About this file
This document is a comprehensive set of mechanical and electrical engineering design drawings for the Regional Transportation District (RTD) Mechanical Upgrades project at the Security Command Center located in Denver, Colorado. The project involves mechanical and electrical system upgrades, specifically focusing on replacing two existing rooftop heating and cooling units (RTU-1 and RTU-2) with new units. The drawings, prepared by HDR Engineering and dated November 25, 2024, include detailed plans for HVAC demolition, new HVAC installation, electrical power plans, one-line electrical diagrams, and various technical specifications and notes.
The electrical upgrades include replacing the existing rooftop units with new units that have different electrical load requirements. The service load justification indicates a net load change of 12,470 VA added to the existing 250A service, bringing the total service load to 76,532 VA or 92 amps at 480V, three-phase. The project involves modifying existing electrical circuits, with the existing 30A3P circuit breaker for RTU-2 potentially being reused and the circuit breaker for RTU-1 being replaced with a new 40A3P circuit breaker. The drawings also show the existing electrical infrastructure, including a 100 KVA generator, utility transformer, and various electrical panels, with careful attention to maintaining the existing electrical system's integrity while implementing the necessary upgrades.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/
2" 1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2
/2
3:
:5
P
M \\d en -s rv 1\
N ew fo rm a\
4\
\1
9\ 6.
0_ C
A D
_B
IM
\6 .2
_W
IP
\R T
D _M ec h
U pg ra de s.
rv t
G0001
RTD MECHANICAL UPGRADES - SECURITY
COMMAND CENTER
COVER SHEET
THE REGIONAL TRANSPORTATION DISTRICT
SECURITY COMMAND CENTER
1205 W 7th Ave, DENVER, CO 80204
100% CONSTRUCTION DOCUMENTATION
RTD MECHANICAL UPGRADES
HDR Engineering Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
MARK REVISIONS BY DATE
1 50% DESIGN DEVELOPMENT 1/12/2024
2 75% CONSTRUCTION DOCUMENTS 3/13/2024
3 100% CONSTRUCTION DOCUMENTS 11/25/2024
HD
R-
A So rt Co de
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
1/2
1"
2" 6/2
0/2
6 2 :12
:55 P
M Fil e P ath FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
50% DESIGN DEVELOPMENT1 EAB 01/12/2024
The Ballard Group, Inc.
Mechanical Consulting Engineers
(303) 988-4514
75% CONSTRUCTION DOCUMENTS2 EAB 03/12/2024
100% CONSTRUCTION DOCUMENTS3 EAB 11/25/2024
M-001
MECHANICAL COVER SHEET
11-25-20
VESTIBULE
CORRIDOR
WORK
AREA
OFFICE
STORAGE
ADMIN.
OFFICE
ADMIN.
OFFICE
WOMEN'S
RESTROOM
ADMIN.
OFFICE
VIEWING
ROOM
MEN'S
RESTROOM
CORRIDOR
KITCHEN
STORAGE
ROOM
COMM./TELE.
ROOM
JAN.
ELEC.
ROOM
CORRIDOR
OFFICE
CONFERENCE
ROOM
OFFICE
VESTIBULE
CORRIDOR
WORK
AREA
OFFICE
STORAGE
ADMIN.
OFFICE
ADMIN.
OFFICE
WOMEN'S
RESTROOM
ADMIN.
OFFICE
VIEWING
ROOM
MEN'S
RESTROOM
CORRIDOR
KITCHEN
STORAGE
ROOM
COMM./TELE.
ROOM
JAN.
ELEC.
ROOM
CORRIDOR
OFFICE
CONFERENCE
ROOM
OFFICE
HD
R-
A So rt Co de
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
1/2
1"
2" 6/2
0/2
6 2 :12
:55 P
M Fil e P ath FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
50% DESIGN DEVELOPMENT1 EAB 01/12/2024
The Ballard Group, Inc.
Mechanical Consulting Engineers
(303) 988-4514
75% CONSTRUCTION DOCUMENTS2 EAB 03/12/2024
100% CONSTRUCTION DOCUMENTS3 EAB 11/25/2024
HVAC ROOF DEMOLITION PLAN
HVAC ROOF PLAN
HVAC DEMOLITION FLOOR PLAN
HVAC FLOOR PLAN
M-101
HVAC FLOOR PLANS
Scale
1/8" = 1'-0"
0 4' 8' 16'
HD
R-
A So rt Co de
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
1/2
1"
2" 6/2
0/2
6 2 :12
:55 P
M Fil e P ath FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
50% DESIGN DEVELOPMENT1 EAB 01/12/2024
The Ballard Group, Inc.
Mechanical Consulting Engineers
(303) 988-4514
75% CONSTRUCTION DOCUMENTS2 EAB 03/12/2024
100% CONSTRUCTION DOCUMENTS3 EAB 11/25/2024
SCALE: NONE
ROOFTOP UNIT CONTROL DIAGRAM
RTU-1 & 2
BAS NETWORK DIAGRAM
SCALE: NONE
M-301
HVAC SCHEDULES, DETAILS, AND CONTROL DRAWINGS
E-001
SYMBOLS, LEGEND & GENERAL NOTES
DRAWOUT CIRCUIT BREAKER
CIRCUIT BREAKER
INTERRUPTER SWITCH
METERING DEVICE
JUNCTION BOX (SIZE AS REQUIRED UNO)
SHADING INDICATES EGRESS FIXTURE
SHEET NOTE DESIGNATION
EMERGENCY LIGHTING UNIT
DOWNLIGHT
STRIP FIXTURE
SHUNT TRIP DEVICE
GROUND FAULT INTERRUPTER DEVICE
SURFACE MOUNT TROFFER
SPEAKER
TELEVISION OUTLET: 18" AFF (UNO)
TELEPHONE TERMINAL BOARD (TTB)
DATA / VOICE OUTLET: FLOOR MOUNTED
MULTI-OUTLET ASSEMBLY: SPACING PER DWGS
FIXTURE DESIGNATION: F1=TYPE (SEE FIXTURE SCH.)
REVISION DELTA: NUMBER REPRESENTS REVISION
EQUIPMENT CONNECTION
TELEPHONE OUTLET: 18" AFF
NEUTRAL CONDUCTOR
PHASE CONDUCTOR(S)
ISOLATED GROUNDING CONDUCTOR
HOMERUN TO PANELBOARD OR DEVICE
NEUTRAL CONDUCTOR (N=1, 2N=2 NEUTRALS,
PHASE CONDUCTOR(S)
GROUNDING CONDUCTOR
HOMERUN CIRCUIT DESIGNATION
PANELBOARD DESIGNATION
HOMERUN CIRCUIT DESIGNATION
(3 PHASE CIRCUIT SHOWN)
* FIXTURE SCHEDULE HAS PRECEDENCE *
VOLUMETRIC TROFFER
FLANGED TROFFER
WALL PACK
POLE MOUNT
EXIT SIGN FIXTURE - SHADED AREA DENOTES LIGHTED
FACE - ARROWS INDICATE DIRECTION
DATA / VOICE OUTLET: 18" AFF - 1 VOICE, 1 DATA JACK,
TRANSFORMER
MOTOR - # INDICATES HP
FUSE
VOLUME CONTROL
PHASE CONDUCTOR(S)
GROUNDING CONDUCTOR
PANELBOARD DESIGNATION
NORMALLY OPEN (NO) CONTACT
NORMALLY CLOSED (NC) CONTACT
GROUNDING BAR
TICS = NO. OF #12 WIRES (UNO) IF MORE THAN
TWO WITHIN RACEWAY. GROUNDING CONDUCTOR
(NOT SHOWN) ALWAYS REQUIRED.
CURRENT TRANSFORMER
REMOTE METER
GENERATOR
GROUND FAULT RELAY W/ CT OR SENSOR
3N=3 NEUTRALS)
TRANSFER SWITCH (A=AUTOMATIC, M=MANUAL)
# FOR POLES 2, 3 OR 4
THERMOSTAT (PROVIDED BY MECH. CONTRACTOR UNO)
COIL - VOLTAGE PER CONTROL DIAGRAMS
PILOT LIGHT (LED) NON PUSH-TO-TEST
THERMAL OVERLOAD
MAGNETIC OVERLOAD
PUSH BUTTON NORMALLY OPEN (NO)
HAND-OFF-AUTO (HOA) SELECTOR SWITCH
LIMIT SWITCH NORMALLY OPEN (NO)
PUSH BUTTON ILLUMINATED (LED)
PILOT LIGHT (LED) PUSH-TO-TEST. LETTER INDICATES
COLOR (R=RED, G=GREEN, A=AMBER, Y=YELLOW)
PUSH BUTTON NORMALLY CLOSED (NC)
LIMIT SWITCH NORMALLY CLOSED (NC)
A
ADA
AFC
AFCI
AFF
AFG
AHJ
AIC
AL
ATS
AWG
BC
BKR
C
CEC
CKT
CLG
CO
CT
CU
DB
DDC
DPDT
DPST
DWG
(E)
ELEC
EM
EMT
(F)
FLA
FMC
FPEN
GFI
GFR
GND
HID
HOA
HP
HSKP
IMC
J-BOX
K
KVA
KW
LTG
IG
MCB
MCM
MFG
MLO
MS
MSB
MTS
NC
NEC
NEMA
NIC
NL
NO
NTS
NVE
P
PH/Ø
PV
PNL
PTC
PWR
(R)
RAC
RFC
RSC
SE
SPDT
SPST
STC
SW
TE
TTB
TYP
UL
UNO
UNSW
UPS
V
VA
VFD
W
WP
(X)
XFMR OR XF
AMPS
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED CEILING
ARC-FAULT CIRCUIT INTERRUPTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
AMP INTERRUPTING CAPACITY
ALUMINUM
AUTOMATIC TRANSFER SWITCH
AMERICAN WIRE GAUGE
BARE COPPER
BREAKER
CONDUIT/RACEWAY
CALIFORNIA ENERGY COMMISSION
CIRCUIT
CEILING
CONDUIT/RACEWAY ONLY
CURRENT TRANSFORMER
COPPER
DISTRIBUTION BOARD
DIRECT DIGITAL CONTROLLER
DOUBLE-POLE, DOUBLE-THROW
DOUBLE-POLE, SINGLE-THROW
DRAWING
EXISTING TO REMAIN
ELECTRICAL
EMERGENCY
ELECTRICAL METALLIC TUBING
FUTURE
FULL LOAD AMPS
FLEXIBLE METAL CONDUIT (STEEL)
FUSE PER EQUIP. NAMEPLATE
GROUND FAULT INTERRUPT
GROUND FAULT RELAY
GROUND
HIGH INTENSITY DISCHARGE
HAND-OFF-AUTO SWITCH
HORSEPOWER
HOUSEKEEPING
INTERMEDIATE METAL CONDUIT
JUNCTION BOX
kcmil (300K = 300 kcmil)
KILOVOLT AMPS
KILOWATT
LIGHTING
ISOLATED GROUND
MAIN CIRCUIT BREAKER
THOUSAND CIRCULAR MILS
MANUFACTURER
MAIN LUGS ONLY
MOTOR STARTER
MAIN SWITCHBOARD
MANUAL TRANSFER SWITCH
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NOT IN CONTRACT
NIGHTLIGHT
NORMALLY OPEN
NOT TO SCALE
NV ENERGY
POLE
PHASE
PHOTOVOLTAIC
PANEL
PV USA TEST CONDITIONS
POWER
RELOCATE/RELOCATED
RIGID ALUMINUM CONDUIT
RIGID FIBERGLASS CONDUIT
RIGID STEEL CONDUIT
SERVICE ENTRANCE
SINGLE-POLE, DOUBLE-THROW
SINGLE-POLE, SINGLE-THROW
STANDARD TEST CONDITIONS
SWITCH
TELECOM
TELEPHONE TERMINATION BOARD
TYPICAL
UNDERWRITER'S LABORATORY
UNLESS NOTED OTHERWISE
UNSWITCHED
UNINTERRUPTED POWER SUPPLY
VOLTS
VOLT AMPS
VARIABLE FREQUENCY DRIVE
WATTS
WEATHER PROOF
EXISTING TO BE REMOVED
TRANSFORMER
FEEDER DESIGNATION
DATA OUTLET: 18" AFF
SURGE PROTECTION DEVICE
SPD SURGE PROTECTION DEVICE
ELECTRICAL LEGEND
DEVICE MOUNTED AT NON-STANDARD HEIGHT. IF NO HEIGHT
SHOWN VERIFY HEIGHT WITH ARCHITECT
QUAD RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
DUPLEX RECEPTACLE: FLOOR MOUNTED
DUPLEX RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
SINGLE RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
DUPLEX RECEPTACLE: HALF SWITCHED, +18" AFF
ISOLATED GROUND TYPE RECEPTACLE (ORANGE TRIANGLE),
20A, 125V, NEMA 5-20IG, +18" AFF
DUPLEX RECEPTACLE GFI TYPE - 20A, 125V, NEMA 5-20 GFI
SPECIAL PURPOSE RECEPTACLE: SEE DWGS FOR NEMA
DUPLEX RECEPTACLE: CEILING MOUNTED
MULTI-OUTLET ASSEMBLY: SPACING PER DWGS
QUAD RECEPTACLE: FLOOR MOUNTED
BLANK GFCI PROTECTIVE DEVICE IN READILY ACCESSIBLE
LOCATION (LABEL PROTECTED DEVICES)
PHOTOELECTRIC CELL (ON ROOF FACING NORTH UNO)
OCCUPANCY SENSOR - WALL MOUNTED 48" AFF
CONTROL STATION
TIME WALL SWITCH EQUAL TO HUBBELL DT2000W
SWITCH WITH PILOT LIGHT 48" AFF
DIMMER OPERATED SWITCH 48" AFF
KEY OPERATED SWITCH 48"
SINGLE POLE SWITCH 48" AFF
THREE WAY SWITCH 48" AFF
FOUR WAY SWITCH 48" AFF
MANUAL MOTOR STARTER
COMMUNICATIONS OR SIGNAL
PRIMARY
SECONDARY
OVERHEAD SERVICE
CONDUIT/RACEWAY BELOW GRADE OR BELOW FLOOR
CONDUIT/RACEWAY IN WALL OR ABOVE CEILING
LOW VOLTAGE AND/OR CONTROL WIRING
CONDUIT/RACEWAY STUB OUT: MARK AND CAP (SITE)
TELEPHONE
TIMECLOCK
BREAK OR RUN CONTINUES
CONDUIT/RACEWAY SLEEVE
EMERGENCY CIRCUIT
CONTACTOR OR RELAY
OCCUPANCY SENSOR - CEILING MOUNTED. PROVIDE
WITH POWER PACK PER MFG REQUIREMENTS.
SWITCH WITH LIGHTED HANDLE
TELEVISION
0-10V DIMMING OCCUPANCY SENSOR - WALL MOUNTED
48" AFF - EQUAL TO SENSOR SWITCH WSX-D
OCCUPANCY SENSOR - CORNER MOUNTED. PROVIDE
WITH POWER PACK PER MFG REQUIREMENTS.
DUPLEX "CLOCK" RECEPTACLE: 125V, NEMA 5-20R, +60" AFF
QUAD RECEPTACLE: CEILING MOUNTED
LENSED TROFFER
DEVICE MOUNTED AT NON-STANDARD HEIGHT. IF NO HEIGHT
SHOWN VERIFY HEIGHT WITH ARCHITECT
(RR) REMOVE AND REPLACE
HA-[1,3,5,3N]G
HA-(1.3.5)G
XF
PC
TC
GFI
M
ST
S
TV
VC
A
M
G
GFI
X"
T
J
F1
48" AFF
+18" AFF
COMBO DUAL USB CHARGER / DUPLEX RECEPTACLE, 5.1A, (1)
TYPE A & (1) TYPE C USB (3.1, 3.0, 2.0 AND 1.1 COMPATIBLE),
20A, 125V, NEMA 5-20R, +18AFF
QUAD USB CHARGER, 5.1A, (2) TYPE A & (2) TYPE C USB (3.1,
3.0, 2.0 AND 1.1 COMPATIBLE), +18AFF
CONFIGURATION
2 BLANKS
BRANCH CIRCUIT (WHEN TIC MARKS ARE NOT
SHOWN) = (1) PHASE, (1) NEUTRAL AND (1)
GROUNDING CONDUCTOR
L R
E M M1
K H
= LIGHTING
= RECEPTACLES
= EQUIPMENT = MOTOR
= LARGEST MOTOR
= KITCHEN EQUIP
= ELECTRIC HEAT
PANELBOARD: SURFACE MOUNTED
PANELBOARD: FLUSH MOUNTED
SWITCHBOARD OR DISTRIBUTION PANEL
TRANSFORMER
PULLBOX / VAULT
MOTOR STARTER
COMBINATION MOTOR STARTER
COMBINATION MOTOR STARTER PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
DISCONNECT SWITCH - FUSIBLE (FUSED PER EQUIP.
NAMEPLATE)
DISCONNECT SWITCH - NON-FUSIBLE
DISCONNECT SWITCH PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
ENCLOSED CIRCUIT BREAKER
GROUND ROD
SHUNT TRIP STATION OR EMERGENCY PUSHBUTTON
REMOTE METER
NOTE: THIS IS A MASTER SYMBOL LIST. IT MAY BE THAT NOT ALL SYMBOLS SHOWN ARE USED WITHIN THIS SET OF PLANS. HEIGHTS GIVEN ARE TO TOP OF BOX.
BREAKERS: 20 = SINGLE POLE CIRCUIT BREAKER 20/2 = TWO POLE CIRCUIT BREAKER 20/3 = THREE POLE CIRCUIT BREAKER 20A = ARC FAULT CIRCUIT BREAKER 20C = CONTROLLABLE CIRCUIT BREAKER 20G = GFI CIRCUIT BREAKER
DRAWING SCHEDULE
SHEET DESCRIPTION
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS & GENERAL NOTES
E-101 POWER PLAN - LEVEL 01
E-201 POWER PLANS - ROOF LEVEL
E-301 ONE-LINE DIAGRAM
TOTAL SHEETS IN ISSUE:
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
/1
3/
SCOPE OF WORK
PROVIDE NEW ELECTRICAL CONNECTIONS FOR REPLACEMENT OF ROOF MOUNTED HVAC EQUIPMENT.
GENERAL NOTES
1. INSTALLATION SHALL COMPLY WITH CURRENTLY ADOPTED 2023 NEC AND LOCAL CODES. ALL WORK
PRACTICESSHALL COMPLY WITH NFPA 70E. ENERGIZED WORK IS PROHIBITED UNLESS PERFORMED UNDER AN APPROVED ENERGIZED WORK PERMIT WITH AN IEE 1584 COMPLIANT ARC FLASH ASSESSMENT
2. DATA PRESENTED ON THESE DRAWINGS ARE REPRESENTS DESIGN INTENT BASED ON AVAILABLE INFORMATION, BUT FIELD VERIFICATION OF ALL DIMENSIONS, LOCATIONS, LEVELS, ETC. TO SUIT FIELD CONDITIONS IS REQUIRED. REVIEW ALL CIVIL DETAILS AND ADJUST WORK TO MEET THE REQUIREMENTS OF
CONDITIONS SHOWN. DISCREPANCIES BETWEEN DIFFERENT PLANS OR BETWEEN DRAWINGS AND
SPECIFICATIONS, OR REGULATIONS AND CODES GOVERNING THE INSTALLATION SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER IN WRITING.
3. ALL WORK SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER AND IN ACCORDANCE WITH NECA STANDARDS, INCLUDING NECA 1 STANDARDS FOR GOOD WORKMANSHIP IN ELECTRICAL CONSTRUCTION.
4. ALL WORK SHALL BE SUBJECT TO INSPECTION AND POSSIBLE REJECTION IF NOT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER.
5. WORK REJECTED DUE TO CONTRACT, COD, SPECIFICATION, DRAWINGS, OR COORDINATIONDEFICIENCIES
WORK SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
6. PROVIDE REPRODUCIBLE RECORD DRAWINGS OF ALL COMPLETED WORK. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
7. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARD AND ABANDONED MATERIALS FROM DEMOLITION AND INSTALLATION. THIS INCLUDES BUT IS NOT LIMITED TO CONDUIT, FASTENERS, BOXES, & ETC. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN PLACE. ALL ABANDONED
CONDUIT SHALL BE CAPPED. ALL DEMOLISHED CONDUCTORS SHALL BE REMOVED.
8. DO NOT SPLICE FEEDER CONDUCTORS UNLESS WRITTEN PRIOR APPROVAL HAS BEEN OBTAINED FROM THE
ENGINEER. APPROVING SPECIFIC CONTRACTOR PROPOSED LOCATION AND SPLICING METHOD.
9. THE MAXIMUM NUMBER OF CONDUIT BENDS SHALL NOT BE GREATER THAN 270 DEGREES BETWEEN PULLING
STRUCTURES. THIS INCLUDES THE AGGREGATE OF ALL HORIZONTAL AND VERTICAL CHANGES.
10. ALL CONDUIT, PULLBOXES AND VAULTS SHALL BE LABELED PER THE SPECIFICATIONS.
11. EACH CONDUIT SHALL BE PROVIDED WITH A 1250 LBS. PULL ROPE AND TO/FROM IDENTIFICATION TAGS
NOTE: "(E)" IN HOMERUN INDICATES NEW HOMERUN
TO EXISTING PANEL
D
ES
IG
N
D
EV
EL
O
PM
EN
T
/1 2/
N/A N/A
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-2550% DESIGN DEVELOPMENT1 JM 2024-01-12
ELECTRICAL
75% CONSTRUCTION DOCUMENTS2 JM 2024-03-13
100% CONSTRUCTION DOCUMENTS3 JM 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
0%
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
/2
5/
11/25/2024
M
C T
T A
XF
XF
XF
F
CONFERENCE
ROOM
OFFICE
CORRIDOR
ELEC.
ROOM
JAN.
COMM./TELE.
ROOM
STORAGE
ROOM
KITCHEN
CORRIDOR
MEN'S
RESTROOM
VIEWING
ROOM
ADMIN.
OFFICE
WOMEN'S
RESTROOM
ADMIN.
OFFICE
ADMIN.
OFFICE
STORAGE
OFFICE
WORK
AREA
OFFICE
CORRIDOR
CORRIDOR
VESTIBULE
E-101
POWER PLAN - LEVEL 01
SCALE:
POWER PLAN - LEVEL 011
E-101 1/8" = 1'-0"
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. TERMINAL UNITS SHOWN FOR REFERENCE ONLY. CONTROL WIRING TO EACH UNIT (NOT SHOWN) BY
TEMPERATURE CONTROLS CONTRACTOR. REFER TO TEMPERATURE CONTROL DRAWINGS FOR MORE
INFORMATION.
3. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
4. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
5. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
6. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
Scale
1/8" = 1'-0"
0 4' 8' 16'
1/8" = 1'-0" N/A
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-2550% DESIGN DEVELOPMENT1 JM 2024-01-12
ELECTRICAL
75% CONSTRUCTION DOCUMENTS2 JM 2024-03-13
100% CONSTRUCTION DOCUMENTS3 JM 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
(E) 45KVA
"TRANSFORMER #2"
(E) "LP2"
(E) "LP1"
(E) 400A ATS
(E) (E)
(E) 400A3P
SERVICE DISCONNECT
(E) 75 KVA UTILITY
TRANSFORMER
(E) 100KVA
GENERATOR
(E) TTBAREA OF WORK
(E) 45KVA
"TRANSFORMER #1"
(E) MDP
RTU - 2: REFER TO
ROOF PLAN
RTU - 1: REFER TO
ROOF PLAN
FOR REFERENCE ONLY
F
F
E-201
POWER PLANS - ROOF LEVEL
SCALE:
POWER PLAN - ROOF LEVEL1
E-201 1/8" = 1'-0"
DEMOLITION -
SCALE:
POWER PLAN - ROOF LEVEL2
E-201 1/8" = 1'-0"
NEW CONSTRUCTION
GENERAL NOTES - DEMOLITION
1. THIS DRAWING REPRESENTS THE EXISTING POWER SYSTEMS WITHIN THE EXISTING BUILDING (AREA TO
BE REMODELED). THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, RELOCATING AND REWIRING ALL EQUIPMENT AS INDICATED ON THE DRAWINGS, INCLUDING EQUIPMENT THAT LIES WITHIN WALLS AND
CEILINGS TO BE DEMOLISHED OR REMODELED.
2. (X) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE REMOVED, (R) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE RELOCATED, (E) AND/OR HALFTONE LINES INDICATE EXISTING
EQUIPMENT TO REMAIN UNLESS NOTED OTHERWISE.
3. SALVAGEABLE ITEMS REMOVED DURING DEMOLITION SHALL BE OFFERED TO OWNER PRIOR TO
DISPOSAL OR REMOVAL FROM SITE.
4. EXISTING CIRCUITS AS INDICATED ARE BASED ON LIMITED FIELD OBSERVATION AND INFORMATION PER RECORD DRAWINGS AND SHALL BE FIELD VERIFIED BY ELECTRICAL CONTRACTOR PRIOR TO START OF
DEMOLITION WORK.
5. THE CONTRACTOR SHALL SALVAGE AND REUSE EXISTING BOXES AND CONDUIT WHERE POSSIBLE.
DAMAGED CONDUIT, FITTINGS BOXES, ETC. MAY NOT BE RE-USED. NEW CIRCUITING AS INDICATED ON THE DRAWINGS IS SHOWN FOR INTENT ONLY AND MAY VARY BASED ON ACTUAL FIELD CONDITIONS
(NEW CIRCUITING SHALL MATCH EXISTING WHERE POSSIBLE TO UTILIZE EXISTING HOME-RUN
CONDUITS, ETC.). KEEP AS-BUILT DRAWINGS CURRENT WITH ANY DEVIATION IN CIRCUITING FROM WHAT
IS INDICATED WITHIN THESE PLANS.
6. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARDED AND ABANDONED MATERIALS LEFT OVER FROM DEMOLITION AND INSTALLATION. THIS INCLUDES, BUT IS NOT LIMITED TO, CONDUIT, FASTENERS AND BOXES. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN
PLACE. ALL ABANDONED CONDUIT SHALL BE CAPPED.
SHEET NOTES
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS,
CONDUIT, AND EXISTING DISCONNECT. REMOVE CONDUCTORS BACK TO SOURCE . CONDUIT MAY BE REUSED FOR CONNECTION TO NEW EQUIPMENT. DISCONNECT EXISTING DUCT SMOKE DETECTOR AND
SAFE OFF FIRE ALARM CONNECTION TO NEW EQUIPMENT. COORDINATE DEMOLITION OF HVAC
EQUIPMENT WITH MECHANICAL CONTRACTOR PRIOR TO THE START OF WORK.
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS AND CONDUIT BACK TO EXISTING DISCONNECT. SAFE OFF CONDUCTORS FOR RE-CONNECTION TO NEW
EQUIPMENT . EXISTING CONDUCTORS AND CONDUIT MAY BE REUSED FOR CONNECTION TO NEW
EQUIPMENT. DISCONNECT EXISTING DUCT SMOKE DETECTOR AND SAFE OFF FIRE ALARM CONNECTION TO NEW EQUIPMENT. COORDINATE DEMOLITION OF HVAC EQUIPMENT WITH MECHANICAL CONTRACTOR
PRIOR TO THE START OF WORK.
RECONNECT NEW DUCT SMOKE DETECTOR TO NEW HVAC EQUIPMENT. COORDINATION CONNECTION
WITH TEMPERATURE CONTROLS AND MECHANICAL CONTRACTOR PRIOR TO THE START OF WORK.
EXISTING HVAC MOUNTED RECEPTACLE SHALL BE DEMOLISHED. DE-ENERGIZE RECEPTACLE AND
REMOVE CONDUCTORS AND CONDUIT BACK TO SOURCE OR NEAREST JUNCTION BOX TO REMAIN.
EXISTING BRANCH CIRCUIT SHALL BE REUSED TO SERVE NEW INTEGRAL RTU RECEPTACLE
EXTEND EXISTING BRANCH CIRCUIT AND CONDUIT PREVIOUSLY SERVING DEMOLISHED RECEPTACLE FOR CONNECTION TO RECEPTACLE INTEGRAL TO NEW RTU UNIT. COORDINATE CONNECTION WITH
MECHANICAL CONTRACTOR PRIOR TO START OF WORK.
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. TERMINAL UNITS SHOWN FOR REFERENCE ONLY. CONTROL WIRING TO EACH UNIT (NOT SHOWN) BY
TEMPERATURE CONTROLS CONTRACTOR. REFER TO TEMPERATURE CONTROL DRAWINGS FOR MORE
INFORMATION.
3. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
4. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
5. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
6. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
Scale
1/8" = 1'-0"
0 4' 8' 16'
1/8" = 1'-0" N/A
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-2550% DESIGN DEVELOPMENT1 JM 2024-01-12
ELECTRICAL
75% CONSTRUCTION DOCUMENTS2 JM 2024-03-13
100% CONSTRUCTION DOCUMENTS3 JM 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
1 (X) RTU-1
2 (X) RTU-2
(X)
MDP-(7.9.11)G
MDP-(1.3.5)G
(N) RTU
(N) RTU
CONTROLLER
G
GND NEUT
(E) 100 KVA GENERATOR
277/480V, 3PH, 4W
(E) 150A CB
(E) PAD MOUNTED 75 KVA 277/480V,
3PH, 4W UTILITY TRANSFORMER
(E) GROUND ROD
C T
M
400/3
250A
FRS-R
(E) UTILITY
METER
(E) HEAVY DUTY
NEMA 3R (SERVICE
RATED/LOCKABLE)
(E) 400 A AUTOMATIC
TRANSFER SWITCH
NEMA 3R
250/3
MCB
70/3
(E)
PANEL
"MDP"
70/3
2XF
150/3
(E)
PANEL
"LP2"
XF
150/3
(E)
PANEL
"LP1"
(E) CWP, BLDG STEEL
(E) CWP, BLDG
STEEL
(E) 45 KVA TRANSFORMER
480-120/208 3PH, 4W
FLOOR MOUNTED
(E) 45 KVA TRANSFORMER
480-120/208 3Ø, 4W
FLOOR MOUNTED
FEEDER SCHEDULE
(E) [4-#250 CU; #4 GND]2-1/2"C)
(E) [3-#4 CU; #8 GND]1-1/4"C)
(E) [4-#1/0 CU; #6 GND]2"C)
(E) #6 GND
(E) #2 GND
P
(E) CT CABINET
AREA OF WORK
E-301
ONE-LINE DIAGRAM
GENERAL NOTES - ONELINES
1. ONE LINE DIAGRAMS ARE SHOWN FOR REFERENCE ONLY. ELECTRICAL WORK IS ANTICIPATED TO BE
LIMITED TO THE BRANCH CIRCUIT LEVEL OF THE ELECTRICAL DISTRIBUTION SYSTEM.
SCALE:
ONE-LINE DIAGRAM1
E-301 N/A
UTILITY 12-MONTH PEAK DEMAND: 41 KW
TOTAL EXISTING LOAD: (41KW / 0.8PF) X 100 = 51,250 VA
51,250 VA X 1.25 (NEC 220.87) = 64,062 VA
(X) RTU-1: -19,953 VA
(X) RTU-2: -19,953 VA
(N) RTU-1: 26,604 VA
(X) RTU-2: 19,121 VA
LARGEST MOTOR (NEC 430.24): 0.25 X 26,604 = 6,651 VA
NET LOAD CHANGE ADDED TO 250A SERVICE: 12,470 VA
NEW TOTAL SERVICE LOAD: 76,532 VA OR 92 AMPS @480V, 3PH
SHEET NOTES
EXISTING 30A3P CIRCUIT BREAKER AND BRANCH CIRCUIT SERVING RTU-2 MAY BE REUSED FOR CONNECTION TO NEW EQUIPMENT. EXISTING 30A3P CIRCUIT BREAKER AND BRANCH CIRCUIT SERVING RTU-1 SHALL BE REPLACED WITH NEW 40A3P CIRCUIT BREAKER AND BRANCH CIRCUIT FOR CONNECTION
TO NEW EQUIPMENT. REFER TO HVAC ELECTRICAL CONNECTION SCHEDULE FOR WIRING
CONFIGURATION.
AFTER HVAC EQUIPMENT IS ENERGIZED, THE CONTRACTOR SHALL TEST THE EXISTING GENERATOR AT LOAD. REFER TO SPECIFICATION SECTION 26 60 00 ELECTRICAL SYSTEM TESTING FOR ADDITIONAL
TESTING REQUIREMENTS
SERVICE LOAD JUSTIFICATION
N/A N/A
RTD MECHANICAL UPGRADES
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-2550% DESIGN DEVELOPMENT1 JM 2024-01-12
ELECTRICAL
75% CONSTRUCTION DOCUMENTS2 JM 2024-03-13
100% CONSTRUCTION DOCUMENTS3 JM 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
| Sheets |
| G0001 - COVER SHEET |