About this file
These documents are construction and engineering drawings for the Elati Light Rail Facility (LRF) HVAC Replacements and Upgrades Phase 2A project, prepared by HDR Engineering for the Regional Transportation District (RTD) in Denver, Colorado. The project involves comprehensive mechanical and electrical system upgrades, including the replacement of multiple Make-Up Air (MAU) units, heating water boilers, and associated electrical infrastructure. The drawings, dated November 25, 2024, provide detailed plans for demolition of existing HVAC equipment, structural modifications, new equipment installation, electrical power distribution, and control systems across the facility's mezzanine and primary levels.
The project scope includes replacing three Make-Up Air units (MAU-1, MAU-2, MAU-3), upgrading electrical connections, installing new transformers and panelboards, and modifying the existing electrical distribution system. The total service load change is estimated at 105,207 VA, bringing the new total service load to 834,895 VA or 1,004 amps at 480V. The electrical drawings demonstrate a comprehensive approach to maintaining system reliability, including short circuit analysis, conductor schedules, and equipment grounding details. The project appears to be funded through RTD's capital improvement budget, with a focus on modernizing aging infrastructure and improving the facility's mechanical and electrical systems.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/
2" 1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/3
1/
0:
:3
A M
\\d en
-s rv
1\ N ew fo rm a\
4\
\1
9\
6.
0_
C A
D _B
IM
\6
.2 _W
IP
\R
T D
_M ec h U pg ra de s.
rv t
G0003-2A
COVER SHEET
THE REGIONAL TRANSPORTATION DISTRICT
HDR Engineering Denver 1670 Broadway, Suite 3400 Denver, CO 80202-4824
ELATI MAINTENANCE FACILITY
2701 S Elati St, DENVER, CO 80110
100% CONSTRUCTION DOCUMENTATION
ELATI LRF HVAC REPLACEMENTS AND UPGRADES
ELATI LRF HVAC REPLACEMENTS AND UPGRADES
MARK REVISIONS BY DATE
6 100% CONSTRUCTION DOCUMENTATION 11/25/2024
PHASE 2A
1/2
1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2/
3:
:37 P
M \\d en -sr v1 \N ew for ma \15
4\1
4\1
9\6
.0_
CA
D_
BI
M\ 6.2
_W
IP
\R
TD
_M ec h U pg ra de s.r vt
ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
HDR Engineering
Denver
1670 Broadway, Suite 3400
Denver, CO
80202-4824
MARK REVISIONS BY DATE
4 50% DESIGN DEVELOPMENT 10/18/2024
5 100% CONSTRUCTION DOCUMENTATION 11/22/2024
EAB
EAB
M-001
MECHANICAL COVER SHEET
11-25-20
1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2/
3:
:37 P
M \\d en -sr v1 \N ew for ma \15
4\1
4\1
9\6
.0_
CA
D_
BI
M\ 6.2
_W
IP
\R
TD
_M ec h U pg ra de s.r vt
ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
HDR Engineering
Denver
1670 Broadway, Suite 3400
Denver, CO
80202-4824
MARK REVISIONS BY DATE
4 50% DESIGN DEVELOPMENT 10/18/2024
5 100% CONSTRUCTION DOCUMENTATION 11/22/2024
EAB
EAB
HVAC DEMOLITION MEZZANINE PLAN
HVAC DEMOLITION MEZZANINE PLAN
HVAC DEMOLITION MEZZANINE PLAN
MD-102
HVAC DEMOLITION MEZZANINEPLANS
Scale
1/8" = 1'-0"
0 4' 8' 16'
KEY PLAN
KEY PLAN
KEY PLAN
1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2/
3:
:37 P
M \\d en -sr v1 \N ew for ma \15
4\1
4\1
9\6
.0_
CA
D_
BI
M\ 6.2
_W
IP
\R
TD
_M ec h U pg ra de s.r vt
ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
HDR Engineering
Denver
1670 Broadway, Suite 3400
Denver, CO
80202-4824
MARK REVISIONS BY DATE
4 50% DESIGN DEVELOPMENT 10/18/2024
5 100% CONSTRUCTION DOCUMENTATION 11/22/2024
EAB
EAB
M-201
HVAC MEZZANINE PLANS
Scale
1/8" = 1'-0"
0 4' 8' 16'
HVAC MEZZANINE PLAN
HVAC MEZZANINE PLAN
HVAC MEZZANINE PLAN KEY PLAN
KEY PLAN
KEY PLAN
1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2/
3:
:37 P
M \\d en -sr v1 \N ew for ma \15
4\1
4\1
9\6
.0_
CA
D_
BI
M\ 6.2
_W
IP
\R
TD
_M ec h U pg ra de s.r vt
ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
HDR Engineering
Denver
1670 Broadway, Suite 3400
Denver, CO
80202-4824
MARK REVISIONS BY DATE
4 50% DESIGN DEVELOPMENT 10/18/2024
5 100% CONSTRUCTION DOCUMENTATION 11/22/2024
EAB
EAB
M-301
HVAC SCHEDULES
1"
2"
SHEET REFERENCE
NUMBER:
4' 8' 16'
FILE NAME:
HORZ SCALE:
VERT SCALE:
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
/2/
3:
:37 P
M \\d en -sr v1 \N ew for ma \15
4\1
4\1
9\6
.0_
CA
D_
BI
M\ 6.2
_W
IP
\R
TD
_M ec h U pg ra de s.r vt
ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
HDR Engineering
Denver
1670 Broadway, Suite 3400
Denver, CO
80202-4824
MARK REVISIONS BY DATE
4 50% DESIGN DEVELOPMENT 10/18/2024
5 100% CONSTRUCTION DOCUMENTATION 11/22/2024
EAB
EAB
HEATING WATER SYSTEM - CONTROL DIAGRAM
SCALE: NONE
MAKEUP AIR UNIT - CONTROL DIAGRAM
SCALE: NONE MAU-1,2
M-501
HVAC CONTROL DRAWINGS
MAKEUP AIR UNIT - CONTROL DIAGRAM
SCALE: NONE MAU-3
BAS NETWORK DIAGRAM
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
E-701 N/A
E-001
ELECTRICAL SYMBOLS, LEGEND & GENERAL NOTES
DRAWOUT CIRCUIT BREAKER
CIRCUIT BREAKER
INTERRUPTER SWITCH
METERING DEVICE
JUNCTION BOX (SIZE AS REQUIRED UNO)
SHADING INDICATES EGRESS FIXTURE
SHEET NOTE DESIGNATION
EMERGENCY LIGHTING UNIT
DOWNLIGHT
STRIP FIXTURE
SHUNT TRIP DEVICE
GROUND FAULT INTERRUPTER DEVICE
SURFACE MOUNT TROFFER
SPEAKER
TELEVISION OUTLET: 18" AFF (UNO)
TELEPHONE TERMINAL BOARD (TTB)
DATA / VOICE OUTLET: FLOOR MOUNTED
MULTI-OUTLET ASSEMBLY: SPACING PER DWGS
FIXTURE DESIGNATION: F1=TYPE (SEE FIXTURE SCH.)
REVISION DELTA: NUMBER REPRESENTS REVISION
EQUIPMENT CONNECTION
TELEPHONE OUTLET: 18" AFF
NEUTRAL CONDUCTOR
PHASE CONDUCTOR(S)
ISOLATED GROUNDING CONDUCTOR
HOMERUN TO PANELBOARD OR DEVICE
NEUTRAL CONDUCTOR (N=1, 2N=2 NEUTRALS,
PHASE CONDUCTOR(S)
GROUNDING CONDUCTOR
HOMERUN CIRCUIT DESIGNATION
PANELBOARD DESIGNATION
HOMERUN CIRCUIT DESIGNATION
(3 PHASE CIRCUIT SHOWN)
* FIXTURE SCHEDULE HAS PRECEDENCE *
VOLUMETRIC TROFFER
FLANGED TROFFER
WALL PACK
POLE MOUNT
EXIT SIGN FIXTURE - SHADED AREA DENOTES LIGHTED
FACE - ARROWS INDICATE DIRECTION
DATA / VOICE OUTLET: 18" AFF - 1 VOICE, 1 DATA JACK,
TRANSFORMER
MOTOR - # INDICATES HP
FUSE
VOLUME CONTROL
PHASE CONDUCTOR(S)
GROUNDING CONDUCTOR
PANELBOARD DESIGNATION
NORMALLY OPEN (NO) CONTACT
NORMALLY CLOSED (NC) CONTACT
GROUNDING BAR
TICS = NO. OF #12 WIRES (UNO) IF MORE THAN
TWO WITHIN RACEWAY. GROUNDING CONDUCTOR
(NOT SHOWN) ALWAYS REQUIRED.
CURRENT TRANSFORMER
REMOTE METER
GENERATOR
GROUND FAULT RELAY W/ CT OR SENSOR
3N=3 NEUTRALS)
TRANSFER SWITCH (A=AUTOMATIC, M=MANUAL)
# FOR POLES 2, 3 OR 4
THERMOSTAT (PROVIDED BY MECH. CONTRACTOR UNO)
COIL - VOLTAGE PER CONTROL DIAGRAMS
PILOT LIGHT (LED) NON PUSH-TO-TEST
THERMAL OVERLOAD
MAGNETIC OVERLOAD
PUSH BUTTON NORMALLY OPEN (NO)
HAND-OFF-AUTO (HOA) SELECTOR SWITCH
LIMIT SWITCH NORMALLY OPEN (NO)
PUSH BUTTON ILLUMINATED (LED)
PILOT LIGHT (LED) PUSH-TO-TEST. LETTER INDICATES
COLOR (R=RED, G=GREEN, A=AMBER, Y=YELLOW)
PUSH BUTTON NORMALLY CLOSED (NC)
LIMIT SWITCH NORMALLY CLOSED (NC)
A
ADA
AFC
AFCI
AFF
AFG
AHJ
AIC
AL
ATS
AWG
BC
BKR
C
CEC
CKT
CLG
CO
CT
CU
DB
DDC
DPDT
DPST
DWG
(E)
ELEC
EM
EMT
(F)
FLA
FMC
FPEN
GFI
GFR
GND
HID
HOA
HP
HSKP
IMC
J-BOX
K
KVA
KW
LTG
IG
MCB
MCM
MFG
MLO
MS
MSB
MTS
NC
NEC
NEMA
NIC
NL
NO
NTS
NVE
P
PH/Ø
PV
PNL
PTC
PWR
(R)
RAC
RFC
RSC
SE
SPDT
SPST
STC
SW
TE
TTB
TYP
UL
UNO
UNSW
UPS
V
VA
VFD
W
WP
(X)
XFMR OR XF
AMPS
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED CEILING
ARC-FAULT CIRCUIT INTERRUPTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
AMP INTERRUPTING CAPACITY
ALUMINUM
AUTOMATIC TRANSFER SWITCH
AMERICAN WIRE GAUGE
BARE COPPER
BREAKER
CONDUIT/RACEWAY
CALIFORNIA ENERGY COMMISSION
CIRCUIT
CEILING
CONDUIT/RACEWAY ONLY
CURRENT TRANSFORMER
COPPER
DISTRIBUTION BOARD
DIRECT DIGITAL CONTROLLER
DOUBLE-POLE, DOUBLE-THROW
DOUBLE-POLE, SINGLE-THROW
DRAWING
EXISTING TO REMAIN
ELECTRICAL
EMERGENCY
ELECTRICAL METALLIC TUBING
FUTURE
FULL LOAD AMPS
FLEXIBLE METAL CONDUIT (STEEL)
FUSE PER EQUIP. NAMEPLATE
GROUND FAULT INTERRUPT
GROUND FAULT RELAY
GROUND
HIGH INTENSITY DISCHARGE
HAND-OFF-AUTO SWITCH
HORSEPOWER
HOUSEKEEPING
INTERMEDIATE METAL CONDUIT
JUNCTION BOX
kcmil (300K = 300 kcmil)
KILOVOLT AMPS
KILOWATT
LIGHTING
ISOLATED GROUND
MAIN CIRCUIT BREAKER
THOUSAND CIRCULAR MILS
MANUFACTURER
MAIN LUGS ONLY
MOTOR STARTER
MAIN SWITCHBOARD
MANUAL TRANSFER SWITCH
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NOT IN CONTRACT
NIGHTLIGHT
NORMALLY OPEN
NOT TO SCALE
NV ENERGY
POLE
PHASE
PHOTOVOLTAIC
PANEL
PV USA TEST CONDITIONS
POWER
RELOCATE/RELOCATED
RIGID ALUMINUM CONDUIT
RIGID FIBERGLASS CONDUIT
RIGID STEEL CONDUIT
SERVICE ENTRANCE
SINGLE-POLE, DOUBLE-THROW
SINGLE-POLE, SINGLE-THROW
STANDARD TEST CONDITIONS
SWITCH
TELECOM
TELEPHONE TERMINATION BOARD
TYPICAL
UNDERWRITER'S LABORATORY
UNLESS NOTED OTHERWISE
UNSWITCHED
UNINTERRUPTED POWER SUPPLY
VOLTS
VOLT AMPS
VARIABLE FREQUENCY DRIVE
WATTS
WEATHER PROOF
EXISTING TO BE REMOVED
TRANSFORMER
FEEDER DESIGNATION
DATA OUTLET: 18" AFF
SURGE PROTECTION DEVICE
SPD SURGE PROTECTION DEVICE
ELECTRICAL LEGEND
DEVICE MOUNTED AT NON-STANDARD HEIGHT. IF NO HEIGHT
SHOWN VERIFY HEIGHT WITH ARCHITECT
QUAD RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
DUPLEX RECEPTACLE: FLOOR MOUNTED
DUPLEX RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
SINGLE RECEPTACLE: 20A, 125V, NEMA 5-20, +18" AFF
DUPLEX RECEPTACLE: HALF SWITCHED, +18" AFF
ISOLATED GROUND TYPE RECEPTACLE (ORANGE TRIANGLE),
20A, 125V, NEMA 5-20IG, +18" AFF
DUPLEX RECEPTACLE GFI TYPE - 20A, 125V, NEMA 5-20 GFI
SPECIAL PURPOSE RECEPTACLE: SEE DWGS FOR NEMA
DUPLEX RECEPTACLE: CEILING MOUNTED
MULTI-OUTLET ASSEMBLY: SPACING PER DWGS
QUAD RECEPTACLE: FLOOR MOUNTED
BLANK GFCI PROTECTIVE DEVICE IN READILY ACCESSIBLE
LOCATION (LABEL PROTECTED DEVICES)
PHOTOELECTRIC CELL (ON ROOF FACING NORTH UNO)
OCCUPANCY SENSOR - WALL MOUNTED 48" AFF
CONTROL STATION
TIME WALL SWITCH EQUAL TO HUBBELL DT2000W
SWITCH WITH PILOT LIGHT 48" AFF
DIMMER OPERATED SWITCH 48" AFF
KEY OPERATED SWITCH 48"
SINGLE POLE SWITCH 48" AFF
THREE WAY SWITCH 48" AFF
FOUR WAY SWITCH 48" AFF
MANUAL MOTOR STARTER
COMMUNICATIONS OR SIGNAL
PRIMARY
SECONDARY
OVERHEAD SERVICE
CONDUIT/RACEWAY BELOW GRADE OR BELOW FLOOR
CONDUIT/RACEWAY IN WALL OR ABOVE CEILING
LOW VOLTAGE AND/OR CONTROL WIRING
CONDUIT/RACEWAY STUB OUT: MARK AND CAP (SITE)
TELEPHONE
TIMECLOCK
BREAK OR RUN CONTINUES
CONDUIT/RACEWAY SLEEVE
EMERGENCY CIRCUIT
CONTACTOR OR RELAY
OCCUPANCY SENSOR - CEILING MOUNTED. PROVIDE
WITH POWER PACK PER MFG REQUIREMENTS.
SWITCH WITH LIGHTED HANDLE
TELEVISION
0-10V DIMMING OCCUPANCY SENSOR - WALL MOUNTED
48" AFF - EQUAL TO SENSOR SWITCH WSX-D
OCCUPANCY SENSOR - CORNER MOUNTED. PROVIDE
WITH POWER PACK PER MFG REQUIREMENTS.
DUPLEX "CLOCK" RECEPTACLE: 125V, NEMA 5-20R, +60" AFF
QUAD RECEPTACLE: CEILING MOUNTED
LENSED TROFFER
DEVICE MOUNTED AT NON-STANDARD HEIGHT. IF NO HEIGHT
SHOWN VERIFY HEIGHT WITH ARCHITECT
(RR) REMOVE AND REPLACE
HA-[1,3,5,3N]G
HA-(1.3.5)G
XF
PC
TC
GFI
M
ST
S
TV
VC
A
M
G
GFI
X"
T
J
F1
(N)RTU
48" AFF
+18" AFF
COMBO DUAL USB CHARGER / DUPLEX RECEPTACLE, 5.1A, (1)
TYPE A & (1) TYPE C USB (3.1, 3.0, 2.0 AND 1.1 COMPATIBLE),
20A, 125V, NEMA 5-20R, +18AFF
QUAD USB CHARGER, 5.1A, (2) TYPE A & (2) TYPE C USB (3.1,
3.0, 2.0 AND 1.1 COMPATIBLE), +18AFF
CONFIGURATION
2 BLANKS
BRANCH CIRCUIT (WHEN TIC MARKS ARE NOT
SHOWN) = (1) PHASE, (1) NEUTRAL AND (1)
GROUNDING CONDUCTOR
L R
E M M1
K H
= LIGHTING
= RECEPTACLES
= EQUIPMENT = MOTOR
= LARGEST MOTOR
= KITCHEN EQUIP
= ELECTRIC HEAT
PANELBOARD: SURFACE MOUNTED
PANELBOARD: FLUSH MOUNTED
SWITCHBOARD OR DISTRIBUTION PANEL
TRANSFORMER
PULLBOX / VAULT
MOTOR STARTER
COMBINATION MOTOR STARTER
COMBINATION MOTOR STARTER PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
DISCONNECT SWITCH - FUSIBLE (FUSED PER EQUIP.
NAMEPLATE)
DISCONNECT SWITCH - NON-FUSIBLE
DISCONNECT SWITCH PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE PROVIDED BY OTHERS
(COORDINATE WITHSTAND RATINGS WITH EQUIP SUPPLIER)
ENCLOSED CIRCUIT BREAKER
GROUND ROD
SHUNT TRIP STATION OR EMERGENCY PUSHBUTTON
REMOTE METER
NOTE: THIS IS A MASTER SYMBOL LIST. IT MAY BE THAT NOT ALL SYMBOLS SHOWN ARE USED WITHIN THIS SET OF PLANS. HEIGHTS GIVEN ARE TO TOP OF BOX.
BREAKERS: 20 = SINGLE POLE CIRCUIT BREAKER 20/2 = TWO POLE CIRCUIT BREAKER 20/3 = THREE POLE CIRCUIT BREAKER 20A = ARC FAULT CIRCUIT BREAKER 20C = CONTROLLABLE CIRCUIT BREAKER 20G = GFI CIRCUIT BREAKER
NOTE: "(E)" IN HOMERUN INDICATES NEW HOMERUN
TO EXISTING PANEL
GENERAL NOTES
1. INSTALLATION SHALL COMPLY WITH CURRENTLY ADOPTED 2023 NEC AND LOCAL CODES. ALL WORK
PRACTICES SHALL COMPLY WITH NFPA 70E. ENERGIZED WORK IS PROHIBITED UNLESS PERFORMED UNDER AN APPROVED ENERGIZED WORK PERMIT WITH AN IEE 1584 COMPLIANT ARC FLASH ASSESSMENT
2. DATA PRESENTED ON THESE DRAWINGS REPRESENTS DESIGN INTENT BASED ON AVAILABLE INFORMATION BUT FIELD VERIFICATION OF ALL DIMENSIONS, LOCATIONS, LEVELS, ETC. TO SUIT FIELD CONDITIONS IS REQUIRED. REVIEW ALL CIVIL DETAILS AND ADJUST WORK TO MEET THE REQUIREMENTS OF CONDITIONS SHOWN. DISCREPANCIES BETWEEN DIFFERENT PLANS OR BETWEEN DRAWINGS AND SPECIFICATIONS, OR REGULATIONS AND CODES GOVERNING THE INSTALLATION SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER IN WRITING.
3. ALL WORK SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER AND IN ACCORDANCE WITH NECA STANDARDS, INCLUDING NECA 1 STANDARDS FOR GOOD WORKMANSHIP IN ELECTRICAL CONSTRUCTION.
4. ALL WORK SHALL BE SUBJECT TO INSPECTION AND POSSIBLE REJECTION IF NOT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS AND INSTALLED IN A NEAT AND WORKMANLIKE MANNER.
5. ANY WORK REJECTED DUE TO CONTRACT, COD, SPECIFICATION, DRAWINGS, OR COORDINATION
DEFICIENCIES SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
6. PROVIDE REPRODUCIBLE RECORD DRAWINGS OF ALL COMPLETED WORK. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS
7. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARD AND ABANDONED MATERIALS FROM DEMOLITION AND INSTALLATION. THIS INCLUDES BUT IS NOT LIMITED TO CONDUIT, FASTENERS, BOXES, & ETC. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN PLACE. ALL ABANDONED
CONDUIT SHALL BE CAPPED. ALL DEMOLISHED CONDUCTORS SHALL BE REMOVED.
8. DO NOT SPLICE FEEDER CONDUCTORS UNLESS WRITTEN PRIOR APPROVAL HAS BEEN OBTAINED FROM THE
ENGINEER. APPROVING SPECIFIC CONTRACTOR PROPOSED LOCATION AND SPLICING METHOD.
9. THE MAXIMUM NUMBER OF CONDUIT BENDS SHALL NOT BE GREATER THAN 270 DEGREES BETWEEN PULLING
STRUCTURES. THIS INCLUDES THE AGGREGATE OF ALL HORIZONTAL AND VERTICAL CHANGES.
10. ALL CONDUIT, PULLBOXES AND VAULTS SHALL BE LABELED PER THE SPECIFICATIONS.
11. EACH SPARE CONDUIT SHALL BE PROVIDED WITH A 1250 LBS. PULL ROPE AND TO/FROM IDENTIFICATION
TAGS.
N/A
SCOPE OF WORK - PHASE 2A
REPLACE EXISTING (3) MAKE UP AIR UNITS, AND BOILER EACH WITH NEW EQUIPMENT. PROVIDE NEW ELECTRICAL
CONNECTIONS TO EACH PIECE OF NEW EQUIPMENT.
DRAWING SCHEDULE - PHASE 2A
SHEET DESCRIPTION
E-001 ELECTRICAL SYMBOLS, LEGEND & GENERAL NOTES
ED-201 DEMOLITION POWER PLANS - LEVEL 02
E-101 POWER PLAN - LEVEL 01
E-201 POWER PLANS - LEVEL 02
E-501 ONE-LINE DIAGRAM
E-601 ELECTRICAL SCHEDULES
E-701 ELECTRICAL DETAILS
TOTAL SHEETS IN ISSUE:
0%
C O
N
ST
R U
C
TI
O N
D R
AW
IN
G S
/2
5/
N/A
11/25/2024
AREA OF WORK
XF XF
XF
J
J
J
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
ED-201
DEMOLITION POWER PLANS - LEVEL 02
SCALE:
POWER PLAN - LEVEL 021
ED-201 1/16" = 1'-0"
DEMOLITION
GENERAL NOTES - DEMOLITION
KEY PLAN
1. THIS DRAWING REPRESENTS THE EXISTING POWER SYSTEMS WITHIN THE EXISTING BUILDING (AREA TO BE REMODELED). THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, RELOCATING AND REWIRING ALL EQUIPMENT AS INDICATED ON THE DRAWINGS, INCLUDING EQUIPMENT THAT LIES WITHIN WALLS AND
CEILINGS TO BE DEMOLISHED OR REMODELED.
2. (X) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE REMOVED, (R) AND/OR DASHED LINES INDICATE EXISTING EQUIPMENT TO BE RELOCATED, (E) AND/OR HALFTONE LINES INDICATE EXISTING
EQUIPMENT TO REMAIN UNLESS NOTED OTHERWISE.
3. SALVAGEABLE ITEMS REMOVED DURING DEMOLITION SHALL BE OFFERED TO OWNER PRIOR TO
DISPOSAL OR REMOVAL FROM SITE.
4. EXISTING CIRCUITS AS INDICATED ARE BASED ON LIMITED FIELD OBSERVATION AND INFORMATION PER RECORD DRAWINGS AND SHALL BE FIELD VERIFIED BY ELECTRICAL CONTRACTOR PRIOR TO START OF
DEMOLITION WORK.
5. THE CONTRACTOR SHALL SALVAGE AND REUSE EXISTING BOXES AND CONDUIT WHERE POSSIBLE.
DAMAGED CONDUIT, FITTINGS BOXES, ETC. MAY NOT BE RE-USED. NEW CIRCUITING AS INDICATED ON THE DRAWINGS IS SHOWN FOR INTENT ONLY AND MAY VARY BASED ON ACTUAL FIELD CONDITIONS
(NEW CIRCUITING SHALL MATCH EXISTING WHERE POSSIBLE TO UTILIZE EXISTING HOME-RUN
CONDUITS, ETC.). KEEP AS-BUILT DRAWINGS CURRENT WITH ANY DEVIATION IN CIRCUITING FROM WHAT
IS INDICATED WITHIN THESE PLANS.
6. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DISCARDED AND ABANDONED MATERIALS LEFT OVER FROM DEMOLITION AND INSTALLATION. THIS INCLUDES, BUT IS NOT LIMITED TO, CONDUIT, FASTENERS AND BOXES. MATERIALS EMBEDDED IN GRADE AND / OR CONCRETE MAY BE ABANDONED IN
PLACE. ALL ABANDONED CONDUIT SHALL BE CAPPED.
SHEET NOTES
SCALE:
POWER PLAN - LEVEL 022
ED-201 1/16" = 1'-0"
DEMOLITION
1/16" = 1'-0"
1/ ED-201
2/ ED-201
(E) PANEL "L1B3"
(E) TRANSFORMER "L1B3"
(E) PANEL "H1B3"
(E) SWITCHBOARD "SBA" (E) PANEL "L1B1"
(E) TRANSFORMER "L1B1"
(E) PANEL "H1B1"
(E) TRANSFORMER "L1B2"
(E) PANEL "H1B2"
(E) PANEL "L1B2"
(E) 2-SECTION PANEL "H1B4"
(E) TRANSFORMER "L1B4"
(E) PANEL "L1B4"
AREA OF WORK
(E)
(E)
(E) P-4
STORAGESTAIR 'B'
FREIGHT
ELEVATOR
MECHANICAL
ROOM
ELECTRONICS
SHOP
MEZZANINE
ELEV.
EQUIP.
ELECTRICAL
ROOM
HVAC
REPAIR SHOP
HVAC
REPAIR SHOP
STAIR 'A'
PARTS /
STOREROOM
(X) H1A2-[20,22,24,N]G
(X) 2
(X) MAU-2
(E)
(X) MAU-1
(X) H1A2-[14,16,18,N]G (X)
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS AND CONDUIT BACK TO NEAREST JUNCTION BOX TO REMAIN. SAFE OFF CONDUCTORS FOR RECONNECTION
TO NEW MAKE UP AIR UNIT. DEMOLISH ASSOCIATED EQUIPMENT MOUNTED VFD AND BUCKBOOST
TRANSFORMER. COORDINATE DEMOLITION WITH GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND OWNER PRIOR TO THE START OF WORK.
REMOVE EXISTING EQUIPMENT MOUNTED CONVENIENCE RECEPTACLE. REMOVE CONDUCTORS AND
CONDUIT BACK TO NEAREST JUNCTION BOX TO REMAIN.
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS BACK TO SOURCE , CAP CONDUIT AND ABANDON IN PLACE WITH PULLSTRING. REMOVE EXISTING ASSOCIATED
VFD. COORDINATE DEMOLITION WITH GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, AND
OWNER PRIOR TO THE START OF WORK.
EXISTING HVAC CONTROL PANELS ARE BEING REPLACED. COORDINATE DEMOLITION AND REPLACEMENT
WITH TEMPERATURE CONTROLS CONTRACTOR.
EXISTING HVAC EQUIPMENT SHALL BE DEMOLISHED. DE-ENERGIZE AND REMOVE CONDUCTORS AND CONDUIT BACK TO SOURCE. COORDINATE DEMOLITION WITH GENERAL CONTRACTOR, MECHANICAL
CONTRACTOR, AND OWNER PRIOR TO THE START OF WORK.
(X) 2
(X) H1B3-[26,28,30,N]G
(X) MAU-3
(E)
(X) P-3
(X) L1A-[22,N)G
(X) B-1
0 8' 16' 32'
SCALE: 1/16"=1'-0" (IN FEET)
(E)
(X) H1A3-(61,63,65)G
XF
XFATS
XF
XF
E-101
POWER PLAN - LEVEL 01
SCALE:
POWER PLAN - LEVEL 011
E-101 1/16" = 1'-0"
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. TERMINAL UNITS SHOWN FOR REFERENCE ONLY. CONTROL WIRING TO EACH UNIT (NOT SHOWN) BY
TEMPERATURE CONTROLS CONTRACTOR. REFER TO TEMPERATURE CONTROL DRAWINGS FOR MORE
INFORMATION.
3. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
4. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
5. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
6. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
KEY PLAN
1/16" = 1'-0"
1/ E-101
(E) PANEL "L1A4"
(E) TRANSFORMER "T-L1A4"
(E) 2-SECTION PANEL "H1A3"
(E) TRANSFORMER "T-L1A3"
(E) GENERATOR REMOTE ANNUNCIATOR
(E) PANEL "H1A4"
(E) PANEL "L1A3"
(E) ATS
(E) MAIN SWITCHBOARD "MSA"
AREA OF WORKAREA OF WORK
(E) PANEL "L1A2"
(E) PANEL "H1A1"
(E) 2 SECTION PANEL "L1A1"
(E) PANEL "H1A2"
(E) TRANSFORMER "T-L1A1"
(E) TRANSFORMER "T-L1A2"
TOOL BOX
STORAGE
PART'S
OFFICE
PARTS
COUNTER
TOOL
ROOM
COMMON
WORK AREA
BATTERY
ROOM
ELECTRICAL
ROOM
MEN
REPORT/
SIGN-OUT
125A
WOMEN
JAN
QUIET
ROOM
FITNESS
ROOM
TELE/DATA
ROOM
133STORAGE
TRANS/MAINT
TRAINERS
COMPUTER
TRAINING
SECURITY
VESTIBULE
CONTROLLER/
SUPERVISOR
COUNSEL
LR ASSIST
MANAGER
REPORT/
SIGN-OUT
LUNCH
ROOM
KITCHEN/
VENDING
PLAN
ROOM
103A
ADMIN
TECH
GENERAL
SUPERINTENDENT
LR TRANS
MANAGER
LR MAINT
MANAGER
SR LEAD
EQUIP ENG
LEAD CNTRL
SUPERVISOR
CONFERENCE
ROOM
COPY
102C
CUSTOMER
SERVICE
VESTIBULE
BREAK
102D
LIBRARY
102F
SECRETARY
102E
SECRETARY
102E LOCKER
ALCOVE
LOBBY
VESTIBULE
HALLWAY
WAITING
102A
RECEPTION
102B
CREW/BREAK ROOM
KITCHENETTE/VENDING
139A
UNIFORM
LOCKER AREA
134C
HALLWAY
134B
PARTS
STOREROOM
FIRE
CONTROL
A/V
STORAGE
WOMEN
MEN
MAINTENANCE
OF WAY
CONFERENCE/
TRAINING
CHR/TBL
STORAGE
118A
HALLWAY
134A
ELECTRICAL
HALLWAY
134G
MEN'S
SHOWER ROOM
HAZARDOUS
MATERIAL STORAGE
LUBE/COMPRESSOR
ROOM
FACILITY MAINTENANCE
SHOP/STORAGE
OFFICE
STAIR 'C'
MEN
MEN'S
LOCKER AREA
138A
HALLWAY
134F
WOMEN
WOMEN'S
LOCKER AREA
137A
STAIR 'B'
STAIR 'A'
142 HALLWAY
134E
HALLWAY
134D
JANITOR
LIBRARY
WORK STATION
RECORD'S
STORAGE
157A
SUPERVISOR'S
OFFICE
LIBRARY
WORK STATION
FREIGHT
ELEVATOR
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
(E)
(E)
0 8' 16' 32'
SCALE: 1/16"=1'-0" (IN FEET)
FOR REFERENCE ONLY
AREA OF WORK
F
AREA OF WORK
XF
XF XF
XF
J
F
F
J
J
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
E-201
POWER PLANS - LEVEL 02
GENERAL NOTES - NEW WORK
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (N) AND/OR SOLID LINES INDICATE NEW
EQUIPMENT UNLESS NOTED OTHERWISE.
2. TERMINAL UNITS SHOWN FOR REFERENCE ONLY. CONTROL WIRING TO EACH UNIT (NOT SHOWN) BY
TEMPERATURE CONTROLS CONTRACTOR. REFER TO TEMPERATURE CONTROL DRAWINGS FOR MORE
INFORMATION.
3. THE CONTRACTOR SHALL OBTAIN ALL WIRING DIAGRAMS ASSOCIATED WITH MECHANICAL EQUIPMENT CONTROLS FROM MECHANICAL/CONTROLS CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED AND INSTALLED BY CONTROLS CONTRACTOR. ANY CONDUIT REQUIRED FOR CONTROL WIRING SHALL BE
PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR AND SHALL BE COMPLETED UNDER THE
SUPERVISION OF MECHANICAL/CONTROLS CONTRACTOR.
4. LOCATE ALL DISCONNECTS, STARTERS AND DRIVES WHERE ACCESSIBLE. PROVIDE ACCESS AND CLEARANCE AS REQUIRED PER NEC. PROVIDE ACCESS HATCH IF LOCATED ABOVE HARD LID CEILING.
5. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR MECHANICAL UNIT MODEL NUMBERS AND
SPECIFIC ELECTRICAL REQUIREMENTS, OPTIONS AND ACCESSORIES.
6. INFORMATION ON MECHANICAL DRAWINGS SUPERSEDE INFORMATION SHOWN ON ELECTRICAL
DRAWINGS. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL DRAWINGS PRIOR TO
ROUGH-IN.
7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ELECTRICAL REQUIREMENTS FOR FINAL
MECHANICAL EQUIPMENT INSTALLED. SHOULD THERE BE ANY DISCREPANCY BETWEEN ACTUAL
EQUIPMENT INSTALLED AND ELECTRICAL OR MECHANICAL DRAWINGS, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY FOR CLARIFICATION AND FURTHER DIRECTION.
SHEET NOTES
EXTEND EXISTING CONDUIT AND CONDUCTORS SERVING PREVIOUS UNIT TO NEW 100A3P FUSIBLE SWITCH. PROVIDE CONDUIT AND CONDUCTORS FOR FINAL CONNECTION TO HVAC EQUIPMENT PER
HVAC EQUIPMENT ELECTRICAL CONNECTION SCHEDULE. COORDINATE FINAL CONNECTION TO
EQUIPMENT WITH MECHANICAL CONTRACTOR PRIOR TO THE START OF WORK.
PROVIDE NEW WEATHERPROOF 5-20R GFCI RECEPTACLE. EXTEND EXISTING BRANCH CIRCUIT AND
CONDUIT SERVING PREVIOUS EQUIPMENT RECEPTACLE TO NEW RECEPTACLE.
PROVIDE NEW FEEDER FOR CONNECTION TO NEW HVAC EQUIPMENT PER HVAC EQUIPMENT
ELECTRICAL CONNECTION SCHEDULE. COORDINATE FINAL CONNECTION TO EQUIPMENT WITH
MECHANICAL CONTRACTOR PRIOR TO THE START OF WORK.
COORDINATE REPLACEMENT OF AHU CONTROLS WITH WITH TEMPERATURE CONTROLS CONTRACTOR.
SCALE:
POWER PLAN - LEVEL 021
E-201 1/16" = 1'-0"
KEY PLAN
SCALE:
POWER PLAN - LEVEL 022
E-201 1/16" = 1'-0"
1/16" = 1'-0"
1/ E-201
2/ E-201
(E) PANEL "L1B3"
(E) TRANSFORMER "L1B3"
(E) PANEL "H1B3"
(E) SWITCHBOARD "SBA" (E) PANEL "L1B1"
(E) PANEL "H1B1"
(E) TRANSFORMER "L1B2"
(E) PANEL "H1B2"
(E) PANEL "L1B2"
(E) 2-SECTION PANEL "H1B4"
(E) TRANSFORMER "L1B4"
(E) PANEL "L1B4"
AREA OF WORK
STORAGESTAIR 'B'
FREIGHT
ELEVATOR
MECHANICAL
ROOM
ELECTRONICS
SHOP
MEZZANINE
ELEV.
EQUIP.
ELECTRICAL
ROOM
HVAC
REPAIR SHOP
HVAC
REPAIR SHOP
STAIR 'A'
PARTS /
STOREROOM
MAU
(E)
(E)
(E)
MAU
H1A2-[20,22,24,N]G
H1A2-[14,16,18,N]G
(E) AHU-1
B
(E) P-4
(E) P-5 (E) P-6
(E) B-2
MAU
H1B3-[26,28,30,N]G
TRANSFORMER
"T-L2A3"
PANEL "L2A3"
L2A3-(1,3,5)G
(E)
(E)
E-501
ONE-LINE DIAGRAM
GENERAL NOTES - ONELINE - DEMOLITION
1. (X) AND/OR HATCHING INDICATE EXISTING EQUIPMENT TO BE REMOVED, (R) AND/OR DASHED LINES INDICATE
EXISTING EQUIPMENT TO BE RELOCATED, (E) INDICATE EXISTING EQUIPMENT TO REMAIN UNLESS NOTED
OTHERWISE.
SCALE:
ONE-LINE DIAGRAM1
E-501 N/A
HDR Engineering Denver
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
GENERAL NOTES - ONELINE - NEW CONSTRUCTION
1. (E) AND/OR HALFTONE LINES INDICATE EXISTING EQUIPMENT, (R) AND/OR DASHED LINES INDICATE RELOCATED
EQUIPMENT, SOLID LINES INDICATE NEW EQUIPMENT UNLESS NOTED OTHERWISE.
2. PANELBOARD AND BREAKER INTERRUPTING CAPACITIES (AIC) SHALL BE FULLY RATED. SERIES RATING OF
BREAKER DEVICES AND EQUIPMENT IS NOT PERMITTED.
3. ALL CONDUCTOR SIZES ARE BASED ON COPPER. ALUMINUM IS NOT PERMITTED.
4. DO NOT SPLICE FEEDER CONDUCTORS UNLESS PRIOR APPROVAL HAS BEEN OBTAINED FROM THE ENGINEER.
5. CONTRACTOR SHALL PREPARE THE SHORT CIRCUIT AND COORDINATION STUDY PRIOR TO ORDERING DISTRIBUTION EQUIPMENT TO VERIFY ALL EQUIPMENT RATINGS, BREAKER TYPES, AND SETTINGS REQUIRED. THE SCOPE OF THE STUDY MUST INCLUDE ALL UPSTREAM BRANCHES OF THE DISTRIBUTION SYSTEM BACK TO THE SERVICE ENTRANCE, EVEN IF NOT BEING MODIFIED BY THIS PROJECT. ANY CHANGES TO EQUIPMENT RATINGS OR BREAKER TYPES IN ORDER TO PROVIDE A CODE REQUIRED SELECTIVELY COORDINATED SYSTEM SHALL NOT
RESULT IN ADDITIONAL COST TO THE OWNER.
6. CONTRACTOR SHALL PROVIDE ARC FLASH STUDY IN ACCORDANCE WITH NFPA 70E AND IEEE 1584 AND INSTALL LABELS FOR ALL EQUIPMENT PER NEC 110.6. THE SCOPE OF THE STUDY MUST INCLUDE ALL UPSTREAM BRANCHES OF THE DISTRIBUTION SYSTEM BACK TO THE SERVICE ENTRANCE, EVEN IF NOT BEING MODIFIED BY THIS PROJECT. PERFORM STUDY WITH AID OF COMPUTER SOFTWARE PROGRAM AND BY A COLORADO LICENSED
ELECTRICAL ENGINEER. OBTAIN ACTUAL FAULT DUTY AT XCEL ENERGY TRANSFORMERS.
7. VOLTAGE DROP CALCULATIONS ARE BASED ON LOAD OF 80% OF EACH BREAKER SIZE.
8. PROVIDE ENGRAVED NAMEPLATES SCREW ATTACHED ON ALL PANELS. MINIMUM SIZE 1 1/2"x3".
SHEET NOTES
NEW SURFACE MOUNT PANELBOARD. REFER TO SPECIFICATIONS PANELBOARD SCHEDULE FOR
ADDITIONAL REQUIREMENTS
NEW 15 KVA TRANSFORMER, REFER TO SPECIFICATIONS AND NEW CONSTRUCTIONS FOR ADDITIONAL
REQUIREMENTS
EXISTING 20A1P PREVIOUSLY SERVING DEMOLISHED BOILER SHALL BE DESIGNATED AS "SPARE".
PROVIDE UPDATED PANELCARD INDEX IN PANELBOARD.
REMOVE EXISTING 60A3P AND EXISTING 50A3P PREVIOUSLY SERVING DEMOLISHED MAU-1 AND
DEMOLISHED MAU-2. REPLACE BOTH BREAKERS WITH (2) NEW 70A3P CIRCUIT BREAKERS TO SERVE NEW
MAU-1 AND NEW MAU-2 RESPECTIVELY. MATCH EXISTING BREAKER TYPE AND AIC RATING.
EXISTING 100A3P CIRCUIT BREAKER AND FEEDER PREVIOUSLY SERVING DEMOLISHED MAU-3 MAY BE
REUSED TO SERVE NEW MAU-3.
REFER TO PANEL SCHEDULE "H1A3" FOR LOAD JUSTIFICATION ON EXISTING GENERATOR AND ATS.
AFTER BOILER AND HEAT TRACE SYSTEMS ARE INSTALLED AND ENERGIZED, THE CONTRACTOR SHALL TEST THE EXISTING GENERATOR AT LOAD. REFER TO SPECIFICATION SECTION 26 60 00 ELECTRICAL
SYSTEM TESTING FOR ADDITIONAL TESTING REQUIREMENTS
M
(E) L1A1 (E) H1A1 (E) H1A2
(E) MAIN DISTRIBUTION SWITCHBOARD "MSA"
3P
4000A, 480/277V, 3 PHASE, 4 WIRE, 65 KAIC
(E)300A
3P MB
(E) 4000A
(E)TVSS
(E)#3/0 CU
BLDG
STEEL
N G
PIPE
COLD WATER
(E)#3/0 CU
(E)500A 3P
(E)400A 3P
(E)3000A 3P
FEEDER
UTILITY
XFMR
(E) UTILITY
METER
(E) UTILITY
(E) L1A4 (E) H1A4
OFFICE AREA
(E)1#2 CU
208/120V
(E) T-L1A1 480V-
75KVA
(E)300A 3P
(E)300A 3P
(E)400A 3P
(E)400A 3P
(E)MCC1 (E)MCC2
(E)#6 CU
(E)T-L1B1 480V-
45KVA
208/120V
(E) H1B1 (E) L1B1
208/120V
75KVA
480V- (E)T-L1B2
(E)#2 CU
(E) H1B2 (E) L1B2 (E) H1B3
(E)T-L1B3 480V-
75KVA
208/120V
(E)#2 CU
(E) L1B3 (E) H1B4
(E)T-L1B4 480V-
45KVA
208/120V
(E)#6 CU
(E) L1B4
(E)225A 3P 3P
(E)400A
MAINTENANCE AREA
(E) DISTRIBUTION SWITCHBOARD "SBA"
3000A, 480/277V, 3 PHASE, 4 WIRE, 65 KAIC
3/4"D x 10'
(E)#3/0 CU TO
3P (E)70A
(E)ELEV
(E)60A 3P
(E)125A 3P
(E)60A 3P
3P (E)60A
3P (E)400A
(E) H1A3
45KVA
1#6 CU
(E) T-L1A3 480V- 208/120V
(E) L1A3
(E)150A 3P
(E)200A 3P
(E)300A 3P
(E)60A 3P
(E)60A 3P
(E)125A 3P
GFR
RELAY
HOUSE 1
(E)SWITCH
HEATER-
(E)SWITCH
HEATER-
RELAY
HOUSE 2
(E)SWITCH
HEATER-
RELAY
HOUSE 3
3P (E)400A
G
(E) 400A/3P A.T.S.
STANDBY GENERATOR
(E) 250KW
480/277V, 3 PHASE, 4 WIRE
GND ROD
3P 200A
3P (E)400A (E)200A
3P
208/120V
(E)1#2 CU
(E)T-L1A2 480V-
75KVA
(E)125A 3P
(E) L1A2
OFFICE AREA
ROOM
TELE/DATA
208/120V
(E)#6 CU
(E)T-L1C1 480V-
45KVA
JANITOR ROOM
(E)L1C1 (E)H1C1
(E)60A 3P
(E)1#2 CU
45KVA
480V-
(E) T-L1A4
208/120V
(E)500A 3P
(E)400A 3P
SPARE
ST
(E)125A 3P
(E)100A 3P
(HOIST)(HOIST)(WASH)
(E)MCC
SPARESPARE
(E)ANNUNCIATOR
PANEL
100% RATED
PHASE NEUTRAL GROUND CONDUIT NO. OF RUNS
500 -500 4" 11
SYMBOL
500 500 400 3 1/2" 8
250 250 2 2 1/2" 2
350 350 4 3" 1
1/0 - 6 1 1/2" 1
1 - 6 1 1/2" 1
14 8- 1 1/4"
6 10-
CONDUCTORS
CONDUCTOR SCHEDULE
2 1/2"33/03/0
1"
6 6 10 1 1/4" 1
350 - 4 2 1/2" 1
250 250 4 2 1/2" 1
4/0 6- 12"
1/0 1/0 6 2" 1
2 2 8 1 1/2" 1
5A
7A
8A
9A
11A
12A
3 4 7A 12 4 8A 7A 5A
6 9A 6 9A
8 12A
12A
10 5 5 4 4 6
9A 4 11A 3
12A 8 9A 6 6 12 8
12A8
P S
AREA OF WORK
AREA OF WORK
1#8 CU
T-L2A3 480V-208/120V
15KVA
13A
L2A3
25A 3P
AREA OF WORK
AREA OF WORK
4 4 8 1 1/4" 111
110 10- 3/4"13A
SHORT CIRCUIT ANALYSIS
AVAILABLE AIC
H1B4
L1B1
L1B2
L1A1
L1A2
H1A3
H1B1
H1B2
H1B3
SBA
MSA
PANEL
H1A1
H1A2
3533,717
4,440
7,430
5,716
7,430
PANEL KAIC RATING
8,989
35,074
33,717
29,258
33,717
46,374
48,982
5,801
7,430L1B3 10
4,440L1B4 10
MCC 1,790 42
4,440L1C1 10
H1C1 7,842 18
35,074H1A4 65
4,440L1A3 10
4,440L1A4 10
BASED ON A 2500KVA UTILITY TRANSFORMER WITH 60,200A AVAILABLE
MCC1 7,190 42
MCC2 5,046 42
FAULT CURRENT.
N/AN/A
N/A
VOLTAGE DROP = 0.11%
VOLTAGE
DROP = 3.00%
789L2A3 10
(E) ACC
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
E-601
ELECTRICAL SCHEDULES
N/A
SERVICE LOAD JUSTIFICATION - PHASE 2A
UTILITY 12-MONTH PEAK DEMAND: 467KW
TOTAL EXISTING LOAD: (467KW / 0.8PF) X 1000 = 583,750 VA
583,750 VA X 1.25(NEC 220.87) = 729,688 VA
(X)MAU-1: -36,000 VA
(X)MAU-2: - 36,000 VA
(X)MAU-3: - 45,000 VA
(X)ACC-1: -133,000 VA (PHASE 1 SEPARATE CONTRACT)
(X)B-1: - 600 VA
(X)P-3: -2823 VA
(N)MAU-1: 43,231 VA
(N)MAU: 43,231 VA
(N)MAU-3: 54,039 VA
(N)CH-1: 162,951 VA (PHASE 1 SEPARATE CONTRACT)
(N)B-1: 7,241 VA
LARGEST MOTOR (NEC 430.24): 42,816 VA
NET LOAD CHANGE ADDED TO (E) 4000 A SERVICE: 105,207 VA
NEW TOTAL SERVICE LOAD: 834,895 VA OR 1004 AMPS @ 480V, 3PH
MARK REVISIONS BY DATE SHEET REFERENCE
NUMBER:
1670 Broadway, Suite 3400 Denver, CO 80202-4824
CHECKED BY: MGJM
WP APPROVED BY: DATE:
DATE:DESIGNED BY:
DRAWN BY: DATE:
DATE: FILE NAME:
HORZ SCALE:
VERT SCALE:
MG
2024-11-25
ENGINEERING DIVISION
REGIONAL TRANSPORTATION DISTRICT
1560 BROADWAY, SUITE 700
DENVER, CO 80202
(303) 628-9000
2024-11-25
2024-11-25 2024-11-25
681 Sierra Rose Drive, Suite B | Reno, NV 89511 | 775.826.9010 4601 DTC Boulevard, Suite 740 | Denver, CO 80237 | 720.481.3290 pkelectrical.com | PK#23151
100% CONSTRUCTION DRAWINGS1 JM 2024-11-25 ELATI LRF HVAC REPLACEMENT AND UPGRADES
PHASE 2A
E-701
ELECTRICAL DETAILS
N/A
E-701 SCALE: N/A
SHEET NOTES- DETAILS
TRANSFORMER GROUNDING
AND BONDING DETAIL
XFMRPRI
PNL
SEC.
N
XO
EQUIPMENT GROUNDING CONDUCTOR (PRIMARY) - PER NEC 2017, ARTICLE 250.122 AND 250.66.
SYSTEM BONDING JUMPER - PER NEC 2017, ARTICLE 250.28(D)(1).
GROUNDED CONDUCTOR (NEUTRAL) - DO NOT BOND THE GROUNDED CONDUCTOR TO THE FIRST
SYSTEM DISCONNECTING MEANS IF THE SYSTEM BONDING JUMPER IS INSTALLED IN THE TRANSFORMER
ENCLOSURE. SIZE THE SYSTEM BONDING JUMPER PER NEC 2017, ARTICLE 250.28(D)(1).
SUPPLY SIDE BONDING JUMPER (SECONDARY) - PER NEC 2017, ARTICLE 250.66, 250.30(A)(2) AND 250.102(C)(1).
EQUIPMENT GROUNDING TERMINAL BAR.
ISOLATED NEUTRAL TERMINAL BAR.
GROUNDING ELECTRODE - PER NEC 2017, ARTICLE 250.30(A)(4).
BONDING JUMPERS - PER NEC 2017, ARTICLE 250.66 AND 250.104(D)(1)(2)(3).
EQUIPMENT GROUNDING TERMINAL BAR - PER NEC 2017, ARTICLE 250.30(A)(1)(5) CONNECT TO A SINGLE
POINT.
SUPPLY SIDE BONDING JUMPER (IF REQUIRED - SEE NOTE #3). PER NEC 2017, ARTICLE 250.30(A)(2).
BUSHINGS - PER NEC 2017, ARTICLE 300.4(G) AND 250.92.
4 3
5 6
E-701 SCALE: N/A
ELECTRICAL CABLE
PENETRATION CMU WALL DETAIL
CONCRETE
BLOCK
SEALANT
INSTALLED TO
5/8" DEPTH
WITH 1/4" CROWN
CONDUIT/MC CABLE
N/A
| Sheets |
| G0003-2A - COVER SHEET |