Sheraden_Park_Phase_1_Construction_-_SOV.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Sheraden Park Phase 1 Construction
- Solicitation number
- 2026-IFB-152
- Issued by
- Allegheny County, Pennsylvania
About this file
This is a Schedule of Values document for Sheraden Park Phase 1 Construction in Pittsburgh, Allegheny County, Pennsylvania, prepared on behalf of the City of Pittsburgh Department of Public Works using the AIA Document G703 format. The project encompasses comprehensive park improvements including demolition and site preparation, earthwork and grading, concrete foundations and flatwork, asphalt paving, site surfacing, site fencing, plumbing, stormwater management infrastructure, electrical systems and lighting, site furnishings and equipment, and landscaping. Work items include removal of existing structures and utilities, installation of 316 linear feet of 12" HDPE storm pipe and additional PVC storm piping, concrete walkways and pads, asphalt paving with subbase, pickleball and basketball court installations with fencing, parking area development with ADA markings, drinking fountains, garden areas with raised beds, trail surfaces, rain gardens with bioswales, LED lighting systems including sport court lighting at 30' mounting height, signage, and site furnishings such as benches, bicycle racks, and grills.
The document presents a detailed line-item breakdown organized by 24 base bid categories and two add alternate categories for tree furnishing and installation, with the base bid categories addressing general conditions, demolition, site preparation, concrete work, paving, stormwater management, electrical infrastructure, and landscaping. Add Alternate 1 provides for furnishing and installation of 33 two-inch caliper trees and 36 three-inch caliper trees, totaling 69 trees of specified species including serviceberry, hazel alder, redbud, dogwood, apple varieties, yellow birch, black gum, American sycamore, and white oak. All scheduled values are listed as zero in the document, indicating this is a template format awaiting contractor pricing and application data during the construction administration phase.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G703
| Sheraden Park Phase I Improvements — City of Pittsburgh, Allegheny County | ||||||
| (reference for) AIA Document G703 — Continuation Sheet / Schedule of Values | ||||||
| APPLICATION NO: | APPLICATION DATE: | PERIOD TO: | ARCHITECT'S PROJECT NO: | 304 2202 | ||
| ITEM | ||||||
| NO. | DESCRIPTION OF WORK | SCHEDULED | ||||
| VALUE | WORK COMPLETED |
FROM PREVIOUS
| APPLICATION | WORK COMPLETED |
| THIS PERIOD | MATERIALS |
PRESENTLY
STORED TOTAL
COMPLETED
| AND STORED | % | BALANCE | ||
| TO FINISH | RETAINAGE | |||
| GENERAL CONDITIONS | ||||
| 1 | General Conditions | 0 | - | |
| • Mobilization and demobilization |
• Performance and payment bond
• Permits (Contractor to pick up all parent permits and apply for all subsequent permits)
• Maintenance and traffic protection
• Temporary construction fence
• Survey and layout
• Project management, supervision, progress meetings, and submittals
• Record drawings and project closeout
• Miscellaneous general conditions
| DEMOLITION AND SITE PREPARATION | |||
| 2 | Demolition | 0 | - |
| • Remove existing trees, stumps, and grind to 6" below grade |
• Remove existing concrete curb, curb stops, and guard rails
• Remove existing light poles, foundations, and block building (sports field)
• Remove existing benches, grills, water fountains, and cut/cap utilities
• Remove existing play equipment, pipe (ex. building), fence posts, and bollards
• Remove existing electrical equipment and infrastructure
• Demolish existing asphalt, concrete, stone, and play surfaces with subbase
• Remove existing chain link fence and guide rail with foundations
• Clear and grub all vegetation, brush, stumps, and organic material within limits of work
| 3 | Erosion and Sediment Control (E&S) | 0 | - |
| • Installation, maintenance, inspection, and removal of all E&S BMPs |
• Silt fence, inlet protection, rock check dams, and sediment traps as required
• Topsoil stockpile management and concrete washout area
• Tree protection fencing for all trees designated to remain
• Compliance with approved E&S plan throughout duration of construction
| EARTHWORK AND GRADING | |||
| 4 | Site Cut/Fill and Grading | 0 | - |
| • Rough grading — unclassified excavation and earthmoving |
• Finish grading of all paved, planted, lawn, and seeded areas
• Haul and import of suitable fill material as required
• Pavement sawcut (24" wide) at all existing pavement tie-in locations
• Pavement sawcut restoration to match existing cross section
| 5 | Trenching | 0 | - |
| • Trench for underdrains along walking trails and hillside areas |
• Trench for potable water pipe serving drinking fountain
• Trench for sewer drain pipe serving drinking fountain
• Trench for electrical conduit runs; see also Electrical
• All trench backfill, compaction, and surface restoration
| CONCRETE | |||
| 6 | Concrete Foundations | 0 | - |
| • Foundations for 25' City standard vehicular light poles |
• Foundations for Musco sport court lighting poles
• Foundations for pickleball net posts and basketball hoop posts
• Foundation for playground equipment — coordinate with Kompan (by Others)
| 7 | Concrete Flatwork and Curb | 0 | - |
| • 4" concrete paving and aggregate subbase for pedestrian walkways |
• 4" concrete pads for City benches (10 EA) and park benches
• 16" reinforced concrete pad for drinking fountain
• Concrete curb
• Detectable warning surfaces at all curb ramp locations
| SITEWORK | |||
| 8 | Asphalt Paving and Subbase | 0 | - |
| • Standard duty asphalt paving and subbase |
• Heavy duty asphalt paving and subbase
• Asphalt wedge curb
• Precast wheel stops
| 9 | Site Surfacing | 0 | - |
| • Crushed stone trail surface and subbase |
• Playground safety surfacing — pour-in-place rubber with 6" aggregate base; by Others, Contractor to coordinate
• Engineered wood fiber mulch (EWF) 6" depth in playground areas
• Traffic guide rail
| 10 | Pavement Markings and Striping | 0 | - |
| • ADA pavement markings — parking symbols, access aisle striping, and diagonal hatching |
• Parking lot striping, road striping, bicycle shared symbols, and crosswalk markings
• Basketball and pickleball court markings
• Painted pedestrian walk markings
| 11 | Masonry and Edging | 0 | - |
| • Segmental retaining wall, less than 4-ft height |
• Metal landscape edging at garden and planting bed edges
• Repaint existing shelter roof and columns
| SITE FENCING | |||
| 12 | Site Fencing | 0 | - |
| • 6' chain link fence at pickleball court |
• 10' chain link fence at basketball court
• 10' chain link fence at community gardens
• 4' wide chain link gate at community garden enclosure
• 4' ornamental metal fence
| PLUMBING | |||
| 13 | Plumbing | 0 | - |
| • Potable water pipe from point of connection to drinking fountain |
• Sewer drain pipe from drinking fountain to point of connection
• Plumbing connection at source — location and depth to be verified in field
• Yard hydrant serving community garden area
• PWSA taps and connections as required (assumes 15' depth)
| STORMWATER MANAGEMENT | |||
| 14 | Stormwater Piping and Underdrains | 0 | - |
| • 12" HDPE storm pipe (316 LF) and 12" perforated HDPE |
• 15" SDR 26 PVC storm pipe (118 LF) and 18" SDR 26 PVC storm pipe
• 4" SCH 40 PVC underdrain — rain garden and trails
• 4" PVC cleanouts (8 EA) and flared end sections
• R-3 riprap at pipe outlets
| 15 | Stormwater Inlets, Structures, and Manholes | 0 | - |
| • Type 'M' inlets (4 EA), outlet control structures |
• Yard drain 2'x2' (1 EA), permanent storm inlet filters
• Camera inspection and cleaning of existing storm inlets and piping — work by Others; formal proposal required
| 16 | Stormwater BMPs and Rain Gardens | 0 | - |
| • Rain garden landscaping and BMPs — grading, soil amendment, underdrain, overflow structures, planting, and mulch |
• Vegetated channel with infiltration trench — excavation, geotextile, aggregate, underdrain, channel grading, and planting
• Soil amendment — haul in from approved off-site source
| ELECTRICAL | |||
| 17 | Electrical Infrastructure | 0 | - |
| • Electrical trench, PVC Schedule 40 conduit (1", 2", 3" as applicable), backfill, and marker tape |
• Junction boxes 24"x24" Type B
• Lighting control panel (Musco), Panel SL (400A MLO), 225A circuit breaker, contactors, and control transformer
• Remove existing electrical equipment along northern interior wall and coordinate Duquesne Light service connections
• Replace existing electrical room luminaire with new LED vaportight surface mount fixture
• Electrical testing and inspections; ground resistance testing at all pole foundations (max. 25 ohms)
| 18 | Site Lighting | 0 | - |
| • City standard 25' vehicular light poles and arm-mount LED luminaires — Lumec Road Focus RFM, 2700K, integral photocell |
• Musco TLC-LED-550 sport court lighting poles and luminaires at 30' mounting height
• Push button activators and amber strobe lights on poles P1, P2, and P3
• All wiring connections, testing, and commissioning for a complete and operational system
| SITE FURNISHINGS AND EQUIPMENT | |||
| 19 | Signage | 0 | - |
| • Trail wayfinding signage — post and foundation installation; sign panels by DPW |
• Park entrance sign — post and foundation installation; sign panel by DPW
• Road signage attached to existing telephone poles
| 20 | Site Equipment | 0 | - |
| • Pickleball net and post assembly |
• Basketball hoop, backboard, and post assembly; coordinate with concrete foundations
• Playground equipment (Kompan) — furnished and installed by Others; Contractor to coordinate
• 8'x10' garden shed
| 21 | Site Furnishings | 0 | - |
| • Bicycle racks — Dero triple |
• Trash and recycling receptacles, paired
• Park benches, frame only
• Drinking fountain with potable water and sanitary drain connections
• Outdoor grill and City standard grill
• Pipe bollards and collapsible bollards
| LANDSCAPING | |||
| 22 | Trees, Shrubs, and Plantings | 0 | - |
| • Tree pit preparation for 2½" CAL. trees and 3" CAL. trees — see Add Alternate 1 for furnishing and installation |
• Shrub planting, #5 container
• Perennial and ornamental grass planting, #2 container
• Raised garden beds and ADA-accessible garden planters
| 23 | Seeding and Groundcover | 0 | - |
| • Steep slope meadow seed mix at 1.5 lb/1,000 SF |
• Pollinator meadow seed mix at 1.5 lb/1,000 SF
• Rain garden seed mix at 1.0 lb/1,000 SF
• Lawn seed mix at 5.0 lb/1,000 SF
• Cover crops (grain oats/grain rye by season) in meadow and rain garden seeding areas
| 24 | Topsoil and Mulch | 0 | - |
| • Topsoil placed to 4" depth in lawn and seed mix areas |
• Double-shredded wood mulch at 3" depth in planting beds
| BASE BID TOTAL | - | - | - | - | - | - | |
| ADD ALTERNATE 1 — Tree Furnishing and Installation (if City Forestry and TreePGH are unable to provide and install) | |||||||
| 1a | Tree Furnishing and Installation (2½" CAL.) | 0 | - | ||||
| • Furnishing and complete installation of 2½" caliper trees — 33 EA total |
• Amelanchier canadensis / Canadian Serviceberry (7), Alnus serrulata / Hazel Alder (13), Cercis canadensis / Eastern Redbud (6), Cornus florida / Flowering Dogwood (3), Malus domestica 'Gala' / Gala Apple (2), Malus domestica 'Honeycrisp' / Honeycrisp Apple (2)
• B&B stock meeting ANSI Z60.1; includes delivery, planting, staking, mulching, watering, and initial maintenance
• Tree pit preparation included in Base Bid under K-1; this Alternate awarded only upon written Owner direction
| 1b | Tree Furnishing and Installation (3" CAL.) | 0 | - |
| • Furnishing and complete installation of 3" caliper trees — 36 EA total |
• Betula alleghaniensis / Yellow Birch (5), Nyssa sylvatica / Black Gum (10), Platanus occidentalis / American Sycamore (2), Quercus alba / White Oak (19)
• B&B stock meeting ANSI Z60.1; includes delivery, planting, staking, mulching, watering, and initial maintenance
• Tree pit preparation included in Base Bid under K-1; this Alternate awarded only upon written Owner direction Add Alternate 1 Subtotal - - - - - -
File details come from the government source that posted it. Updated .