This document is a memorandum from the Department of the Air Force Headquarters regarding an exemption to several Unified Facilities Criteria (UFC) related to fire protection requirements for aircraft maintenance hangars and corrosion control/paint facilities. The exemption allows the implementation of the Sundown Policy, which prohibits the use of foam-based fire suppression systems in Tier 2 facilities and authorizes the use of Ignitable Liquid Drainage Flooring Assemblies (ILDFA) in Tier 1 facilities. The memorandum outlines the specific fire protection features required for Tier 1 and Tier 2 facilities, including the use of automatic water sprinkler systems, infrared detection, and drainage trenches. This exemption is intended to prevent the expenditure of funds on non-required systems and ensure the expedient implementation of the Sundown Policy.

The related federal contract opportunity is for the replacement of the existing high expansion foam system (HEFS) with a water fire suppression system, Water Deluge System (WDS), in the aircraft maintenance bay of Building 50. The project also includes the repair and replacement of all damage in the pump house, and the restoration of the fire suppression system in Building 50 to a functional state. The contract is a small business set-aside with a NAICS code of 238220 and a period of performance of 245 calendar days, divided into two Notices to Proceed (NTP). NTP #1 is for pre-construction submittals (63 calendar days), and NTP #2 is for construction (182 calendar days). The acquisition will be a firm-fixed price contract, and all prospective offerors must be registered in the System for Award Management (SAM) to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Foam Fire Suppression System with Water Deluge System, newest first.
File Type Posted
Solicitation Cancelation MFR.pdf PDF
Statement of Work -MXDP22-1013 - Construction.pdf PDF
Attachment C. Deluge Liquidated Damages Signed.pdf PDF
E. AETC 47.pdf PDF
F. Financial Institution Reference Sheet.pdf PDF
G. Past Performance Questionnaire.pdf PDF
JandA MONACO.pdf PDF
Progress Schedule and Progress Report.xlsx XLSX spreadsheet
UFC 3-400-02 Design Engineering Weather Data.pdf PDF
UFC 3-401-01 Mechanical Engineering.pdf PDF
MXDP22-1013_Sub 05_Final Specifications.pdf PDF
Attachment B. Wage Determination TX20240186.pdf PDF
Laughlin AFB Division 01 General Specifications.pdf PDF
UFC 3-420-01 Plumbing Systems.pdf PDF
Attachment D. Notification of Compliance with Contract Insurance Requirements.pdf PDF
Fire Suppression System Plan Set.pdf PDF
EQ Contractor Tech Specs 2024.pdf PDF
Laughlin_AFB_Installation Facilities Standards.pdf PDF
FM Data Sheet 3-26 Fire Protection for Nonstorage O.pdf PDF
UFC 3-410-01 HVAC.pdf PDF
UFC 3-410-02 Direct Digital Control for HVAC Other.pdf PDF
UFC 3-501-01 Electrical Engineering.pdf PDF
Solicitation - FA309924R0008.pdf PDF
Attachment A. Statement of Work MXDP 22-1013.docx DOCX document
Sundown Policy for Foam Fire Suppression Systems.pdf PDF
Schedule of Submittals.xlsx XLSX spreadsheet
UFC 3-230-01 Water Storage and Distribution.pdf PDF
UFC 3-600-01 Fire Protection Engineering for Facilities.pdf PDF
UFC 4-211-01 Aircraft Maintenance Hangars.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS UNITED STATES AIR FORCE

WASHINGTON DC

MEMORANDUM FOR ALWING/CC

HQ USACE CECW-CE

HQ NAVFAC Chief Engineer

FROM: HQ USAF/A4C-2

1260 Air Force Pentagon Washington, DC 20330-1260

SUBJECT: Exemption to UFC 1-200-01, DoD Building Code, with Change 1, UFC 3-600-01, Fire Protection Engineering for Facilities, UFC 4-211-01, Aircraft Maintenance Hangars and UFC 4-211-02, Aircraft Corrosion Control and Paint Facilities, to implement Sundown Policy for Foam Fire Suppression Systems

Reference: (a) Sundown Policy for Foam Fire Suppression Systems, 16 Nov 2021

UFC 3-600-01, Fire Protection Engineering for Facilities, requires that aircraft hangars are designed and constructed in accordance with UFC 4-211-01, Aircraft Maintenance Hangars, and UFC 4-211-02, Aircraft Corrosion Control and Paint Facilities, which in turn require foam based fire suppression systems in order to be occupied by fueled aircraft. AFCEC/COSM Fire Protection Engineer is currently developing and coordinating modifications to criteria to implement the Foam Sundown Policy, which prohibits installation of foam based fire suppression in Tier 2 facilities and authorizes installation of Ignitable Liquid Drainage Flooring Assemblies (ILDFA) in Tier 1 facilities. Before updated criteria are released, an exemption is required in accordance with UFC 1-200-01, DoD Building Code, with Change 1.

The following fire protection features shall be implemented in lieu of features provided by UFC 4-211-01 for aircraft maintenance, repair depot, storage, and alert hangars, UFC 4-211- 02 for corrosion control and paint facilities, and UFC 3-600-01 for tension fabric hangars:

a. Tier 1 Facilities. An ILDFA is an acceptable alternative in lieu of high expansion foam systems and low expansion foam systems; Tier 1 facilities will be provided with an ILDFA unless it is impractical to do so. Where ILDFA is provided, the associated automatic sprinkler system must meet the hydraulic requirements of FM Data Sheet 3-26, Fire Protection for Nonstorage Occupancies, and be installed in accordance with UFC 3-600-01, Fire Protection Engineering for Facilities; hangar bays are classified as hazard category no. 3; infrared detection is required, except that detectors shall be provided around the perimeter of hangar bays such that all portions of the hangar shall be within the cone of vision, and in range of at least two detectors, and the fire alarm system signal shall be activated based on one detector. Hangars protected by high expansion or low expansion foam shall be provided with drainage trenches meeting the requirements of section 7-11, Floors and Trench Drains, UFC 4-211-01, Aircraft Maintenance Hangars, unless modifying scope during construction is impractical when evaluating cost and schedule.

18 January 2022

b. Tier 2 Facilities. The Tier 2 fire protection standard is an automatic water sprinkler system rather than a specialized system such as ILDFA or foam-based system. Automatic sprinkler systems must meet the hydraulic requirements of FM Data Sheet 3-26, Fire Protection for Nonstorage Occupancies, and be installed in accordance with UFC 3-600-01, Fire Protection Engineering for Facilities; hangar bays are classified as hazard category no. 3; infrared detection is required, except that detectors shall be provided around the perimeter of hangar bays such that all portions of the hangar shall be within the cone of vision, and in range of at least two detectors, and the fire alarm system signal shall be activated based on one detector; infrared detection used to activate pre-action systems, shall meet the existing criteria in UFC 4-211-01, Aircraft Maintenance Hangars; drainage trenches, meeting the requirements of section 7-11, Floors and Trench Drains, UFC 4-211-01, Aircraft Maintenance Hangars, shall be provided for new facilities.

To ensure the expedient implementation of the Sundown Policy Memo and prevent expenditure of funds on non-required systems in Tier 2 facilities, I also approve an exemption from UFC 1-200-01, DOD Building Code, section 1-3.1 which defines when UFC changes apply to design-bid-build and design-build projects. Existing projects to install new or upgrade high expansion or low expansion foam systems need to be modified in design, regardless of design completion percentage, or in execution unless the feature under modification is already installed.

Although aviation fuel involved hangar fires are an infrequent event, the impact could be catastrophic. Fire Emergency Service personnel should exercise caution when entering these facilities in response to fire alarms or reported fire events; since fire protection system performance may not be as desired or expected.

For questions concerning the design criteria above and conflict resolution between the Sundown Policy, this exemption memo and/or associated UFCs, contact the AFCEC/COSM Fire Protection Engineering point of contact, Mr. Andrew Carmean (andrew.carmean@us.af.mil).

NANCY J. BALKUS, P.E., SES

Deputy Director of Civil Engineering DCS/Logistics, Engineering & Force Protection cc:

SF/S4

NGB/A4C

AFRC/A4C

ALMAJCOM/A4C

AFCEC/CC

2022-01-18T22:21:26-0500
BALKUS.NANCY.J.1082115974