This is a Small Business Enterprise (SBE) goal memorandum issued by Pinellas County, Florida, for the South Cross Bayou Advanced Water Reclamation Facility (SCBAWRF) generator controls and switchgear replacement project. The project involves removal and replacement of four 3200-ampere draw-out generator circuit breakers and six 2000-ampere draw-out feeder circuit breakers in two 277/480-volt switchgear lineups, along with removal of six free-standing generator/engine control cabinets and installation of new Schneider Electric MasterPact MTZ circuit breakers and Modicon M580 Programmable Logic Controllers. Qualified electrical contractors must be FDOT prequalified or submit documentation of at least three comparable previous projects with owner references. The Step 1 qualification submittals are due March 19, 2026, at 3:00 p.m., with a non-mandatory pre-bid conference on March 11, 2026, at 9:00 a.m. Step 2 sealed bids are due March 31, 2026, at 3:00 p.m. Contract performance shall not exceed 450 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $1,352.17 per calendar day for non-completion.

The memorandum establishes a 4 percent SBE participation goal, specifically designating SBE electrical contractors to install wire and conduit between switchboards and generator control enclosures, including labor and materials. Contractors must provide bid bonds equal to 5 percent of the base bid and performance and payment bonds at 100 percent of contract value, maintain comprehensive insurance coverage including Workers' Compensation, Commercial General Liability, Excess or Umbrella Liability, and Cyber Risk Liability policies, and comply with E-Verify work authorization requirements. Payment shall be made in accordance with Florida's Local Government Prompt Payment Act with net 45-day payment terms available, with Pinellas County retaining 5 percent of monthly payments until final completion. A permit allowance of $15,000 and a work line item of $418,000 are referenced in the pricing proposal template.

View the file

Other files

File Type Posted
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1_(Addendum_#1_Revision).pdf PDF
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1.pdf PDF
Appendix_4_-_Special_Notice.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_S&S_11x17_Drawings_09-10-25.pdf PDF
26-0256-ITB-C_Pricing_Proposal_(for_reference_only).pdf PDF
26-0256_-_Insurance_Requirements_-_South_Cross_Bayou_Replacement_of_Generator_and_Switchgear.docx DOCX document
26-0256_Sample_P&P_Bonds.pdf PDF
Sample_Change_Order.pdf PDF
E-Verify_Affidavit.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
APPENDIX_7_-_SBE_COMPLIANCE_FORM.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
26-0256-ITB-C_Sample_Construction_Agreement.pdf PDF
Switchgear_Map_location.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_Revised_Specs_04-29-25_(2).pdf PDF
QUALIFICATION_SUBMITTAL_FORM_8-25.pdf PDF
Sample_Application_for_Payment.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
SCB_AWRF_SBE_Memo_03-24-23.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03/24/23

SCBSBE.MEMO

M E M O R A N D U M

RE: South Cross Bayou AWRF Generator Controls and Switchgear Replacement

DATE: March 24, 2023

I recommend a SBE goal of 4% of the total bid amount.

The work identified to achieve this SBE goal is that of a SBE electrical contractor to install the wire and conduit between Switchboard A and B and the generator control enclosures. This work should include labor and materials.

Bob E. Hallman, P.E.