A003.pdf
PDF 2 MB Posted
- Attached to
- Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- SB1341-18-RP-0009
About this file
Amendment A003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign-in_Sheet_April_30_Visit.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| Attach_6_Price_Breakdown.xlsx | XLSX spreadsheet | |
| Attach_5_DBWages.pdf | ||
| Attach_1_General_Requirements.pdf | ||
| Attach_2_Berm_SOW.pdf | ||
| RFP_Attch_B_NIST_AMD_Boulder_PPQ_Form.doc | DOC document | |
| RFP_Attch_A_Construction_Exp_Proj-Data-Sheet.doc | DOC document | |
| Signin_Sheet.pdf | ||
| Attach_3_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf | ||
| Attach_4_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf | ||
| 1442_MACC_RFP.pdf | ||
| MACC.PPTX | PPTX presentation | |
| Draft_RFP.pdf | ||
| DRAFT_MACC_SOW.docx | DOCX document | |
| DRAFT_NIST_WWVB_Tower_8Anchor_Repair_Specs_2014.09.pdf | ||
| Draft_NIST_WWVB_Tower_8_Anchor_Repairs_Drawings_2014-10-20.pdf | ||
| DRAFT_Task_Order_SOW.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Attachment Page
Offeror Questions and Government Responses May 2, 2018
Question 1: Will NIST be removing the current solar panel tray from the site? Or will the contractor be responsible for this?
Answer 1: Contractor will be required to move the solar panel tray to a designated location on-site.
Question 2: Horizontal Directional Drilling uses HDPE Conduit. Is this acceptable in lieu of PVC for underground conduit?
Answer 2: Yes.
Question 3: What is the extent of the grounding wires? The barb wire fence or the chain link fence?
Answer 3: The chain link fence.
Question 4: How close to Tower 8 are the grounding wires?
Answer 4: The wires radiate out from the helix house ½ degree to the chain link fence.
Question 5: What is the extent of the Tower 8 Foundation?
Answer 5: See drawings on next pages.
Question 6: If work were to take place in the Helix Building: Can walls of the Helix Building be penetrated? Is surface mounted conduit on the interior and exterior of the building acceptable?
Answer 6: All work will be conducted outside of the Helix building.
Question 7: Does the sump pump need to be monitored at any other location besides at the Sump Pump Controller?
Answer 7: No.
Question 8: Can Schedule 80 PVC Conduit be used in lieu of Schedule 40?
Answer 8: Yes.
Question 9: In regard to directional boring - Where does the grounding plate noted on sheet E2 end (how far will direction boring be required from Tower 8 Base)?
Answer 9: Use the drawing provided on the next page. The dimensions on the drawing are approximates.
Contractor will need to field verify all dimensions after contract award.
Question 10: Will portable restrooms be allowed onsite?
Answer 10: Yes.
Question 11: Please confirm the grounding grid/plane ends at the fence.
Answer 11: It ends at the chain link fence.
Question 12: Please provide a detail on the layout/spacing/materials used in the grounding grid/plane.
Answer 12: This information is not available.
Question 13: Please confirm that a SWPPP or NOI will not be required for this project
Answer 13: The NOI is required for projects exceeding one acre or part of a plan of development exceeding one acre. Dewatering permit will be required.
Question 14: Please provide the sign in sheet from the sitewalk.
Answer 14: The Sign-in Sheet was posted to FBO.gov on May 1, 2018.
PAGE 2 OF 4 SB134118RP0009A003
PAGE 3 OF 4 SB134118RP0009A003
Offeror Questions and Government Responses May 2, 2018
PAGE 4 OF 4 SB134118RP0009A003
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable Descript: The purpose of this amendment is to provide Offeror Questions and Government Responses.
All other terms and conditions remain unchanged.
| Descript1: |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 4 |
| DocNo: SB134118RP0009A003 |
| EffDate: MAY 02, 2018 |
| ReqNo: NB196000-18-01699 |
| ProjNo: |
| IssuedByCode: 000014 |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
325 BROADWAY
BOULDER CO 80305-3328
| AdminByCode: |
| AdminBy: See Block 6 |
| ContractorCode: |
| FacCode: |
| SolNo: SB134118RP0009 |
| SolDate: APR 06, 2018 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |
File details come from the government source that posted it.