Section L - Attachment L-1 - Major Equipment List Template.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- US Coast Guard Waterways Commerce Cutter Program
- Solicitation number
- 70Z02321RPRT00300
About this file
This solicitation requests proposals for the design and construction of 27 Waterways Commerce Cutters for the U.S. Coast Guard. Offerors must submit proposals by July 30th, 2021. The Coast Guard intends to award a single Indefinite Delivery Indefinite Quantity contract.
The Waterways Commerce Cutters will replace vessels that support construction and maintenance of aids to navigation, reposition river buoys, and position and maintain floating aids. The solicitation is set aside for small businesses and provides for long lead time materials, spares, training, and support. Offerors must register in the System for Award Management and be certified under the United States/Canada Joint Certification Program to receive restricted technical data. Questions are due by June 1st, 2021.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER
| USCG Waterways Commerce Cutter |
| Design and Construction |
Major Equipment List Template
| Attachment L-X |
| Prepared By |
United States Coast Guard
70Z02321RPRT00300
&"Times New Roman,Regular"Major Equipment List Template
&"Times New Roman,Regular"DISTRIBUTION STATEMENT A - Approved for public release; distribution is unlimited. &"Times New Roman,Regular"Page 1
Instructions-Changes
| [INSERT BIDDER NAME HERE] | ||
| INSTRUCTIONS & DEFINITIONS | 1 | At a minimum, the following equipment is to be included in the Major Equipment List (MEL): |
i) Engines
ii) Generators
iii) Switchboards, load centers, and power panels
iv) Z-Drives
v) Cranes
vi) Hydraulic Power Units
vii) Deck Machinery
| CHANGES | Spreadsheet is provided in unlocked format as the information provided by any bidder may not perfectly dovetail into the format provided. Maintain the format of the spreadsheet as close as possible to the original configuration. Document any changes on this sheet below by stating the original sheet number, cell(s) changed, and brief description of the change. | ||
| Sheet | Cell(s) | Description of Change |
MEL
| ESWBS | Equipment Dimensions | Maintenance and Operation Envelope | Weight | Electric | Vendor Information | |||||
| ESWBS | ESWBS | |||||||||
| Title / System | System/Component Type | Equipment Name | Location | Quantity | Equipment Performance Characteristics | |||||
| (Rating /Size) | Length | |||||||||
| (in) | Width | |||||||||
| (in) | Height | |||||||||
| (in) | Length | |||||||||
| (in) | Width | |||||||||
| (in) | Height | |||||||||
| (in) | Weight |
(Dry) lb Weight (Wet) lb Power Required
| (HP) | Phase | Frequency | |
| (Hz) | Voltage | ||
| (Volts) | Potential | ||
| Vendor | Model No. / | ||
| Type | Notes | Date Updated | Source of Data |
(Internal, Doc/Dwg Name, File Name)
File details come from the government source that posted it. Updated .