Section D - Packaging and Marking_WCC 043021.docx

DOCX document 38 KB Posted

Attached to
US Coast Guard Waterways Commerce Cutter Program
Solicitation number
70Z02321RPRT00300
Issued by

About this file

This solicitation requests proposals for the design and production of Waterways Commerce Cutters for the U.S. Coast Guard. The Coast Guard seeks to award an indefinite delivery, indefinite quantity contract to a small business for up to twenty-seven cutters, long lead time materials, spare parts, training, and support. Proposals are due by July 30, 2021. Questions are due by June 1, 2021. The cutters will replace aging vessels to perform construction and maintenance of aids to navigation, reposition river buoys, and position floating aids. Access to technical data is restricted and requires registration under the United States/Canada Joint Certification Program.

View the file

Other files

File Type Posted
Section L - Instructions to Offerors_A00004.docx DOCX document
70Z02321RPRT00300_A00004_KO_Signed.pdf PDF
J-2 - Design and Readiness Review Requirements and Criteria_v2.0_A00003.pdf PDF
Section L - Instructions to Offerors_A00003.docx DOCX document
WCC_RFP_Change_Log_A00003.docx DOCX document
70Z02321RPRT00300_A00003_KO_Signed1.pdf PDF
Attachment J-4 - CDRL_v2.0_A00003.pdf PDF
Section F Deliveries or Performance_WCC_A00003.docx DOCX document
Section C - WCC SOW_v3.0_A00003.pdf PDF
WCC_RFP_Industry_Responses_A00003.docx DOCX document
J-1I - GFI List_v2.0 _A00003.pdf PDF
70Z02321RPRT00300_A00002 KO signed.pdf PDF
Attachment J-1F - WCC PPD-070-1 - ABS Classification Guide A00002.pdf PDF
Attachment J-1E - FL_2602_11_1_-_1 Spud Arrangements A00002.pdf PDF
Attachment J-12 - Records Management Requirements A00002.pdf PDF
Section L Attachment L-2 Price Worksheets A00002.xlsx XLSX spreadsheet
Attachment J-1 - WCC System Specification A00002.pdf PDF
Attachment J-9 Tech Data and Computer Software Data Rights_v2.0 [A00002].pdf PDF
Attachment J-1J - Outfitting List_v2.0 [A00002].xlsx XLSX spreadsheet
WCC_RFP_Change_Log_Amendment_00002.docx DOCX document
WCC_RFP_Industry_Responses_Amendment_00002.docx DOCX document
Attachment J-1C - WCC-SK-580-002_A_ConstDeck A00002.pdf PDF
Attachment J-1B - WCC-SK-580-001-A-BuoyDeck A00002.pdf PDF
Attachment J-1G - WCC PPD-512-001 - HVAC DCM A00002.pdf PDF
Section L - Attachment L-4 - Preliminary Weight Estimate A00002.xlsx XLSX spreadsheet
Section L - Instructions to Offerors A00002.docx DOCX document
Section B - Supplies or Services and Prices_WCC_UPDATED A00002.docx DOCX document
Section C - WCC SOW_v2.0 [A00002].pdf PDF
Section B - Supplies or Services and Prices A00002.pdf PDF
Attachment J-11 - Section 508 Requirements_v1.0 [A00002].pdf PDF
Attachment J-10 - EPA Tables A00002.xlsx XLSX spreadsheet
Section J - Attachment Index_v2.0 [A00002].pdf PDF
70Z02321RPRT00300_A00001 KO signed.pdf PDF
70Z02321RPRT00300_A00001 KO signed.pdf PDF
WCC_RFP_Change_Log_Amendment_001_.docx DOCX document
WCC_RFP_Industry_Responses_Amendment_001_.docx DOCX document
Amendment A00001_Section L - Instructions to Offerors.docx DOCX document
Response to Q65 - Picture of Crane w Hammer and Lead.pdf PDF
Response to Q60 - Sketch of Bow Shapes.pdf PDF
WCC_RFP_Change_Log_22 Jun 2021.docx DOCX document
WCC_RFP_Industry_Responses_22 Jun 2021.docx DOCX document
Question Form.xlsx XLSX spreadsheet
Section B - Supplies or Services and Prices_WCC_UPDATED 051221.docx DOCX document
Section F - Deliveries or Performance_WCC 043021.docx DOCX document
Section G - Contract Administration_WCC 043021.docx DOCX document
Section K - Representations and Certifications_WCC 043021.docx DOCX document
Section L - Attachment L-2 - Price Worksheets 043021.xlsx XLSX spreadsheet
Section L - Attachment L-1 - Major Equipment List Template.xlsx XLSX spreadsheet
Section L - Attachment L-3 - Design Placemat Template.xlsx XLSX spreadsheet
Solicitation Cover Page - Sections A and B.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG Waterways Commerce Cutter 70Z02321RPRT00300

Part I – The Schedule Section D – Packaging and Marking

TABLE OF CONTENTS

D.1PACKAGING OF DATA AND SUPPLIES
D.2IDENTIFICATION MARKING OF PARTS
D.3MARKING AND PACKING LISTS
D.4MARKINGS OF WARRANTED ITEMS

D.1 PACKAGING OF DATA AND SUPPLIES

(a) All data to be delivered shall be specified in the contract sections titled Technical Specification (J-1) and Contract Data Requirements List (J-4)

(b) Supplies-

(1) Packaging: The supplies furnished hereunder shall be packaged in accordance with best commercial practices unless explicitly specified otherwise in the Contract.

(2) Master Packing List: The Contractor shall prepare Master Packing Lists for all equipment to be shipped, detailing nomenclature, quantity, value, part number and whether the material is hazardous. All hazardous material shall be accompanied by the applicable Material Safety Data Sheets.

(3) Preservation: The supplies furnished hereunder shall be cleaned, preserved, packaged, packed and marked in accordance with the Contract. When not otherwise specified, spare, repair parts, and material removed from the boat for shipment to the USCG (as directed) shall be packaged to ensure protection against corrosion, deterioration, physical, and electrical damage during shipment from the Contractor to the point of delivery.

D.2 IDENTIFICATION MARKING OF PARTS

(a) Identification marking of individual parts within the systems, equipment, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with the Contract. To the extent identification marking of such parts is not specified in the Contract, such marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D.3 MARKING AND PACKING LISTS

(a) Marking: Shipments, shipping containers, and palletized unit loads of supplies furnished hereunder shall be packaged in accordance with best commercial practices unless explicitly specified otherwise in the Contract.

(b) Packing List: The packing list shall be on the DD Form 250 (and if needed on the continuation sheet DD Form 250C) and shall identify the contents of each shipment, shipping container or palletized unit load and shall be provided by the Contractor with each shipment. A copy of the packing list shall be placed inside or securely attached to the outside of each box for shipment, including if shipped with the boat. When a Contract Line Item Identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items. Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List: In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification: All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by Original Equipment Manufacturer (OEM) part number and/or National Stock Number.

D.4 MARKINGS OF WARRANTED ITEMS

(a) Pursuant to the requirements of FAR 46.706(b)(5), the Contractor shall stamp or mark the items delivered or otherwise furnish notice with the items of the existence of the warranty. Brief markings shall include:

(1) A statement that a warranty exists;

(2) The substance of the warranty; and

(3) Duration of warranty.

(b) For commercial items, the Contractor’s trade practice in warranty marking is acceptable if sufficient information is presented for supply personnel and users to identify warranted supplies.

D-1

File details come from the government source that posted it. Updated .