SOK-D-NXRAD-C004.pdf
PDF 276 KB Posted
- Solicitation number
- 6973GH-20-R-00139
About this file
This solicitation requests proposals to replace an existing 9' x 25' Engine Generator shelter with a 13' x 25' Concrete Masonry Unit shelter at the NEXRAD SOK facility in Loleau, Kauai, Hawaii. Offerors must provide all labor, materials, equipment, insurance, and supervision to complete the work according to attached specifications, drawings, and other documents. Proposals are due by August 31, 2020 and must be submitted via email with the solicitation number in the subject line. The contract will be a firm-fixed-price construction contract awarded to the responsible offeror with the lowest price. Site visits are not recommended due to COVID-19 restrictions and all questions must be submitted in writing by August 24. Offerors must be registered in SAM.gov by the due date.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRIOR TO EXCAVATION.
THE CONTRACTOR SHALL PERFORM AN UNDERGROUND UTILITY PROBE
SPECIAL PRECAUTIONS
SCOPE OF WORKPAINT SPECIFICATIONS
METAL ROOF DECK UNDERSIDE:
2.3 MILS DFT@320 SF/GAL/COAT
BEN MOORE’S ULTRA SPEC HP29 DTM ACRYLIC SEMI-GLOSS
1.7-2.3 MILS DFT@300-400 SF/GAL
BEN MOORE’S SUPER SPEC P04 ACRYLIC METAL PRIMER
2 COATS:
1 COAT:
CMU WALL SURFACES:
TREATED WOOD BLOCKING
2-2x6 CONT. PRESSURE
TOP OF METAL DECK
EVERY OTHER FLUTE
3" PUDDLE WELD
16" BOND BEAM
2-#5
1/2" PRESSURE TREATED PLYWOOD
METAL FLASHING
12"
13’-0"
FINISH FLOOR
FINISH GROUND LEVEL
SCALE: 3/8" = 1’-0"
SECTION A
13’-0"
DETAIL A
WITH 2-#5 CONT.
16" BOND BEAM
GRADE
24"
9’-4"
6"
12"
TYPICAL WALL
SCALE: 3/8" = 1’-0"
6" CHB
METAL FLASHING
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
02’ 2’ 4’ 6’
SCALE: 3/8" = 1’-0"
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
METAL FLASHING
UNDER AND OVER
EPDM MEMBRANE
INSTALL
1/2" FIBER BOARD
INSTALL
INSULATION
3" POLYISOCYANURATE
INSTALL
METAL ROOF DECK
INSTALL
STUDS AT 18" ON CENTER
3/8" DIA. X 3" HEADED ANCHOR
1/4" THK CONT. PLATE WITH
INSTALL
EXPANSION JOINT
INSTALL
@ 18" O.C.
#4 REBAR
BASE COURSE
AGGREGATE
DENSE GRADED
SUBGRADE
COMPACTED
SCALE: 1/4" = 1’-0"
A
C004
DETAIL
EXISTING STRUCTURES.
SPACED @ 3’ O.C. TO SURROUNDING
INSTRUCTION) 6" EMBEDMENT
AS PER MANUFACTURER’S
DRILL AND EPOXY (HILTY HY-150
INSTALL
EACH WAY
SLAB W/ #4@18" O.C.
8" THICK CONCRETE
INSTALL
@32" O.C.
HORIZONTAL REBAR
CELLS,TYP. AND #5
IN FULL GROUTED
6" CHB W/#5@24"O.C.
INSTALL
SUB BASE
95% COMPACTED
@16" O.C.
#4 TIES
6-#5 w/
INSTALL
BASE FILL, 95% COMPACTED
6" DEEP, 3/4" AGGREGATE
INSTALL
ON METAL DECKING
INSTALL BUILT-UP ROOF
INSTALL
INSTALL
EPDM MEMBRANE
INSTALL
INSULATION
3" POLYISOCYANURATE
INSTALL
6" DEEP METAL ROOF DECK
INSTALL
HORIZONTAL REBAR @ 32" O.C.
GROUTED CELLS, TYP. AND #5
HEIGHT #5 @ 24" O.C. IN FULL
INSTALL VERTICAL REBAR FULL
6-#5 WITH #4 TIES @ 16" O.C.
INSTALL
FOOTING 2’ DEEP
EMBEDDED IN CONCRETE
VERTICAL #5 REBAR
SPECIFICATIONS
NOT TO SCALE
B
C004
CONCRETE SIDEWALK
EACH WAY
SLAB WITH #4 @ 18" O.C.
INSTALL 8" THK CONCRETE
E D
M
IS
S
U E
D F
O R
DETAILS
HI
WY
JKB
ML 08/29/2018 1704153
SOK-D-NXRAD-C004
C O
N S
T R
U C
T
IO
N
ENGINEERING SERVICES
INFRASTRUCTURE
NEXRAD
EG SHELTER
KAUAIIOLEAU
PROJECT ENGINEER MGR: ENGINEERING - LA
s o k -d -n x ra d -c
.d g n
DRAWING PRODUCED ON WSA MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
PROPOSED
IN OPEN POSITION.
4. DOOR TO WALL LATCH TO ALLOW FOR DOOR TO BE HELD
SEE PAINT SPECIFICATIONS.
3. PAINT UNDERSIDE OF METAL ROOF DECK (CEILING), WHITE COLOR.
2. FURNISH ONE (1) STAINLESS STEEL DOOR WITH LOCKSETS.
OUTSIDE & WHITE INSIDE. SEE PAINT SPECIFICATIONS.
EG BUILDING, TOOLED JOINTS (2 SIDES), AND PAINT BEIGE
1. CONSTRUCTION OF THE CONCRETE MASONRY UNIT (CMU)
DISTRUBED.
9. REPLACE ANY WEED BLOCK MATERIAL AND GROUND COVER
LIMITATIONS RECOMMENDED BY ROOFING MANUFACTURER.
TEMPERATURE RESTRICTIONS: DO NOT EXCEED TEMPERATURE
PRECIPITATION DURING APPLICATION.
PRECIPITATIONS OR IN THE EVENT THERE IS A PROBABILITY OF
PRECIPITATIONS: DO NOT APPLY INSULATION MATERIALS DURING
8. ENVIRONMENTAL REQUIREMENTS:
DOOR HANDLE/LOCK GUARD PLATE FOR DOOR.
MANUFACTURER: HAGER, STANLEY
4-1/2" x 4-1/2" BALL BEARING, HEAVY WEIGHT.
HINGES: FULL MORTISE TYPE, STAINLESS STEEL, OUTSWING DOORS,
MANUFACTURER: BESTLOCK
STAINLESS STEEL CHASSIS.
KEYABLE TO EXISTING MASTERKEY SYSTEM; 2-3/4" INCH BACKSET,
LOCKSETS: MORTISE TYPE, 7-PIN INTERCHANGEABLE CORE,
7. FINISH HARDWARES:
6. THRESHOLD AND WEATHER-STRIPPING (ALL AROUND).
WITH A #4 FINISH, 1 3/4", FLAT BAR ASTRAGAL (FULL HEIGHT).
FIRE RATED (2 HOUR) 16 GUAGE STAINLESS STEEL MIN., 316L
5. METAL DOORS:
(EPDM) MEMBRANE.
0.060" THICK, ETHYLENE PROPYLENE DIENE TERPOLYMER
MEMBRANE MATERIALS: FIRESTONE RUBBERGUARD, NOMINAL
FIRESTONE SO 95 + ISOCYANURATE BOARD: CLASS 2
4. ROOF INSULATION: FIRESTONE WOOD FIBERBOARD CLASS E.
SURFACES. PAY PARTICULAR ATTENTION TO JOINTS.
MAKE VERTICAL AND HORIZONTAL PASSES TO SATURATE ALL
SEE PAINT SPECIFICATIONS SUBMITTAL’S ARE REQ. ON COLORS.
GRADE N 6"x8"x16" STRECHER BLOCK.
3. CONCRETE MASONRY UNITS:
2. REINFORCEMENT: DEFORMED BARS, ASTM A615, GRADE 40
1. CONCRETE: COMPRESSIVE STRENGTH, 4000 PSI
CONCRETE FLOOR SURFACE:
INSTALL 2 COATS:
1 COAT:
2 COATS:
3 COAT:
1.8 MILS DFT@350-400 SF/GAL/COAT
BEN MOORE’S ULTRA SPEC N539 INTERIOR LATEX SEMI-GLOSS
(SECOND COAT)
7.4 MILS DFT@75 SF/GAL (FIRST COAT) 9.8 MILS DFT@100 SF/GAL
PAINT-TINTED TO BEIGE PER MANUFACTURER’S INSTRUCTIONS.
ZINSSER’S WATER-TITE MOLD & MILDEW PROOF WATERPROOFING
1.5 MIL DFT @ 350-450 SF/GAL/COAT
COROTECH V440 WATERBORNE ANIME EPOXY-BATTLESHIP GRAY
DFT @ 350-450 SF/GAL.
COROTECH V155 100% SOLID EPOXY PRO-PRIME 1.0-1.5 MILS
REPLACEMENT SHELTER FOR EG
s o k -d -n x ra d -c
.d g n
/1
/2
:4
:5
P
M Is a b e ll e C
T R I n a
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
| 2020-05-06T15:01:38-0700 | |
| ELYZZA E SESON |
| 2020-05-06T16:13:31-0700 | |
| HARRY MOREAU |