ADDENDUM_3_CD_304_2202_L119_GRAD_5.pdf

PDF 819 KB Posted

Attached to
Sheraden Park Phase 1 Construction
Solicitation number
2026-IFB-152
Issued by
Allegheny County, Pennsylvania

About this file

This is Addendum 3 to the site grading plan for the Sheraden Park Phase 1 Construction project in Pittsburgh, Pennsylvania, prepared by Fahringer, McClarty, Grey, Inc. as the civil engineer and Klavon Design Associates, Inc. as the landscape architect. The addendum provides updated existing contours and proposed grading specifications for Area 5 of the project, which includes site preparation, earthwork, and drainage management. The overall grading work entails approximately 3,500 cubic yards of cut (with a maximum depth of 4.25 feet) and 2,000 cubic yards of fill (with a maximum depth of 3.00 feet). Key specifications include proof-rolling of exposed subgrades with minimum ten passes using a vibratory roller compactor, removal of soft or loose zones through undercutting, stabilization using AASHTO No. 1 crushed stone if required, and compaction of cohesive fill to a minimum of 95 percent of maximum standard Proctor dry density and granular fill to at least 70 percent relative density. Steep slopes exceeding 25 percent must be stabilized through vegetation and plantings, with finished slopes not to exceed 1.5:1 ratio for cut slopes and 2:1 ratio for fill slopes.

The document specifies that the contractor is responsible for locating all underground utilities, avoiding damage during installation, and repairing any damage incurred. The contractor must also verify all existing field conditions and report discrepancies to the owner and landscape architect prior to commencing work. All edges of existing curbing, asphalt, concrete roadway, and concrete sidewalks that abut new construction must be sawcut to clean, smooth edges, with new and existing paving or earthwork blended smoothly at grade transitions. The general contractor is required to fine-grade all disturbed beds and planting areas in preparation for the landscape contractor, and inlets must be maintained clear of sediment and debris to ensure proper water flow. Drawings are based on surveys prepared by Tri-State Design and Development dated February 8, 2023, with additional survey information provided on September 5, 2023.

View the file

Other files

File Type Posted
Sheraden_Park_Phase_1_Construction_(Addendum_#3_Revision).pdf PDF
ADDENDUM_3_CD_304_2202_L115_GRAD_1.pdf PDF
ADDENDUM_3_CD_304_2202_L117_GRAD_3.pdf PDF
ADDENDUM_3_CD_304_2202_L118_GRAD_4.pdf PDF
ADDENDUM_3_CD_304_2202_L116_GRAD_2.pdf PDF
Sheraden_Park_Phase_1_Construction_(Addendum_#2_Revision).pdf PDF
ADDENDUM_2_2026-08-19_0819_Klavon_Sheraden_100%_submission_SS_ADD_2_V0.pdf PDF
ADDENDUM_2_SheradenPark_L115_GRAD_1.pdf PDF
ADDENDUM_2_SheradenPark_L119_GRAD_5.pdf PDF
Addendum_2_SheradenPark_000_TS.pdf PDF
ADDENDUM_2_Sheraden_Park_Geohazard_Report.pdf PDF
Sheraden_Park_Phase_1_Construction_-_Drawings_Rev1.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev2.pdf PDF
Sheraden_Park_Phase_1_Construction.pdf PDF
Pennsylvania_Prevailing_Wage_Rates_7.15.2026.aspx —
010000_Div01_Sheraden_Park_Rev1-full.pdf PDF
Sheraden_Park_Phase_1_Construction_-_Drawings_.pdf PDF
Sheraden_Park_Phase_1_Construction_-_SOV.xlsx XLSX spreadsheet
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev1.pdf PDF
2026-02-20_Sheraden_Park_BidSet.pdf PDF
2026-06-02_SheradenPark_SOV.xlsx XLSX spreadsheet
2026-06-02_SheradenPark_Alternates+ItemDescriptions.docx DOCX document
2026-06-02_SheradenPark_BidForm.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2% (M

AX

2%

(MAX.)

863.34

+863.72

863.02

+863.4

+863.5

3:1 SLOPE

875 + 875.48 + 875.17

2% (M

AX.)

'-4

98'

60'

±2 3'

-1 0"

±7'

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

C O

M

PAC

T C

O M

PAC

T

10'

10'

'-4

EXISTING 1' CONTOUR

PROPOSED 1' CONTOUR

PROPOSED 5' CONTOUR

FFE FIRST FLOOR ELEVATION

BW BOTTOM OF WALL

TW TOP OF WALL

SPOT ELEVATION

EXISTING 5' CONTOUR

PERCENT SLOPE5%

+790.5

CB CATCH BASIN

BC BOTTOM OF CURB

TC TOP OF CURB

LP LOW POINT

ACCESSIBLE PATH

DEMOLITION CONTOUR

1. DRAWINGS GENERATED BASED ON SURVEY

PREPARED BY TRI-STATE DESIGN AND

DEVELOPMENT DATED FEBRUARY 8, 2023;

ADDITIONAL SURVEY INFORMATION PROVIDED

ON SEPTEMBER 05, 2023.

2. PRIOR TO CONSTRUCTION, THE CONTRACTOR IS

RESPONSIBLE FOR LOCATING ALL UNDER-

GROUND UTILITIES AND SHALL AVOID DAMAGE

TO ALL UTILITIES DURING INSTALLATION. THE

CONTRACTOR IS RESPONSIBLE FOR REPAIRING

ALL DAMAGE TO UTILITIES, STRUCTURES, SITE

APPURTENANCES, ETC., WHICH MAY OCCUR AS A

RESULT OF CONSTRUCTION.

4. KLAVON DESIGN IS RESPONSIBLE FOR APPLYING

FOR ALL PARENT PERMITS NECESSARY TO

INITIATE THE WORK. CONTRACTOR IS

RESPONSIBLE FOR PICKING UP ALL PARENT

PERMITS AND APPLYING FOR ALL SUBSEQUENT

PERMITS NECESSARY TO COMPLETE THE WORK.

5. INLETS SHALL BE MAINTAINED SO AS NOT TO

ALLOW ANY SEDIMENT OR DEBRIS TO PREVENT

THE FLOW OF WATER INTO THE INLETS. ANY

OBSTRUCTIONS TO THE PIPE SHOULD BE

REMOVED.

6. CONTRACTOR SHALL VERIFY ALL EXISTING

CONDITIONS IN THE FIELD AND REPORT ANY

DISCREPANCIES IN THE SITE SURVEY TO THE

OWNER AND/OR LANDSCAPE ARCHITECT PRIOR

TO STARTING ANY WORK

7. AT ALL LOCATIONS WHERE EXISTING CURBING,

ASPHALT, CONCRETE ROADWAY OR CONCRETE

SIDEWALK ABUT NEW CONSTRUCTION, THE EDGE

OF THE EXISTING CURB OR PAVEMENTS SHALL

BE SAWCUT TO A CLEAN, SMOOTH EDGE.

8. WHERE NEW PAVING OR EARTHWORK MEETS

EXISTING PAVING OR EARTHWORK SMOOTHLY

BLEND LINE AND GRADE OF EXISTING WITH NEW.

9. GENERAL CONTRACTOR TO FINE GRADE ALL

DISTURBED BEDS & PLANTING AREAS IN

PREPARATION FOR LANDSCAPE CONTRACTOR.

10. REFER TO SPECIFICATIONS FOR SITE MATERIAL

SELECTIONS.

SHEET NUMBER

SHEET TITLE

DRAWN BY: ARG

PROJECT

DATE

NOTES

2026.01.15

OWNER

414 Grant Street, Room 301 Pittsburgh, PA 15219

PE

R

M

IT

D O

C U

M

EN

TS

.0 2.

CHECKED BY: RAW

SCALE:

Sheraden Park Phase I Improvements City of Pittsburgh, Allegheny County

PROFESSIONAL SEAL

CIVIL ENGINEER

FAHRINGER, McCARTY, GREY, INC.

1610 GOLDEN MILE HIGHWAY

MONROEVILLE, PA 15146

P 724.327.0599

CONTACT: JON SWERIGEN, RLA

JSWERINGEN@FMGINC.US

ELECTRICAL ENGINEER

SANTANGELO & LINDSAY, INC.

732 THIRD AVENUE, SUITE 102

NEW BRIGHTON, PA 15066

P 724.847.0407

CONTACT: CHRISELLEN LINDSAY, P.E.

CLINDSAY@SANTANGELOLINDSAY.COM

LANDSCAPE ARCHITECT

KLAVON DESIGN ASSOCIATES, INC.

64 S 14TH STREET

PITTSBURGH, PA 15203

P 412.394.1181

CONTACT: RACHELLE WOLF

RWOLF@KLAVONDESIGN.COM

THE GATEWAY ENGINEERS, INC.

100 MCMORRIS ROAD

PITTSBURGH, PA 15205

P 855-634-9284

CONTACT: NATHANIEL S. HAYES, PE

NHAYES@GATEWAYENGINEERS.COM

GEOTECH ENGINEER

1"=20'

Site Grading Plan - Area 5

L119

SE

E

SH

EE

T L1

L119

SITE GRADING PLAN - AREA 5

SCALE: 1" = 20'

NORTH

0' 10' 20' 40'

GRAPHIC SCALE

KEY PLAN NORTH

LEGEND

+863.82

NOTES

SURBAN STREET

PARKING LOT

STABILIZE WITH STEEP

SLOPE SEED MIX, TYP.

L124

GRADING NOTES (CITY OF PITTSBURGH)

EROSION AND ELEVATED SOIL MOISTURE CONDITIONS ARE PRESENT AND WILL IMPACT THE

LONG-TERM PERFORMANCE OF THE PROPOSED PARK FEATURES. REVIEW THE FOLLOWING FOR

COUNTERMEASURES TO THE GEO-HAZARDS DESCRIBED ABOVE:

1. FILL/BACKFILL CONSIDERATIONS

1.1. GRADING AROUND THE BASKETBALL PARKING LOT AND THE NEW ADA ACCESSIBLE

PARKING STALLS, ALL TOPSOIL, VEGETATION, AND OTHER DELETERIOUS MATERIALS

SHOULD BE REMOVED.

1.2. EXPOSED SUBGRADES SHOULD BE PROOF-ROLLED WITH A MINIMUM OF TEN (10) PASSES

WITH A WALK-BEHIND (STATIC WEIGHT) VIBRATORY ROLLER COMPACTOR.

1.3. SOFT OR LOOSE ZONES DELINEATED BY THE PROOF-ROLLING SHOULD BE UNDERCUT AN

ADDITIONAL FOOT BELOW THE FINAL RESPECTIVE SUBGRADE LEVEL.

1.4. SHOULD THE UNDERCUT SUBGRADE REMAIN UNSUITABLE, IT SHOULD BE STABILIZED BY

'PUNCHING' SUITABLE, INERT (NON-CARBONACEOUS, NON-PYRITIFEROUS,

NON-EXPANSIVE, AND NON-SLAG) CRUSHED STONE MEETING THE SIZE AND GRADING

REQUIREMENTS OF AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION

OFFICIALS (AASHTO) NO. 1 INTO IT TO CREATE AN ADEQUATE "WORKING SURFACE".

1.5. EXCAVATED MATERIAL TO BE USED AS BACKFILL SHALL BE EITHER PLACED AND

COMPACTED IN THE WORK AREA AS SOON AS POSSIBLE TO LIMIT ITS EXPOSURE TO

RAINFALL EVENTS, OR PROTECTED WITH PLASTIC TARPS IF INSTALLATION REQUIRES

MULTIPLE DAYS.

1.6. COHESIVE FILL SHOULD BE COMPACTED TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM

STANDARD PROCTOR DRY DENSITY AS DETERMINED BY ASTM TEST DESIGNATION D698,

AT WATER CONTENTS WITHIN THREE PERCENT (±3%) OF THE OPTIMUM WATER CONTENT

ESTABLISHED BY THAT TEST.

1.7. GRANULAR FILL SHOULD BE COMPACTED TO AT LEAST 70 PERCENT RELATIVE DENSITY AS

DETERMINED BY ASTM TEST DESIGNATIONS D4253 AND 4254-16.

2. STEEP SLOPES (EXCEEDING 25%) SHALL BE STABILIZED BY VEGETATION/PLANTINGS AS

SPECIFIED ON DRAWINGS L120 - L124.

2.1. FINISHED SLOPES SHALL COMPLY WITH THE FOLLOWING MAXIMUM RATIOS:

2.1.1. CUT SLOPES: 1.5:1 (HORIZONTAL TO VERTICAL)

2.1.2. FILL SLOPES: 2:1 (HORIZONTAL TO VERTICAL)

3. ROUGH ORDER OF MAGNITUDE (ROM) FOR GRADING SITE-WIDE:

3.1. OVERALL CUT VOLUME: 3,500 CY

3.2. MAX. CUT DEPTH: 4.25 FT

3.2. OVERALL FILL VOLUME: 2,000 CY

3.3. MAX. FILL DEPTH: 3.00 FT

2026-08-07 Addendum 2 - Ex. Contours2

2026-08-26 Addendum 3 - Ex. Contours3

AutoCAD SHX Text

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

MAG#8

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

MAG#7

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

CONC DITCH

AutoCAD SHX Text

ASPH DITCH

AutoCAD SHX Text

ASPH DITCH

AutoCAD SHX Text

CONC DITCH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

AutoCAD SHX Text

OH

Sheets and Views
L119 GRAD 5

File details come from the government source that posted it. Updated .