Attach_6_Price_Breakdown.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
SB1341-18-RP-0009
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

Attachment 6 Price Breakdown Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
A003.pdf PDF
Sign-in_Sheet_April_30_Visit.pdf PDF
A002.pdf PDF
A001.pdf PDF
Attach_5_DBWages.pdf PDF
Attach_3_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf PDF
Attach_4_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf PDF
1442_MACC_RFP.pdf PDF
MACC.PPTX PPTX presentation
Attach_1_General_Requirements.pdf PDF
Attach_2_Berm_SOW.pdf PDF
RFP_Attch_B_NIST_AMD_Boulder_PPQ_Form.doc DOC document
RFP_Attch_A_Construction_Exp_Proj-Data-Sheet.doc DOC document
Signin_Sheet.pdf PDF
Draft_RFP.pdf PDF
DRAFT_MACC_SOW.docx DOCX document
Draft_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf PDF
DRAFT_Task_Order_SOW.docx DOCX document
DRAFT_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Worksheet Price Breakdown

DivisionPriceDivisionPrice
01 - General Requirements21 - Fire Suppression
02 - Existing Conditions22 - Plumbing
03 - Concrete23 - Heating, Ventilating, and Air-Conditioning (HVAC)
04 - Masonry26 - Electrical
05 - Metals27 - Communications
06 - Wood, Plastics, and Composites28 - Electronic Safety and Security
07 - Thermal and Moisture Protection31 - Earthwork
08 - Openings32 - Exterior Improvements
09 - Finishes33 - Utilities
10 - Specialties34 - Transportation
11 - Equipment35 - Waterway and Marine Transportation
12 - Furnishings41 - Material Processing and Handling Equipment
13 - Special Construction44 - Pollution Control Equipment
14 - Conveying Equipment46 - Water and Wastewater Equipment
48 - Electric Power Generation
Totalling Components
General Construction SubtotalGeneral Construction Profit (XX%)
General Construction Overhead (XX%)General Construction Bonding (XX%)
GRAND TOTAL

Attachment 6

SB1341-18-RP-0009

File details come from the government source that posted it.