This is Addendum 3 to the Site Grading Plan for Sheraden Park Phase 1 Improvements, a project managed by the City of Pittsburgh Department of Public Works in collaboration with the landscape architect Klavon Design Associates, civil engineer Fahringer, McCArty, Grey Inc., and geotech engineer The Gateway Engineers Inc. The addendum presents updated existing contours for Area 1 of the park site located at 701 Thornton Street, Pittsburgh, and establishes grading parameters for the construction phase. The project encompasses approximately 3,500 cubic yards of cut with a maximum depth of 4.25 feet and 2,000 cubic yards of fill with a maximum depth of 3.00 feet. Cut slopes must comply with a maximum ratio of 1.5:1 (horizontal to vertical), while fill slopes are limited to 2:1. The grading plan includes specifications for site preparation, compaction requirements for both cohesive and granular fill materials, slope stabilization through vegetation and plantings, and protocols for managing erosion and elevated soil moisture conditions. The contractor is responsible for locating all underground utilities prior to construction, fine-grading all disturbed beds and planting areas, and verifying field conditions against the survey prepared by Tri-State Design and Development dated February 8, 2023, with additional information updated September 5, 2023.
The addendum includes detailed technical requirements for subgrade preparation, including proof-rolling with a minimum of ten passes using a walk-behind vibratory roller compactor and potential stabilization using AASHTO No. 1 crushed stone if unsuitable conditions are encountered. Cohesive fill must be compacted to a minimum of 95 percent of maximum standard Proctor dry density per ASTM D698, while granular fill requires compaction to at least 70 percent relative density per ASTM D4253 and D4254-16. All existing curbing, asphalt, concrete roadway, and concrete sidewalk edges are to be saw-cut to clean, smooth edges where they abut new construction. The contractor is responsible for repairing any damage to utilities, structures, or site appurtenances resulting from construction activities. Klavon Design is responsible for applying for all parent permits necessary to initiate work, while the contractor must pick up all parent permits and apply for subsequent permits required to complete the project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
767.58
769.00
769.00
768.20
765.52
3:
SL
O
PE
2%
(MAX.)
3:1 SLOPE
765.55
2% (M
AX.)
1% (MAX.
COURT SLOPE)
4%
+765.00
765.43+
765.70 +
764.88
+768.20
768.50+769.00
768.50
768.50
+766.13 770.88
+ + 766.25
766.55
765.35+
+766.06
+771.32
+771.80
+771.78
+771.32
+771.35
+ 765.55 +
+768.50
+ LP 762.50 (CB)
LP 766.10 (CB)
LP 771.00 (CB)
3:1 SLOPE
LP 770.68 (CB)
COMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT
768.20768.50
768.50
768.35 768.41
768.53 768.75
764.65
'-4
98'
60'
±2 3'
-1 0"
±7'
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
C O
M
PAC
T C
O M
PAC
T
10'
10'
'-4
EXISTING 1' CONTOUR
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
FFE FIRST FLOOR ELEVATION
BW BOTTOM OF WALL
TW TOP OF WALL
SPOT ELEVATION
EXISTING 5' CONTOUR
PERCENT SLOPE5%
+790.5
CB CATCH BASIN
BC BOTTOM OF CURB
TC TOP OF CURB
LP LOW POINT
ACCESSIBLE PATH
DEMOLITION CONTOUR
1. DRAWINGS GENERATED BASED ON SURVEY
PREPARED BY TRI-STATE DESIGN AND
DEVELOPMENT DATED FEBRUARY 8, 2023;
ADDITIONAL SURVEY INFORMATION PROVIDED
ON SEPTEMBER 05, 2023.
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR IS
RESPONSIBLE FOR LOCATING ALL UNDER-
GROUND UTILITIES AND SHALL AVOID DAMAGE
TO ALL UTILITIES DURING INSTALLATION. THE
CONTRACTOR IS RESPONSIBLE FOR REPAIRING
ALL DAMAGE TO UTILITIES, STRUCTURES, SITE
APPURTENANCES, ETC., WHICH MAY OCCUR AS A
RESULT OF CONSTRUCTION.
4. KLAVON DESIGN IS RESPONSIBLE FOR APPLYING
FOR ALL PARENT PERMITS NECESSARY TO
INITIATE THE WORK. CONTRACTOR IS
RESPONSIBLE FOR PICKING UP ALL PARENT
PERMITS AND APPLYING FOR ALL SUBSEQUENT
PERMITS NECESSARY TO COMPLETE THE WORK.
5. INLETS SHALL BE MAINTAINED SO AS NOT TO
ALLOW ANY SEDIMENT OR DEBRIS TO PREVENT
THE FLOW OF WATER INTO THE INLETS. ANY
OBSTRUCTIONS TO THE PIPE SHOULD BE
REMOVED.
6. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS IN THE FIELD AND REPORT ANY
DISCREPANCIES IN THE SITE SURVEY TO THE
OWNER AND/OR LANDSCAPE ARCHITECT PRIOR
TO STARTING ANY WORK
7. AT ALL LOCATIONS WHERE EXISTING CURBING,
ASPHALT, CONCRETE ROADWAY OR CONCRETE
SIDEWALK ABUT NEW CONSTRUCTION, THE EDGE
OF THE EXISTING CURB OR PAVEMENTS SHALL
BE SAWCUT TO A CLEAN, SMOOTH EDGE.
8. WHERE NEW PAVING OR EARTHWORK MEETS
EXISTING PAVING OR EARTHWORK SMOOTHLY
BLEND LINE AND GRADE OF EXISTING WITH NEW.
9. GENERAL CONTRACTOR TO FINE GRADE ALL
DISTURBED BEDS & PLANTING AREAS IN
PREPARATION FOR LANDSCAPE CONTRACTOR.
10. REFER TO SPECIFICATIONS FOR SITE MATERIAL
SELECTIONS.
SHEET NUMBER
SHEET TITLE
DRAWN BY: ARG
PROJECT
DATE
NOTES
2026.01.15
OWNER
414 Grant Street, Room 301 Pittsburgh, PA 15219
PE
R
M
IT
D O
C U
M
EN
TS
.0 2.
CHECKED BY: RAW
SCALE:
Sheraden Park Phase I Improvements City of Pittsburgh, Allegheny County
PROFESSIONAL SEAL
CIVIL ENGINEER
FAHRINGER, McCARTY, GREY, INC.
1610 GOLDEN MILE HIGHWAY
MONROEVILLE, PA 15146
P 724.327.0599
CONTACT: JON SWERIGEN, RLA
JSWERINGEN@FMGINC.US
ELECTRICAL ENGINEER
SANTANGELO & LINDSAY, INC.
732 THIRD AVENUE, SUITE 102
NEW BRIGHTON, PA 15066
P 724.847.0407
CONTACT: CHRISELLEN LINDSAY, P.E.
CLINDSAY@SANTANGELOLINDSAY.COM
LANDSCAPE ARCHITECT
KLAVON DESIGN ASSOCIATES, INC.
64 S 14TH STREET
PITTSBURGH, PA 15203
P 412.394.1181
CONTACT: RACHELLE WOLF
RWOLF@KLAVONDESIGN.COM
THE GATEWAY ENGINEERS, INC.
100 MCMORRIS ROAD
PITTSBURGH, PA 15205
P 855-634-9284
CONTACT: NATHANIEL S. HAYES, PE
NHAYES@GATEWAYENGINEERS.COM
GEOTECH ENGINEER
1"=20'
Site Grading Plan - Area 1
L1151 L115
SITE GRADING PLAN - AREA 1
SCALE: 1" = 20'
NORTH
0' 10' 20' 40'
GRAPHIC SCALE
SEE SHEET L116
LEGEND
KEY PLAN NORTH
NOTES
EROSION AND ELEVATED SOIL MOISTURE CONDITIONS ARE PRESENT AND WILL IMPACT THE
LONG-TERM PERFORMANCE OF THE PROPOSED PARK FEATURES. REVIEW THE FOLLOWING FOR
COUNTERMEASURES TO THE GEO-HAZARDS DESCRIBED ABOVE:
1. FILL/BACKFILL CONSIDERATIONS
1.1. GRADING AROUND THE BASKETBALL PARKING LOT AND THE NEW ADA ACCESSIBLE
PARKING STALLS, ALL TOPSOIL, VEGETATION, AND OTHER DELETERIOUS MATERIALS
SHOULD BE REMOVED.
1.2. EXPOSED SUBGRADES SHOULD BE PROOF-ROLLED WITH A MINIMUM OF TEN (10) PASSES
WITH A WALK-BEHIND (STATIC WEIGHT) VIBRATORY ROLLER COMPACTOR.
1.3. SOFT OR LOOSE ZONES DELINEATED BY THE PROOF-ROLLING SHOULD BE UNDERCUT AN
ADDITIONAL FOOT BELOW THE FINAL RESPECTIVE SUBGRADE LEVEL.
1.4. SHOULD THE UNDERCUT SUBGRADE REMAIN UNSUITABLE, IT SHOULD BE STABILIZED BY
'PUNCHING' SUITABLE, INERT (NON-CARBONACEOUS, NON-PYRITIFEROUS,
NON-EXPANSIVE, AND NON-SLAG) CRUSHED STONE MEETING THE SIZE AND GRADING
REQUIREMENTS OF AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION
OFFICIALS (AASHTO) NO. 1 INTO IT TO CREATE AN ADEQUATE "WORKING SURFACE".
1.5. EXCAVATED MATERIAL TO BE USED AS BACKFILL SHALL BE EITHER PLACED AND
COMPACTED IN THE WORK AREA AS SOON AS POSSIBLE TO LIMIT ITS EXPOSURE TO
RAINFALL EVENTS, OR PROTECTED WITH PLASTIC TARPS IF INSTALLATION REQUIRES
MULTIPLE DAYS.
1.6. COHESIVE FILL SHOULD BE COMPACTED TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM
STANDARD PROCTOR DRY DENSITY AS DETERMINED BY ASTM TEST DESIGNATION D698,
AT WATER CONTENTS WITHIN THREE PERCENT (±3%) OF THE OPTIMUM WATER CONTENT
ESTABLISHED BY THAT TEST.
1.7. GRANULAR FILL SHOULD BE COMPACTED TO AT LEAST 70 PERCENT RELATIVE DENSITY AS
DETERMINED BY ASTM TEST DESIGNATIONS D4253 AND 4254-16.
2. STEEP SLOPES (EXCEEDING 25%) SHALL BE STABILIZED BY VEGETATION/PLANTINGS AS
SPECIFIED ON DRAWINGS L120 - L124.
2.1. FINISHED SLOPES SHALL COMPLY WITH THE FOLLOWING MAXIMUM RATIOS:
2.1.1. CUT SLOPES: 1.5:1 (HORIZONTAL TO VERTICAL)
2.1.2. FILL SLOPES: 2:1 (HORIZONTAL TO VERTICAL)
3. ROUGH ORDER OF MAGNITUDE (ROM) FOR GRADING SITE-WIDE:
3.1. OVERALL CUT VOLUME: 3,500 CY
3.2. MAX. CUT DEPTH: 4.25 FT
3.2. OVERALL FILL VOLUME: 2,000 CY
3.3. MAX. FILL DEPTH: 3.00 FT
GRADING NOTES (CITY OF PITTSBURGH)
STABILIZE WITH STEEP
SLOPE SEED MIX, TYP.
L120
2026-08-07 Addendum 2 - Ex. Contours2
2026-08-26 Addendum 3 - Ex. Contours3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CP1
AutoCAD SHX Text
MAG
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
CONC DITCH
AutoCAD SHX Text
ASPH DITCH
AutoCAD SHX Text
ASPH DITCH
AutoCAD SHX Text
CONC DITCH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
AutoCAD SHX Text
OH
| Sheets and Views |
| L115 GRAD 1 |
File details come from the government source that posted it. Updated .