Mariposa_Data_Center_Cooling_Stamped_DWGS.pdf
PDF 10 MB Posted
- Attached to
- HVAC Replacements at Elati, Mariposa, and Security Command Center Locations (15% SBE Goal)
- Solicitation number
- IFB 325DH003
- Issued by
- Denver County, Colorado
About this file
These are the 100% Construction Documentation drawings for the Mariposa Light Rail Facility (LRF) Data Center In-Row Cooling project, prepared by HDR Engineering for the Regional Transportation District (RTD) in Denver, Colorado. The project involves mechanical and electrical upgrades to the existing data center, specifically focusing on replacing and upgrading HVAC equipment. The documents are dated November 25, 2024, and include comprehensive electrical and mechanical plans covering demolition and new construction across multiple building levels, including detailed one-line electrical diagrams, power plans, equipment schedules, and load calculations.
The electrical design includes replacing existing HVAC equipment with new cooling units, modifying electrical connections, and updating the electrical distribution system. The load calculations indicate the project will add approximately 17,076 VA to the existing Generator Distribution Panel (GDP) and increase the total service load to 1,282,371 VA. The electrical design maintains the existing 2000A service and 150kW generator while integrating new Computer Room Air Conditioning (CRAC) units, Air Cooled Condensing Units (ACCU), and associated electrical infrastructure. The documents show careful consideration of existing equipment, demolition requirements, and new equipment placement, with a focus on maintaining operational continuity during the upgrade process.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/
2" 1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2
/2
3:
:5
P
M \\d en -s rv 1\
N ew fo rm a\
4\
\1
9\ 6.
0_ C
A D
_B
IM
\6 .2
_W
IP
\R T
D _M ec h
U pg ra de s.
rv t
G0002
MARIPOSA LRF DATA CENTER IN-ROW
COOLING
COVER SHEET
THE REGIONAL TRANSPORTATION DISTRICT
MARIPOSA LIGHT RAIL FACILITY
655 Mariposa St, DENVER, CO 80204
100% CONSTRUCTION DOCUMENTATION
RTD MECHANICAL UPGRADES
HDR Engineering Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
MARK REVISIONS BY DATE
1 50% DESIGN DEVELOPMENT 1/12/2024
2 75% CONSTRUCTION DOCUMENTS 3/13/2024
3 100% CONSTRUCTION DOCUMENTS 11/25/2024
HD
R-
A So rt Co de
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
1/2
1"
2" 6/2
0/2
6 2 :12
:55 P
M Fil e P ath FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
50% DESIGN DEVELOPMENT1 EAB 01/12/2024
The Ballard Group, Inc.
Mechanical Consulting Engineers
(303) 988-4514
75% CONSTRUCTION DOCUMENTS2 EAB 03/13/2024
MARIPOSA LRF DATA CENTER IN-ROW COOLING
100% CONSTRUCTION DOCUMENTS3 EAB 11/25/2024
M-001
MECHANICAL COVER SHEET
11-25-20
A So rt Co de
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
1/2
1"
2" 6/2
0/2
6 2 :12
:55 P
M Fil e P ath FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
50% DESIGN DEVELOPMENT1 EAB 01/12/2024
The Ballard Group, Inc.
Mechanical Consulting Engineers
(303) 988-4514
75% CONSTRUCTION DOCUMENTS2 EAB 03/13/2024
MARIPOSA LRF DATA CENTER IN-ROW COOLING
100% CONSTRUCTION DOCUMENTS3 EAB 11/25/2024
HVAC ROOF DEMOLITION PLAN
HVAC ROOF PLAN
HVAC DEMOLITION FLOOR PLAN
HVAC FLOOR PLAN
M-101
HVAC FLOOR PLANS
Scale
1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
KEY PLAN
A So rt Co de
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
1/2
1"
2" 6/2
0/2
6 2 :12
:55 P
M Fil e P ath FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
50% DESIGN DEVELOPMENT1 EAB 01/12/2024
The Ballard Group, Inc.
Mechanical Consulting Engineers
(303) 988-4514
75% CONSTRUCTION DOCUMENTS2 EAB 03/13/2024
MARIPOSA LRF DATA CENTER IN-ROW COOLING
100% CONSTRUCTION DOCUMENTS3 EAB 11/25/2024
M-301
HVAC SCHEDULES, DETAILS, AND CONTROL DRAWINGS
COMPUTER ROOM AIR CONDITIONING CONTROL DIAGRAM
BAS NETWORK DIAGRAM
HUMIDIFIER CONTROL DIAGRAM
DATA CENTER CONTROL DIAGRAM
MARIPOSA LRF DATA CENTER IN-ROW COOLING
HDR ENGINEERING
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY:
APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
ELECTRICAL
JM
WP
2024-11-25
2024-11-25 MG
MG 2024-11-25
2024-11-25 1 50% DESIGN DEVELOPMENT 2024-01-23JM
2 75% CONSTRUCTION DRAWINGS 2024-03-13JM
3 100% CONSTRUCTION DRAWINGS 2024-11-25JM
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
E-001
ELECTRICAL SYMBOLS, LEGEND & GENERAL NOTES
DRAWOUT CIRCUIT BREAKER
CIRCUIT BREAKER
INTERRUPTER SWITCH
METERING DEVICE
JUNCTION BOX (SIZE AS REQUIRED UNO)
SHADING INDICATES EGRESS FIXTURE
SHEET NOTE DESIGNATION
EMERGENCY LIGHTING UNIT
DOWNLIGHT
STRIP FIXTURE
SHUNT TRIP DEVICE
GROUND FAULT INTERRUPTER DEVICE
SURFACE MOUNT TROFFER
SPEAKER
TELEVISION OUTLET: 18" AFF (UNO)
TELEPHONE TERMINAL BOARD (TTB)
DATA / VOICE OUTLET: FLOOR MOUNTED
MULTI-OUTLET ASSEMBLY: SPACING PER DWGS
FIXTURE DESIGNATION: F1=TYPE (SEE FIXTURE SCH.)
REVISION DELTA: NUMBER REPRESENTS REVISION
EQUIPMENT CONNECTION
TELEPHONE OUTLET: 18" AFF
NEUTRAL CONDUCTOR
PHASE CONDUCTOR(S)
ISOLATED GROUNDING CONDUCTOR
HOMERUN TO PANELBOARD OR DEVICE
NEUTRAL CONDUCTOR (N=1, 2N=2 NEUTRALS,
PHASE CONDUCTOR(S)
GROUNDING CONDUCTOR
HOMERUN CIRCUIT DESIGNATION
PANELBOARD DESIGNATION
HOMERUN CIRCUIT DESIGNATION
(3 PHASE CIRCUIT SHOWN)
* FIXTURE SCHEDULE HAS PRECEDENCE *
VOLUMETRIC TROFFER
FLANGED TROFFER
WALL PACK
POLE MOUNT
EXIT SIGN FIXTURE - SHADED AREA DENOTES LIGHTED
FACE - ARROWS INDICATE DIRECTION
DATA / VOICE OUTLET: 18" AFF - 1 VOICE, 1 DATA JACK,
TRANSFORMER
MOTOR - # INDICATES HP
FUSE
VOLUME CONTROL
PHASE CONDUCTOR(S)
GROUNDING CONDUCTOR
PANELBOARD DESIGNATION
NORMALLY OPEN (NO) CONTACT
NORMALLY CLOSED (NC) CONTACT
GROUNDING BAR
TICS = NO. OF #12 WIRES (UNO) IF MORE THAN
TWO WITHIN RACEWAY. GROUNDING CONDUCTOR
(NOT SHOWN) ALWAYS REQUIRED.
CURRENT TRANSFORMER
REMOTE METER
GENERATOR
GROUND FAULT RELAY W/ CT OR SENSOR
3N=3 NEUTRALS)
TRANSFER SWITCH (A=AUTOMATIC, M=MANUAL)
# FOR POLES 2, 3 OR 4
THERMOSTAT (PROVIDED BY MECH. CONTRACTOR UNO)
COIL - VOLTAGE PER CONTROL DIAGRAMS
PILOT LIGHT (LED) NON PUSH-TO-TEST
THERMAL OVERLOAD
MAGNETIC OVERLOAD
PUSH BUTTON NORMALLY OPEN (NO)
HAND-OFF-AUTO (HOA) SELECTOR SWITCH
LIMIT SWITCH NORMALLY OPEN (NO)
PUSH BUTTON ILLUMINATED (LED)
PILOT LIGHT (LED) PUSH-TO-TEST. LETTER INDICATES
COLOR (R=RED, G=GREEN, A=AMBER, Y=YELLOW)
PUSH BUTTON NORMALLY CLOSED (NC)
LIMIT SWITCH NORMALLY CLOSED (NC)
A
ADA
AFC
AFCI
AFF
AFG
AHJ
AIC
AL
ATS
AWG
BC
BKR
C
CEC
CKT
CLG
CO
CT
CU
DB
DDC
DPDT
DPST
DWG
(E)
ELEC
EM
EMT
(F)
FLA
FMC
FPEN
GFI
GFR
GND
HID
HOA
HP
HSKP
IMC
J-BOX
K
KVA
KW
LTG
IG
MCB
MCM
MFG
MLO
MS
MSB
MTS
NC
NEC
NEMA
NIC
NL
NO
NTS
NVE
P
PH/Ø
PV
PNL
PTC
PWR
(R)
RAC
RFC
RSC
SE
SPDT
SPST
STC
SW
TE
TTB
TYP
UL
UNO
UNSW
UPS
V
VA
VFD
W
WP
(X)
XFMR OR XF
AMPS
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED CEILING
ARC-FAULT CIRCUIT INTERRUPTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
AMP INTERRUPTING CAPACITY
ALUMINUM
AUTOMATIC TRANSFER SWITCH
AMERICAN WIRE GAUGE
BARE COPPER
BREAKER
CONDUIT/RACEWAY
CALIFORNIA ENERGY COMMISSION
CIRCUIT
CEILING
CONDUIT/RACEWAY ONLY
CURRENT TRANSFORMER
COPPER
DISTRIBUTION BOARD
DIRECT DIGITAL CONTROLLER
DOUBLE-POLE, DOUBLE-THROW
DOUBLE-POLE, SINGLE-THROW
DRAWING
EXISTING TO REMAIN
ELECTRICAL
EMERGENCY
ELECTRICAL METALLIC TUBING
FUTURE
FULL LOAD AMPS
FLEXIBLE METAL CONDUIT (STEEL)
FUSE PER EQUIP. NAMEPLATE
GROUND FAULT INTERRUPT
GROUND FAULT RELAY
GROUND
HIGH INTENSITY DISCHARGE
HAND-OFF-AUTO SWITCH
HORSEPOWER
HOUSEKEEPING
INTERMEDIATE METAL CONDUIT
JUNCTION BOX
kcmil (300K = 300 kcmil)
KILOVOLT AMPS
KILOWATT
LIGHTING
ISOLATED GROUND
MAIN CIRCUIT BREAKER
THOUSAND CIRCULAR MILS
MANUFACTURER
MAIN LUGS ONLY
MOTOR STARTER
MAIN SWITCHBOARD
MANUAL TRANSFER SWITCH
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NOT IN CONTRACT
NIGHTLIGHT
NORMALLY OPEN
NOT TO SCALE
NV ENERGY
POLE
PHASE
PHOTOVOLTAIC
PANEL
PV USA TEST CONDITIONS
POWER
RELOCATE/RELOCATED
RIGID ALUMINUM CONDUIT
RIGID FIBERGLASS CONDUIT
RIGID STEEL CONDUIT
SERVICE ENTRANCE
SINGLE-POLE, DOUBLE-THROW
SINGLE-POLE, SINGLE-THROW
STANDARD TEST CONDITIONS
SWITCH
TELECOM
TELEPHONE TERMINATION BOARD
TYPICAL
UNDERWRITER'S LABORATORY
UNLESS NOTED OTHERWISE
UNSWITCHED
UNINTERRUPTED POWER SUPPLY
VOLTS
VOLT AMPS
VARIABLE FREQUENCY DRIVE
WATTS
WEATHER PROOF
EXISTING TO BE REMOVED
TRANSFORMER
FEEDER DESIGNATION
DATA OUTLET: 18" AFF
SURGE PROTECTION DEVICE
SPD SURGE PROTECTION DEVICE
ELECTRICAL LEGEND
DEVICE MOUNTED AT NON-STANDARD HEIGHT. IF NO HEIGHT
SHOWN VERIFY HEIGHT WITH ARCHITECT
QUAD RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
DUPLEX RECEPTACLE: FLOOR MOUNTED
DUPLEX RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
SINGLE RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
DUPLEX RECEPTACLE: HALF SWITCHED, +18" AFF
ISOLATED GROUND TYPE RECEPTACLE (ORANGE TRIANGLE),
20A, 125V, NEMA 5-20IG, +18" AFF
DUPLEX RECEPTACLE GFI TYPE - 20A, 125V, NEMA 5-20 GFI
SPECIAL PURPOSE RECEPTACLE: SEE DWGS FOR NEMA
DUPLEX RECEPTACLE: CEILING MOUNTED
MULTI-OUTLET ASSEMBLY: SPACING PER DWGS
QUAD RECEPTACLE: FLOOR MOUNTED
BLANK GFCI PROTECTIVE DEVICE IN READILY ACCESSIBLE
LOCATION (LABEL PROTECTED DEVICES)
PHOTOELECTRIC CELL (ON ROOF FACING NORTH UNO)
OCCUPANCY SENSOR - WALL MOUNTED 48" AFF
CONTROL STATION
TIME WALL SWITCH EQUAL TO HUBBELL DT2000W
SWITCH WITH PILOT LIGHT 48" AFF
DIMMER OPERATED SWITCH 48" AFF
KEY OPERATED SWITCH 48"
SINGLE POLE SWITCH 48" AFF
THREE WAY SWITCH 48" AFF
FOUR WAY SWITCH 48" AFF
MANUAL MOTOR STARTER
COMMUNICATIONS OR SIGNAL
PRIMARY
SECONDARY
OVERHEAD SERVICE
CONDUIT/RACEWAY BELOW GRADE OR BELOW FLOOR
CONDUIT/RACEWAY IN WALL OR ABOVE CEILING
LOW VOLTAGE AND/OR CONTROL WIRING
CONDUIT/RACEWAY STUB OUT: MARK AND CAP (SITE)
TELEPHONE
TIMECLOCK
BREAK OR RUN CONTINUES
CONDUIT/RACEWAY SLEEVE
EMERGENCY CIRCUIT
CONTACTOR OR RELAY
OCCUPANCY SENSOR - CEILING MOUNTED. PROVIDE
WITH POWER PACK PER MFG REQUIREMENTS.
SWITCH WITH LIGHTED HANDLE
TELEVISION
0-10V DIMMING OCCUPANCY SENSOR - WALL MOUNTED
48" AFF - EQUAL TO SENSOR SWITCH WSX-D
OCCUPANCY SENSOR - CORNER MOUNTED. PROVIDE
WITH POWER PACK PER MFG REQUIREMENTS.
DUPLEX "CLOCK" RECEPTACLE: 125V, NEMA 5-20R, +60" AFF
QUAD RECEPTACLE: CEILING MOUNTED
LENSED TROFFER
DEVICE MOUNTED AT NON-STANDARD HEIGHT. IF NO HEIGHT
SHOWN VERIFY HEIGHT WITH ARCHITECT
(RR) REMOVE AND REPLACE
HA-[1,3,5,3N]G
HA-(1.3.5)G
XF
F
N
CB
PC
TC
S S3
S4
SK
D
SP
SM
ST
OS
GFI
M
ST
S
TV
VC
C
A
M
M
G
GFI
SL
SPD
OS
D
C
S
P
OH
T
TV
X"
T
J
F1
48" AFF
+18" AFF
COMBO DUAL USB CHARGER / DUPLEX RECEPTACLE, 5.1A, (1)
TYPE A & (1) TYPE C USB (3.1, 3.0, 2.0 AND 1.1 COMPATIBLE),
20A, 125V, NEMA 5-20R, +18AFF
QUAD USB CHARGER, 5.1A, (2) TYPE A & (2) TYPE C USB (3.1,
3.0, 2.0 AND 1.1 COMPATIBLE), +18AFF
CONFIGURATION
2 BLANKS
BRANCH CIRCUIT (WHEN TIC MARKS ARE NOT
SHOWN) = (1) PHASE, (1) NEUTRAL AND (1)
GROUNDING CONDUCTOR
L R
E M M1
K H
= LIGHTING
= RECEPTACLES
= EQUIPMENT = MOTOR
= LARGEST MOTOR
= KITCHEN EQUIP
= ELECTRIC HEAT
PANELBOARD: SURFACE MOUNTED
PANELBOARD: FLUSH MOUNTED
SWITCHBOARD OR DISTRIBUTION PANEL
TRANSFORMER
PULLBOX / VAULT
MOTOR STARTER
COMBINATION MOTOR STARTER
COMBINATION MOTOR STARTER PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
DISCONNECT SWITCH - FUSIBLE (FUSED PER EQUIP.
NAMEPLATE)
DISCONNECT SWITCH - NON-FUSIBLE
DISCONNECT SWITCH PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
ENCLOSED CIRCUIT BREAKER
GROUND ROD
SHUNT TRIP STATION OR EMERGENCY PUSHBUTTON
REMOTE METER
NOTE: THIS IS A MASTER SYMBOL LIST. IT MAY BE THAT NOT ALL SYMBOLS SHOWN ARE USED WITHIN THIS SET OF PLANS. HEIGHTS GIVEN ARE TO TOP OF BOX.
BREAKERS: 20 = SINGLE POLE CIRCUIT BREAKER 20/2 = TWO POLE CIRCUIT BREAKER 20/3 = THREE POLE CIRCUIT BREAKER 20A = ARC FAULT CIRCUIT BREAKER 20C = CONTROLLABLE CIRCUIT BREAKER 20G = GFI CIRCUIT BREAKER
DRAWING SCHEDULE
SHEET DESCRIPTION
E-001 ELECTRICAL SYMBOLS, LEGEND & GENERAL NOTES
E-101 POWER PLAN - LEVEL 01
E-201 POWER PLANS - LEVEL 02
E-301 POWER PLANS - ROOF LEVEL
E-501 ONE-LINE DIAGRAM
E-601 ELECTRICAL SCHEDULES
TOTAL SHEETS IN ISSUE:
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
/1
3/
NOTE: "(E)" IN HOMERUN INDICATES NEW HOMERUN
TO EXISTING PANEL
SCOPE OF WORK
REMOVE EXISTING CRAC UNITS AND CONDENSING UNITS SERVING SERVER EQUIPMENT RM 214, AND PROVIDE ELECTRICAL CONNECTIONS TO SERVER RACK IN-ROW COOLING CRAC UNITS AND ASSOCIATED ROOF TOP MOUNTED CONDENSING UNITS. PROVIDE ELECTRICAL CONNECTION TO NEW HUMIDIFIER UNIT IN SERVER EQUIPMENT RM 214.
GENERAL NOTES
1. INSTALLATION SHALL COMPLY WITH CURRENTLY ADOPTED 2023 NEC AND LOCAL CODES. ALL WORK
PRACTICES SHALL COMPLY WITH NFPA 70E. ENERGIZED WORK IS PROHIBITED UNLESS PERFORMED UNDER AN APPROVED ENERGIZED WORK PERMIT WITH AN IEE 1584 COMPLIANT ARC FLASH ASSESSMENT
2. DATA PRESENTED ON THESE DRAWINGS REPRESENTS DESIGN INTENT BASED ON AVAILABLE INFORMATION, BUT FIELD VERIFICATION OF ALL DIMENSIONS, LOCATIONS, LEVELS, ETC. TO SUIT FIELD CONDITIONS IS REQUIRED. REVIEW ALL CIVIL DETAILS AND ADJUST WORK TO MEET THE REQUIREMENTS OF CONDITIONS SHOWN. DISCREPANCIES BETWEEN DIFFERENT PLANS OR BETWEEN DRAWINGS AND SPECIFICATIONS, OR REGULATIONS AND CODES GOVERNING THE INSTALLATION SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER IN WRITING.
3. ALL WORK SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER AND IN ACCORDANCE WITH NECA STANDARDS, INCLUDING NECA 1 STANDARDS FOR GOOD WORKMANSHIP IN ELECTRICAL CONSTRUCTION.
4. ALL WORK SHALL BE SUBJECT TO INSPECTION AND POSSIBLE REJECTION IF NOT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER.
5. ANY WORK REJECTED DUE TO CONTRACT, COD, SPECIFICATION, DRAWINGS, OR COORDINATION
DEFICIENCIES BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
6. PROVIDE REPRODUCIBLE RECORD DRAWINGS OF ALL COMPLETED WORK. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
7. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARD AND ABANDONED MATERIALS FROM DEMOLITION AND INSTALLATION. THIS INCLUDES BUT IS NOT LIMITED TO CONDUIT, FASTENERS, BOXES, & ETC. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN PLACE. ALL ABANDONED
CONDUIT SHALL BE CAPPED. ALL DEMOLISHED CONDUCTORS SHALL BE REMOVED.
8. DO NOT SPLICE FEEDER CONDUCTORS UNLESS WRITTEN PRIOR APPROVAL HAS BEEN OBTAINED FROM THE
ENGINEER. APPROVING SPECIFIC CONTRACTOR PROPOSED LOCATION AND SPLICING METHOD.
9. THE MAXIMUM NUMBER OF CONDUIT BENDS SHALL NOT BE GREATER THAN 270 DEGREES BETWEEN PULLING
STRUCTURES. THIS INCLUDES THE AGGREGATE OF ALL HORIZONTAL AND VERTICAL CHANGES.
10. ALL CONDUIT, PULLBOXES AND VAULTS SHALL BE LABELED PER THE SPECIFICATIONS.
11. EACH SPARE CONDUIT SHALL BE PROVIDED WITH A 1250 LBS. PULL ROPE. AND TO/FROM IDENTIFICATION
TAGS
D
ES
IG
N
D
EV
EL
O
PM
EN
T
/2 3/
N/A N/A
0%
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
/2
5/
11/25/2024
FIRE COMMAND
CENTER
LOBBY
VESTIBULE
FIELD
SUPERVISORS
OFFICE
OFFICE
WOMEN
MEN
JANITOR
LUNCH
LOADING
113OFFICE
TOOLS
ROOM
BOILER
ROOM
PARTS
ELEV
EQUIP
ROOM
DOCK
STAIR
"C"
SPRINKLER
VALVE
FRT
ELEV
PARTS
LUBE
ROOM
XF XF
MARIPOSA LRF DATA CENTER IN-ROW COOLING
HDR ENGINEERING
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY:
APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
ELECTRICAL
JM
WP
2024-11-25
2024-11-25 MG
MG 2024-11-25
2024-11-25 1 50% DESIGN DEVELOPMENT 2024-01-23JM
2 75% CONSTRUCTION DRAWINGS 2024-03-13JM
3 100% CONSTRUCTION DRAWINGS 2024-11-25JM
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
E-101
POWER PLAN - LEVEL 01
SCALE:
POWER PLAN - LEVEL 011
E-101 3/32" = 1'-0"
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. TERMINAL UNITS SHOWN FOR REFERENCE ONLY. CONTROL WIRING TO EACH UNIT (NOT SHOWN) BY
TEMPERATURE CONTROLS CONTRACTOR. REFER TO TEMPERATURE CONTROL DRAWINGS FOR MORE
INFORMATION.
3. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
4. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
5. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
6. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
N/A 3/32" = 1'-0"
(E) 30 KVA
AREA OF WORK
(E) HPA(E) 45KVA (E) EMB (E) EMA
(E) GDP
AREA OF WORK
(E) 150
GENER
(E) MDS(E) 40KVA UPS
(E) LPA(E) LPA-1
0 16' 32' 64'
SCALE: 3/32"=1'-0" (IN FEET)
KEY PLAN
FOR REFERENCE ONLY
OFFICE
CONFERENCE
ROOM
BREAK
AREA
MEN
WOMEN
OFFICE
SERVER EQUIPMENT
ROOM
CONTROL CENTER
PLATFORM
BREAK ROOM
BRAKE PARTS
REPAIR
UPPER PARTS
WORK OUT
ROOM
JAN.
FIRE CONTROL
ROOM
CORR.
CORR.
ELEC.
CLOSET
XF
FFF F
OFFICE
CONFERENCE
ROOM
BREAK
AREA
MEN
WOMEN
OFFICE
SERVER EQUIPMENT
ROOM
CONTROL CENTER
PLATFORM
BREAK ROOM
BRAKE PARTS
REPAIR
UPPER PARTS
WORK OUT
ROOM
JAN.
FIRE CONTROL
ROOM
CORR.
CORR.
ELEC.
CLOSET
XF
MARIPOSA LRF DATA CENTER IN-ROW COOLING
HDR ENGINEERING
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY:
APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
ELECTRICAL
JM
WP
2024-11-25
2024-11-25 MG
MG 2024-11-25
2024-11-25 1 50% DESIGN DEVELOPMENT 2024-01-23JM
2 75% CONSTRUCTION DRAWINGS 2024-03-13JM
3 100% CONSTRUCTION DRAWINGS 2024-11-25JM
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
E-201
POWER PLANS - LEVEL 02
SCALE:
POWER PLAN - LEVEL 022
E-201 3/32" = 1'-0"
NEW CONSTRUCTION
SCALE:
POWER PLAN - LEVEL 021
E-201 3/32" = 1'-0"
DEMOLITION
GENERAL NOTES - DEMOLITION
1. THIS DRAWING REPRESENTS THE EXISTING POWER SYSTEMS WITHIN THE EXISTING BUILDING (AREA TO
BE REMODELED). THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, RELOCATING AND REWIRING ALL EQUIPMENT AS INDICATED ON THE DRAWINGS, INCLUDING EQUIPMENT THAT LIES WITHIN WALLS AND
CEILINGS TO BE DEMOLISHED OR REMODELED.
2. (X) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE REMOVED, (R) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE RELOCATED, (E) AND/OR HALFTONE LINES INDICATE EXISTING
EQUIPMENT TO REMAIN UNLESS NOTED OTHERWISE.
3. SALVAGEABLE ITEMS REMOVED DURING DEMOLITION SHALL BE OFFERED TO OWNER PRIOR TO
DISPOSAL OR REMOVAL FROM SITE.
4. EXISTING CIRCUITS AS INDICATED ARE BASED ON LIMITED FIELD OBSERVATION AND INFORMATION PER RECORD DRAWINGS AND SHALL BE FIELD VERIFIED BY ELECTRICAL CONTRACTOR PRIOR TO START OF
DEMOLITION WORK.
5. THE CONTRACTOR SHALL SALVAGE AND REUSE EXISTING BOXES AND CONDUIT WHERE POSSIBLE.
DAMAGED CONDUIT, FITTINGS BOXES, ETC. MAY NOT BE RE-USED. NEW CIRCUITING AS INDICATED ON THE DRAWINGS IS SHOWN FOR INTENT ONLY AND MAY VARY BASED ON ACTUAL FIELD CONDITIONS
(NEW CIRCUITING SHALL MATCH EXISTING WHERE POSSIBLE TO UTILIZE EXISTING HOME-RUN
CONDUITS, ETC.). KEEP AS-BUILT DRAWINGS CURRENT WITH ANY DEVIATION IN CIRCUITING FROM WHAT
IS INDICATED WITHIN THESE PLANS.
6. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARDED AND ABANDONED MATERIALS LEFT OVER FROM DEMOLITION AND INSTALLATION. THIS INCLUDES, BUT IS NOT LIMITED TO, CONDUIT, FASTENERS AND BOXES. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN
PLACE. ALL ABANDONED CONDUIT SHALL BE CAPPED.
SHEET NOTES
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
3. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
4. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
5. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
6. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS BACK
TO SOURCE AND CONDUIT BACK TO NEAREST JUNCTION BOX TO REMAIN. REFER TO NEW
CONSTRUCTION PLAN FOR LOCATIONS OF NEW CRAC UNITS. REFER TO ROOF POWER PLANS FOR
EXISTING CONDUIT ROUTING. COORDINATE PHASING OF EQUIPMENT DEMOLITION WITH GENERAL
CONTRACTOR, MECHANICAL CONTRACTOR, AND OWNER PRIOR TO THE START OF WORK.
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS AND
CONDUIT BACK TO SOURCE. REFER TO NEW CONSTRUCTION PLAN FOR LOCATIONS OF NEW CRAC
UNITS. REFER TO ROOF POWER PLANS FOR EXISTING CONDUIT ROUTING. COORDINATE PHASING OF
EQUIPMENT DEMOLITION WITH GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND OWNER
PRIOR TO THE START OF WORK.
PROVIDE 5-20R RECEPTACLE FOR CONNECTION TO CORD AND PLUG CONDENSATE PUMP. EXTEND
NEAREST EXISTING CONVENIENCE RECEPTACLE BRANCH CIRCUIT TO SERVE NEW PUMP. COORDINATE
MOUNTING LOCATION OF RECEPTACLE WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.
PROVIDE NEW FEEDER TO SERVE NEW HVAC EQUIPMENT. COORDINATE LOCATION OF ROOF
PENETRATION AND PHASING OF EQUIPMENT INSTALLATION WITH GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND OWNER PRIOR TO THE START OF WORK. REFER TO HVAC EQUIPMENT CONNECTION
SCHEDULE FOR ADDITIONAL INFORMATION.
N/A 3/32" = 1'-0"
(E) CRLA
(E)
(E)
(E) CRLB
(E) CRLA-1
(E)
(X) CRAC-1
1 2
(E)
(E)
(X) CRAC-2
(E) 75KVA (E) CRHA
(E) CRLA
(E)
(E)
(E) CRLB
(E) CRLA-1
(E)
(E)
(E)
(E) 75KVA (E) CRHA
5 5
SG
CRAC
CRAC
UP TO ROOF
GDP-
(1.3.5)G
GDP-
(7.9.11)G
UP
TO
ROOF
HPA-
(20.22.24)G
(E) LPA-[41,N]G
CRAC
GDP-
(19,21, 23)G
0 16' 32' 64'
SCALE: 3/32"=1'-0" (IN FEET)
KEY PLAN
J J
F
F
F
J
J
J
F
F
J J
MARIPOSA LRF DATA CENTER IN-ROW COOLING
HDR ENGINEERING
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY:
APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
ELECTRICAL
JM
WP
2024-11-25
2024-11-25 MG
MG 2024-11-25
2024-11-25 1 50% DESIGN DEVELOPMENT 2024-01-23JM
2 75% CONSTRUCTION DRAWINGS 2024-03-13JM
3 100% CONSTRUCTION DRAWINGS 2024-11-25JM
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
E-301
POWER PLANS - ROOF LEVEL
SCALE:
POWER PLAN - ROOF LEVEL2
E-301 3/32" = 1'-0"
NEW CONSTRUCTION
SCALE:
POWER PLAN - ROOF LEVEL1
E-301 3/32" = 1'-0"
DEMOLITION
GENERAL NOTES - DEMOLITION
1. THIS DRAWING REPRESENTS THE EXISTING POWER SYSTEMS WITHIN THE EXISTING BUILDING (AREA TO
BE REMODELED). THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, RELOCATING AND REWIRING ALL EQUIPMENT AS INDICATED ON THE DRAWINGS, INCLUDING EQUIPMENT THAT LIES WITHIN WALLS AND
CEILINGS TO BE DEMOLISHED OR REMODELED.
2. (X) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE REMOVED, (R) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE RELOCATED, (E) AND/OR HALFTONE LINES INDICATE EXISTING
EQUIPMENT TO REMAIN UNLESS NOTED OTHERWISE.
3. SALVAGEABLE ITEMS REMOVED DURING DEMOLITION SHALL BE OFFERED TO OWNER PRIOR TO
DISPOSAL OR REMOVAL FROM SITE.
4. EXISTING CIRCUITS AS INDICATED ARE BASED ON CASUAL FIELD OBSERVATION AND INFORMATION PER RECORD DRAWINGS AND SHALL BE FIELD VERIFIED BY ELECTRICAL CONTRACTOR PRIOR TO START OF
DEMOLITION WORK.
5. THE CONTRACTOR SHALL SALVAGE AND REUSE EXISTING BOXES AND CONDUIT WHERE POSSIBLE.
DAMAGED CONDUIT, FITTINGS BOXES, ETC. MAY NOT BE RE-USED. NEW CIRCUITING AS INDICATED ON THE DRAWINGS IS SHOWN FOR INTENT ONLY AND MAY VARY BASED ON ACTUAL FIELD CONDITIONS
(NEW CIRCUITING SHALL MATCH EXISTING WHERE POSSIBLE TO UTILIZE EXISTING HOME-RUN
CONDUITS, ETC.). KEEP AS-BUILT DRAWINGS CURRENT WITH ANY DEVIATION IN CIRCUITING FROM WHAT
IS INDICATED WITHIN THESE PLANS.
6. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARDED AND ABANDONED MATERIALS LEFT OVER FROM DEMOLITION AND INSTALLATION. THIS INCLUDES, BUT IS NOT LIMITED TO, CONDUIT, FASTENERS AND BOXES. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN
PLACE. ALL ABANDONED CONDUIT SHALL BE CAPPED.
SHEET NOTES
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
3. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
4. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
5. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
6. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS AND DISCONNECT. REMOVE CONDUCTORS BACK TO SOURCE AND CONDUIT BACK TO NEAREST JUNCTION BOX TO REMAIN. COORDINATE PHASING OF EQUIPMENT DEMOLITION WITH GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND OWNER PRIOR TO THE START OF WORK.
DEMOLISH EXISTING ROOF MOUNTED RECEPTACLE. DEMOLISH BRANCH CIRCUIT AND CONDUIT BACK TO
NEAREST JUNCTION BOX TO REMAIN.
EXISTING PULLBOX SERVES (X) CRAC-1, -2 AND CU-1,-2. EXISTING RACEWAY MAY BE REUSED TO SERVE A SINGLE SET OF HVAC EQUIPMENT ( IE CONDENSING UNIT AND ASSOCIATED CRAC UNIT). SEPARATE
RACEWAY(S) WILL BE INSTALLED TO SERVE REMAINING SETS.
SINGLE RACEWAY MAY BE USED TO SERVE A SINGLE SET OF EQUIPMENT (IE CONDENSING UNIT AND ASSOCIATED CRAC UNIT). IF A SINGLE RACEWAY IS INSTALLED, CONTRACTOR SHALL BE RESPONSIBLE
ACCOUNTING FOR CONDUCTOR QUANTITY AND TEMPERATURE DE-RATING OF THE ELECTRICAL
CONDUCTORS WHEN DETERMINING FINAL CONDUCTOR SIZE TO SERVE EACH PIECE OF HVAC
EQUIPMENT. CONTRACTOR SHALL COORDINATE FINAL CONDUCTOR SIZE WITH DESIGN TEAM PRIOR TO
INSTALLATION.
PROVIDE NEW EQUIPMENT MOUNTED RECEPTACLE. EXTEND EXISTING BRANCH CIRCUIT AND CONDUIT
TO NEW RECEPTACLE.
EXTEND EXISTING RACEWAY TO SERVE NEW HVAC EQUIPMENT.
PROVIDE NEW DEDICATED 20A, 120V BRANCH CIRCUIT (2#12,#12G) 3/4" CONDUIT FOR CONNECTION TO
LOW AMBIENT TEMERATURE DAMPER. COORDINATE FINAL CONNECTION WITH MECHANICAL
CONTRACTOR PRIOR TO START OF WORK.
N/A 3/32" = 1'-0"
(X) LPA-41
(E) CONDUIT DOWN
TO LEVEL 02 SERVING
(X) CRAC-2
(X) CU-2 1
TO PANEL GDP
ON LEVEL 01
(X) LPA-41
(E) RTU-1
(X) CU-1 1
(E) CONDUIT DOWN
TO LEVEL 02 SERVING
(X) CRAC-1
TO PANEL GDP
ON LEVEL 01
GDP-(2.4.6)G
(E) RTU-1
(N)
TO LEVEL
02 BELOW
TO LEVEL
02 BELOW
(N)
(N) ACCU
(N) ACCU
ACCU
GDP-(14,16,18)G
GDP-(14,16,18)G
0 16' 32' 64'
SCALE: 3/32"=1'-0" (IN FEET)
CRLA-1[30,N]G
CRLA-1[26,N]G
CRLA-1[28,N]G
KEY PLAN
E-501
ONE-LINE DIAGRAM
SCALE:
ONE-LINE DIAGRAM1
E-501 N/A
MARIPOSA LRF DATA CENTER IN-ROW COOLING
HDR ENGINEERING
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY:
APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
ELECTRICAL
JM
WP
2024-11-25
2024-11-25 MG
MG 2024-11-25
2024-11-25 1 50% DESIGN DEVELOPMENT 2024-01-23JM
2 75% CONSTRUCTION DRAWINGS 2024-03-13JM
3 100% CONSTRUCTION DRAWINGS 2024-11-25JM
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
GENERAL NOTES - ONELINE - DEMOLITION
1. (X) AND/OR HATCHING INDICATE EXISTING EQUIPMENT TO BE REMOVED, (R) AND/OR DASHED LINES
INDICATE EXISTING EQUIPMENT TO BE RELOCATED, (E) AND/OR SOLID LINES INDICATE EXISTING
EQUIPMENT TO REMAIN UNLESS NOTED OTHERWISE.
GENERAL NOTES - ONELINE - NEW CONSTRUCTION
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (R) AND/OR DASHED LINES INDICATE
RELOCATED EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW EQUIPMENT UNLESS NOTED
OTHERWISE.
2. PANELBOARD AND BREAKER INTERRUPTING CAPACITIES (AIC) SHALL BE FULLY RATED AS AN ASSEMBLY.
SERIES RATING OF BREAKER DEVICES AND EQUIPMENT IS NOT PERMITTED.
3. ALL CONDUCTOR SIZES ARE BASED ON COPPER. ALUMINUM IS NOT PERMITTED.
4. DO NOT SPLICE FEEDER CONDUCTORS UNLESS PRIOR APPROVAL HAS BEEN OBTAINED FROM THE
ENGINEER.
5. CONTRACTOR SHALL PREPARE THE SHORT CIRCUIT AND COORDINATION STUDY PRIOR TO ORDERING DISTRIBUTION EQUIPMENT TO VERIFY ALL EQUIPMENT RATINGS, BREAKER TYPES, AND SETTINGS REQUIRED. THE SCOPE OF THE STUDY MUST INCLUDE ALL UPSTREAM BRANCHES OF THE DISTRIBUTION SYSTEM BACK TO THE SERVICE ENTRANCE, EVEN IF NOT BEING MODIFIED BY THIS PROJECT. ANY CHANGES TO EQUIPMENT RATINGS OR BREAKER TYPES IN ORDER TO PROVIDE A CODE REQUIRED
SELECTIVELY COORDINATED SYSTEM SHALL NOT RESULT IN ADDITIONAL COST TO THE OWNER.
6. CONTRACTOR SHALL PROVIDE ARC FLASH STUDY IN ACCORDANCE WITH NFPA 90E AND INSTALL LABELS FOR ALL EQUIPMENT PER NEC 110.6. THE SCOPE OF THE STUDY MUST INCLUDE ALL UPSTREAM BRANCHES OF THE DISTRIBUTION SYSTEM BACK TO THE SERVICE ENTRANCE, EVEN IF NOT BEING MODIFIED BY THIS PROJECT. PERFORM STUDY WITH AID OF COMPUTER SOFTWARE PROGRAM AND BY A
NEVADA LICENSED ELECTRICAL ENGINEER. OBTAIN ACTUAL FAULT DUTY AT NV ENERGY
TRANSFORMERS.
7. CONTRACTOR SHALL PROVIDE ARC FLASH STUDY IN ACCORDANCE WITH NFPA 90E AND INSTALL LABELS FOR ALL EQUIPMENT PER NEC 110.6. PERFORM STUDY WITH AID OF COMPUTER SOFTWARE PROGRAM AND BY A NEVADA LICENSED ELECTRICAL ENGINEER. OBTAIN ACTUAL FAULT DUTY AT NV ENERGY
TRANSFORMERS.
8. PROVIDE ENGRAVED NAMEPLATES SCREW ATTACHED ON ALL PANELS. MINIMUM SIZE 1 1/2"x3".
SHEET NOTES
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED AND REPLACED. REMOVED EXISTING CONDUCTORS BACK TO SOURCE. EXISTING CIRCUIT BREAKER SHALL BE REUSED TO SERVE NEW EQUIPMENT. REFER TO POWER PLANS REGARDING DEMOLITION AND/OR REUSE OF EXISTING RACEWAYS. COORDINATE PHASING OF EQUIPMENT DEMOLITION WITH GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND
OWNER PRIOR TO THE START OF WORK. DURING DEMOLITION, ONE CRAC UNIT AND ASSOCATED
CONDENSING UNIT WILL NEED TO REMAIN OPERATION AT ALL TIMES.
PROVIDE NEW FEEDER AND DISCONNECT TO SERVE NEW EQUIPMENT. REFER TO HVAC ELECTRICAL
CONNECTION SCHEDULE FOR ADDITIONAL INFORMATION.
PROVIDE NEW 20A, 480V 3PH, DEDICATED FEEDER AND 20A3P CIRCUIT BREAKER TO SERVE NEW
ELECTRIC STEAM HUMIDIER
REMOVE EXISTING 175A3P SPARE CIRCUIT BREAKER AND REPLACE WITH NEW 40A3P CIRCUIT BREAKER TO SERVE NEW CRAC UNIT. MATCH EXISTING TYPE AND AIC RATING. COORDINATE ANY REQUIRED
OUTAGES WITH GC AND OWNER IN ADVANCE OF BREAKER REPLACEMENT
PROVIDE NEW 20A3P CIRCUIT BREAKER IN EXISTING SPACE TO SERVE NEW CONDENSING UNIT. MATCH EXISTING TYPE AND AIC RATING. COORDINATE ANY REQUIRED OUTAGES WITH GC AND OWNER IN
ADVANCE OF BREAKER REPLACEMENT
AFTER HVAC EQUIPMENT IS ENERGIZED, THE CONTRACTOR SHALL TEST THE EXISTING GENERATOR AT LOAD. REFER TO SPECIFICATION SECTION 26 60 00 ELECTRICAL SYSTEM TESTING FOR ADDITIONAL
TESTING REQUIREMENTS
N/A N/A
(E) PAD MOUNTED UTILITY
TRANSFORMER
P
M
(E)100A/3P
100A LPS
(E)2000A/ 3P
2000A
KRPC 3P
200A
LPS
200A/ 3P
200A
LPS
(E) 200A/
200A
LPS
300A
LPS
100A
LPS
200A
LPS
200A
LPS
200A
LPS
200A
LPS
60A
LPS
60A
LPS
(E)HPA
T
(E)LPA(E)45
KVA
(E) (4#1 , 1#6 GND)- 2" C(E) (3#4 , 1#6 GND)- 1 1/4" C
(E) (4#1 , 1#6 GND)- 2" C
(E)200A/3P
200A LPS
(E)100A/3P
60A LPS
G
(E) DOUBLE LUGS
(E) GENERATOR
ANNUNCIATIOR
(E) 150KW/188KVA
GENSET
480/277V, 3PH, 4W
(E) (4#4/0 , 1#1 GND)- 2 1/2" C
(E)100A/3P
ATS
(E)200A/3P
ATS
(E) (4#1 , 1#6 GND)- 2" C
(E) (4#4/0 , 1#1 GND)- 2 1/2" C
(E) (4#1 , 1#6 GND)- 2" C
(E)200A/3P
(E)125/3 (E)125/3 (E)40/3 (E)40/3 (E)20/3 (E)20/3 (E)125/3
(X)
CU-1
(X)
CU-2
(X)
CRAC-1
(X)
CRAC-2
(E) MAIN DISTRIBUTION SWITCHBOARD "MDS"
480/277V, 3PH, 4W
2,000A BUS
100,000 AIC
(E) (#4/0 CU) 1"C. TO
COMM GND BUS
(E) GENERATOR DISTRIBUTION PANEL "GDP"
480/277V, 3PH, 4W
225A BUS
N G
3P
(E) 200A/
3P
(E) 400A/
3P
(E) 100A/
3P
(E) 200A/
3P
(E) 200A/
3P
(E) 200A/
3P
(E) 200A/
3P
(E) 100A/
3P
(E) 100A/
60A
LPS
3P
(E) 100A/
(E) CLRB
T
(E) (4#1/0, #6G)-2"C.
(E) (#3/4, #8G)-1 1/4"C.
(E) 45KVA TRANSFORMER(E) PANEL
"HBP"
(E) PANEL
"PPA"
(E) PANEL
"PPB"
(E) PANEL
"PPC"
(E) PANEL
"MCS"
(E) PANEL
"MCP"
(E) 200AS
"WHEEL
TRUING"
(E) 25 HP
COMPRESSOR
(E) 25 HP
COMPRESSOR(E) (4#3/0 , 1#6 GND)- 2" C
(E) 6[(4#500 CU MCM) 3 1/2"C]
(E) PANEL "EMA"
AREA OF WORKAREA OF WORK
(E) 75KVA
TRANSFORMER
(N) 40A3P
(E) (4#3/0, 1/6 GND)-2"C AREA OF WORK
(E) 40 KVA UPS
F30AS
30.0 A FRS-R
F30AS
30.0 A FRS-R
F30AS
15.0 A FRS-R
F30AS
15.0 A FRS-R
(E)LPA-1
(E) 60/3
(N) CRAC
(N) CRAC
(N) ACCU
(N) ACCU
(N) 20A3P 4 5
F F
(N) CRAC
(N) ACCU
(E)CRHA
T
(E) XFMR
75 KVA
480-208/120V
3PH, 4W
(E)CRLA
(E)100A 3P
(E)CRLA-2
MARIPOSA LRF DATA CENTER IN-ROW COOLING
HDR ENGINEERING
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY:
APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
ELECTRICAL
JM
WP
2024-11-25
2024-11-25 MG
MG 2024-11-25
2024-11-25 1 50% DESIGN DEVELOPMENT 2024-01-23JM
2 75% CONSTRUCTION DRAWINGS 2024-03-13JM
3 100% CONSTRUCTION DRAWINGS 2024-11-25JM
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
E-601
ELECTRICAL SCHEDULES
LOAD JUSTIFICATIONS
PANEL GDP
EXISTING LOAD: 103,400 VA
(X)CRAC-1: -2,826 VA
(X)CRAC-2: -2,826 VA
(X)CU-1: -9,727 VA
(X)CU-2: -9,727 VA
TOTAL DEMOLISHED LOAD: -19,454 VA
(N)CRAC-1: 13,967 VA
(N)CRAC-2: 13,967 VA
(N)ACCU-1: 2,327 VA
(N)ACCU-2: 2,327 VA
CRLA-2 ADDED LOAD: 450VA
LARGEST MOTOR (NEC 430.24): 3,492 VA
TOTAL ADDED LOAD: 36,350 VA
NET LOAD CHANGE ADDED TO PANEL "GDP": 17,076 VA OR 20 AMPS @ 480V, 3PH
NEW TOTAL LOAD ON PANEL "GDP": 120,476 VA OR 144 AMPS @ 480V, 3PH
(E) 40KVA UPS
EXISTING LOAD: 15,099 VA
ADDED LOAD: 350 VA
NEW TOTAL LOAD ON 40KVA UPS: 15,549 VA OR 32.1 AMPS @480V, 3PH
SERVICE CALCULATION
UTILITY 12-MONTH PEAK DEMAND: 805 KW
TOTAL EXISTING LOAD: (805KW / 0.8PF) X 1000 = 1,006,250 VA
1,006,250 VA X 1.25(NEC 220.87) = 1,257,813 VA
NET LOAD CHANGE ADDED TO PANEL "GDP": 17,076 VA
(N) SG-1: 7,482 VA
NET LOAD CHANGE ADDED TO 2000A SERVICE: 24,558 VA or 29 AMPS @ 480V, 3PH
NEW TOTAL SERVICE LOAD: 1,282,371 VA OR 1541 AMPS @ 480V, 3PH