SOK-D-NXRAD-D008.pdf
PDF 231 KB Posted
- Solicitation number
- 6973GH-20-R-00139
About this file
This solicitation is for a firm-fixed-price construction contract to replace an existing 9' x 25' Engine Generator shelter with a 13' x 25' CMU shelter at the NEXRAD SOK facility located in Loleau, Kauai, Hawaii. The Federal Aviation Administration requires furnishing all materials, equipment, labor, transportation, insurance, notifications, licenses, permits, fees and supervision to perform the work described in the attached specifications, drawings and documents. Questions regarding the project scope, drawings or documents are due by August 24, 2020. Proposals must be received by August 31, 2020. The contractor must be registered in the System for Award Management and complete and return the attached forms by the closing date. The contract will be awarded according to the Acquisition Management System in place of the Federal Acquisition Regulation.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPS/GEN MODULE LAYOUT PLAN
40’-0"
15’-5"
01’ 2’ 5’
SCALE: 1/2" = 1’-0"
1’
SCALE: 1/2"=1’-0"
TANK
DAY
RESISTIVE ELEMENTS
LOAD BANK
ENGINE GENERATOR
LCB-1
PANEL
CONTROL
CHARGER
BATTERY
LIGHT
EMERGENCY
LIGHT SWITCH
THERMOSTAT
EXHAUST FAN
(ABOVE)
LCB-2
LOAD BANK CONTROL PANEL
SIMPLX RESISTIVE
ATS
RMM AUX ALARM PANEL (BELOW)
RMM ALARM PANEL (BELOW)
GUTTER (TOP)
RMS CABINET
CONTROL PANEL
LOAD BANK
CONTROL SUBPANEL
LOAD BANK POWER &
GRAVITY DAMPERS
INTAKE
HOOD
LOUVER
MOTORIZED
RADIATOR
DISCHARGE
PLENUM
E/G EXHAUST W/
THERMO BLANKET
150A
PANEL E2
JUNCTION BOX
EXHAUST FAN HOOD
GRAVITY DAMPER
EXHAUST FAN
SEE NOTE 14
SEE NOTE 5
SEE NOTE 10
SEE NOTE 12
SEE NOTE 6
SEE NOTE 7
SEE NOTE 4
SEE NOTE 8 & 9
NOTES:
LEGEND:
TO BE REMOVE
EQUIPMENT DURING SCHEDULED OUTAGE.
CABLES (APPROX. 800’) TO SUPPORT
ENGINE GENERATOR, TEMPORARY ATS, TEMPORARY
CONTRACTOR TO PROVIDE TEMPORARY 125KW
REMOVED BY THE FAA.
ALL RMM DEVICES SHALL BE IDENTIFIED AND
(EPA AND OSHA) REGULATION.
BY THE FAA, LOCAL COUNTY/STATE AND FEDERAL
OF ALL DISPOSAL DOCUMENTATION AS REQUIRED
REGULATIONS. THE FAA SHALL BE GIVEN A COPY
IN ACCORDANCE WITH ALL EXISTING FAA/EPA/OSHA
DISPOSE OF ALL HAZARDOUS FLUIDS/MATERIALS
ASSOCIATED EQUIPMENT. THE CONTRACTOR SHALL
DRAIN ALL OF THE FLUIDS FROM THE EG AND IT’S
REMOVE THE INTAKE HOOD AND LOUVER.
GROUND FUEL TANK.
FUEL PIPING SHALL BE REMOVED BACK TO THE ABOVE
CABLE/FUEL PIPING ASSOCIATED WITH THE 125KW EG.
REMOVE THE DAYTANK AND ALL ASSOCIATED CONDUIT/
CABLE ASSOCIATED WITH THE EG EXHAUST HOOD.
LOADBANK AND LOUVER)AND ALL ASSOCIATED CONDUIT/
REMOVE THE EG EXHAUST HOOD (WHICH INCLUDES THE
CABLE ASSOCIATED WITH THE 125KW EG.
REMOVE THE 125KW EG AND ALL ASSOCIATED CONDUIT/
LOADBANK CONTROL PANEL ENCLOSURE.
ASSOCIATED CONDUIT/CABLE ASSOCIATED WITH THE
REMOVE THE LOADBANK CONTROL PANEL AND ALL
CABLE ASSOCIATED WITH THE ATS ENCLOSURE.
REMOVE THE ATS AND ALL ASSOCIATED CONDUIT/
CABLE ASSOCIATED WITH THE PANEL E2.
REMOVE PANEL E2 AND ALL ASSOCIATED CONDUIT/
EXHAUST HOOD ASSEMBLY.
ASSOCIATED CONDUIR/CABLE ASSOCIATED WITH THE
INCLUDES THE DAMPER AND EXHAUST FAN) AND ALL
REMOVE THE EXHAUST HOOD ASSEMBLY (WHICH
WITH THE IN AIR VENT.
REMOVE ASSOCIATED CONDUIT AND CABLE ASSOCIATED
REMOVE THE INTAKE HOOD AND INLET AIR VENT.
AND STUB-UPS TO EXISTING EG SHELTER.
REMOVE ALL ASSOCIATED UNDERGROUND CONDUITS
FOUNDATION AND STEPS.
REMOVE THE ENTIRE 40’ CONTAINER AND ITS
E D
M
IS
S
U E
D F
O R
HI
WY
IMI
ES 08/29/2018 1704153
SOK-D-NXRAD-D008
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
INFRASTRUCTURE
NEXRAD
MODULE ELEVATIONS AND DETAILS
DEMO UPS/GENERATOR
KAUAIIOLEAU
PROJECT ENGINEER MGR: ENGINEERING - LA
s o k -d -n x ra d -d
.d g n
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
REPLACEMENT SHELTER FOR EG
s o k -d -n x ra d -d
.d g n
/1
/2
:3
:5
P
M Is a b e ll e C
T R I n a
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
| 2020-05-06T15:13:24-0700 | |
| ELYZZA E SESON |
| 2020-05-06T16:17:24-0700 | |
| HARRY MOREAU |
File details come from the government source that posted it. Updated .