About this file

This document outlines a federal contract solicitation by the Federal Aviation Administration to replace an engine generator shelter. The FAA is seeking to replace an existing 9' x 25' engine generator shelter with a 13' x 25' concrete masonry unit shelter at its NEXRAD facility in Loleau, Kauai, Hawaii. Interested contractors must be registered in the System for Award Management by August 31, 2020 to be eligible. Proposals are due by 5:00pm CST on August 31, 2020 and should be emailed to Amanda J. Garen. The solicitation is for a firm-fixed-price construction contract to furnish all materials, equipment, labor, permits and other requirements to complete the work described in the specifications and drawings. Due to COVID-19, site visits are not recommended, and all questions must be submitted in writing by August 24th.

View the file

Other files

File Type Posted
Questions and Answers on SIR 6973GH-20-R-00139.pdf PDF
wp-d-645-40931-s06 (EG Bldg Foundation).pdf PDF
sok-d-nxrad-c003 markup.pdf PDF
6973GH-20-R-00139 Amendment 0002.pdf PDF
6973GH-20-R-00139 Amendment 0001.pdf PDF
6973GH-20-R-00139 Photos of Site.pdf PDF
SOK-D-NXRAD-E024.pdf PDF
Scope of Work for the Kauai (SOK) NEXRAD Facility 120-208V 3 Phase System.doc DOC document
Contractors Release Form DOT F 4220.4.pdf PDF
SOK-D-NXRAD-E016.pdf PDF
SOK-D-NXRAD-D007.pdf PDF
SOK-D-NXRAD-E021.pdf PDF
Experience Information Form.doc DOC document
FAA-C-1391e Installation Termination Splicing and Transient-Surge Protection.....pdf PDF
SOK-D-NXRAD-E025.pdf PDF
SOK-D-NXRAD-E039.pdf PDF
SOK-D-NXRAD-C003.pdf PDF
Performance Bond.pdf PDF
SOK-D-NXRAD-D008.pdf PDF
SOK-D-NXRAD-C004.pdf PDF
Payment Bonds.doc DOC document
SOK-D-NXRAD-G005.pdf PDF
SOK-D-NXRAD-G006.pdf PDF
SOK-D-NXRAD-C005.pdf PDF
WP-D-645-40931-E18.pdf PDF
FAA-STD-019f Lightning and Surge Protection Grounding Bonding and Shielding...pdf PDF
SOK-D-NXRAD-E023.pdf PDF
FAA-C-1217G Electrical Work Interior.pdf PDF
SOK-D-NXRAD-D006.pdf PDF
Solicitation (SIR) 6973GH-20-R-00139.pdf PDF
Wage Determination HI20200001 as of 7-24-2020.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

VOLTS

PHASE

AMPS

3-#12

G

LOAD DUMP

400A

TRANSFORMER

UTILITY

SPLICE CABINET

CT CABINET

2-4" RGS 1

" RSC2

1IN 2

1-#4/0 (G)

4-#4/0 &

IN 3" RGS UNDERGROUND CONDUIT

4-#4/0 & 1-#2 (G) XHHW

2 SETS

IN 4"C

4-#1/0, & 1-#2 (G)

3PH, 4W

600A

ATS

LMC-208Y

EDCO MODEL

SURGE ARRESTER

PULLBOX

CONTROL HOUSING

INSIDE GENERATOR

2 SETS 4-#4/0

(GENSET MOUNTED)

600 AF/450 AT

GENERATOR CIRCUIT BREAKER

LCB1 -

3 PH, 4W

125KW 208Y/120V

DIESEL GENSET

IN 4" (C), TO 4" LTF

8-#4/0, & 1-#2 (G)

600AF/400AT

MTD CIRCUIT BREAKER

LOAD BANK DISCONNECT SWITCH WALL

LCB2 -

IN 4" (C), TO 4" LTF

6-#4/0, & 1-#2 (G)

1-#2 AWG GND

6-#4/0

4" EMT

1-#6 AWG GND

3-#6 AWG,

W/ 15-#4, AWG

TWO 2" EMT

1-#16 AWG GND

14-#16 AWG,

1" EMT

ELEMENTS

RESISTIVE

LOAD BANK

SUBPANELS

PWR & CNTL

LOAD BANK

PANEL

CONTROL

LOAD BANK

150A

PANEL E2

UNDERGROUND CONDUIT

IN A 3"RGS)

2 (4-#4/0 & 1-#4/0 (G)

120/208V, 3PH, 4W, 600A BUS

MDPE SQ D, HCP

208/120V, 3P, 4W

UPS 80 KVA

NOTES:

PULLBOX #1

PULLBOX #2

SEE NOTE 1

SEE NOTE 2

E/G BUILDING

UPS BUILDING

SERVICE DISCONNECT SWITCH

TYPE Q23225NS

ENCLOSURE, SQ D

CIRCUIT BREAKER

NEMA 3R, STAINLESS STEEL

PN 120-3Y-A1-4-06-A

TVSS

300A300A300A100A450A

203 204 205

300A

300A

300A

225A250A

150A

BYPASS

CB1

BREAKER

CIRCUIT

INPUT

SPARE

TVSS

TVSS

PANEL

UPS BYPASS

LOADBANK

80 KW, UPS

PORTABLE

PANEL

UPS ROOM

24"x24"x12"

PULLBOX

100A

214213 206

1P

15A

1P

20A

1P

40A

3P

60A

3P

20A 1P 15A

200A

60A 1R

15A3P

60A 3R

3P 60A

208/120V, 3PH, 4W, 225A

TS

M O

T O

R

S T

A R

T E

R

BENEATH

RADOME DECK

IN

T

E R

N A

L

L T ’S

R E

C ’S

S T

A

IR

L T ’S

CR

BREAKER

15A

125A

TVSS TVSS

125A

"MDP"

J-BOX

CONTROL PANEL

INTERLOCKING

A/C

CIRCUIT

M A

N U

A L

R A

D O

M E

T O

W E

R

120/208V, 3PH, 4W, 400A BUS

MDPC SQ D, HCN

TVSS

CP1

PANEL 1

CP2

PANEL 1

FAN SF-1

RADOME VENT DAMPER

CU-1 AH-1

15 AMPS

(SPST)

TOGGLE SW.

S T

A R

T E

R

M O

T O

R

M A

N U

A L

RADAR EQUIPMENT

BUILDING

NOTE 6

SEE

ATS EG

SEE NOTE 3

TEMP CABLES

SEE NOTE 5

GND ROD

AND

1/0 GND

TEMP ATS & EG

SEE NOTE 3

TEMP CABLES

SEE NOTE 4

SEE NOTE 7

E D

M

IS

S

U E

D F

O R

HI

WY

CGV

ES 05/23/2019 1400551

SOK-D-NXRAD-E038

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

INFRASTRUCTURE

NEXRAD

TEMPORARY SINGLE LINE

KAUAIIOLEAU

PROJECT ENGINEER MGR: ENGINEERING - LA

s o k -d -n x ra d -e

.d g n

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

REPLACEMENT SHELTER FOR EG

NOTED ITEMS: #1, #2, #3, #4, #6 AND #7.

THE CONTRACTOR SHALL RENT EQUIPMENT FOR A PERIOD OF 6 MONTHS FOR

APPROVED BY THE LOCAL SSC AND RESIDENT ENGINEER.

ALL TEMPORARY CABLES CABLES SHALL BE PROTECTED AND SAFELY ROUTED

SIDES. THESE WILL SERVE AS AN ACCESS POINT FOR TEMPORARY CABLES.

AND INSTALL 2-4" RGS NIPPLES BELOW IT WITH SCREW TYPE COVERS ON BOTH

THE CONTRACTOR SHALL USE EXISTING 6" NIPPLE PENETRATION OF UPS BUILDING

THE CONTRACTOR SHALL PROVIDE TEMPORARY CABLE 1-#1/05 TYPE W.

THE CONTRACTOR SHALL PROVIDE TEMPORARY CABLE 1-#4/0-05 TYPE W.

(B).

CONDUCTOR FOR TEMPORARY E/G IN ACCORDANCE WITH NEC ARTICLE 702.11(A) OR

CONTRACTOR FURNISHED AND INSTALLED GROUND ROD AND GROUNDING ELECTRODE

AND BLOCK HEATER.

FROM THE EQUIPMENT BUILDING TO THE TEMPORARY E/G SET BATTERY CHARGER

THE CONTRACTOR SHALL PROVIDE A TEMPORARY POWER CORD (2/#12 WITH GND),

OF 4-#4/0 TYPE W WITH #1 GND.

THE CONTRACTOR SHALL PROVIDE CABLE FOR THE TEMPORARY SERVICE ONE SET

600A, 120/208V, 3P, 4W, NEMA 3R, OPEN TRANSITION.

THE CONTRACTOR SHALL PROVIDE A TEMPORARY AUTOMATIC TRANSFER SWITCH,

125KW, 120/208V, 3P, 4W WITH AUTO START AND SUB-BASE FUEL TANK.

THE CONTRACTOR SHALL PROVIDE A TEMPORARY PORTABLE ENGINE GENERATOR,

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

s o k -d -n x ra d -e

.d g n

/6 /2

:4

:5

A

M Is a b e ll e C

T R I n a

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

2020-05-06T15:28:50-0700
ELYZZA E SESON
2020-05-06T16:22:19-0700
HARRY MOREAU

File details come from the government source that posted it. Updated .