APPENDIX_7_-_SBE_COMPLIANCE_FORM.pdf

PDF 160 KB Posted

Attached to
South Cross Bayou Replacement of Generator Controls and Switchgear (GEN2) (PID 004906A) - STEP 1
Solicitation number
26-0256-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is an SBE (Small Business Enterprise) Compliance Form for Pinellas County, Florida, related to the South Cross Bayou Replacement of Generator Controls and Switchgear project (PID 004906A). The form documents prime contractor and subcontractor information for compliance with SBE participation goals established by Pinellas County. The project involves the removal and replacement of four 3200-ampere draw out generator circuit breakers and six 2000-ampere draw out feeder circuit breakers in two 277/480 volt, 3-phase switchgear lineups at the Pinellas County South Cross Bayou Advanced Water Reclamation Facility. Additional work includes removal of six free-standing, floor-mounted generator/engine control cabinets and their internal control components, with all systems to be fully tested and operational upon completion.

The compliance form requires bidders to identify all subcontractors and their respective contract amounts, contacts, and addresses for review by Pinellas County purchasing staff. The form includes a mandatory SBE project goal percentage specified in the special conditions section of the solicitation, with a certification requirement that all submitted information is true and complete. Purchasing staff must verify compliance with stated SBE goals and indicate whether the bidder meets or fails to meet the required participation threshold. The form becomes part of the executed contract with Pinellas County and must be signed by an authorized representative of the bidding entity.

View the file

Other files

File Type Posted
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1_(Addendum_#1_Revision).pdf PDF
South_Cross_Bayou_Replacement_of_Generator_Controls_and_Switchgear_(GEN2)_(PID_004906A)_-_STEP_1.pdf PDF
Appendix_4_-_Special_Notice.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_S&S_11x17_Drawings_09-10-25.pdf PDF
26-0256-ITB-C_Pricing_Proposal_(for_reference_only).pdf PDF
26-0256_-_Insurance_Requirements_-_South_Cross_Bayou_Replacement_of_Generator_and_Switchgear.docx DOCX document
26-0256_Sample_P&P_Bonds.pdf PDF
Sample_Change_Order.pdf PDF
E-Verify_Affidavit.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
26-0256-ITB-C_Sample_Construction_Agreement.pdf PDF
Switchgear_Map_location.pdf PDF
SCB_AWRF_Generator_Controls_&_Switchgear_Replacement_Revised_Specs_04-29-25_(2).pdf PDF
QUALIFICATION_SUBMITTAL_FORM_8-25.pdf PDF
Sample_Application_for_Payment.pdf PDF
OpenGov_Fillable-_Final.pdf PDF
Airport_Security_Program.pdf PDF
Notice_of_Intent_to_Sole_Source_07-25-2023.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
SCB_AWRF_SBE_Memo_03-24-23.pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 7 - SBE COMPLIANCE FORM

APPENDIX 7 – SBE COMPLIANCE FORM

PRIME CONTRACTOR NAME:

SUBCONTRACTOR(S) INFORMATION:

COMPANY: COMPANY:

ADDRESS: ADDRESS:

AMOUNT OF

SUBCONTRACTED

WORK: $

AMOUNT OF

SUBCONTRACTED

WORK: $

CONTACT: CONTACT:

EMAIL: EMAIL:

TELEPHONE: TELEPHONE:

COMPANY: COMPANY:

ADDRESS: ADDRESS:

AMOUNT OF

SUBCONTRACTED

WORK: $

AMOUNT OF

SUBCONTRACTED

WORK: $

CONTACT: CONTACT:

EMAIL: EMAIL:

TELEPHONE: TELEPHONE:

I certify that the information included in this Compliance Form is true and complete to the best of my knowledge and belief. I further understand and agree that this Compliance Form shall become a part of my contract with Pinellas County.

FOR PINELLAS COUNTY USE ONLY:

I have reviewed this Compliance Form and found the Bidder IS IS NOT in compliance with the Invitation to Bid SBE goals.

Purchasing Staff Member:

Initials: Date:

Name and Title of Authorized Representative:

Signature:

MANDATORY SBE PROJECT GOAL PERCENTAGE LISTED IN SPECIAL CONDITIONS SECTION