About this file

This solicitation is for a firm-fixed-price construction contract to replace an existing 9' x 25' Engine Generator shelter with a 13' x 25' CMU shelter at the NEXRAD SOK facility located in Loleau, Kauai, Hawaii. The Federal Aviation Administration requires furnishing all materials, equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision to perform the work described in the attached specifications, drawings and documents. Questions regarding the project scope, drawings or documents are due by August 24, 2020. Proposals must be received by August 31, 2020. The contractor must be registered in the System for Award Management and complete and return the attached forms by the closing date. The contract will be awarded according to the Acquisition Management System in place of the Federal Acquisition Regulation.

View the file

Other files

File Type Posted
Questions and Answers on SIR 6973GH-20-R-00139.pdf PDF
wp-d-645-40931-s06 (EG Bldg Foundation).pdf PDF
sok-d-nxrad-c003 markup.pdf PDF
6973GH-20-R-00139 Amendment 0002.pdf PDF
6973GH-20-R-00139 Amendment 0001.pdf PDF
6973GH-20-R-00139 Photos of Site.pdf PDF
SOK-D-NXRAD-E024.pdf PDF
Scope of Work for the Kauai (SOK) NEXRAD Facility 120-208V 3 Phase System.doc DOC document
Contractors Release Form DOT F 4220.4.pdf PDF
SOK-D-NXRAD-E038.pdf PDF
SOK-D-NXRAD-E016.pdf PDF
SOK-D-NXRAD-D007.pdf PDF
SOK-D-NXRAD-E021.pdf PDF
Experience Information Form.doc DOC document
FAA-C-1391e Installation Termination Splicing and Transient-Surge Protection.....pdf PDF
SOK-D-NXRAD-E025.pdf PDF
SOK-D-NXRAD-E039.pdf PDF
SOK-D-NXRAD-C003.pdf PDF
Performance Bond.pdf PDF
SOK-D-NXRAD-C004.pdf PDF
Payment Bonds.doc DOC document
SOK-D-NXRAD-G005.pdf PDF
SOK-D-NXRAD-G006.pdf PDF
SOK-D-NXRAD-C005.pdf PDF
WP-D-645-40931-E18.pdf PDF
FAA-STD-019f Lightning and Surge Protection Grounding Bonding and Shielding...pdf PDF
SOK-D-NXRAD-E023.pdf PDF
FAA-C-1217G Electrical Work Interior.pdf PDF
SOK-D-NXRAD-D006.pdf PDF
Solicitation (SIR) 6973GH-20-R-00139.pdf PDF
Wage Determination HI20200001 as of 7-24-2020.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPS/GEN MODULE LAYOUT PLAN

40’-0"

15’-5"

01’ 2’ 5’

SCALE: 1/2" = 1’-0"

1’

SCALE: 1/2"=1’-0"

TANK

DAY

RESISTIVE ELEMENTS

LOAD BANK

ENGINE GENERATOR

LCB-1

PANEL

CONTROL

CHARGER

BATTERY

LIGHT

EMERGENCY

LIGHT SWITCH

THERMOSTAT

EXHAUST FAN

(ABOVE)

LCB-2

LOAD BANK CONTROL PANEL

SIMPLX RESISTIVE

ATS

RMM AUX ALARM PANEL (BELOW)

RMM ALARM PANEL (BELOW)

GUTTER (TOP)

RMS CABINET

CONTROL PANEL

LOAD BANK

CONTROL SUBPANEL

LOAD BANK POWER &

GRAVITY DAMPERS

INTAKE

HOOD

LOUVER

MOTORIZED

RADIATOR

DISCHARGE

PLENUM

E/G EXHAUST W/

THERMO BLANKET

150A

PANEL E2

JUNCTION BOX

EXHAUST FAN HOOD

GRAVITY DAMPER

EXHAUST FAN

SEE NOTE 14

SEE NOTE 5

SEE NOTE 10

SEE NOTE 12

SEE NOTE 6

SEE NOTE 7

SEE NOTE 4

SEE NOTE 8 & 9

NOTES:

LEGEND:

TO BE REMOVE

EQUIPMENT DURING SCHEDULED OUTAGE.

CABLES (APPROX. 800’) TO SUPPORT

ENGINE GENERATOR, TEMPORARY ATS, TEMPORARY

CONTRACTOR TO PROVIDE TEMPORARY 125KW

REMOVED BY THE FAA.

ALL RMM DEVICES SHALL BE IDENTIFIED AND

(EPA AND OSHA) REGULATION.

BY THE FAA, LOCAL COUNTY/STATE AND FEDERAL

OF ALL DISPOSAL DOCUMENTATION AS REQUIRED

REGULATIONS. THE FAA SHALL BE GIVEN A COPY

IN ACCORDANCE WITH ALL EXISTING FAA/EPA/OSHA

DISPOSE OF ALL HAZARDOUS FLUIDS/MATERIALS

ASSOCIATED EQUIPMENT. THE CONTRACTOR SHALL

DRAIN ALL OF THE FLUIDS FROM THE EG AND IT’S

REMOVE THE INTAKE HOOD AND LOUVER.

GROUND FUEL TANK.

FUEL PIPING SHALL BE REMOVED BACK TO THE ABOVE

CABLE/FUEL PIPING ASSOCIATED WITH THE 125KW EG.

REMOVE THE DAYTANK AND ALL ASSOCIATED CONDUIT/

CABLE ASSOCIATED WITH THE EG EXHAUST HOOD.

LOADBANK AND LOUVER)AND ALL ASSOCIATED CONDUIT/

REMOVE THE EG EXHAUST HOOD (WHICH INCLUDES THE

CABLE ASSOCIATED WITH THE 125KW EG.

REMOVE THE 125KW EG AND ALL ASSOCIATED CONDUIT/

LOADBANK CONTROL PANEL ENCLOSURE.

ASSOCIATED CONDUIT/CABLE ASSOCIATED WITH THE

REMOVE THE LOADBANK CONTROL PANEL AND ALL

CABLE ASSOCIATED WITH THE ATS ENCLOSURE.

REMOVE THE ATS AND ALL ASSOCIATED CONDUIT/

CABLE ASSOCIATED WITH THE PANEL E2.

REMOVE PANEL E2 AND ALL ASSOCIATED CONDUIT/

EXHAUST HOOD ASSEMBLY.

ASSOCIATED CONDUIR/CABLE ASSOCIATED WITH THE

INCLUDES THE DAMPER AND EXHAUST FAN) AND ALL

REMOVE THE EXHAUST HOOD ASSEMBLY (WHICH

WITH THE IN AIR VENT.

REMOVE ASSOCIATED CONDUIT AND CABLE ASSOCIATED

REMOVE THE INTAKE HOOD AND INLET AIR VENT.

AND STUB-UPS TO EXISTING EG SHELTER.

REMOVE ALL ASSOCIATED UNDERGROUND CONDUITS

FOUNDATION AND STEPS.

REMOVE THE ENTIRE 40’ CONTAINER AND ITS

E D

M

IS

S

U E

D F

O R

HI

WY

IMI

ES 08/29/2018 1704153

SOK-D-NXRAD-D008

C O

N S

T R

U C

T

IO

N

ENGINEERING SERVICES

INFRASTRUCTURE

NEXRAD

MODULE ELEVATIONS AND DETAILS

DEMO UPS/GENERATOR

KAUAIIOLEAU

PROJECT ENGINEER MGR: ENGINEERING - LA

s o k -d -n x ra d -d

.d g n

DRAWING PRODUCED ON WSA MICROSTATION SYSTEM

ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

REPLACEMENT SHELTER FOR EG

s o k -d -n x ra d -d

.d g n

/1

/2

:3

:5

P

M Is a b e ll e C

T R I n a

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

H

G

F

E

D

C

12345678

REVDRAWING NO

DATE JCN

APPROVED BY

ISSUED BY

CHECKED

DRAWN

DESIGNED

SUBMITTED BY

REVIEWED BY

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV

DATE

APPROVED

DESCRIPTION JCN

DATE

REDLINE

APVD

A

2020-05-06T15:13:24-0700
ELYZZA E SESON
2020-05-06T16:17:24-0700
HARRY MOREAU

File details come from the government source that posted it. Updated .