Addendum_2_SheradenPark_000_TS.pdf

PDF 635 KB Posted

Attached to
Sheraden Park Phase 1 Construction
Solicitation number
2026-IFB-152
Issued by
Allegheny County, Pennsylvania

About this file

This is an Addendum 2 document for the City of Pittsburgh Department of Public Works' Sheraden Park Phase 1 Construction project, issued January 15, 2026, providing updated permit drawings and project site information. The project encompasses comprehensive park improvements at 701 Thornton Street, Pittsburgh, including site demolition and preparation, earthwork and grading (approximately 3,500 cubic yards of cut and 2,000 cubic yards of fill), concrete walkways (4,090 square feet) and asphalt paving (43,725 square feet), stormwater management infrastructure with rain gardens and storm pipe installation, electrical systems with ten 25-foot vehicular light poles and three sport court lighting poles, pickleball and basketball courts with protective fencing, landscaping including 81 trees and shrub plantings, site furnishings, ADA-compliant improvements, and recreational trail construction. The addendum updates existing contours on the permit drawings to support design accuracy. A mandatory pre-bid meeting was held July 31, 2026 at 10:00 AM via Microsoft Teams, with bids due August 28, 2026 at 2:00 PM, and contract award scheduled for September 1, 2026. Questions from bidders are due August 14, 2026 at 5:00 PM.

The project is subject to Pennsylvania prevailing wage requirements effective July 15, 2026, and requires bidders to demonstrate good faith efforts to achieve Disadvantaged Business Enterprise participation goals of 18 percent for Minority-Owned Businesses, 7 percent for Women-Owned Businesses, 5 percent for Veteran-Owned Small Businesses, and 3 percent for LGBTQIA+ businesses. Bids must be submitted on a lump-sum fixed-price basis with no escalation permitted. Upon award, contractors must provide a Performance Bond and Payment Bond each equal to 100 percent of contract price and General Liability insurance with minimum $1,000,000 per occurrence and $2,000,000 aggregate coverage. Contractors are required to utilize web-based project management software (Procore Technologies or approved equivalent) and designate a Safety Supervisor with minimum ten years construction experience and five years safety responsibility within fifteen days of Notice of Award. Two add alternates provide unit pricing for tree furnishing and installation if City Forestry and TreePGH cannot provide the service.

View the file

Other files

File Type Posted
Sheraden_Park_Phase_1_Construction_(Addendum_#3_Revision).pdf PDF
ADDENDUM_3_CD_304_2202_L115_GRAD_1.pdf PDF
ADDENDUM_3_CD_304_2202_L117_GRAD_3.pdf PDF
ADDENDUM_3_CD_304_2202_L118_GRAD_4.pdf PDF
ADDENDUM_3_CD_304_2202_L119_GRAD_5.pdf PDF
ADDENDUM_3_CD_304_2202_L116_GRAD_2.pdf PDF
Sheraden_Park_Phase_1_Construction_(Addendum_#2_Revision).pdf PDF
ADDENDUM_2_2026-08-19_0819_Klavon_Sheraden_100%_submission_SS_ADD_2_V0.pdf PDF
ADDENDUM_2_SheradenPark_L115_GRAD_1.pdf PDF
ADDENDUM_2_SheradenPark_L119_GRAD_5.pdf PDF
ADDENDUM_2_Sheraden_Park_Geohazard_Report.pdf PDF
Sheraden_Park_Phase_1_Construction_-_Drawings_Rev1.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev2.pdf PDF
Sheraden_Park_Phase_1_Construction.pdf PDF
Pennsylvania_Prevailing_Wage_Rates_7.15.2026.aspx —
Sheraden_Park_Phase_1_Construction_-_Drawings_.pdf PDF
Sheraden_Park_Phase_1_Construction_-_SOV.xlsx XLSX spreadsheet
010000_Div01_Sheraden_Park_Rev1-full.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev1.pdf PDF
2026-02-20_Sheraden_Park_BidSet.pdf PDF
2026-06-02_SheradenPark_SOV.xlsx XLSX spreadsheet
2026-06-02_SheradenPark_Alternates+ItemDescriptions.docx DOCX document
2026-06-02_SheradenPark_BidForm.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REGIONAL MAP VICINITY MAP

Project Site

Project Site

ISSUE DATE: 2026.01.15

Klavon Design Associates, Inc.

64 South 14th Street Pittsburgh, PA 15203 P 412-394-1181 x111 Contact: Rachelle Wolf rwolf@klavondesign.com

The Gateway Engineers, Inc.

100 McMorris Road Pittsburgh, PA 15205 P 855-634-9284 Contact: Nathaniel S. Hayes, PE nhayes@gatewayengineers.com

Fahringer, McCarty, Grey, Inc.

1610 Golden Mile Highway Monroeville, PA 15146 P 724-327-0599 x212 Contact: Jon Sweringen, RLA jsweringen@fmginc.us

Santangelo & Lindsay, Inc.

732 3rd Avenue, Suite 102 New Brighton, PA 15066 724-847-0407 Contact: Chris Lindsay clindsay@santangelolindsay.com

LANDSCAPE ARCHITECT

GEOTECH ENGINEER

CIVIL ENGINEER

ELECTRICAL ENGINEER

City of Pittsburgh 414 Grant Street, Room 301 Pittsburgh, PA 15219 412-255-8852 Contact: Andrea Ketzel andrea.ketzel@pittsburghpa.gov

OWNER

CITY of Pittsburgh - Sheraden Park Phase I Improvements PERMIT DOCUMENTS Project Number: 2023-85034

INDEX OF DRAWINGS

- Title Sheet L100 Site Reference Plan L101 Existing Conditions Plan - North L102 Existing Conditions Plan - South L103 Site Demolition Plan - North L104 Site Demolition Plan - South L105 Site Materials Plan - Area 1 L106 Site Materials Plan - Area 2 L107 Site Materials Plan - Area 3 L108 Site Materials Plan - Area 4 L109 Site Materials Plan - Area 5 L110 Site Layout Plan - Area 1 L111 Site Layout Plan - Area 2 L112 Site Layout Plan - Area 3 L113 Site Layout Plan - Area 4 L114 Site Layout Plan - Area 5 L115 Site Grading Plan - Area 1 L116 Site Grading Plan - Area 2 L117 Site Grading Plan - Area 3 L118 Site Grading Plan - Area 4 L119 Site Grading Plan - Area 5 L120 Site Landscape Plan - Area 1 L121 Site Landscape Plan - Area 2 L122 Site Landscape Plan - Area 3 L123 Site Landscape Plan - Area 4 L124 Site Landscape Plan - Area 5 L125 Signage Plan - North L126 Signage Plan - South L501 Site Details L502 Site Details L503 Site Details L504 Site Details L505 Landscape Details L506 Landscape Details

Site Drawings C100 Overall Erosion Control Plan C101 Erosion and Sedimentation Control Plan - North C102 Erosion and Sedimentation Control Plan - South C200 Erosion Control Details C201 Erosion Control Details C400 Post Construction Stormwater Management Plan - Detailed C401 Post Construction Stormwater Management Plan - Detailed C402 Post Construction Stormwater Management Plan - Detailed C403 Post Construction Stormwater Management Plan - Detailed C404 Post Construction Stormwater Management Plan - Detailed C500 PCSM BMP Details C501 PCSM BMP Details C502 PCSM BMP Details

Civil Drawings

E100 Site Lighting Electrical Notes and Legend E101 Site Lighting Electrical Plan - Area 1 E102 Site Lighting Electrical Plan - Area 2 E103 Site Lighting Electrical Plan - Area 3 E500 Electrical Engineer Details E501 Electrical Engineer Details E502 Electrical Engineer Details

Site Electrical Drawings

Alternate 1 Planting - Tree Plantings (L120-L124, L505-L506) Alternates

NEIGHBORHOOD MAP

Project Site Entry

Address: 701 Thornton Street, Pittsburgh, PA 15204 (corner of Thornton St. and Ashlyn St.)

SHERADEN

PARK

PE

R

M

IT

D O

C U

M

EN

TS

.0 2.

2026-08-03 Addendum 1 - Electrical Notes1

REVISIONS

2026-08-07 Addendum 2 - Ex. Contours2

Sheets and Views
TS

File details come from the government source that posted it. Updated .