This document is a Schedule of Submittals for a federal contract to Replace Foam Fire Suppression System with Water Deluge System at Laughlin Air Force Base in Del Rio, Texas. The contract number is FA8903-21-D-0039.
The key details are:
- This is a firm-fixed price contract for construction services to replace the existing high expansion foam system with a water fire suppression system in the aircraft maintenance bay of Building 50, repair and replace damage in the pump house, and bring the fire suppression system to a functional state.
- The period of performance is 245 calendar days, with two Notices to Proceed - one for 63 calendar days of pre-construction submittals, and one for 182 calendar days of construction.
- This is a total small business set-aside procurement under NAICS code 238220 with a $19M small business size standard.
- The contract requires the submission of numerous pre-construction, construction, and closeout submittals including shop drawings, product data, design data, test reports, certifications, and operation and maintenance documentation across multiple specification sections.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD100 Submittal Register
| TITLE: | Laughlin Air Force Base | SUBMITTAL REGISTER | ||||||||||||||||
| JOB NAME: | Replace Foam Fire Suppression System, B50 | |||||||||||||||||
| LOCATION: | Del Rio, TX | |||||||||||||||||
| CONTRACT NO: | FA8903-21-D-0039 | |||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Transmittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Reviewer | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 14 00 | 1 | Preconstruction Submittals | List of Contact Personnel | 1.4.1.1 | |||||||||||||||
| 2 | 01 30 00 | 1 | Preconstruction Submittals | View Location Map | 1.4 | |||||||||||||||
| 3 | 01 30 00 | 1 | Preconstruction Submittals | Progress and Completion Pictures | 1.5 | |||||||||||||||
| 4 | 01 30 00 | 4 | Samples | Color Boards | 1.3 | G | ||||||||||||||
| 5 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Project Scheduler Qualifications | 1.3 | G | ||||||||||||||
| 6 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Preliminary Project Schedule | 3.4.1 | G | ||||||||||||||
| 7 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Initial Project Schedule | 3.4.2 | G | ||||||||||||||
| 8 | 01 32 01.00 10 | 1 | Preconstruction Submittals | Periodic Schedule Update | 3.6.2 | G | ||||||||||||||
| 9 | 01 33 00 | 1 | Preconstruction Submittals | Submittal Register | 1.7 | G | ||||||||||||||
| 10 | 01 45 00.00 10 | 1 | Preconstruction Submittals | Contractor Quality Control (CQC) Plan | 3.2 | G | ||||||||||||||
| 11 | 01 45 00.00 10 | 6 | Test Reports | Verification Statement | 3.9.2 | |||||||||||||||
| 12 | 01 50 00 | 1 | Preconstruction Submittals | Construction Site Plan | 1.3 | G | ||||||||||||||
| 13 | 01 50 00 | 1 | Preconstruction Submittals | Traffic Control Plan | 3.3.1 | G | ||||||||||||||
| 14 | 01 50 00 | 1 | Preconstruction Submittals | Haul Road Plan | 2.2.1 | G | ||||||||||||||
| 15 | 01 50 00 | 1 | Preconstruction Submittals | Contractor Computer Cybersecurity Compliance Statements | 1.6.1.4 | G | ||||||||||||||
| 16 | 01 50 00 | 1 | Preconstruction Submittals | Contractor Temporary Network Cybersecurity Compliance Statements | 1.6.6 | G | ||||||||||||||
| 17 | 01 50 00 | 6 | Test Reports | Backflow Preventer Tests | 3.4 | |||||||||||||||
| 18 | 01 50 00 | 7 | Certificates | Backflow Tester | 1.4.1 | |||||||||||||||
| 19 | 01 50 00 | 7 | Certificates | Backflow Preventers | 1.4 | |||||||||||||||
| 20 | 01 57 19 | 1 | Preconstruction Submittals | Preconstruction Survey | 1.5.1 | |||||||||||||||
| 21 | 01 57 19 | 1 | Preconstruction Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 22 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Manager Qualifications | 1.5.4 | G | ||||||||||||||
| 23 | 01 57 19 | 1 | Preconstruction Submittals | Employee Training Records | 1.5.5 | G | ||||||||||||||
| 24 | 01 57 19 | 1 | Preconstruction Submittals | Environmental Protection Plan | 1.6 | G | ||||||||||||||
| 25 | 01 57 19 | 1 | Preconstruction Submittals | Dirt and Dust Control Plan | 1.6.7.1 | G | ||||||||||||||
| 26 | 01 57 19 | 1 | Preconstruction Submittals | Solid Waste Management Permit | 1.9 | G | ||||||||||||||
| 27 | 01 57 19 | 6 | Test Reports | Monthly Solid Waste Disposal Report | 1.9.1 | G | ||||||||||||||
| 28 | 01 57 19 | 7 | Certificates | Employee Training Records | 1.5.5 | G | ||||||||||||||
| 29 | 01 57 19 | 11 | Closeout Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 30 | 01 57 19 | 11 | Closeout Submittals | Assembled Employee Training Records | 1.5.5 | G | ||||||||||||||
| 31 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Permit | 1.9 | G | ||||||||||||||
| 32 | 01 57 19 | 11 | Closeout Submittals | Waste Determination Documentation | 3.7.1 | G | ||||||||||||||
| 33 | 01 57 19 | 11 | Closeout Submittals | Project Solid Waste Disposal Documentation Report | 3.7.2.1 | G | ||||||||||||||
| 34 | 01 57 19 | 11 | Closeout Submittals | Sales Documentation | 3.7.2.1 | G | ||||||||||||||
| 35 | 01 57 19 | 11 | Closeout Submittals | Contractor Certification | 3.7.2.1 | |||||||||||||||
| 36 | 01 57 19 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.7.3.1 | G | ||||||||||||||
| 37 | 01 57 19 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.7.3.6 | G | ||||||||||||||
| 38 | 01 58 00 | 2 | Shop Drawings | Sign Legend Orders | 1.3.1 | G | ||||||||||||||
| 39 | 01 74 19 | 1 | Preconstruction Submittals | Construction Waste Management Plan | 1.7 | G | ||||||||||||||
| 40 | 01 74 19 | 6 | Test Reports | Quarterly Reports | 1.9.2 | |||||||||||||||
| 41 | 01 74 19 | 6 | Test Reports | Annual Report | 1.9.3 | |||||||||||||||
| 42 | 01 78 00 | 3 | Product Data | Warranty Management Plan | 1.6.1 | |||||||||||||||
| 43 | 01 78 00 | 3 | Product Data | Warranty Tags | 1.6.4 | |||||||||||||||
| 44 | 01 78 00 | 3 | Product Data | Spare Parts Data | 1.5 | |||||||||||||||
| 45 | 01 78 00 | 8 | Manufacturer's Instructions | Instructions | 1.6.1 | |||||||||||||||
| 46 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.4 | G | ||||||||||||||
| 47 | 01 78 00 | 11 | Closeout Submittals | As-Built Drawings | 3.1 | G | ||||||||||||||
| 48 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 3.3 | G | ||||||||||||||
| 49 | 01 78 00 | 11 | Closeout Submittals | As-Built Record of Equipment and Materials | 1.6.1 | |||||||||||||||
| 50 | 01 78 23 | 10 | Operation and Maintenance Data | O&M Database | 1.4 | G | ||||||||||||||
| 51 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | G | ||||||||||||||
| 52 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | G | ||||||||||||||
| 53 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | G | ||||||||||||||
| 54 | 01 78 23 | 11 | Closeout Submittals | Training Video Recording | 3.1.4 | G | ||||||||||||||
| 55 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.6 | G | ||||||||||||||
| 56 | 01 91 00.15 10 | 1 | Preconstruction Submittals | Commissioning Firm | 1.7 | G | ||||||||||||||
| 57 | 01 91 00.15 10 | 1 | Preconstruction Submittals | Lead Commissioning Specialist | 1.7.1 | G | ||||||||||||||
| 58 | 01 91 00.15 10 | 1 | Preconstruction Submittals | Technical Commissioning Specialists | 1.7.2 | G | ||||||||||||||
| 59 | 01 91 00.15 10 | 6 | Test Reports | Interim Construction Phase Commissioning Plan | 3.1.2.1 | G | ||||||||||||||
| 60 | 01 91 00.15 10 | 6 | Test Reports | Final Construction Phase Commissioning Plan | 3.1.2.2 | G | ||||||||||||||
| 61 | 01 91 00.15 10 | 6 | Test Reports | Pre-Functional Checklists | 3.1.4.2 | G | ||||||||||||||
| 62 | 01 91 00.15 10 | 6 | Test Reports | Issues Log | 1.8 | |||||||||||||||
| 63 | 01 91 00.15 10 | 6 | Test Reports | Commissioning Report | 3.2 | G | ||||||||||||||
| 64 | 01 91 00.15 10 | 7 | Certificates | Certificate of Readiness | 1.9 | G | ||||||||||||||
| 65 | 01 91 00.15 10 | 10 | Operation and Maintenance Data | Training Plan | 3.1.5 | G | ||||||||||||||
| 66 | 01 91 00.15 10 | 10 | Operation and Maintenance Data | Training Attendance Rosters | 3.1.5 | G | ||||||||||||||
| 67 | 01 91 00.15 10 | 10 | Operation and Maintenance Data | Systems Manual | 3.1.6 | G | ||||||||||||||
| 68 | 01 91 00.15 10 | 10 | Operation and Maintenance Data | Systems Manual | 3.1.6 | G | ||||||||||||||
| 69 | 01 91 00.15 10 | 11 | Closeout Submittals | Final Construction Phase Commissioning Plan | 3.1.2.2 | S | ||||||||||||||
| 70 | 02 41 00 | 1 | Preconstruction Submittals | Demolition Plan | 1.2.2 | G | ||||||||||||||
| 71 | 02 41 00 | 1 | Preconstruction Submittals | Existing Conditions | 1.11 | |||||||||||||||
| 72 | 02 41 00 | 7 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 73 | 03 30 53 | 2 | Shop Drawings | Installation Drawings | 1.5 | G | ||||||||||||||
| 74 | 03 30 53 | 3 | Product Data | Air-Entraining Admixture | 2.2.3.1 | |||||||||||||||
| 75 | 03 30 53 | 3 | Product Data | Water-Reducing or Retarding Admixture | 2.2.3.2 | |||||||||||||||
| 76 | 03 30 53 | 3 | Product Data | Curing Materials | 2.2.8 | |||||||||||||||
| 77 | 03 30 53 | 3 | Product Data | Conveying and Placing Concrete | 3.2 | |||||||||||||||
| 78 | 03 30 53 | 3 | Product Data | Formwork | 2.2.6 | |||||||||||||||
| 79 | 03 30 53 | 3 | Product Data | Mix Design Data | 2.3 | G | ||||||||||||||
| 80 | 03 30 53 | 3 | Product Data | Ready-Mix Concrete | 2.3 | |||||||||||||||
| 81 | 03 30 53 | 3 | Product Data | Curing Compound | 2.4.1 | |||||||||||||||
| 82 | 03 30 53 | 6 | Test Reports | Aggregates | 2.2.2 | |||||||||||||||
| 83 | 03 30 53 | 6 | Test Reports | Concrete Mixture Proportions | 2.1.3 | G | ||||||||||||||
| 84 | 03 30 53 | 6 | Test Reports | Compressive Strength Testing | 3.8.3 | G | ||||||||||||||
| 85 | 03 30 53 | 6 | Test Reports | Slump | 3.8.3 | G | ||||||||||||||
| 86 | 03 30 53 | 6 | Test Reports | Air Content | 3.8.3 | |||||||||||||||
| 87 | 03 30 53 | 6 | Test Reports | Water | 2.2.4 | |||||||||||||||
| 88 | 03 30 53 | 7 | Certificates | Cementitious Materials | 2.2.1 | |||||||||||||||
| 89 | 03 30 53 | 7 | Certificates | Aggregates | 2.2.2 | |||||||||||||||
| 90 | 03 30 53 | 7 | Certificates | Delivery Tickets | 2.3 | |||||||||||||||
| 91 | 03 30 53 | 8 | Manufacturer's Instructions | Curing Compound | 2.4.1 | |||||||||||||||
| 92 | 05 05 20 | 1 | Preconstruction Submittals | Installer Qualifications | 1.5.1.1 | G | ||||||||||||||
| 93 | 05 05 20 | 1 | Preconstruction Submittals | Post-Installed Anchor Special Inspector Qualifications | 1.5.1.2 | G | ||||||||||||||
| 94 | 05 05 20 | 3 | Product Data | Mechanical Anchors in Concrete | 2.1.1.3 | G | ||||||||||||||
| 95 | 05 05 20 | 3 | Product Data | Adhesive Anchor System in Concrete | 2.1.1.4 | G | ||||||||||||||
| 96 | 05 05 20 | 3 | Product Data | Non-Shrink, Non-Metallic Grout | 3.1.3 | G | ||||||||||||||
| 97 | 05 05 20 | 6 | Test Reports | Post-Installed Anchor Special Inspections Report | 3.3.4 | G | ||||||||||||||
| 98 | 05 05 20 | 7 | Certificates | Post-Installed Anchor Certification | 2.1.1.1 | G | ||||||||||||||
| 99 | 05 05 20 | 8 | Manufacturer's Instructions | Manufacturer's Printed Installation Instructions | 2.1.1.2 | G | ||||||||||||||
| 100 | 05 05 20 | 8 | Manufacturer's Instructions | Non-Shrink, Non-Metallic Grout | 3.1.3 | G | ||||||||||||||
| 101 | 05 05 20 | 8 | Manufacturer's Instructions | Manufacturer's Material Safety Data Sheets | 1.5 | |||||||||||||||
| 102 | 05 30 00 | 2 | Shop Drawings | Fabrication Drawings | 1.3.4 | G | ||||||||||||||
| 103 | 05 30 00 | 3 | Product Data | Accessories | 2.2 | |||||||||||||||
| 104 | 05 30 00 | 3 | Product Data | Deck Units | 2.1 | |||||||||||||||
| 105 | 05 30 00 | 3 | Product Data | Touch-Up Paint | 2.1.4 | |||||||||||||||
| 106 | 05 30 00 | 3 | Product Data | Welding Equipment | 1.3.2 | |||||||||||||||
| 107 | 05 30 00 | 3 | Product Data | Welding Rods and Accessories | 1.3.2 | |||||||||||||||
| 108 | 05 30 00 | 3 | Product Data | Recycled Content of Steel Products | 2.1 | S | ||||||||||||||
| 109 | 05 30 00 | 5 | Design Data | Deck Units | 2.1 | G | ||||||||||||||
| 110 | 05 30 00 | 7 | Certificates | Welder Qualifications | 1.3.2 | |||||||||||||||
| 111 | 05 30 00 | 7 | Certificates | Welding Procedures | 1.3.2 | |||||||||||||||
| 112 | 05 30 00 | 7 | Certificates | Manufacturer's Certificate | 1.3.1 | |||||||||||||||
| 113 | 07 84 00 | 2 | Shop Drawings | Firestopping System | 2.1 | G | ||||||||||||||
| 114 | 07 84 00 | 3 | Product Data | Firestopping Materials | 2.2 | G | ||||||||||||||
| 115 | 07 84 00 | 6 | Test Reports | Inspection | 3.3 | G | ||||||||||||||
| 116 | 07 84 00 | 7 | Certificates | Inspector Qualifications | 1.5.2 | |||||||||||||||
| 117 | 07 84 00 | 7 | Certificates | Firestopping Materials | 2.2 | |||||||||||||||
| 118 | 07 84 00 | 7 | Certificates | Installer Qualifications | 1.5.1 | G | ||||||||||||||
| 119 | 09 90 00 | 2 | Shop Drawings | Piping Identification | 3.6 | |||||||||||||||
| 120 | 09 90 00 | 3 | Product Data | Coating | 2.1 | G | ||||||||||||||
| 121 | 09 90 00 | 3 | Product Data | Product Data Sheets | 2.1 | |||||||||||||||
| 122 | 09 90 00 | 4 | Samples | Color | 2.2 | G | ||||||||||||||
| 123 | 09 90 00 | 8 | Manufacturer's Instructions | Mixing | 2.1 | |||||||||||||||
| 124 | 09 90 00 | 8 | Manufacturer's Instructions | Manufacturer's Safety Data Sheets | 1.7.1 | |||||||||||||||
| 125 | 09 90 00 | 10 | Operation and Maintenance Data | Coatings | 2.1 | G | ||||||||||||||
| 126 | 10 44 16 | 2 | Shop Drawings | Fire Extinguishers | 2.1.1 | G | ||||||||||||||
| 127 | 10 44 16 | 2 | Shop Drawings | Accessories | Part 2 | G | ||||||||||||||
| 128 | 10 44 16 | 2 | Shop Drawings | Cabinets | Part 2 | G | ||||||||||||||
| 129 | 10 44 16 | 2 | Shop Drawings | Wall Brackets | 2.2.1 | G | ||||||||||||||
| 130 | 10 44 16 | 2 | Shop Drawings | Schedule | 1.5 | G | ||||||||||||||
| 131 | 10 44 16 | 3 | Product Data | Fire Extinguishers | 2.1.1 | G | ||||||||||||||
| 132 | 10 44 16 | 3 | Product Data | Accessories | Part 2 | G | ||||||||||||||
| 133 | 10 44 16 | 3 | Product Data | Cabinets | Part 2 | G | ||||||||||||||
| 134 | 10 44 16 | 3 | Product Data | Wall Brackets | 2.2.1 | G | ||||||||||||||
| 135 | 10 44 16 | 3 | Product Data | Replacement Parts List | 3.2.1 | G | ||||||||||||||
| 136 | 10 44 16 | 7 | Certificates | Fire Extinguishers Certifications | 2.1.1 | G | ||||||||||||||
| 137 | 10 44 16 | 7 | Certificates | Manufacturer's Warranty with Inspection Tag | 1.4 | G | ||||||||||||||
| 138 | 21 13 13 | 1 | Preconstruction Submittals | Qualified Fire Protection Engineer (QFPE) | 1.2.3 | G | ||||||||||||||
| 139 | 21 13 13 | 1 | Preconstruction Submittals | Sprinkler System Designer | 1.4.2.1 | G | ||||||||||||||
| 140 | 21 13 13 | 1 | Preconstruction Submittals | Sprinkler System Installer | 1.4.2.2 | G | ||||||||||||||
| 141 | 21 13 13 | 2 | Shop Drawings | Shop Drawing | 1.2.1.1 | G | ||||||||||||||
| 142 | 21 13 13 | 3 | Product Data | Fittings | 2.2.1.2 | G | ||||||||||||||
| 143 | 21 13 13 | 3 | Product Data | Valves | 2.2.5 | G | ||||||||||||||
| 144 | 21 13 13 | 3 | Product Data | Relief Valves | 2.7.5 | G | ||||||||||||||
| 145 | 21 13 13 | 3 | Product Data | Sprinklers | 2.6 | G | ||||||||||||||
| 146 | 21 13 13 | 3 | Product Data | Pipe Hangers and Supports | 2.2.4 | G | ||||||||||||||
| 147 | 21 13 13 | 3 | Product Data | Sprinkler Alarm Switch | 2.3.1 | G | ||||||||||||||
| 148 | 21 13 13 | 3 | Product Data | Valve Supervisory (Tamper) Switch | 2.3.2 | G | ||||||||||||||
| 149 | 21 13 13 | 3 | Product Data | Fire Department Connection | 2.5 | G | ||||||||||||||
| 150 | 21 13 13 | 3 | Product Data | Backflow Prevention Assembly | 2.4 | G | ||||||||||||||
| 151 | 21 13 13 | 3 | Product Data | Air Vent | 2.7.6 | G | ||||||||||||||
| 152 | 21 13 13 | 3 | Product Data | Hose Valve | 2.4.1 | G | ||||||||||||||
| 153 | 21 13 13 | 3 | Product Data | Nameplates | 2.1.2 | G | ||||||||||||||
| 154 | 21 13 13 | 5 | Design Data | Hydraulic Calculations | 1.2.1.2 | G | ||||||||||||||
| 155 | 21 13 13 | 6 | Test Reports | Test Procedures | 3.6.1 | G | ||||||||||||||
| 156 | 21 13 13 | 7 | Certificates | Verification of Compliant Installation | 3.6.2.1 | G | ||||||||||||||
| 157 | 21 13 13 | 7 | Certificates | Request for Government Final Test | 3.6.2.2 | G | ||||||||||||||
| 158 | 21 13 13 | 10 | Operation and Maintenance Data | Operating and Maintenance (O&M) Instructions | 3.8 | G | ||||||||||||||
| 159 | 21 13 13 | 10 | Operation and Maintenance Data | Spare Parts | 1.6 | G | ||||||||||||||
| 160 | 21 13 13 | 11 | Closeout Submittals | As-built drawings | 3.8 | |||||||||||||||
| 161 | 21 30 00 | 1 | Preconstruction Submittals | Fire Pump Installation Related Submittals | 1.3 | |||||||||||||||
| 162 | 21 30 00 | 1 | Preconstruction Submittals | Fire Protection Specialist | 1.7.1 | G | ||||||||||||||
| 163 | 21 30 00 | 2 | Shop Drawings | Installation Drawings | 3.3.1 | G | ||||||||||||||
| 164 | 21 30 00 | 2 | Shop Drawings | As-Built Drawings | 3.11.2 | G | ||||||||||||||
| 165 | 21 30 00 | 2 | Shop Drawings | Piping Layout | 3.3.2 | G | ||||||||||||||
| 166 | 21 30 00 | 2 | Shop Drawings | Pump Room | 3.3.2 | G | ||||||||||||||
| 167 | 21 30 00 | 3 | Product Data | Catalog Data | 2.1 | G | ||||||||||||||
| 168 | 21 30 00 | 3 | Product Data | Spare Parts | 1.6 | |||||||||||||||
| 169 | 21 30 00 | 3 | Product Data | Preliminary Tests | 3.8.2 | |||||||||||||||
| 170 | 21 30 00 | 3 | Product Data | Field Tests | 3.8 | G | ||||||||||||||
| 171 | 21 30 00 | 3 | Product Data | Manufacturer's Representative | 1.7.6 | G | ||||||||||||||
| 172 | 21 30 00 | 3 | Product Data | Field Training | 3.11.1 | G | ||||||||||||||
| 173 | 21 30 00 | 3 | Product Data | Final Acceptance Test | 3.8.4 | |||||||||||||||
| 174 | 21 30 00 | 6 | Test Reports | Preliminary Tests | 3.8.2 | |||||||||||||||
| 175 | 21 30 00 | 7 | Certificates | Fire Protection Specialist | 1.7.1 | |||||||||||||||
| 176 | 21 30 00 | 7 | Certificates | Qualifications of Welders | 1.7.2 | |||||||||||||||
| 177 | 21 30 00 | 7 | Certificates | Qualifications of Installer | 1.7.3 | |||||||||||||||
| 178 | 21 30 00 | 7 | Certificates | Preliminary Test Certification | 1.7.4 | |||||||||||||||
| 179 | 21 30 00 | 7 | Certificates | Final Test Certification | 1.7.5 | |||||||||||||||
| 180 | 21 30 00 | 10 | Operation and Maintenance Data | Operating and Maintenance Instructions | 3.11.1 | G | ||||||||||||||
| 181 | 21 30 00 | 10 | Operation and Maintenance Data | Flow Meter | 2.15 | |||||||||||||||
| 182 | 23 05 93 | 1 | Preconstruction Submittals | Independent TAB Agency and Personnel Qualifications | 1.5.1 | G | ||||||||||||||
| 183 | 23 05 93 | 1 | Preconstruction Submittals | TAB Firm | 1.5.6.1 | G | ||||||||||||||
| 184 | 23 05 93 | 1 | Preconstruction Submittals | TAB Team Assistants | 1.2 | G | ||||||||||||||
| 185 | 23 05 93 | 1 | Preconstruction Submittals | TAB Team Engineer | 1.2 | G | ||||||||||||||
| 186 | 23 05 93 | 1 | Preconstruction Submittals | TAB Specialist | 1.5.6.2 | G | ||||||||||||||
| 187 | 23 05 93 | 1 | Preconstruction Submittals | TAB Team Field Leader | 1.2 | G | ||||||||||||||
| 188 | 23 05 93 | 2 | Shop Drawings | TAB Schematic Drawings and Report Forms | 1.3.2 | G | ||||||||||||||
| 189 | 23 05 93 | 3 | Product Data | Equipment and Performance Data | 1.3 | G | ||||||||||||||
| 190 | 23 05 93 | 3 | Product Data | TAB Related HVAC Submittals | 1.5.6.4 | G | ||||||||||||||
| 191 | 23 05 93 | 3 | Product Data | TAB Procedures | 1.5.5 | G | ||||||||||||||
| 192 | 23 05 93 | 3 | Product Data | Systems Readiness Check | 1.3.2 | G | ||||||||||||||
| 193 | 23 05 93 | 6 | Test Reports | Prerequisite HVAC Work Checkout List | 1.6.1 | G | ||||||||||||||
| 194 | 23 05 93 | 6 | Test Reports | Prerequisite HVAC Work Checkout List | 1.6.1 | G | ||||||||||||||
| 195 | 23 05 93 | 6 | Test Reports | Prerequisite HVAC Work Checkout List | 1.6.1 | G | ||||||||||||||
| 196 | 23 05 93 | 6 | Test Reports | TAB Report | 1.5.7.1 | G | ||||||||||||||
| 197 | 23 05 93 | 7 | Certificates | Independent TAB Agency and Personnel Qualifications | 1.5.1 | G | ||||||||||||||
| 198 | 23 05 93 | 7 | Certificates | TAB Submittal and Work Schedule | 1.6.1 | G | ||||||||||||||
| 199 | 23 05 93 | 7 | Certificates | TAB Pre-Field Engineering Report | 1.6.1.1 | G | ||||||||||||||
| 200 | 23 05 93 | 7 | Certificates | Instrument Calibration Certificates | 1.5.4 | G | ||||||||||||||
| 201 | 23 05 93 | 7 | Certificates | TAB Procedures Summary | 3.6 | G | ||||||||||||||
| 202 | 23 05 93 | 7 | Certificates | TAB Firm | 1.5.6.1 | G | ||||||||||||||
| 203 | 23 05 93 | 7 | Certificates | Prerequisite HVAC Work Check Out List | 1.6.1 | G | ||||||||||||||
| 204 | 23 05 93 | 7 | Certificates | Certified Final Tab Report | 1.5.2.3 | G | ||||||||||||||
| 205 | 23 30 00 | 2 | Shop Drawings | Detail Drawings | 1.4.3 | G | ||||||||||||||
| 206 | 23 30 00 | 3 | Product Data | Duct Access Doors | 2.7.2 | G | ||||||||||||||
| 207 | 23 30 00 | 3 | Product Data | Louvers | 2.7.3 | |||||||||||||||
| 208 | 23 30 00 | 3 | Product Data | Panel Type Power Wall Ventilators | 2.8.1.1 | |||||||||||||||
| 209 | 23 30 00 | 3 | Product Data | Test Procedures | 1.4.4 | |||||||||||||||
| 210 | 23 30 00 | 6 | Test Reports | Performance Tests | 3.9 | G | ||||||||||||||
| 211 | 23 30 00 | 8 | Manufacturer's Instructions | Manufacturer's Installation Instructions | 3.2 | |||||||||||||||
| 212 | 23 30 00 | 8 | Manufacturer's Instructions | Operation and Maintenance Training | 3.11.2 | |||||||||||||||
| 213 | 23 30 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.11.1 | G | ||||||||||||||
| 214 | 23 30 00 | 10 | Operation and Maintenance Data | Panel Type Power Wall Ventilators | 2.8.1.1 | G | ||||||||||||||
| 215 | 23 30 00 | 11 | Closeout Submittals | Indoor Air Quality During Construction | 3.1 | G | ||||||||||||||
| 216 | 23 81 00 | 3 | Product Data | Spare Parts | 3.7.1 | |||||||||||||||
| 217 | 23 81 00 | 3 | Product Data | Posted Instructions | 3.4 | |||||||||||||||
| 218 | 23 81 00 | 3 | Product Data | Coil Corrosion Protection | 2.5.1 | |||||||||||||||
| 219 | 23 81 00 | 3 | Product Data | System Performance Tests | 3.6 | |||||||||||||||
| 220 | 23 81 00 | 3 | Product Data | Training | 3.4 | G | ||||||||||||||
| 221 | 23 81 00 | 3 | Product Data | Inventory | 1.5 | |||||||||||||||
| 222 | 23 81 00 | 3 | Product Data | Supplied Products | 2.1 | |||||||||||||||
| 223 | 23 81 00 | 3 | Product Data | Manufacturer's Standard Catalog Data | 2.2 | G | ||||||||||||||
| 224 | 23 81 00 | 6 | Test Reports | Refrigerant Tests, Charging, and Start-Up | 3.5 | G | ||||||||||||||
| 225 | 23 81 00 | 6 | Test Reports | System Performance Tests | 3.6 | G | ||||||||||||||
| 226 | 23 81 00 | 7 | Certificates | Service Organizations | 3.7.2 | |||||||||||||||
| 227 | 23 81 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.4 | G | ||||||||||||||
| 228 | 23 81 00 | 11 | Closeout Submittals | Ozone Depleting Substances | 2.2.2.2 | G | ||||||||||||||
| 229 | 23 82 46.00 40 | 2 | Shop Drawings | Fabrication Drawings | 1.2.1 | G | ||||||||||||||
| 230 | 23 82 46.00 40 | 3 | Product Data | Performance Data | 2.1 | G | ||||||||||||||
| 231 | 23 82 46.00 40 | 3 | Product Data | Electric Unit Heaters | 2.1 | G | ||||||||||||||
| 232 | 23 82 46.00 40 | 3 | Product Data | Heating Element | 2.2.1 | G | ||||||||||||||
| 233 | 23 82 46.00 40 | 3 | Product Data | Controls | 2.2.2 | G | ||||||||||||||
| 234 | 23 82 46.00 40 | 3 | Product Data | Casings | 3.1.1 | G | ||||||||||||||
| 235 | 23 82 46.00 40 | 3 | Product Data | Propellers and Motors | 2.2.3 | G | ||||||||||||||
| 236 | 23 82 46.00 40 | 8 | Manufacturer's Instructions | Manufacturer's Instructions | 1.2.1 | G | ||||||||||||||
| 237 | 25 05 11 | 1 | Preconstruction Submittals | Contractor Computer Cybersecurity Compliance Statements | 1.8.1.6 | G | ||||||||||||||
| 238 | 25 05 11 | 1 | Preconstruction Submittals | Contractor Temporary Network Cybersecurity Compliance Statements | 1.8.6 | G | ||||||||||||||
| 239 | 25 05 11 | 1 | Preconstruction Submittals | Cybersecurity Interconnection Schedule | 1.7.2 | G | ||||||||||||||
| 240 | 25 05 11 | 1 | Preconstruction Submittals | Proposed STIG and SRG Applicability Report | 1.7.1 | G | ||||||||||||||
| 241 | 25 05 11 | 2 | Shop Drawings | Network Communication Report | 1.7.3 | G | ||||||||||||||
| 242 | 25 05 11 | 2 | Shop Drawings | Cybersecurity Riser Diagram | 1.7.6 | G | ||||||||||||||
| 243 | 25 05 11 | 3 | Product Data | Control System Cybersecurity Documentation | 1.7.8 | G | ||||||||||||||
| 244 | 25 05 11 | 6 | Test Reports | Control System Cybersecurity Testing Procedures | 3.6.1 | G | ||||||||||||||
| 245 | 25 05 11 | 6 | Test Reports | Control System Cybersecurity Testing Report | 3.6.3 | G | ||||||||||||||
| 246 | 25 05 11 | 11 | Closeout Submittals | Software and Configuration Backups | 1.7.5 | G | ||||||||||||||
| 247 | 25 05 11 | 11 | Closeout Submittals | System Maintenance Tool Software | 3.4 | G | ||||||||||||||
| 248 | 25 05 11 | 11 | Closeout Submittals | STIG, SRG and Vendor Guide Compliance Result Report | 1.7.7 | G | ||||||||||||||
| 249 | 25 05 11 | 11 | Closeout Submittals | Control System Inventory Report | 1.7.4 | G | ||||||||||||||
| 250 | 26 20 00 | 2 | Shop Drawings | Panelboards | 2.1 | G | ||||||||||||||
| 251 | 26 20 00 | 2 | Shop Drawings | Transformers | 2.13 | G | ||||||||||||||
| 252 | 26 20 00 | 2 | Shop Drawings | Marking Strips | 3.1.7.1 | G | ||||||||||||||
| 253 | 26 20 00 | 3 | Product Data | Receptacles | 2.9 | G | ||||||||||||||
| 254 | 26 20 00 | 3 | Product Data | Circuit Breakers | 2.10.3 | G | ||||||||||||||
| 255 | 26 20 00 | 3 | Product Data | Switches | 2.8 | G | ||||||||||||||
| 256 | 26 20 00 | 3 | Product Data | Transformers | 2.13 | G | ||||||||||||||
| 257 | 26 20 00 | 3 | Product Data | Enclosed Circuit Breakers | 2.11 | G | ||||||||||||||
| 258 | 26 20 00 | 3 | Product Data | Motor Controllers | 2.15 | G | ||||||||||||||
| 259 | 26 20 00 | 3 | Product Data | Manual Motor Starters | 2.16 | G | ||||||||||||||
| 260 | 26 20 00 | 3 | Product Data | Surge Protective Devices | 2.23 | G | ||||||||||||||
| 261 | 26 20 00 | 6 | Test Reports | 600-volt Wiring Test | 3.5.2 | G | ||||||||||||||
| 262 | 26 20 00 | 6 | Test Reports | Grounding System Test | 3.5.5 | G | ||||||||||||||
| 263 | 26 20 00 | 6 | Test Reports | Transformer Tests | 3.5.3 | G | ||||||||||||||
| 264 | 26 20 00 | 6 | Test Reports | Ground-fault Receptacle Test | 3.5.4 | G | ||||||||||||||
| 265 | 26 20 00 | 9 | Manufacturer's Field Reports | Transformer Factory Tests | 2.25.1 | |||||||||||||||
| 266 | 26 20 00 | 10 | Operation and Maintenance Data | Electrical Systems | 1.5.1 | G | ||||||||||||||
| 267 | 26 28 01.00 10 | 3 | Product Data | Fault Current Analysis | 2.1 | |||||||||||||||
| 268 | 26 28 01.00 10 | 3 | Product Data | Protective Device Coordination Study | 2.1 | |||||||||||||||
| 269 | 26 28 01.00 10 | 3 | Product Data | System Coordinator | 1.4.1 | |||||||||||||||
| 270 | 26 51 00 | 2 | Shop Drawings | Luminaire Drawings | 1.5.1 | G | ||||||||||||||
| 271 | 26 51 00 | 3 | Product Data | Luminaires | 2.2 | G | ||||||||||||||
| 272 | 26 51 00 | 3 | Product Data | Light Sources | 2.3 | G | ||||||||||||||
| 273 | 26 51 00 | 3 | Product Data | LED Drivers | 2.4 | G | ||||||||||||||
| 274 | 26 51 00 | 3 | Product Data | Luminaire Warranty | 1.6.1 | G | ||||||||||||||
| 275 | 26 51 00 | 3 | Product Data | Lighting Controls Warranty | 1.6.2 | G | ||||||||||||||
| 276 | 26 51 00 | 3 | Product Data | Switches | 2.5.2.1 | G | ||||||||||||||
| 277 | 26 51 00 | 3 | Product Data | Emergency Drivers | 2.6.1 | G | ||||||||||||||
| 278 | 26 51 00 | 3 | Product Data | Linear LED Lamps | 2.3.1.1 | G | ||||||||||||||
| 279 | 26 51 00 | 5 | Design Data | Luminaire Design Data | 1.5.2 | G | ||||||||||||||
| 280 | 26 51 00 | 5 | Design Data | Photometric Plan | 1.5.4 | G | ||||||||||||||
| 281 | 26 51 00 | 7 | Certificates | LED Driver and Dimming Switch Compatibility Certificate | 1.5.3 | G | ||||||||||||||
| 282 | 26 51 00 | 10 | Operation and Maintenance Data | Lighting System | 1.7.1 | G | ||||||||||||||
| 283 | 26 51 00 | 10 | Operation and Maintenance Data | Lighting Control System | 1.7.2 | G | ||||||||||||||
| 284 | 26 51 00 | 10 | Operation and Maintenance Data | Maintenance Staff Training Plan | 3.3.2.1 | G | ||||||||||||||
| 285 | 26 51 00 | 10 | Operation and Maintenance Data | End-User Training Plan | 3.3.2.2 | G | ||||||||||||||
| 286 | 28 31 70 | 1 | Preconstruction Submittals | Qualified Fire Protection Engineer (QFPE) | 1.3.2 | G | ||||||||||||||
| 287 | 28 31 70 | 1 | Preconstruction Submittals | Fire alarm system designer | 1.9.2.1 | G | ||||||||||||||
| 288 | 28 31 70 | 1 | Preconstruction Submittals | Supervisor | 1.9.2.2 | G | ||||||||||||||
| 289 | 28 31 70 | 1 | Preconstruction Submittals | Technician | 1.9.2.3 | G | ||||||||||||||
| 290 | 28 31 70 | 1 | Preconstruction Submittals | Installer | 1.9.2.4 | G | ||||||||||||||
| 291 | 28 31 70 | 1 | Preconstruction Submittals | Test Technician | 1.9.2.5 | G | ||||||||||||||
| 292 | 28 31 70 | 1 | Preconstruction Submittals | Fire Alarm System Site-Specific Software Acknowledgement | 1.7 | G | ||||||||||||||
| 293 | 28 31 70 | 2 | Shop Drawings | Nameplates | 1.9.1.3 | G | ||||||||||||||
| 294 | 28 31 70 | 2 | Shop Drawings | Instructions | 2.2.3 | G | ||||||||||||||
| 295 | 28 31 70 | 2 | Shop Drawings | Wiring Diagrams | 1.9.1.4 | G | ||||||||||||||
| 296 | 28 31 70 | 2 | Shop Drawings | System Layout | 1.9.1.5 | G | ||||||||||||||
| 297 | 28 31 70 | 2 | Shop Drawings | Notification Appliances | 1.9.1.6 | G | ||||||||||||||
| 298 | 28 31 70 | 2 | Shop Drawings | Initiating devices | 1.9.1.7 | G | ||||||||||||||
| 299 | 28 31 70 | 2 | Shop Drawings | Battery Power | 1.9.1.8 | G | ||||||||||||||
| 300 | 28 31 70 | 2 | Shop Drawings | Voltage Drop Calculations | 1.9.1.9 | G | ||||||||||||||
| 301 | 28 31 70 | 3 | Product Data | Manual Stations | 2.4 | G | ||||||||||||||
| 302 | 28 31 70 | 3 | Product Data | Carbon monoxide detector | 2.5 | G | ||||||||||||||
| 303 | 28 31 70 | 3 | Product Data | Addressable Interface Devices | 2.6 | G | ||||||||||||||
| 304 | 28 31 70 | 3 | Product Data | Addressable Control Modules | 2.7 | G | ||||||||||||||
| 305 | 28 31 70 | 3 | Product Data | Notification Appliances | 1.9.1.6 | G | ||||||||||||||
| 306 | 28 31 70 | 3 | Product Data | Batteries | 2.11.1 | G | ||||||||||||||
| 307 | 28 31 70 | 3 | Product Data | Battery Chargers | 2.11.2 | G | ||||||||||||||
| 308 | 28 31 70 | 3 | Product Data | Supplemental Notification Appliance Circuit Panels | 2.11.1.1 | G | ||||||||||||||
| 309 | 28 31 70 | 3 | Product Data | Auxiliary Power Supply Panels | 2.11.1.1 | G | ||||||||||||||
| 310 | 28 31 70 | 3 | Product Data | Surge Protective Devices | 2.12 | G | ||||||||||||||
| 311 | 28 31 70 | 3 | Product Data | Alarm Wiring | 2.12 | G | ||||||||||||||
| 312 | 28 31 70 | 3 | Product Data | Back Boxes and Conduit | 3.3.4 | G | ||||||||||||||
| 313 | 28 31 70 | 3 | Product Data | Terminal Cabinets | 3.3.2 | G | ||||||||||||||
| 314 | 28 31 70 | 3 | Product Data | Automatic Fire Alarm Transmitters | 2.14 | G | ||||||||||||||
| 315 | 28 31 70 | 3 | Product Data | Radio Transmitter and Interface Panels | 2.14.1 | G | ||||||||||||||
| 316 | 28 31 70 | 3 | Product Data | Document Storage Cabinet | 3.10.3 | G | ||||||||||||||
| 317 | 28 31 70 | 6 | Test Reports | Test Procedures | 3.6.1 | G | ||||||||||||||
| 318 | 28 31 70 | 7 | Certificates | Verification of Compliant Installation | 3.6.2.1 | G | ||||||||||||||
| 319 | 28 31 70 | 7 | Certificates | Request for Government Final Test | 3.6.2.2 | G | ||||||||||||||
| 320 | 28 31 70 | 10 | Operation and Maintenance Data | Operation and Maintenance (O&M) Instructions | 3.8 | G | ||||||||||||||
| 321 | 28 31 70 | 10 | Operation and Maintenance Data | Instruction of Government Employees | 3.9 | G | ||||||||||||||
| 322 | 28 31 70 | 11 | Closeout Submittals | As-Built Drawings | 1.9.1.12 | |||||||||||||||
| 323 | 28 31 70 | 11 | Closeout Submittals | Spare Parts | 1.11.1 |