
SEATED
CONNECTION
W x
W14x22
W14x22
" 9
W14x22
W14x22 W14x22
W14x22
C8X11.5
C8X11.5
C X
.2
C X
.2
M=70kft M=70kftM=70kft M=70kft
BENT PLATE BENT PLATE
/7 S5-004.
36k 25k
40k 26k
25k 36k
25k 20k
20k 25k
26k 26k 26k 26k 26k 40k
15k 15k 15k 15k k k k k k k k k k k k k k k k k k k
OF ARCH
WP
S5-005
V
IF
/2
V
IF
/1
VIF
4'-5" 27'-0" 25'-11" 25'-11" 27'-0"
VIF
4'-5"
VIF
5'-0"
VIF
3'-7"
VIF
17'-4"
VIF
17'-4"
VIF
3'-7"
VIF
5'-0"
W21x62
W21x62
W14x22
W16x31
W18x40
W14x22
W16x31 W14x22
W21x62
W21x62
W21x44
W14x22 W14x22
W14x22
W21x44
V
IF
/1
M=50kft
M=78kft
M=15kft
M k ft
M=15kft
M=78kft M=50kft
M=45kft
M=48kft
M=35kftM=30kft
M k ftM=30kft
M=35kft
M=48kft M=48kft
M=45kft
M=45kft
M k ft
M=15kft
M=15kft
M k ft
M=45kft
M=48kft
W x
(1
W x
(1
12kW16x31 (12'-3")18k
W x
(1
M k ft
W x
(1
/2
M k ft
W x
(1
/2
M k ft
(13'-5 1/2")
(13'-5 1/2")
H P
L P
L P
M=60kft
W18x40
(12'-4 1/4")
M=60kft
M=60kft
W18x40
(12'-4 1/4") M=60kft k
W x
(1
/4 k
W x
(1
/4
M k ft
W x
(1
/4
M k ft
M k ft
W x
(1
/4
M k ft
W x
(1
/4 ")M k ft
W x
(1
/4 ")M k ft
W x
(1
12k W16x31 (12'-3")
18k
W x
(1
W x
(1
M k ft
W x
(1
M k ft
W x
(1 k
W x
(1 k k
W x
(1 k
(12'-10 15/16") W x
W14x22
W x
W x
12k
W x
12k
RD01
TYP
2" EJ
S5-004
W
W 8 W
W
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W
W
W
W x
W x k k k k k k k k
W
W
6'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 6'-0"
S5-005
6" EOD6" EOD
W
W8x10
TYP
9" EOD
W
W8x10
W8
COPE FLANGE
UNDER DECK
COPE FLANGE
UNDER DECK
W8
NOTE:
CONTRACTOR SHALL HAVE A LICENSED SURVEYOR VERIFY
EXISTING DIMENSIONS, FLOOR ELEVATIONS, OPENINGS,
EXISTING MEMBER SIZES AND FLOOR-TO-FLOOR HEIGHTS
BEFORE ORDERING, DETAILING OR FABRICATING STEEL.
INFORMATION INDICATED ON THESE DRAWINGS IS BASED
ON LIMITED INFORMATION FROM THE RECORD DRAWINGS
AND MUST BE CONFIRMED AT LOCATIONS WHERE NEW
CONSTRUCTION MEETS EXISTING AND INDICATED ON
SUBMITTED SHOP DRAWINGS.
LEGEND
12W16X31 < 3/4" >
XX (KIPS)
BEAM SIZE
NUMBER OF HEADED SHEAR STUDS
BEAM CAMBER
SHEAR REACTION
(IF VALUE EXCEEDS
SHEAR TABLE ON DWG.
S8-000)
MOMENT CONN.
(FULL MOMENT)
CANTILEVER MOMENT
CONN.
NOTES:
1. M = DESIGN MOMENT. PROVIDE FULL ELASTIC CAPACITY IF
NONE IS LISTED.
2. DESIGN SHEAR REACTION EQUALS 10 KIPS IF NONE IS
LISTED.
3. W8 INDICATES W8x10
4. INDICATES BEAM CONNECTION PLATE TO CONCRETE
M =
M =
W
FULL DEPTH STIFFENER CONN.
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC-Lebanon-Renovation of Laboratory B1
04/13/2020
S1-102
595-667
JPLMGB
ROOF FRAMING PLAN
1/8" = 1'-0"
ROOF FRAMING PLAN
1. TOP OF STEEL ELEVATION VARIES. SEE PLAN FOR WORK POINT ELEVATIONS. (___ )
2. RD01 INDICATES SPAN DIRECTION OF ROOF DECK. SEE ROOF DECK SCHEDULE.
3. BOTTOM OF DECK SLOPES WITH T/STEEL WP ELEVATIONS.
ROOF FRAMING LEGEND
STEEL ROOF DECK SCHEDULE
MARK DECK TYPE
MINIMUM STEEL DECK PROPERTIES
REMARKSGAGE I in4 Sp in³ Sn in³ GALV
RD01 1 1/2" Type B 18 0.292 0.318 0.327 G90
1/2" ISOLATION JT (TYP)
STEEL COL - SEE SCHEDULE
NOTES:
1. T = FOOTING THICKNESS - SEE FOOTING SCHEDULE.
2. EVENLY SPACE FOOTING REINFORCEMENT.
FTG - SEE PLAN
AND SCHEDULE ROCK
ENGINEERED FILL
CONC FILL
SOG AND SUB BASE - SEE
PLAN AND TYP SOG DETAIL
COL AND FTG
T/SLAB
SEE PLAN
T/FTG
SEE PLAN
T
W OR L SEE FTG SCHEDULE
CONC FILL
SOG AND SUB BASE - SEE
PLAN AND TYP SOG DETAIL
1/2" ISOLATION JT (TYP)
STEEL COL - SEE SCHEDULE
CONC PIER - SEE
PLAN AND SCHEDULE
DOWELS W/ STD
HOOKS MATCHING
VERT PIER REINF
NOTES:
1. T = FOOTING THICKNESS - SEE FOOTING SCHEDULE.
2. S = PIER TIE SPACING - SEE PIER SCHEDULE.
3. EVENLY SPACE FOOTING REINFORCEMENT.
FTG - SEE PLAN
AND SCHEDULE
ANCHOR RODS - SEE
COL SCHEDULE
ROCK
ENGINEERED FILL
T/SLAB
SEE PLAN
T/PIER
SEE PLAN
T/FTG
SEE PLAN
COL FTG AND PIER
S P
L
IC
E
T E
N S
IO
N
L A
P
S
S /2
T
STANDARD 90°
HOOK (TYP)
SEE SPECIFIC WALL SECTIONS
FOR SIZE AND SPACING OF
WALL REINFORCING. (TYP)
"U"-BARS AT END OF OPENINGS.
MATCH SIZE AND SPACING OF
HORIZ REINFORCING.
WALL CORNERS WALL INTERSECTION
LAP OUTSIDE HORIZONTAL REINF
OR PROVIDE CORNER BARS AS
SHOWN. MATCH SIZE AND SPACING
OF HORIZONTAL WALL REINFORCING.
SKEWED WALL
S E
E P
L A
N
LAP INSIDE HORIZ REINF OR
PROVIDE DOWELS AS SHOWN.
MATCH SIZE AND SPACING OF
HORIZ REINF
DISCONTINUOUS ENDS
S P
L
IC
E
U N
O
T E
N S
IO
N
L A
P
S P
L
IC
E
U N
O
T E
N S
IO
N
L A
P
SPLICE (UNO)
TENSION LAP
SPLICE (UNO)
TENSION LAP
T
1' -0
S P
LI
C E (U
N O
TE
N S
IO
N L
A P
0"
0"
6" CONT
WATERSTOP
SEE SPECIFIC WALL
SECTIONS FOR SIZE AND
SPACING OF WALL REINF
CONTINUE 100 PERCENT OF
HORIZ REINF THROUGH JOINT
JOINT - SEE GENERAL
NOTES FOR SPACING
NOTES:
1. WATERSTOP REQUIRED FOR SUB-GRADE WALLS RETAINING BACKFILL
MATERIAL. OMIT OTHERWISE.
2. ROUGHEN FIRST POUR TO A 1/4" AMPLITUDE OR FORM THE JOINT WITH A
STAY-IN-PLACE PERFORATED METAL BULKHEAD TO ACHIEVE THE SAME
RESULT.
SPLICE
TENSION LAP
4-BAR 8-BAR 12-BAR10-BAR
CROSS TIES
VERT REINF
TIES
PIER
FOOTPRINT
PIER FOOTPRINT
EXTEND HORIZ
WALL REINF INTO PIER
CONT HORIZ WALL REINF
THRU PIER. OMIT VERT WALL
REINF WITHIN PIER FOOTPRINT
EQ EQ
E Q
E Q
EQ EQ
E Q
E Q
EQ EQ
E Q
E Q
E Q
E Q
EQEQ
CROSS TIES
VERT REINF
TIES
CROSS TIES
VERT REINF
TIES
CROSS TIES
VERT REINF
TIES
NOTES:
1. PROVIDE 135 DEGREE HOOKS AT TIES.
2. PROVIDE 135 DEGREE AND 90 DEGREE HOOKS AT CROSS TIES.
3. ALTERNATE HOOK LOCATIONS AT CONSECUTIVE TIES.
ADDITIONAL REINF
- SEE NOTES
ADD 1-#5 x 2'-0" AT
EACH CORNER
NOTES:
1. MAXIMUM OPENING SIZE = 4'-0" x 4'-0" SQUARE OR 4'-0" DIAMETER.
2. PROVIDE 1/2 THE NUMBER OF BARS INTERRUPTED BY THE OPENING
PLUS ONE MORE OF THE SAME SIZE AT EACH SIDE OF OPENING
3. SPACE ADDITIONAL BARS AT 3" ON CENTER.
4. NO ADDITIONAL REINF REQUIRED FOR OPENINGS 10" OR LESS.
SQUARE OR ROUND
OPENING
ELEVATION
PLAN
T Y
P
U-BARS AT INTERRUPTED
REINF TO MATCH SIZE AND SPACING
OF INTERRUPTED REINF
SPLICE
TENSION LAP
TYP
2" CLR
SPLICE (TYP)
TENSION LAP
SEE SPECIFIC WALL SECTIONS
FOR FURTHER INFORMATION
WALL FOOTING W/ ADDL
3-#5 IN BOT/FTG EXTENDED
1'-6" PAST ENCASEMENT
GRADE
NOTES:
1. DO NOT PLACE PIPE TRENCH BELOW COLUMN FOOTINGS.
2. DO NOT PLACE PIPE TRENCH BELOW WALL FOOTINGS IF PIPE RUNS PARALLEL WITH WALL.
3. NO PIPES WITHIN FTG DEPTH. STEP FTG DOWN BELOW PIPE IF ELEVATION CONFLICT.
4. SLEEVES TO BE 1" CLEAR AROUND PIPE. WRAP PIPE W/ COMPRESSIBLE MATERIAL.
5. PLACE CONCRETE FILL AROUND SLEEVE PRIOR TO POURING FOUNDATION.
6. DIMENSIONS NOTED ARE MINIMUM. IF DIMENSIONS CONFLICT WITH DIMENSIONS GIVEN
ELSEWHERE, COMPLY WITH MORE STRINGENT REQUIREMENT.
PIPE
NOTE 4 NOTE 5
PIPE
SECTION A-A
A-A
M
IN6
M
IN4
"H
MIN
"H"
MIN
"H"
N O
T E
MIN
6"
WATERPROOFING OR
DAMPPROOFING SYSTEM
NON WOVEN GEOTEXTILE
W/ 12" LAP AT TOP
ENGINEERED FILL
PERFORATED PVC
PIPE
SEE SPECIFIC WALL
SECTIONS FOR FURTHER
INFORMATION
FILTER MATERIAL
T/GRADE
SEE SITE/CIVIL
T Y
P
INTERIOR
SPACE
TENSION LAP SPLICE LENGTHS FOR BARS
ENCLOSED IN TIES OR STIRRUPS
TENSION LAP SPLICE LENGTHS FOR BARS
NOT ENCLOSED IN TIES OR STIRRUPS
NOTES:
1. TABULATED VALUES ARE GIVEN IN INCHES.
2. DIVIDE TABULATED VALUES BY 1.30 TO ACHIEVE STRAIGHT BAR TENSION DEVELOPMENT LENGTHS.
3. APPLY A 1.30 MULTIPLIER ON TABULATED VALUES FOR USE IN LIGHTWEIGHT CONCRETE.
4. APPLY A 1.50 MULTIPLIER ON TABULATED VALUES FOR EPOXY COATED BARS WITH COVER LESS
THAN 3 BAR DIAMETERS OR CLEAR SPACING LESS THAN 6 BAR DIAMETERS. APPLY A 1.20
MULTIPLIER ON ALL OTHER EPOXY COATED BARS.
5. MULTIPLIERS FOR LIGHTWEIGHT CONCRETE AND EPOXY COATING ARE ADDITIVE.
6. TOP BARS ARE DEFINED AS HORIZONTAL REINFORCEMENT WITH MORE THAN 12 INCHES OF
CONCRETE CAST BELOW THE DEVELOPMENT LENGTH OR SPLICE.
7. "SIDE LAP" LAP SPLICES TO MAINTAIN SPECIFIED CONCRETE COVER. WHEN BARS OF DIFFERENT
SIZE ARE LAP SPLICED, USE THE LARGER OF THE DEVELOPMENT LENGTH OF THE LARGER BAR OR
THE LAP SPLICE LENGTH OF THE SMALLER BAR.
8. NON-CONTACT SPLICES NOT PERMITTED.
BAR
SIZE
#3 28 22 6 25 19 6 22 17 6
#4 38 29 8 33 25 7 29 23 6
#5 47 36 10 41 31 8 36 28 7
#6 56 43 12 49 37 10 44 34 9
#7 81 63 13 71 54 12 63 49 10
#8 93 72 15 81 62 13 72 56 12
#9 105 81 17 91 70 15 81 63 13
#10 118 91 19 102 79 17 92 71 15
#11 131 101 22 114 87 19 102 78 17
#3 17 16 6 16 16 6 16 16 6
#4 28 22 8 25 19 7 22 17 6
#5 41 32 10 36 28 8 32 25 7
#6 56 43 12 49 37 10 44 34 9
#7 90 69 13 78 60 12 70 54 10
#8 112 86 15 97 74 13 87 67 12
#9 135 104 17 117 90 15 105 81 13
#10 162 125 19 141 108 17 126 97 15
#11 190 146 22 165 127 19 147 114 17
STD
HOOK DEV
STD
HOOK DEVTOP OTHER
STD
HOOK DEV
BAR TYPE
3,000 PSI
TOP OTHER
BAR TYPE
TOP OTHER
BAR TYPE
4,000 PSI 5,000 PSI
BAR
SIZE
STD
HOOK DEV
STD
HOOK DEVTOP OTHER
STD
HOOK DEV
BAR TYPE
3,000 PSI
TOP OTHER
BAR TYPE
TOP OTHER
BAR TYPE
4,000 PSI 5,000 PSI
CONCRETE COMPRESSIVE STRENGTH
CONCRETE COMPRESSIVE STRENGTH
PIER SCHEDULE NOTES:
1. SET LOWEST TIE AT ONE HALF THE TIE SPACING ABOVE TOP OF FOOTING.
2. PROVIDE TIES AT 4" ON CENTER FULL LENGTH OF ANCHOR RODS.
3. "W" DIMENSION IS PERPENDICULAR TO COLUMN WEB.
4. "L" DIMENSION IS PARALLEL WITH COLUMN WEB.
5. PIERS ARE CENTERED ON COLUMN CENTERLINES UNLESS NOTED OTHERWISE.
6. CONFIGURE TIES USING ACI REQUIREMENTS AND TO AVOID CONFLICTS WITH
ANCHOR RODS.
W
L
SEALANT
CONTINUE 50 PERCENT OF
HORIZ REINF THROUGH JOINT
6" CONT
WATERSTOP
SEALANT
CUT 50 PERCENT OF
HORIZ REINF
GENERAL NOTES:
1. WATERSTOP REQUIRED FOR SUB-GRADE WALLS
RETAINING BACKFILL MATERIAL. OMIT OTHERWISE.
2. SEE SPECIFIC WALL SECTIONS FOR SIZE AND SPACING
OF WALL REINFORCING.
CONTROL JOINT CONSTRUCTION JOINT
CONSTRUCTION JOINT NOTES:
1. ROUGHEN FIRST POUR TO A 1/4" AMPLITUDE OR FORM
THE JOINT WITH A STAY-IN-PLACE PERFORATED METAL
BULKHEAD TO ACHIEVE THE SAME RESULT.
2. LOCATE CONSTRUCTION JOINTS AT A CONTROL JOINT
1" TYP
SPLICE (UNO)
TENSION LAP
BACKFILLED SIDE
EXPOSED SIDE
BACKFILLED SIDE
EXPOSED SIDE
6" CONT
WATERSTOP
JOINT JOINT
EXPANSION JT FILLER,
BACKER, ROD AND
SEALANT, EA SIDE OF WATERSTOPEXIST CONC
CONSTRUCTION
2"x2" NOTCH SAWCUT
INTO EXIST CONC
6" WATERSTOP CUT TO FIT
AND EPOXY GROUTED INTO
EXISTING CONC
NOTES:
1. WATERSTOPS ARE CENTERED IN NEW WALLS UNLESS OTHERWISE SHOWN.
2. PROVIDE 3/4" CHAMFER AT EXPOSED CORNERS.
3. SEALANT DEPTH SHALL BE A MINIMUM OF 1/2 THE JOINT WIDTH.
4. SEPARATE SEALANT FROM JOINT FILLER WITH POLYETHYLENE TAPE.
TYP
2"
3 MIN
2-#5
CONT DRAINAGE COURSE
#5@12"
#5@12" EW
MIDDLE
ENGINEERED FILL
F R
O S
T D
E P
T H
2'-0"
1'-0"
VERT WALL REINF -
SEE SPECIFIC
SECTIONS FOR
SIZE AND SPACING.
MATCH HORIZ FOOTING
REINFORCING
HORIZ FOOTING
REINFORCING
HORIZ FOOTING
REINFORCING
T (1
M
A X d
T
2'-0" MIN
MIN
1.5d
2d MIN
T
2'-0" MIN
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC-Lebanon-Renovation of Laboratory B1
04/13/2020
S5-001
595-667
TYPICAL FOUNDATION
DETAILS
TYPICAL COLUMN FOOTING WITHOUT PIER
TYPICAL COLUMN FOOTING WITH PIER
TYPICAL WALL REINFORCING DETAILS
TYPICAL WALL CONSTRUCTION JOINT
TYPICAL PIER DETAILS
TYPICAL WALL OPENING REINFORCING
TYPICAL PIPE PENETRATION DETAIL
TYPICAL FOUNDATION
DRAIN AT BELOW GRADE SPACES
TENSION LAP SPLICE LENGTHS
FOR GRADE 60 REINFORCEMENT
CONCRETE PIER SCHEDULE
MARK WIDTH LENGTH
REINFORCEMENT
REMARKSVERTICAL TIES
P24 24" 24" 8-#6 #4@12"
PIER SCHEDULE AND NOTES
TYPICAL JOINT DETAILS AT EXPOSED WALLS
TYPICAL WALL EXPANSION
JOINT AT EXISTING CONSTRUCTION
TYPICAL SITE PAD DETAIL
TYPICAL STEPPED WALL FOOTING DETAIL
NOTES:
1. PROVIDE ENGINEERED FILL IN AREAS THAT DO NOT STABILIZE UNDER PROOFROLLING.
PROOFROLLED
SUB-GRADE
CONTINUOUS
VAPOR BARRIER
DRAINAGE COURSE
SOG
T/SLAB
SEE PLAN
S E
E P
L A
N
WWR - SEE PLAN
ISOLATION
JOINT
CONSTRUCTION
JOINT
CONTRACTION
JOINT
NOTES:
1. LOCATE CONSTRUCTION JOINTS AT CONTRACTION JOINT LOCATIONS SHOWN ON PLAN.
MATCH CONTRACTION JOINT PROFILE.
2. MAXIMUM SPACING BETWEEN CONTRACTION JOINTS = 15'-0". SEE PLAN FOR LOCATIONS.
3. 3/4" x 1'-4" SMOOTH DOWEL AT 18 INCHES ON CENTER. SET AT T/2 BELOW TOP OF SLAB.
GREASE ONE END.
4. DO NOT PLACE DOWELS WITHIN 12" OF A SLAB CORNER.
1/2" FULL DEPTH
JOINT FILLER
SEE NOTE 1
SEE NOTE 3 1-#4 EA SIDE
1/8" SAWN OR
PREFORMED JT
R=1/8" MAX
SOG SUB BASE SEE
PLAN AND TYP SOG
DETAIL
T
T /3
2"
ISOLATION
JOINT
ISOLATION
JOINT
CONSTRUCTION OR
CONTRACTION JOINT (TYP)
1-#4 MID DEPTH
OF SLAB (TYP)
INTERIOR
EXTERIOR
CONSTRUCTION OR
CONTRACTION JOINT (TYP)
CONCRETE
INFILL
CONCRETE INFILL
NOTE:
SEE PLAN FOR SLAB
JOINT LOCATIONS
3" M
IN
3" M
IN
TYP
1'-0"
CONC FDTN
1-#4 MID DEPTH
OF SLAB (TYP)
TYP
1'-0"
COLUNM
COLUMN
COLUMN
2-#4x48" 3/4" CLR
FROM T/SLAB
EDGE OF SLAB
2"
C
LR
2"
SEE SPECIFIC WALL SECTIONS
FOR WALL THICKNESS AND
REINF
ISOLATION JT LOCATED
UNDER THRESHOLD
AT FOUNDATION WALLS
AT BASEMENT WALLS
SOG
COMPOSITE SLAB - SEE
PLAN AND SCHEDULE
NOTE
1. BACKFILL WITH ENGINEERED FILL AT DOORWAYS.
T/SIDEWALK
SEE SITE/CIVIL
T/SIDEWALK
SEE SITE/CIVIL
T/SLAB
SEE PLAN
T/SLAB
SEE PLAN
SEE SPECIFIC WALL SECTIONS
FOR WALL THICKNESS AND
REINF
3 MIN
3/4" Ø @18"x1'-2"
SMOOTH DOWEL
3/4" Ø @18"x1'-2"
SMOOTH DOWEL
ISOLATION JT LOCATED
UNDER THRESHOLD
#4@18" ALT HOOKS. DRILL AND
GROUT 3" INTO CONC
1-#4 CONT @ "W" ≤ 6"
2-#4 CONT @ "W" > 6"
#4 W/ STD HOOK @ 18"
DRILL AND GROUT 3" INTO SOG
SOG
3/4" CHAMFER
(TYP)
#4@12" EW
SOG
3/4" CHAMFER
(TYP)
SOG SUB BASE SEE PLAN
AND TYP SOG DETAIL (TYP)
T O
T
"W"
"H
GENERAL NOTE:
SEE MEP DWGS FOR EXACT
SIZE AND LOCATION OF
CONCRETE PADS AND/OR CURBS
T/SLAB
SEE PLAN
2-#5
CONT
STL STRINGER
TREAD AND CARRIER ANGLE
BRACKET AND ANCHORS
NOTES:
1. SEE ARCH DRAWINGS FOR STAIR LOCATION AND RISER/TREAD CONFIGURATION.
2. THICKENED SLAB LENGTH = STAIR WIDTH + 12 INCHES.
#4@12"x
SOG SUB BASE SEE
PLAN AND TYP SOG
DETAIL
1'-0"1'-0"
3 MIN
1 1
1'-0" MIN
EXISTING
1/2" Ø @18"x1'-6" SMOOTH
DOWELS. GREASE END OF
DOWEL IN NEW SLAB.
DRILL 6" INTO
EXISTING SLAB
T/SLAB
VIF
SOG SUB BASE - BACK FILL AND
COMPACT WITH ENGINEERED FILL
MIN 5" SOG
E Q
E Q
EXISTING
M
IN
#4x24"@12" EF
DRILL AND GROUT ADHESIVE
ANCHOR 6" INTO EXISTING
FOUNDATIONS
T/EXISTING FDTN
SEE PLAN AND VIF
EXISTING FDTN
WALL AND FTG
FDTN WALL - SEE SPECIFIC WALL
SECTIONS FOR FURTHER
INFORMATION.
T/FDTN
SEE PLAN AND VIF
M
IN4
NOTES:
1. ALIGN BOTTOM OF NEW AND EXISTING FOOTINGS. STEP
FOOTING AND WALL AS REQUIRED PER TYPICAL DETAILS.
2. EXTEND NEW FOUNDATIONS DOWN TO THE MINIMUM DEPTH.
GROUND FLOOR
0"
PIPE BASEMENT
-7'-0"
OPEN
EXIST COL EXIST COL
ASSUMED
ROCK
LEAN
CONCRETE
CUT OPENING
AFTER FOUNDATION
REACHES 0.7F'C
EXIST
FOUNDATION
EXIST WALL
12"x8" CONCRETE W/ (2) #5 BOTTOM
DRILL AND GROUT INTO WALL
3'-0"
F
BOND BREAKER ON
TROWELED FINISH
ENGINEERED FILL
#4@12" EW MID
EPOXY COATED
SEE SPECIFIC WALL SECTIONS
FOR WALL THICKNESS AND
REINF
ISOLATION JT - COORDINATE
LOCATION W/ ARCH
DRAINAGE
COURSE T/GRADE
SEE SITE/CIVIL
T/SLAB
SEE PLAN
SEE PLAN SEE ARCH
S E
E A
R C
H
3 MIN
3/4" Ø @18"x1'-2"
SMOOTH DOWEL
T/WALL BEYOND
3/4" Ø @18"x1'-2"
SMOOTH DOWEL
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC-Lebanon-Renovation of Laboratory B1
04/13/2020
S5-002
595-667
TYPICAL FOUNDATION
DETAILS
TYPICAL SLAB ON GRADE
TYPICAL SLAB ON GRADE JOINTS
SLAB ON GRADE
ISOLATION JOINT AT COLUMNS
ADDITIONAL REINFORCING AT
CORNERS IN SLAB-ON-GRADE
TYPICAL FOUNDATION
DETAIL AT DOORWAYS
TYPICAL CONCRETE
CURB AND HOUSEKEEPING PAD DETAIL
INTERIOR STAIR
STRINGER FOUNDATION
SLAB ON GRADE TRENCH INFILL
TYPICAL FOUNDATION WALL AT EXISTING
1/4" = 1'-0"
PIPE BASEMENT OPENING SUPPORT
TYPICAL EXTERIOR STAIR DETAIL
W COLUMN W BEAM
NOTES:
1. DESIGN CONNECTION TO DEVELOP
100% OF BEAM REACTION.
2. PROVIDE ERECTION SEAT OR OFFSET
ANGLES WHERE REQUIRED BY OSHA.
3. PROVIDE DOUBLE ANGLES AT LEAST
ONE HALF THE DEPTH OF THE
FRAMED BEAM.
DOUBLE ANGLE CONNECTION
W/ HS BOLTS IN BEARING
CONNECTION W/ STD OR
SLOTTED HORIZ HOLES
COLUMN
COLUMN
M A
X
BOLTS
3" MAX
W BEAM
W SPANDREL
FULL DEPTH FITTED
STIFFENER PL (3/8" MIN)
3/8" PL IF SPANDREL IS
DEEPER THAN FRAMED BEAM
BY MORE THAN 5 INCHES
HS BOLTS W/
STD HOLES
W BEAM W/ STD COPE
NOTES:
1. DESIGN CONNECTION FOR 100%
OF BEAM REACTION.
2. PROVIDE CONNECTION AT
OPPOSITE END OF FRAMED
BEAM W/ SLOTTED HORIZ HOLES
T/STL
SEE PLAN
SPANDREL
BOLTS
NOTES:
1. SEE COLUMN SCHEDULE FOR
ANCHOR RODS AND BASE PLATES.
2. SEE SPECIFIC WALL AND/OR PIER
DETAILS FOR REINF AND ADDITIONAL
INFORMATION.
L5x3 1/2x5/16 LLV
DECK SUPPORT
FRAMED BEAM CONNECTION
W BEAM
INSIDE FACE OF
WALL BEYOND
COLUMN
SEE PLAN
MIN
1"
T/PIER
SEE PLAN
T/STL
SEE PLAN
CANTILEVER BEAM
W OR HSS COLUMN
(4) 3/4" Ø HS
BOLTS EA SIDE
OF COLUMN
COLUMN
1" CAP PLATE
3/8" STIFFENERS
T/STL
SEE PLAN
W BEAM
W BEAM
SINGLE SHEAR PL
(3/8" MIN)
PRE-TENSIONED HS BOLTS
IN STD HOLES TO DEVELOP
100% OF BEAM REACTION
W COLUMN
COLUMN
BOLTS
CJP
T/STL
SEE PLAN
T /2
M
IN
3" MAX
TYP
PROVIDE STIFFENER PLATES
ASTM A572 GR 50
T
PRE-TENSIONED HS BOLTS IN
STD HOLES TO DEVELOP
100% OF BEAM REACTION
W BEAM
SHEAR PL
W COLUMN
T/STL
SEE PLAN
BOLTS
COLUMN
T M
IN
T /2
3" MAX
CJP
3 SIDES TYP
T f
W BEAM
COLUMN CAP PL THICKNESS
TO MATCH LARGEST BEAM
FLANGE WITH 3/4" MINIMUM
(ASTM A572 GR 50 STEEL)
PLATE TO MATCH BEAM FLANGE
WIDTH AND THICKNESS
ASTM A572 GR 50
W COLUMN
W BEAM
SINGLE SHEAR PL
(3/8" MIN)
PRE-TENSIONED HS BOLTS IN
STD HOLES TO DEVELOP
100% OF BEAM REACTION
COLUMN
T/STL
SEE PLAN
3" MAX
BOLTS
CJP TYP
3 SIDES
TYP
TYP
3 SIDES
TYP
CONTINUITY PLATES
PRE-TENSIONED HS BOLTS IN
STD. HOLES TO DEVELOP
100% OF BEAM REACTION.
1 1/2" RADIUS
W BEAM
SHEAR PL
T/STL
SEE PLAN
3 SIDES TYP
TYP
BOLTS
1/2"x1'-8" FLANGE PLATE
W/ (8) 3/4"Ø BOLTS EACH END
1/2" END PLATE CONNECTION
W/ (8) 3/4"Ø BOLTS
W BEAM -
SEE PLANS
T/STL
SEE PLAN
TYP
M A
X
FLANGE PLATE
STEEL ROOF DECK
5/16" DECK SUPPORT PLATE
TYP
OPENING
SIZE
4" WALLS 6" WALLS 8" WALLS 10" WALLS
3'-0" L3 1/2x3 1/2x1/4 2L3x2 1/2x1/4 2L3 1/2x3 1/2x1/4 3L3x3x1/4
4'-0" L4x3 1/2x1/4 2L3x2 1/2x1/4 2L4x3 1/2x1/4 3L4x3x1/4
5'-0" L4x3 1/2x1/4 2L3 1/2x2 1/2x1/4 2L4x3 1/2x1/4 3L4x3x1/4
6'-0" L5x3 1/2x1/4 WT 7x13 2L5x3 1/2x1/4 3L5x3x1/4
8'-0" L6x3 1/2x5/16 WT 8x15.5 2L6x3 1/2x3/8 3L5x3x3/8
MASONRY STEEL LINTEL SCHEDULE
NOTES:
1. PROVIDE LINTEL FOR MASONRY OPENINGS IN ACCORDANCE WITH THIS SCHEDULE UNLESS
OTHERWISE NOTED.
2. LINTELS THAT ARE PART OF EXTERIOR WALL ASSEMBLIES SHALL HAVE A MINIMUM THICKNESS
OF 5/16" AND BE HOT DIP GALVANIZED.
3. SET LINTELS WITH LONG LEG VERTICAL AND WITH 8 INCHES OF BEARING EACH END.
4. WELD ADJOINING ANGLES TO FORM A SINGLE UNIT.
4" VENEER
L4x4x5/16
L6x4x3/8
L7x4x7/16
L4x4x5/16
L4x4x5/16
12" WALLS
3L3 1/2x3 1/2x1/4
3L4x3 1/2x1/4
3L4x3 1/2x1/4
3L5x3 1/2x1/4
3L6x3 1/2x3/8
4" VENEER 4" WALL 6" AND 8"
WALLS
10" AND 12"
WALLS
3/4"
BEARING PLATE SCHEDULE
FILL POCKET WITH CONCRETE
WHEN FLOOR IS PLACED
BEARING PL AND 1"
MIN NON-SHRINK
GROUT.
(2) 3/4" Ø ANCHOR
RODS W/ (2)
HEAVY HEX NUTS
NOTE:
SEE SPECIFIC WALL DETAILS
FOR REINFORCEMENT AND
ADDITIONAL INFORMATION.
MAXIMUM
REACTION
MINIMUM BEARING
PLATE
Bf
20k 1"x5"xBf+7" ≤ 10"
40k 1-1/2"x5"xBf+7"
60K 2"x5"xBf+7"
T/STL
SEE PLAN
2" MIN "Bf" 2" MIN
≤ 10"
≤ 12"
1" 1"
1 1/2"1 1/2"
EQ EQ
M
IN2
1'-2"
2" 10" 2"
3/4" PL
3/8" PL
1/4
1/4
TYP
#6 TIE
BAR
TYP.
2 - W8 W10 3 - W12, W14
MIN NUMBER OF SLOTTED HOLES
FOR 7/8"ɸ A325N BOLTS
NUMBER 7/8"ɸ X 6"
SHEAR STUDS
W8,C8, W10, W12, OR W14
FRAMING MEMBER SIZE
SEE PLAN
CONNECTION MARK
SEE PLAN
T
C L E
A R
/4
M
IN
M A
X
MAX
2"
A
M A
X
BEAM CONNECTION PLATE TO CONCRETE
W BEAM - SEE PLANS
W GIRDER
-SEE PLANS
NOTE:
DESIGN CONNECTION TO
DEVELOP 100% OF BEAM
REACTION.
SINGLE SHEAR PL (3/8" MIN)
W/ HS BOLTS IN BEARING
CONNECTION W/ SHORT SLOTTED
HORIZ HOLES
T /2
M
IN
3" MAX
BOLTS
T/STL
SEE PLAN
T
227 Fort Pitt Boulevard Pittsburgh, Pennsylvania 15222
T: 412.765.1700 F: 412.765.1711
PROJECT
NORTH
KEY PLAN
TRUE
NORTH
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
FULLY SPRINKLERED
Lebanon, PA
VAMC-Lebanon-Renovation of Laboratory B1
04/13/2020
S5-003
595-667
TYPICAL STEEL FRAMED
DETAILS
TYPICAL FRAMED BEAM
TO WIDE FLANGE COLUMN CONNECTION
TYPICAL FRAMED
BEAM TO SPANDREL CONNECTION
TYPICAL
COLUMN / WALL POCKET DETAIL
CONTINUOUS BEAM
OVER TOP OF COLUMN DETAIL
TYPICAL BEAM TO COLUMN
FLANGE MOMENT CONNECTION
TYPICAL BEAM TO COLUMN
WEB MOMENT CONNECTION
TYPICAL BEAM TO COLUMN FLANGE
MOMENT CONNECTION AT ROOF
TYPICAL BEAM TO COLUMN WEB AT
PERPENDICULAR MOMENT CONNECTION
TYPICAL BEAM TO
BEAM MOMENT CONNECTION
MASONRY STEEL LOOSE LINTEL SCHEDULE
TYPICAL BEAM BEARING
PLATE AT CONCRETE WALL
BEAM CONNECTION PLATE TO CONCRETE
TYPICAL FRAMED BEAM CONNECTION
INDICATES NUMBER OF STUD ANCHORS
EQUALLY SPACED ALONG FULL LENGTH OF BEAM.
CENTER STUDS ON
BEAM WEB UNLESS
OTHERWISE REQUIRED
(SEE NOTE 2)
3/4" Ø HEADED
SHEAR STUDS
5/8" Ø PUDDLE
WELD WHERE NO
STUD IS INDICATED
COMPOSITE
STEEL DECK
W BEAM - SEE PLANS
COMPOSITE
STEEL DECK
DOUBLE ROW OF STUDS
(DECK PARALLEL TO BEAM)
COLUMN
NOTES:
1. SPACE STUDS AS EVENLY AS POSSIBLE IN AVAILABLE DECK FLUTES. WHERE STUD SPACING
EXCEEDS 24 INCHES, PROVIDE ADDITIONAL STUDS AS NECESSARY TO MAINTAIN A 24 INCH
MAXIMUM STUD SPACING.
2. WHERE THE NUMBER OF STUDS EXCEEDS THE NUMBER OF FLUTES, INSTALL REMAINING
STUDS IN DOUBLE OR TRIPLE ROW, STARTING FROM THE BEAM ENDS AND WORKING
TOWARD THE CENTER.
3. WHERE BEAM FLANGE THICKNESS IS LESS THAN 0.30", STUDS MUST BE PLACED AT
CENTERLINE OF THE BEAM.
4. MAINTAIN TRANSVERSE SPACING BETWEEN STUDS AND EDGE DIMENSIONS AS SHOWN ON
PLAN DETAILS ABOVE.
NOTES:
1. SPACE STUDS EQUALLY WITHIN BEAM SEGMENT. WHERE STUD SPACING EXCEEDS 24 INCHES, PROVIDE ADDITIONAL STUDS AS NECESSARY TO MAINTAIN A 24 INCH MAXIMUM STUD SPACING.
2.…