Appendix_4_-_Special_Notice.pdf

PDF 75 KB Posted

Attached to
South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1
Solicitation number
26-0256-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a Special Notice Appendix from Pinellas County, Florida, outlining changes to the Invitation to Bid for Project ID 004906A, the South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2), issued as a rebid. The project involves the removal and replacement of four 3200-ampere draw-out generator circuit breakers and six 2000-ampere draw-out feeder circuit breakers in two 277/480-volt, 3-phase, 4-wire switchgear lineups with 6000-ampere main bus ratings. The scope also includes reconditioning and modifying switchgear lineups and circuit breaker cells as required, along with removal of six free-standing, floor-mounted generator/engine control cabinets and their internal components. The work is located at the Pinellas County South Cross Bayou Advanced Water Reclamation Facility and requires all equipment, materials, and work necessary for complete, fully tested operational systems.

The Special Notice modifies Section 5.23 regarding weekend and holiday work, clarifying that such work is neither anticipated nor guaranteed but may be requested by the contractor with at least 48-hour notice. Section 5.40 establishes submittal requirements, mandating that contractors submit shop plans, data, test results, schedules, and samples at their own expense in a timely manner to prevent delays. The notice specifies that incomplete submittals will be returned and that the Design Professional/Engineer/Project Manager will document review time for submittals exceeding two review cycles. Contractors are responsible for reimbursing the County for all additional review efforts beyond the second submission at the Engineer of Record's standard rate of $492.03 per review, with charges calculated based on actual time recorded for each additional review.

View the file

Other files

File Type Posted
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1_(Addendum_#1_Revision).pdf PDF
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_S&S_11x17_Drawings_09-10-25.pdf PDF
26-0256-ITB-C_Pricing_Proposal_(for_reference_only).pdf PDF
26-0256_-_Insurance_Requirements_-_South_Cross_Bayou_Replacement_of_Generator_and_Switchgear.docx DOCX document
26-0256_Sample_P&P_Bonds.pdf PDF
Sample_Change_Order.pdf PDF
E-Verify_Affidavit.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
APPENDIX_7_-_SBE_COMPLIANCE_FORM.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
26-0256-ITB-C_Sample_Construction_Agreement.pdf PDF
Switchgear_Map_location.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_Revised_Specs_04-29-25_(2).pdf PDF
QUALIFICATION_SUBMITTAL_FORM_8-25.pdf PDF
Sample_Application_for_Payment.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
SCB_AWRF_SBE_Memo_03-24-23.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1of 1

APPENDIX 4 - SPECIAL NOTICE

PID 004906A

South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) - REBID

In Pinellas County, Florida

Notice to Contractor

Changes to Invitation to Bid:

Section 5.23. WEEKEND/HOLIDAY RATE

C. Weekend and holiday work is not anticipated or guaranteed. However, the Contractor may request for consideration to work certain holidays or weekends with least 48-hour notice.

Section 5.40 SUBMITTALS AFTER AWARD

5.40.B

Contractor shall carefully examine the Contract Documents for all requirements for approval of materials to be submitted such as shop Plans, data, test results, schedules and samples. Contractor shall submit all such materials at its own expense and in such form and manner as required by the Contract Documents in sufficient time to prevent any delay in the delivery of such materials and the installation thereof. Incomplete submittals will be returned to the Contractor. The Design Professional/Engineer/Project Manager will record time for submittals handled more than twice. The Contractor shall reimburse the County for charges of the Design Professional/Engineer/Project Manager and his/her consultants for providing more than two reviews of submittals.

The Design Professional/Engineer of Record (EOR)/Project Manager shall document time expended on submittals that require more than two (2) review cycles. In such cases, the Contractor shall be responsible for reimbursing the County for all additional review efforts beyond the second submission.

Reimbursement shall be based on the EOR’s standard rate of $492.03 per review, for time incurred by the EOR’s consultants. Charges will be calculated based on actual time recorded for each additional review.

File details come from the government source that posted it. Updated .