Pennsylvania_Prevailing_Wage_Rates_7.15.2026.aspx

24 KB Posted

Attached to
Sheraden Park Phase 1 Construction
Solicitation number
2026-IFB-152
Issued by
Allegheny County, Pennsylvania

About this file

This is a Pennsylvania Department of Labor & Industry prevailing wage rates document for the City of Pittsburgh Office of Management and Budget's Sheraden Park Phase 1 Construction project (Serial Number: 26-06653). The City of Pittsburgh, through its Department of Public Works, is soliciting bids from qualified general contractors for the Sheraden Park Phase 1 Construction project. The contract award date is scheduled for September 1, 2026, with a determination date of July 15, 2026. The project is classified as both Building and Heavy/Highway work and is located in Allegheny County. The document provides comprehensive prevailing wage rates applicable to the project, with an effective date of July 15, 2026, and is maintained by the Pittsburgh Field Office, which can be contacted at (412) 565-5300 or toll-free at (877) 504-8354.

The prevailing wage rates document establishes mandatory hourly compensation requirements for all trade classifications applicable to building and heavy/highway construction work on this project. The wage schedules include rates for over 60 distinct trade classifications, including electricians, plumbers, carpenters, operators, laborers, iron workers, and numerous other skilled trades. Each classification includes an effective date, hourly rate component, fringe benefits component, and total hourly compensation requirement. Wage rates are tiered with multiple effective dates extending through 2029, reflecting contractual escalation agreements. For example, electricians are required to earn $83.55 total compensation (hourly rate plus fringe benefits) effective December 27, 2024, increasing to $86.83 effective December 26, 2025. Laborers are segmented into multiple classes with different compensation levels, and heavy/highway classifications maintain separate wage schedules from building classifications where applicable.

Text of this file

Project Name: Sheraden Park Phase 1 Construction

General Description: The City of Pittsburgh Office of Management and Budget, on behalf of the Department of Public Works, is soliciting bids from qualified firms for Sheraden Park Phase 1 Construction. General Contractor for Sheraden Park Phase I Construction.

Project Locality City of Pittsburgh

Awarding Agency: City of Pittsburgh

Contract Award Date: 9/1/2026

Serial Number: 26-06653

Project Classification: Building/Heavy/Highway

Determination Date: 7/15/2026

Assigned Field Office: Pittsburgh

Field Office Phone Number: (412)565-5300

Toll Free Phone Number: (877)504-8354

Project County: Allegheny County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 7/15/2026 Page 1 of 6

Project: 26-06653 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 8/1/2024 $43.40 $29.51 $72.91

Asbestos & Insulation Workers 8/1/2025 $45.10 $30.31 $75.41

Boilermakers 6/1/2016 $40.90 $27.61 $68.51

Bricklayer 12/1/2025 $42.00 $26.59 $68.59

Bricklayer 6/1/2026 $42.65 $26.94 $69.59

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2024 $41.49 $19.93 $61.42

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2025 $43.34 $19.93 $63.27

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $42.11 $23.36 $65.47

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $43.26 $24.35 $67.61

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2028 $44.45 $25.19 $69.64

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2029 $45.72 $26.01 $71.73

Cement Masons 7/1/2024 $34.57 $25.09 $59.66

Cement Masons 6/1/2025 $35.52 $25.64 $61.16

Cement Masons 6/1/2026 $36.02 $26.14 $62.16

Drywall Finisher 6/1/2025 $35.16 $25.98 $61.14

Drywall Finisher 6/1/2026 $36.59 $27.30 $63.89

Electricians & Telecommunications Installation Technician

12/27/2024 $50.86 $32.69 $83.55

Electricians & Telecommunications Installation Technician

12/26/2025 $53.11 $33.72 $86.83

Elevator Constructor 1/1/2025 $61.07 $40.05 $101.12

Elevator Constructor 1/1/2026 $63.71 $40.89 $104.60

Glazier 9/1/2024 $37.06 $31.89 $68.95

Glazier 9/1/2025 $38.70 $33.75 $72.45

Iron Workers 6/1/2025 $41.50 $37.36 $78.86

Iron Workers 6/1/2026 $43.50 $37.91 $81.41

Laborers (Class 01 - See notes) 1/1/2025 $27.32 $19.96 $47.28

Laborers (Class 01 - See notes) 1/1/2026 $27.82 $20.46 $48.28

Laborers (Class 02 - See notes) 1/1/2025 $27.47 $19.96 $47.43

Laborers (Class 02 - See notes) 1/1/2026 $27.97 $20.46 $48.43

Laborers (Class 03 - See notes) 1/1/2025 $30.47 $19.96 $50.43

Laborers (Class 03 - See notes) 1/1/2026 $30.97 $20.46 $51.43

Landscape Laborer (Skilled) 1/1/2025 $25.79 $18.78 $44.57

Landscape Laborer (Skilled) 1/1/2026 $26.79 $19.03 $45.82

Landscape Laborer (Tractor Operator) 1/1/2025 $26.09 $18.78 $44.87

Landscape Laborer (Tractor Operator) 1/1/2026 $27.09 $19.03 $46.12

Landscape Laborer 1/1/2025 $25.37 $18.78 $44.15

Landscape Laborer 1/1/2026 $26.37 $19.03 $45.40

Millwright 6/1/2020 $41.68 $20.32 $62.00

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/15/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Class 01 - see notes) 6/1/2024 $41.69 $24.39 $66.08

Operators (Class 01 - see notes) 6/1/2025 $42.72 $24.79 $67.51

Operators (Class 01 - see notes) 6/1/2026 $43.74 $25.29 $69.03

Operators (Class 02 -see notes) 6/1/2024 $35.62 $24.39 $60.01

Operators (Class 02 -see notes) 6/1/2025 $36.67 $24.79 $61.46

Operators (Class 02 -see notes) 6/1/2026 $37.67 $25.29 $62.96

Operators (Class 03 - See notes) 6/1/2024 $32.83 $24.39 $57.22

Operators (Class 03 - See notes) 6/1/2025 $33.88 $24.79 $58.67

Operators (Class 03 - See notes) 6/1/2026 $34.88 $25.29 $60.17

Painters Class 6 (see notes) 6/1/2025 $34.16 $25.81 $59.97

Painters Class 6 (see notes) 6/1/2026 $35.26 $26.51 $61.77

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 6/1/2024 $33.14 $21.04 $54.18

Plasterers 6/1/2026 $34.59 $22.59 $57.18 plumber 6/1/2025 $54.95 $25.87 $80.82 plumber 6/1/2026 $58.05 $25.87 $83.92 plumber 6/1/2027 $61.15 $25.87 $87.02

Pointers, Caulkers, Cleaners 12/1/2025 $41.50 $22.50 $64.00

Pointers, Caulkers, Cleaners 6/1/2026 $42.20 $22.80 $65.00

Roofers 12/1/2025 $41.21 $21.46 $62.67

Roofers 6/1/2026 $42.00 $23.17 $65.17

Sheet Metal Workers 7/1/2025 $45.00 $35.16 $80.16

Sheet Metal Workers 7/1/2026 $46.75 $36.61 $83.36

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 1/1/2026 $46.14 $28.30 $74.44

Sprinklerfitters 7/1/2026 $48.64 $28.30 $76.94

Steamfitters 6/1/2025 $50.20 $31.02 $81.22

Steamfitters 6/1/2026 $53.05 $31.27 $84.32

Stone Masons 12/1/2025 $44.10 $25.22 $69.32

Stone Masons 6/1/2026 $44.70 $25.62 $70.32

Terrazzo Finisher 12/1/2025 $42.75 $19.51 $62.26

Terrazzo Finisher 6/1/2026 $43.82 $19.94 $63.76

Terrazzo Mechanics 12/1/2025 $42.15 $21.76 $63.91

Terrazzo Mechanics 6/1/2026 $43.22 $22.19 $65.41

Tile Finisher 12/1/2025 $33.99 $18.71 $52.70

Tile Finisher 6/1/2026 $34.82 $18.98 $53.80

Tile Setter 12/1/2025 $40.80 $23.25 $64.05

Tile Setter 6/1/2026 $41.66 $23.49 $65.15

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/15/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Window Film / Tint Installer 10/1/2019 $25.00 $2.63 $27.63

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/15/2026 Page 4 of 6

Project: 26-06653 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 1/1/2025 $41.35 $22.09 $63.44

Carpenter 1/1/2026 $42.60 $22.84 $65.44

Carpenter Welder 1/1/2025 $42.85 $22.09 $64.94

Carpenter Welder 1/1/2026 $44.10 $22.84 $66.94

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Cement Finishers 1/1/2024 $35.14 $26.30 $61.44

Cement Finishers 1/1/2025 $35.94 $27.50 $63.44

Cement Masons 1/1/2020 $32.84 $21.10 $53.94

Electric Lineman 6/3/2024 $53.97 $31.05 $85.02

Electric Lineman 6/2/2025 $57.10 $31.63 $88.73

Electricians & Telecommunications Installation Technician

12/27/2024 $51.76 $31.80 $83.56

Electricians & Telecommunications Installation Technician

12/26/2025 $54.16 $32.69 $86.85

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2025 $41.50 $37.36 $78.86

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2026 $43.50 $37.91 $81.41

Laborers (Class 01 - See notes) 1/1/2025 $33.70 $26.00 $59.70

Laborers (Class 01 - See notes) 1/1/2026 $34.70 $27.00 $61.70

Laborers (Class 02 - See notes) 1/1/2025 $33.86 $26.00 $59.86

Laborers (Class 02 - See notes) 1/1/2026 $34.86 $27.00 $61.86

Laborers (Class 03 - See notes) 1/1/2025 $34.25 $26.00 $60.25

Laborers (Class 03 - See notes) 1/1/2026 $35.25 $27.00 $62.25

Laborers (Class 04 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 04 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 05 - See notes) 1/1/2025 $35.11 $26.00 $61.11

Laborers (Class 05 - See notes) 1/1/2026 $36.11 $27.00 $63.11

Laborers (Class 06 - See notes) 1/1/2025 $31.95 $26.00 $57.95

Laborers (Class 06 - See notes) 1/1/2026 $32.95 $27.00 $59.95

Laborers (Class 07 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 07 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 08 - See notes) 1/1/2025 $36.20 $26.00 $62.20

Laborers (Class 08 - See notes) 1/1/2026 $37.20 $27.00 $64.20

Millwright 6/1/2024 $47.59 $23.72 $71.31

Millwright 6/1/2025 $49.72 $23.72 $73.44

Operators (Class 01 - see notes) 1/1/2025 $40.39 $24.23 $64.62

Operators (Class 01 - see notes) 1/1/2026 $41.96 $24.66 $66.62

Operators (Class 02 -see notes) 1/1/2025 $40.13 $24.23 $64.36

Operators (Class 02 -see notes) 1/1/2026 $41.70 $24.66 $66.36

Operators (Class 03 - See notes) 1/1/2025 $36.48 $24.23 $60.71

Operators (Class 03 - See notes) 1/1/2026 $38.05 $24.66 $62.71

Operators (Class 04 - See notes) 1/1/2025 $36.02 $24.23 $60.25

Operators (Class 04 - See notes) 1/1/2026 $37.59 $24.66 $62.25

Operators (Class 05 - See notes) 1/1/2025 $35.77 $24.23 $60.00

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/15/2026 Page 5 of 6

Project: 26-06653 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Class 05 - See notes) 1/1/2026 $37.34 $24.66 $62.00

Operators Class 1-A 1/1/2025 $43.39 $24.23 $67.62

Operators Class 1-A 1/1/2026 $44.96 $24.66 $69.62

Operators Class 1-B 1/1/2025 $42.39 $24.23 $66.62

Operators Class 1-B 1/1/2026 $43.96 $24.66 $68.62

Painters Class 1 (see notes) 6/1/2022 $34.45 $22.82 $57.27

Painters Class 2 (see notes) 6/1/2025 $40.36 $25.81 $66.17

Painters Class 2 (see notes) 6/1/2026 $41.66 $26.51 $68.17

Painters Class 3 (see notes) 6/1/2025 $43.68 $25.81 $69.49

Painters Class 3 (see notes) 6/1/2026 $45.08 $26.51 $71.59

Painters Class 4 (see notes) 6/1/2019 $28.20 $20.06 $48.26

Painters Class 5 (see notes) 6/1/2019 $22.91 $20.06 $42.97

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/15/2026 Page 6 of 6

Other files

File Type Posted
Sheraden_Park_Phase_1_Construction_(Addendum_#3_Revision).pdf PDF
ADDENDUM_3_CD_304_2202_L115_GRAD_1.pdf PDF
ADDENDUM_3_CD_304_2202_L117_GRAD_3.pdf PDF
ADDENDUM_3_CD_304_2202_L118_GRAD_4.pdf PDF
ADDENDUM_3_CD_304_2202_L116_GRAD_2.pdf PDF
ADDENDUM_3_CD_304_2202_L119_GRAD_5.pdf PDF
Sheraden_Park_Phase_1_Construction_(Addendum_#2_Revision).pdf PDF
ADDENDUM_2_2026-08-19_0819_Klavon_Sheraden_100%_submission_SS_ADD_2_V0.pdf PDF
ADDENDUM_2_Sheraden_Park_Geohazard_Report.pdf PDF
ADDENDUM_2_SheradenPark_L115_GRAD_1.pdf PDF
ADDENDUM_2_SheradenPark_L119_GRAD_5.pdf PDF
Addendum_2_SheradenPark_000_TS.pdf PDF
Sheraden_Park_Phase_1_Construction_-_Drawings_Rev1.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev2.pdf PDF
Sheraden_Park_Phase_1_Construction.pdf PDF
010000_Div01_Sheraden_Park_Rev1-full.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev1.pdf PDF
Sheraden_Park_Phase_1_Construction_-_Drawings_.pdf PDF
Sheraden_Park_Phase_1_Construction_-_SOV.xlsx XLSX spreadsheet
2026-06-02_SheradenPark_Alternates+ItemDescriptions.docx DOCX document
2026-06-02_SheradenPark_BidForm.xlsx XLSX spreadsheet
2026-02-20_Sheraden_Park_BidSet.pdf PDF
2026-06-02_SheradenPark_SOV.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .