This is a Small Business Enterprise (SBE) goal memorandum related to the South Cross Bayou Advanced Water Reclamation Facility (SCBAWRF) in Pinellas County, Florida, issued by the State of Florida on March 24, 2023. The project involves the removal and replacement of four 3200-ampere draw-out generator circuit breakers and six 2000-ampere draw-out feeder circuit breakers in two 277/480-volt, 3-phase, 4-wire switchgear lineups with 6000-ampere main bus ratings. Additionally, the work includes removal of six free-standing, floor-mounted generator/engine control cabinets and associated control components. The project scope requires all equipment, materials, and work necessary to deliver complete and fully tested operational systems.

The memorandum establishes a Small Business Enterprise set-aside goal of 4 percent of the total bid amount. The identified work to achieve this SBE goal is the installation of wire and conduit between Switchboard A and B and the generator control enclosures by an SBE electrical contractor, including both labor and materials. The recommendation was prepared by Bob E. Hallman, P.E., in his capacity as a project engineer evaluating the scope of work for SBE participation.

View the file

Other files

File Type Posted
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1_(Addendum_#1_Revision).pdf PDF
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1.pdf PDF
Appendix_4_-_Special_Notice.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_S&S_11x17_Drawings_09-10-25.pdf PDF
26-0256-ITB-C_Pricing_Proposal_(for_reference_only).pdf PDF
26-0256_-_Insurance_Requirements_-_South_Cross_Bayou_Replacement_of_Generator_and_Switchgear.docx DOCX document
26-0256_Sample_P&P_Bonds.pdf PDF
Sample_Change_Order.pdf PDF
E-Verify_Affidavit.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
APPENDIX_7_-_SBE_COMPLIANCE_FORM.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
26-0256-ITB-C_Sample_Construction_Agreement.pdf PDF
Switchgear_Map_location.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_Revised_Specs_04-29-25_(2).pdf PDF
QUALIFICATION_SUBMITTAL_FORM_8-25.pdf PDF
Sample_Application_for_Payment.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Bid_Submittal_Form-JOC.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03/24/23

SCBSBE.MEMO

M E M O R A N D U M

RE: South Cross Bayou AWRF Generator Controls and Switchgear Replacement

DATE: March 24, 2023

I recommend a SBE goal of 4% of the total bid amount.

The work identified to achieve this SBE goal is that of a SBE electrical contractor to install the wire and conduit between Switchboard A and B and the generator control enclosures. This work should include labor and materials.

Bob E. Hallman, P.E.