This document is a set of construction permit drawings for Sheraden Park Phase 1 Improvements prepared by the City of Pittsburgh, involving landscape architect Klavon Design Associates, civil engineer Fahringer McCarty Grey, electrical engineer Santangelo & Lindsay, and geotech engineer The Gateway Engineers. The project encompasses comprehensive improvements to Sheraden Park located at 701 Thornton Street, Pittsburgh, Pennsylvania, including demolition and site preparation; earthwork and grading of approximately 3,500 cubic yards of cut and 2,000 cubic yards of fill; concrete walkways totaling 4,090 square feet and asphalt paving of 43,725 square feet; stormwater management infrastructure featuring rain gardens and 316 linear feet of 12-inch HDPE storm pipe; electrical systems including ten 25-foot vehicular light poles and three Musco sport court lighting poles; construction of pickleball and basketball courts with protective fencing; drinking fountain plumbing; landscaping with 81 trees (43 at 2-inch caliper and 38 at 3-inch caliper), shrubs, and perennial plantings; site furnishings such as benches, bicycle racks, and grills; ADA-compliant improvements; and recreational trail construction. The invitation for bids (IFB #2026-IFB-152) includes a mandatory pre-bid meeting scheduled for July 31, 2026 at 10:00 AM via Microsoft Teams, with bids due August 28, 2026 at 2:00 PM. The contract award is scheduled for September 1, 2026, with project implementation to follow immediately thereafter.

Bidders must submit lump-sum fixed-price bids with no escalation permitted, accompanied by a bid guarantee equal to five percent of the total bid amount. Upon award, contractors must provide a Performance Bond and Payment Bond each equal to 100 percent of the contract price, along with General Liability insurance with minimum coverage of $1,000,000 per occurrence and $2,000,000 aggregate. The City requires demonstration of good faith efforts to achieve Disadvantaged Business Enterprise (DBE) participation goals of 18 percent for Minority-Owned Businesses, 7 percent for Women-Owned Businesses, 5 percent for Veteran-Owned Small Businesses, and 3 percent for LGBTQIA+ businesses, with comprehensive documentation of outreach efforts required at bid submission. The contract is subject to Pennsylvania prevailing wage requirements effective July 15, 2026. Two add alternates provide unit pricing for tree furnishing and installation (69 trees totaling 33 two-inch and 36 three-inch caliper stock) if City Forestry and TreePGH cannot provide these services. Contractors must utilize web-based project management software (Procore Technologies or approved equivalent) and designate a Safety Supervisor with minimum ten years of construction experience and five years of safety responsibility within fifteen days of Notice of Award. Questions regarding the bid must be submitted by August 14, 2026 at 5:00 PM, with bids opened non-mandatory on August 28, 2026 at 3:00 PM.

View the file

Other files

File Type Posted
Sheraden_Park_Phase_1_Construction_(Addendum_#3_Revision).pdf PDF
ADDENDUM_3_CD_304_2202_L119_GRAD_5.pdf PDF
ADDENDUM_3_CD_304_2202_L118_GRAD_4.pdf PDF
ADDENDUM_3_CD_304_2202_L117_GRAD_3.pdf PDF
ADDENDUM_3_CD_304_2202_L116_GRAD_2.pdf PDF
ADDENDUM_3_CD_304_2202_L115_GRAD_1.pdf PDF
Sheraden_Park_Phase_1_Construction_(Addendum_#2_Revision).pdf PDF
ADDENDUM_2_Sheraden_Park_Geohazard_Report.pdf PDF
ADDENDUM_2_SheradenPark_L119_GRAD_5.pdf PDF
ADDENDUM_2_SheradenPark_L115_GRAD_1.pdf PDF
Addendum_2_SheradenPark_000_TS.pdf PDF
ADDENDUM_2_2026-08-19_0819_Klavon_Sheraden_100%_submission_SS_ADD_2_V0.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev2.pdf PDF
Sheraden_Park_Phase_1_Construction.pdf PDF
Pennsylvania_Prevailing_Wage_Rates_7.15.2026.aspx —
Sheraden_Park_Phase_1_Construction_-_SOV.xlsx XLSX spreadsheet
Sheraden_Park_Phase_1_Construction_-_Drawings_.pdf PDF
Sheraden_Park_Phase_1_Construction_Project_Manual_-_Rev1.pdf PDF
010000_Div01_Sheraden_Park_Rev1-full.pdf PDF
2026-02-20_Sheraden_Park_BidSet.pdf PDF
2026-06-02_SheradenPark_Alternates+ItemDescriptions.docx DOCX document
2026-06-02_SheradenPark_SOV.xlsx XLSX spreadsheet
2026-06-02_SheradenPark_BidForm.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .