Attach_6_Price_Breakdown.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- SB1341-18-RP-0009
About this file
Attachment 6 Price Breakdown Worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A003.pdf | ||
| Sign-in_Sheet_April_30_Visit.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| Attach_5_DBWages.pdf | ||
| Attach_3_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf | ||
| Attach_4_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf | ||
| 1442_MACC_RFP.pdf | ||
| MACC.PPTX | PPTX presentation | |
| Attach_1_General_Requirements.pdf | ||
| Attach_2_Berm_SOW.pdf | ||
| RFP_Attch_B_NIST_AMD_Boulder_PPQ_Form.doc | DOC document | |
| RFP_Attch_A_Construction_Exp_Proj-Data-Sheet.doc | DOC document | |
| Signin_Sheet.pdf | ||
| Draft_RFP.pdf | ||
| DRAFT_MACC_SOW.docx | DOCX document | |
| Draft_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf | ||
| DRAFT_Task_Order_SOW.docx | DOCX document | |
| DRAFT_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Worksheet Price Breakdown
| Division | Price | Division | Price |
| 01 - General Requirements | 21 - Fire Suppression | ||
| 02 - Existing Conditions | 22 - Plumbing | ||
| 03 - Concrete | 23 - Heating, Ventilating, and Air-Conditioning (HVAC) | ||
| 04 - Masonry | 26 - Electrical | ||
| 05 - Metals | 27 - Communications | ||
| 06 - Wood, Plastics, and Composites | 28 - Electronic Safety and Security | ||
| 07 - Thermal and Moisture Protection | 31 - Earthwork | ||
| 08 - Openings | 32 - Exterior Improvements | ||
| 09 - Finishes | 33 - Utilities | ||
| 10 - Specialties | 34 - Transportation | ||
| 11 - Equipment | 35 - Waterway and Marine Transportation | ||
| 12 - Furnishings | 41 - Material Processing and Handling Equipment | ||
| 13 - Special Construction | 44 - Pollution Control Equipment | ||
| 14 - Conveying Equipment | 46 - Water and Wastewater Equipment | ||
| 48 - Electric Power Generation | |||
| Totalling Components | |||
| General Construction Subtotal | General Construction Profit (XX%) | ||
| General Construction Overhead (XX%) | General Construction Bonding (XX%) | ||
| GRAND TOTAL |
Attachment 6
SB1341-18-RP-0009
File details come from the government source that posted it.