DRAFT_Task_Order_SOW.docx

DOCX document 33 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
SB1341-18-RP-0009
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

DRAFT SOW for the First Task Order

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
A003.pdf PDF
Sign-in_Sheet_April_30_Visit.pdf PDF
A002.pdf PDF
A001.pdf PDF
Attach_6_Price_Breakdown.xlsx XLSX spreadsheet
Attach_5_DBWages.pdf PDF
Attach_1_General_Requirements.pdf PDF
Attach_2_Berm_SOW.pdf PDF
RFP_Attch_B_NIST_AMD_Boulder_PPQ_Form.doc DOC document
RFP_Attch_A_Construction_Exp_Proj-Data-Sheet.doc DOC document
Signin_Sheet.pdf PDF
Attach_3_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf PDF
Attach_4_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf PDF
1442_MACC_RFP.pdf PDF
MACC.PPTX PPTX presentation
Draft_RFP.pdf PDF
DRAFT_MACC_SOW.docx DOCX document
DRAFT_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf PDF
Draft_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

SB1341-18-RP-0009

SCOPE OF WORK

FOR

Radio Station WWVB Tower 8 Berm Repair Project

PART 1 INTRODUCTION

It is the intent of this Scope of Work to provide the requirements for the NIST Radio Station WWVB Tower 8 Berm Repair Project. This project is to repair the existing earthen berm, provide a causeway to the berm, and install a sump pump within the dam area.

The DOC site campus is located at 325 Broadway in Boulder, Colorado. The work is to be conducted on the satellite campus located at 2000 E Co Rd 58 in Fort Collins, Colorado. The requirements as presented in this document, along with any attachments, are intended to describe the minimum Government requirements.

See the General Instructions for Construction/Maintenance Activities for conducting work included in the contract for information on rules and requirements of performing work on the National Institute of Standards and Technology (NIST) sites in Boulder and Ft. Collins, Colorado.

PART 2 SCOPE OF WORK

Work to be completed is in the vicinity around the Tower 8 guy wire support.

This project is intended to repair the earthen coffer damn around the Tower 8 guy anchor. This project is to repair the berm, including: placement of rip rap, installation of an earthen causeway to the damn, as well as the installation of a sump pump within the damn, with all associated electrical connections. The overall intent of this project is to stop water retention around the Tower 8 guy wire anchor, and maintain maintenance access to the anchor.

The berm was not previously engineered and constructed to endure the impact of the surrounding reservoir, and the drawings were revised to correct the issue. The set of 11 drawings and associated specifications is for the original completion of the berm, and is included for completeness.

The drawings with work pertinent to this contract are: C4, E1, E2, and E3.

The Notice to Proceed for this project will be issued when water levels around the berm are receding, to allow construction completion within the schedule below.

Contractor is to refer to attached engineered drawings and specifications for locations, materials, and project intent.

The Contractor shall coordinate with the Government Contracting Officer’s Representative (COR) all activities required throughout the duration of this task order. The Contractor shall communicate with the COR and the CO on all matters pertaining to the task order.

The magnitude of the project is between $25,000 and $100,000.

PART 3 PROJECT SCHEDULE

Contractor shall have one hundred eighty (180) days to complete the project after the Notice to Proceed is issued.

PART 4 SUBMITTALS REQUIRING ENGINEERING APPROVAL

Contractor shall provide the following submittals to the COR for design team approval

· Submittals as required in the contract drawings and specifications from the following divisions:

· Division 02 - Existing Conditions

· Division 26 - Electrical

· Division 31 - Earthwork

· Division 32 - Exterior Improvements

· Contractor shall provide submittals through a NIST approved, secure electronic site accessible by NIST and Design team responsible for construction administration.