About this file

This document provides details for a federal solicitation seeking construction services. The Federal Aviation Administration is soliciting proposals to replace an existing 9' x 25' engine generator shelter with a 13' x 25' concrete masonry unit shelter at its NEXRAD weather radar facility in Loleau, Kauai, Hawaii. Offerors must be registered in the System for Award Management by August 31, 2020 to be eligible. Proposals are due by 5:00pm Central Standard Time on August 31, 2020 and shall be submitted electronically to the contract specialist's email. The work will be awarded as a firm-fixed-price construction contract and the contractor will be responsible for furnishing all labor, materials, equipment, insurance, and supervision to complete the project. Site visits are not recommended due to COVID-19 restrictions and all questions must be submitted in writing by August 24th.

View the file

Other files

File Type Posted
Questions and Answers on SIR 6973GH-20-R-00139.pdf PDF
wp-d-645-40931-s06 (EG Bldg Foundation).pdf PDF
sok-d-nxrad-c003 markup.pdf PDF
6973GH-20-R-00139 Amendment 0002.pdf PDF
6973GH-20-R-00139 Amendment 0001.pdf PDF
6973GH-20-R-00139 Photos of Site.pdf PDF
SOK-D-NXRAD-E024.pdf PDF
Scope of Work for the Kauai (SOK) NEXRAD Facility 120-208V 3 Phase System.doc DOC document
Contractors Release Form DOT F 4220.4.pdf PDF
SOK-D-NXRAD-E038.pdf PDF
SOK-D-NXRAD-E016.pdf PDF
SOK-D-NXRAD-D007.pdf PDF
SOK-D-NXRAD-E021.pdf PDF
Experience Information Form.doc DOC document
FAA-C-1391e Installation Termination Splicing and Transient-Surge Protection.....pdf PDF
SOK-D-NXRAD-E025.pdf PDF
SOK-D-NXRAD-E039.pdf PDF
SOK-D-NXRAD-C003.pdf PDF
Performance Bond.pdf PDF
SOK-D-NXRAD-D008.pdf PDF
SOK-D-NXRAD-C004.pdf PDF
Payment Bonds.doc DOC document
SOK-D-NXRAD-G005.pdf PDF
SOK-D-NXRAD-G006.pdf PDF
SOK-D-NXRAD-C005.pdf PDF
WP-D-645-40931-E18.pdf PDF
FAA-STD-019f Lightning and Surge Protection Grounding Bonding and Shielding...pdf PDF
FAA-C-1217G Electrical Work Interior.pdf PDF
SOK-D-NXRAD-D006.pdf PDF
Solicitation (SIR) 6973GH-20-R-00139.pdf PDF
Wage Determination HI20200001 as of 7-24-2020.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04’ 4’ 8’

SCALE: 1/4" = 1’-0"

4’-0"

5’-8�"

4’

CHARGER

BATT

120/208V, 3PH, 4W

125KW EG

ATS

MSD

STORAGE SHELTER

UPS BLDG

MDPE

RMM

SEE NOTE 3

TVSS

TANK

DAY

PANEL

CTRL

ENV

SEE NOTE 19

SEE NOTE 16

SEE NOTE 2

SEE NOTE 15

PANEL

HOUSE

EG TVSS

SEE NOTE 17

EG ROOM DS

DISC

TVSS

SEE NOTE 14

"8 74’-3 "8

713’-8

8’-10�"

"8 715’-11

’-6

E D

M

IS

S

U E

D F

O R

HI

WY

JKB

ES 08/29/2018 1704153

SOK-D-NXRAD-E023

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

INFRASTRUCTURE

NEXRAD

UNDERGROUND CONDUIT

ELECTRICAL SITE PLAN AND

KAUAIIOLEAU

PROJECT ENGINEER MGR: ENGINEERING - LA

s o k -d -n x ra d -e

.d g n

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

NOTES FOR UNDERGROUND CONDUIT LAYOUT

19.

18.

17.

16.

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

N

N

N

MDPE TO EG PANEL

TO USE FROM

EXISTING SPARE

ATS TO MDPE

CONDUIT FROM

UNDERGROUND

EXISTING 3"

RMM TO PB#2

CONDUIT FROM

UNDERGROUND

EXISTING 3"

POWER

2-3" PVC

EXISTING

COMM

2-2" PVC

EXISTING

REPLACEMENT SHELTER FOR EG

PB #1

EXISTING

PULLBOX #3

NEW 4’X4’

INSTALL

(FUTURE)

4, 12 & 13

SEE NOTE

1, 12 & 13

SEE NOTE

PB

#24’

X4

’NEWIN

STALL

POWER CONDUCTORS. Ref. FAA-C-1391e, Section 5.5.10e.

OUTSIDE WALL TO OUTSIDE WALL FROM CONDUIT WHICH CONTAIN

SYSTEM. CONDUIT FOR CONTROL CABLES NEED A MINIMUM OF 3"

2" PVC COATED RGS FROM PULLBOX #2 TO EG ROOM FOR RMM

FROM: ATS

TO: MDPE

FROM: MDPE

TO: EG HOUSE PNL

FROM: MAIN SERV DISC SW

TO: EG ROOM DISC SW

CONDUIT.

BRASS TAGS THAT IDENTIFY CABLES BEING INSTALLED FOR EACH

CONDUIT/COUPLING FLUSH WITH THE FINISHED FLOOR.

SWITCH TO LOADBANK CONTROLS UNIT. STUB UP THE

3" PVC COATED RGS FROM 125KW EG LOADBANK DISCONNECT

DISCONNECT SWITCH.

3" PVC COATED RGS FROM NEW PULLBOX #3 TO EG ROOM

2" PVC COATED RGS FROM PULLBOX #2 TO EG HOUSE PANEL.

CONDUIT ENTRY AREA.

3" PVC COATED RGS FROM ATS TO EG. REF DRAWING E021 FOR

ASSEMBLY ON THE INTERIOR OF THE CONCRETE PULLBOX.

A 26"X4"X1/4" COPPER GROUND PLATE WITH COVER AND MOUNTING

THE CONTRACTOR TO GROUND THE INTERIOR CONDUITS.

THE INTERIOR OF THE PULLBOX. THIS GROUND PLATE WILL ALLOW

FROM THE EES TO THE GROUND PLATE WHICH WILL BE INSTALLED ON

A 2" PVC SCH SLEEVE FOR A BARE #4/0 COPPER CONDUCTOR

LINE".

DETECTABLE UNDERGROUND TAPE. "CAUTION: BURIED ELECTRICAL

GRADE SHALL BE 3" PER 100 FEET.

ALL CONDUIT SHALL BE LAID TO SLOPE TOWARDS THE MANHOLE.

MINIMUM CONDUIT DEPTH 24" BELOW GRADE.

MINIMUM OF 3" (OUTSIDE WALL TO OUTSIDE WALL).

MINIMUM SEPARATION BETWEEN CONTROL AND POWER SHALL BE A

DIRECTION.

6" APART (OUTSIDE WALL TO OUTSIDE WALL) IN A VERTICAL

TO OUTSIDE WALL) IN A HORIZONTAL DIRECTION OR NOT LESS THAN

THEY SHALL BE SPACED NOT LESS THAN 2" APART. (OUTSIDE WALL

WHEN TWO OR MORE DUCTS ARE INSTALLED IN THE SAME TRENCH,

2234 TAPE PRIOR TO BURIAL.

THE DAMAGED AREAS OF THE 40 MIL PVC COATING WITH SCOTCH

AFTER THE CONDUIT AND COUPLING HAVE BEEN INSTALLED REPAIR

COATED HOT DIPPED RIGID GALVANIZED STEEL CONDUIT.

ALL UNDERGROUND CONDUIT AND FITTINGS SHALL BE 40 MIL PVC

RATED. MINIMUM LID OPENING TO BE 36"X 36".

NEW 4’X4’ PULLBOX WITH GALVANIZED STEEL LID H-20 TRAFFIC

PULLBOX #2.

(2) - 3" PVC COATED RGS CONDUIT FROM ATS TO EXISTING

DISCONNECT TO NEW PULLBOX #3.

(2) - 3" PVC COATED RGS CONDUIT FROM MAIN SERVICE

RATED. MINIMUM LID OPENING TO BE 36"X 36".

NEW 4’X4’ PULLBOX WITH A GALVANIZED STEEL LID H-20 TRAFFIC INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

INSTALL

s o k -d -n x ra d -e

.d g n

/6 /2

:3

:2

A

M Is a b e ll e C

T R I n a

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

2020-05-06T15:18:52-0700
ELYZZA E SESON
2020-05-06T16:19:16-0700
HARRY MOREAU

File details come from the government source that posted it. Updated .