Q A SET 1
View the file
Other files for this federal contract opportunity
Show all 50
Worldwide Aviation Support Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Reference | Question | Response | |
| 1 | General | Will the government include the current DOS/AW Safety Management System in the Technical Library? | See attachment J.4; Safety Directives. |
2 Table 3.1, III.A, Tab A Table 3.1, III.A, Tab A limits page count to 7 pages per past performance reference, excluding Consent/Client Authorization Letters. However, para. 3.6.1 describes what must be included in Tab A as a copy of the Transmittal Letter and Section 1 of the PPQ for each reference. Just the format for these requirements is equal to 4 pages. We request the cover letter be excluded from Tab A page count and that the total page count for Tab A be expanded to 10 pages so that offerors may adequately describe a contract's relevance and performance in terms of the characteristics or aspects the Government will consider in evaluating relevancy and making a performance assessment, to include quality of services, contract compliance, management effectiveness, business relations, business conduct and small business utilization. Additionally, recommend Item 16 be removed from Section 1 since it requires information that is redundant with Tab B and would add to this page count. Amendment #1 increases of page count from 7 to 20 in Table 3.1, III.A, Tab A.
Your latter question is not understood; "Additionally, recommend Item 16 be removed from Section 1 since it requires information that is redundant with Tab B and would add to this page count." Please re-submit the latter question to lend more clarity and include page reference.
| 3 | RFP Section L, Table 3.1, page 133; and Section L 3.6.1, page 150 | Table 3.1 Section L indicates 3 Past Performance References 7 pages per Reference, excluding Consent and Client Authorization Letters" and Section L 3.6.1 indicates that the Prime Offeror shall submit a minimum of three (3) past performance references for itself." | ||
| Please clarify the maximum number of past performance citations to be referenced by the prime and each teaming partner, joint venture partner, and/or major subcontractor | Amendment #1 increases of page count from 7 to 20 in Table 3.1, III.A, Tab A. | |||
| 4 | Section 2.C.103, Base Support Services | Section 2.C.103, Base Support Services, is missing line items 2.C.103.b(10) through (15). These requirements are reflected in Section 8, Afghanistan. | Section 2 requirements are specific to those that apply at all sites/all locations. 8.C.103.b(10) through 2.C.103.b(15) are specific to Afghanistan only. | |
| 5 | General | CDRLs Provide the following CDRLs: Eradication Report, Cost Report, Ammunition Forecast and Training Report. Question - Are Contract Deliverables (CDRLs) going to be provided in the INL Technical Library for review and planning? | Offeror should propose their respective report/solutions to meet the informational requirements. | |
| 6 | I.2 Clauses | IAW with PWS Line Item 2.C.40.a the phase-in period duration is 6 months. This Line Item also requires the Contractor to provide qualified personnel within 30 days or less after contract award. Attachment J.1 specifies the beginning of the Transition Period as Nov 1, 2014. Question - Does the 30 day requirement for providing qualified personnel begin at notification of contract award - or - at the beginning of the Transition Period, Nov 1, 2014? | Personnel required to be on contract during the transition will commence work on 1 November, 2014. Personnel "folding in" during the transition period will be required IAW your proposed transition plan with full contract performance and staffing being attained at the end of the transition period. | |
| 7 | General | We have been monitoring the FLYDoS website for updates in reference to the recently issued RFP number for INL Worldwide Aviation Support Services SAQMMA-14-R-0319 and have not seen any new data posted, is there additional data planned? | No. We are in the process of taking the website down. For that reason it is not referenced in the solicitation at FBO. The pertinent information for the solicitations will be on FBO or local library. |
| 8 | General | We are aware that Flight Operations, Maintenance and Logistics are combined into a single Aviation Services RFP, SAQMMA14R0319. This RFP mentions PSO and IT as Associate Contracts. Since Safety Compliance is not mentioned as an associated contract, may we ask if a solicitation for this assignment remains as part of the program structure? | Safety is included in requirements under this solicitation. The two other small business set aside solicitations, Safety Compliance and Training, will still be solicited after the award of SAQMMA14R0319. |
| 9 | General | Would the Government consider an extension to the proposal submission date? | Yes, an amendment will be released that will extend the proposal due date to October 2, 2014. |
| 10 | General | Will the USG provide the existing technical library and SOP library to the successful bidder as government owned property? | Yes. It will be assumed as all other GFP, during transition. |
| 11 | General | When does the Government expect to provide responses to Offerors? Due to the proposal submission date, would the Government release responses to Offerors questions as Government responses are finalized. | Our target is within a week of receipt. |
| 12 | J.7 and RFP H.28 Use of Synchronized Pre-Deployment Operational Tracker (SPOT), page 75 | For Contract personnel deployed to Pakistan, will these personnel be provided life support services at a DOS Embassy, US military installation? | Iraq- Embassy medical facility is contracted by USG. Other contract companies can enter an arrangement with them for various levels of care. |
Afg- International Security Assistance Force - AFG clinics in place for DOD and DOS contractors. Requires your company enter into a cost-service agreement with them.
Pakistan: Islamabad allows for medical and hospital care on the economy at contractor expense. However the security issues at Quetta preclude such. Basic and emergency services provided there through USG sarrangement with PAK Military clinic. Emergent or serious illness wiould require evacuation back to Islamabad.
13 L.2.3 FAR 52.234-3 Notice of Earned value Management System, pg. 123 Can a modified EVM format be used for EVMS reporting? Will the Government allow the offeror to include a proposed EVMS reporting plan in our proposal? Yes, propose the solution, including format and reporting, you will bring to the program.
Yes, you may include any features which might demonstrate best value to USG, provided you cover the minimum fields in section L and adhere to page limitations.
14 RFP, Section L (Earned Value Management System), pg 123 Can a tailored EVM format be used for EVMS reporting? Yes, propose the solution, including format and reporting, you will bring to the program.
Yes, you may include any features which might demonstrate best value to USG, provided you cover the minimum fields in section L and adhere to page limitations.
| 15 | L.2.3 FAR 52.234-3 Notice of Earned value Management System, pg. 123 | Can the FAR Clause L.2.3. FAR 52.234-3 -- Notice of Earned Value Management System - Post Award IBR (Jul 2006) be removed from the RFP? The DoD EVMS Implementation Guide discourages the application of EVM on FFP contracts, and contracts that may be categorized as “non-schedule-based”, i.e., those that do not ordinarily contain work efforts which are discrete in nature. Removal of the FAR Clause from this IDIQ would be consistent with that guidance. | No, as numerous elements of task orders will not be FFP. |
| 16 | PWS 1.A.3.d & e Training & Safety | Is the Government still intending to issue separate RFPs for Safety and Training or are those elements included in the World Wide Aviation Support Services RFP? | Safety is included in requirements under this solicitation. The two other small business set aside solicitations, Safety Compliance and Training, will still be solicited after the award of SAQMMA14R0319. |
| 17 | PWS 2.A.4 & various throughout | RFP PWS references minimum aircrew per aircraft requirement as stated in INL/A Operations directives, yet no copy of referenced directives provided. Also the training and Standardization sections all reference same INL-A Operations Directives. Can we have a copy of all applicable Operations Directives as well as SOPS and/or an INL/A Operations POC/website access to reference for future clarification? | Thank you. Attachment J.19 will be included in Amendment 001. |
| 18 | PWS 2.C.40.6 Contract Phase Out (USG assumes 2.C.20b) | Is the Contractor to remain 100% fully staffed during the 6 month transition out? If not, what should the Contractor assume for phasing out of personnel? | At whatever time the phase out transition is required it will be handled as a contract |
modification or task order and the USG would issue a request for proposal at that time with specific requirements. For now it is within scope for eventual exercise and should not be proposed.
19 RFP, Section F.2, Period of Performance, 39 Period of Performance includes a 6 month phase out period, however the phase out period is not included in the J.5 Pricing Table 1 through 10. pricing table 1-10 does not reflect that. Please verify that the 6 month phase out period is not priced. At whatever time the phase out transition is required it will be handled as a contract modification or task order and the USG would issue a request for proposal at that time with specific requirements. For now it is within scope for eventual exercise and should not be proposed.
| 20 | PWS 2.C.42 Security Clearance Requirements | Which positions are classified as "mission critical contractor positions"? | Such are noted in attachment J.11, Minimum Qualifications, as requiring SECRET. |
| 21 | PWS 2.C.43.a Enterprise MIS Transition | Please confirm that at the conclusion of MIS testing the IT contractor will assume responsibility for the MIS system. | No. Once the MIS is successfully tested and implemented, operation and maintenance will remain with the Aviation Support Services contractor. The IT contractor will be responsible to ensuring connectivity and integrity of the network on which all program software resides. |
| 22 | PWS 2.c.45.a Compliance with Safety Management Program | Will Contractor be entitled to perform an assessment of all facilities and equipment during the 6 month phase in period to ensure facilities and equipment are safe for Contractor use and operating properly? If the Contractor encounters an issue that would impact the operational capability or safety function of the facility/equipment, please confirm that will be addressed between the Government and Contractor for remedy and that Contractor will not be penalize for failure to meet an AA should the remedy not be completed during the transition in period? | Yes to all. Such inspection and acceptance is integral to the transition and you should |
account for these in your plan, as will the out-going contractor. USG will preside.
23 PWS 2.C.45.c Environmental Safety Program Compliance Please confirm that the Contractor will be entitled to perform an environmental baseline assessment at each CONUS and OCONUS location during the 6 month transition in period? Any issues will be brought to the Government for determination on remedy. Yes to all. Such inspection and acceptance is integral to the transition and you should account for these in your plan, as will the out-going contractor. USG will preside.
24 PWS 2.C.45.c Environmental Safety Program Compliance Please confirm that the Contractor will be entitled to perform an environmental closeout at the completion of the period of performance and following the assessment and period of performance the Contractor will no longer be liable for any environmental liabilities, fines or damages. Yes to all. Such inspection and acceptance is integral to the transition and you should account for these in your plan, as will the out-going contractor. USG will preside.
25 PWS.2.F.3 CDRLs Please confirm that Contractor format will be acceptable for CDRL submission? Yes, unless otherwise prescribed in the solicitation, the offeror will propose the solution, format, and reporting they will bring to the program.
Yes, you may include any features which might demonstrate best value to USG, provided you cover the minimum fields in section L and adhere to page limitations.
| 26 | RFP C.3.7, Aviation Logistics Services, Minor Construction, pg 29 | Is the Contractor expected to price minor construction in the Sample Task Order or will Contraction be addressed at the task order level? If Contractor is required to include pricing for minor construction in the sample task, please provide specifics on the number and types of construction projects that should be priced? | If, and when construction is required it will be handled as a contract modification or task order and the USG would issue a request for proposal at that time with specific requirements. For now it is within scope for eventual exercise and should not be proposed. |
| 27 | RFP, Section C.4(6) Enterprise Software Transition, Pg 33 | Please verify the current and future MIS systems do not have any classified data requirements and will not interface with any classified networks | There is, and shall be no classified information in the MIS. |
| 28 | RFP, Section H.8 Associate Contractor Agreements, Page 62 and RFP, Section C.3 Flight Operations Services, Page 32 | Section H.8 refers to Associate Contractors, however it does not refer to a Logistics associate contractor as referred to in C.3 Page 32. Please clarify | H.8 correctly calls out IT and PSO as associate contracts. Logistical fuctions under this solicitation fall under Aviation Support Services, as do Operational and Maintenance functions. |
| 29 | RFP, Section L | Please specify the address where proposals should be hand delivered and mailed? | As stated on page 1, block 8 of the solicitation mail or deliver proposals to: |
Office of Acquisition Management (A/LM/AQM) 6767 North Wickham Road, Suite 214 Melbourne, FL 32940
| 30 | RFP, Section L 3.6.1 Past Performance Questionnaires, pg 150 | Would the government consider allowing an introductory section to the Past Performance Volume | Yes, provided you comply with page count limitation. |
| 31 | RFP C.3 | Both Logistics and Flight Operations Services are numbered as C.3. What is the government's intended paragraph number for Flight Operations Services? | Amendment #1 will Change numbering on pages 2, 29, and 31 of solicitation to reflect C.4 for Flight Operations Services, and C.5 for Aviation Maintenance and Engineering Services. |
| 32 | DD-254 and the PWS | The PWS in multiple locations requires a contractor to brief, analyze, and collect classified material, on a 24 hours per day basis at various locations, such as Afghanistan for instance. Yet, the DD-254 does not authorize the Contractor to store classified material. Will the Government arrange for storing classified material and providing 24 hour access at MOBs? | In any such instance the USG will provide requisite facilities, access, guidance, and USG oversight. |
| 33 | RFP H.21.a. Contractor Personnel Medical Requirements | H Clause 21.a. in part reflects “[c]ontractor personnel who deploy for multiple tours, for more than 12 months total must be re-evaluated for fitness to deploy. An examination will remain valid for 15 months from the date of the physical.” |
Rated flight crewmembers require FAA Class II medical examinations valid for 12 months and NRCMs FAA Class III medical examinations valid for either 24 or 60 months.
Do FAA mandated medical examination requirements and periods of validity take precedence over the referenced section of H 21.a?
| Yes. The former requirement is a base line for all employees while the latter is applicable whre called out in the solicittation. The more stringent air crew requirements will apply as stated. | |||
| 34 | RFP Attachment J-11 | The Attachment J-11 header reflects solicitation information unrelated to Worldwide Aviation Support Services. Is Attachment J-11 the correct attachment for this specific solicitation? | Attachment J.11 will be updated via a forthcoming amendment. |
| 35 | RFP Attachment J-11 | Attachment J-11 reflects many positions which appear incompatible with Worldwide Aviation Support Services. The PSO Director position is one example. |
(1) May we assume Attachment J-11 reflects a number of positions inadvertently incorporated therein, like the PSO Director for instance?
(2) If so, does the Government intend to issue a revised Attachment J-11 reflecting labor positions limited strictly to this solicitation? Attachment J-11 purposely included some carry-over from PSO positions for the following reason. Combined, this solicitation now includes wider management, safety, and other requirements than while seperate. Accordingly the additional labor categories, and their corresponding minimum qualifications are included for your information.
Position names, from the PWS, are frequently different from the position titles, referenced for parity with industry labor categories. Both may be different from your own titles for the same categories. Your proposal should pair the PWS requirements to a labor category.
Offerors are not required to use all labor categories in J.11 for pricing the sample task order. Additionally see L.3.7.2 (22) for adding additional labor categories.
36 RFP Attachment J-11 The latter pages of Attachment J-11 incorporates inaccurate information or reflects no information in two of the table columns – specifically Minimum Education and Specific Training. Further, the column for Position Name is devoid of information in many of the latter pages. These inaccuracies, and others we raise in the preceding questions 36 and 37 give rise to substantive questions regarding the overall reliability of J-11. Will the Government issue a revised Attachment J-11, reflecting accurate information across all columns of the document? Where no minimum is written, none applies.
Position names, from the PWS, are frequently different from the position titles, referenced for parity with industry labor categories. Both may be different from your own titles for the same categories. Your proposal should pair the PWS requirements to a labor category. Where minimum qualifications are cited, you must meet or exceed those.
As stated in J.11, **Disclaimer - INL/A will consider trade-off between minimum education and minimum experience, on a case by case basis if proposed** Position names, from the PWS, are frequently different from the position titles, referenced for parity with industry labor categories. Both may be different from your own titles for the same categories. Your proposal should pair the PWS requirements to a labor category.
Offerors are not required to use all labor categories in J.11 for pricing the sample task order. Additionally see L.3.7.2 (22) for adding additional labor categories.
37 Attachment J-11 The qualifications for Logistics Manager appear more stringent than the qualifications for Deputy Director Logistics, Procurement and Support. Will the government please verify the minimum qualifications for Logistics Manager are more stringent than the minimum qualifications for Deputy Director Logistics, Procurement & Support Services? Position names, from the PWS, are frequently different from the position titles, referenced for parity with industry labor categories. Both may be different from your own titles for the same categories. Your proposal should pair the PWS requirements to a labor category.
Offerors are not required to use all labor categories in J.11 for pricing the sample task order. Additionally see L.3.7.2 (22) for adding additional labor categories.
38 RFP H.13.2 Section H.13.2 includes a Program Manager (PM) as key personnel in addition to a Program Director, Operations Manager, Maintenance Manager, Logistics Manager, and Site Managers. Should the Offeror assume the PM is a Business Manager-type position? Yes. Position names, from the PWS, are frequently different from the position titles, referenced for parity with industry labor categories. Both may be different from your own titles for the same categories. Your proposal should pair the PWS requirements to a labor category. Where minimum qualifications are cited, you must meet or exceed those.
| 39 | Attachment J.21 | ||
| Flight hours and aircraft table doesn’t add up correctly. Please determine if the offereor shall correct the formulas in the Table or if a new version will be provided. | Amendment 001 will revise original attachment J.21 | ||
| 40 | Attachment J.21 Aircraft and Flight Hours | ||
| Attachment J.21 appears to have calculation errors. Can the Government please issue a revised attachment? For example, at Patrick, the attachment lists 11 aircraft but the total column states there are only 10 aircraft. Similarly, the total flight hours do not include all hours listed. | Amendment 001 will revise original attachment J.21 | ||
| 41 | PWS, all flight ops sections | There are numerous discrepancies between table J.21 and wording in the PWS. Specifically table shows 12 AT-802 in Columbia but PWS section 4.A references 13 aircraft. For Peru, section 6.A.3, PWS references PC-6, yet PC-6 not included in table j.21. Also, rows and columns totals for table j.21 do not show correct math. Can we please have an accurate and correct table of DOS INL/A fleet assets this PWS will be responsible for as this drives almost all aircrew manning assumptions and plans? | Amendment 001 will revise original attachment J.21 |
| 42 | General | ||
| Is the RFP and resultant contract in support of any NATO/ISAF projects/missions with respect to services performed in Afghanistan? Because the bilateral agreement titled "LETTER OF AGREEMENT ON POLICE, CRIMINAL JUSTICE, AND COUNTERNARCOTICS SUPPORT PROGRAMS BETWEEN THE GOVERNMENT OF THE UNITED STATES OF AMERICA AND THE ISLAMIC REPUBLIC OF AFGHANISTAN" is applicable to the contract, can the Govt confirm that this contract supports the NATO/ISAF mission/projects? | No. Proposals will be evaluated against requirements as per solicitation instructions. | ||
| 43 | General | Please specify what chemicals will be used for the eradication activities? | Glyphosate and Cosmoflux. |
| 44 | General PWS | ||
| The PWS and associated materials/tables reference the INL-A annual FHP. Are these sorties and hours maximums, minimums, or expected? Do you have an ASD by airframe for each? Are they adjusted for historical attrition or reflect expected "surge," urgent or contingency real-world tasking's, or are those in addition to the printed numbers? What is the historical UTE rate per airframe? Expected UTE rate? Or are those answers you are looking for from the selected contractor once they have responsibility for the program? | Flight hours are expected, as these are contracted and funded services. |
Yes, flight hours may adjust up or down based on requirement, but that will be adjusted via contract mod or task order.
Surge and contingency operations are conducted under limitations of existing contracted assets, to include flight hours.
Historical utilization rates are of course considered in determining annual flight hour program.
45 PWS 1.A.3.d & various throughout
Aircrew training is expected in all locations. Can we safely assume the DOS/HN supplied trainees will have already graduated from an undergraduate flying training program (already "rated" with comparable FAA/HN/Military ratings)? Will all trainees be screened for minimum medical and aptitude requirements? What will the contractor responsibilities be for QC'ing the minimum entry prerequisites to be entered into these training programs? Can you confirm the UH-1 is the preferred platform for IERW when those classes are requested? Is Patrick AFB the only location for IERW or do you expect the course to be executed in the host countries? Which ones? What is the anticipated IERW annual student through put? What is are the desired Course Training Standards (CTS) for advanced flight training and IERW syllabi? Do you have student management policies in place to govern training programs? Are the student management policies expected to be developed by the contractor? Initial Entry Rotary Wing (IERW) is not a requirement under this solicitation.
46 PWS 4.a & 4.a.4 PWS references HN training to assume the aerial eradication mission -- how many COL HN/TCN (non-contractor)AT-802 and C-208 pilots are trained and qualified? How many are current? How many are in the pipeline for training? All AT-802 pilots are contracted under this solicitation.
C-208 uses a mix of contract and HN pilots, which currently includes two Colombian National Police (CNP) pilots.
47 PWS 2.C.51 Program Maintenance Under a Firm Fixed Price Contract how is the Contractor to estimate and price unscheduled maintenance? How much unscheduled maintenance should Offerors assume? Please provide historical workload data (e.g. maintenance man hours per flying hour per aircraft) Cited reference 2.C.51 is for contract scope of performance. However, the proposal requires BOM according to L.3.5.4.3, Bill of Materials, referencing attachment J.17.
No, we will not provide historical workload data, as we seek the offerors' approach to best value.
| 48 | PWS 3.C.101.b(1) | Will DOS Air Wing provide the list of approved vendors? | No. Offeror must develop and propose this solution for consideration. See Section L.3.5.4.3. |
| 49 | General | Does the Government require a potential list of time change items? | Yes. Offeror must develop and propose this solution for consideration. See Section L.3.5.4.3. |
| 50 | PWS 3.C.102.d(1) Packing and Crating Material | Is the Government providing the packing and crating material? If not, please confirm this is an unpredictable supply. | No, not provided. |
| 51 | RFP C.3 (6) Force Protection and Security, pg 31 | Will Contractor personnel be badged directly to DOS? | Yes, where necessary those requiring official DOS badging are sponsored by USG. In most cases locally controlled access badging is controlled by the contractor. See sections H.18 and H.19. |
| 52 | RFP C.3 (6) Force Protection and Security, pg 31 | Will security providers be given access to DOS training courses and ranges? Will the prime contractor have the ability to attend DOS pre-deployment courses? | No. Propose your approach to FP training of contractors. |
| 53 | RFP C.3 (6) Force Protection and Security, pg 31 | Will communication equipment be GFE or CFE? | Depends on the proposed approach. We do offer it as GFE, however proposed CFE will be considered for its merit. |
| 54 | RFP C.3 (6) Force Protection and Security, pg 31 | Will personnel fall under the same umbrella as DOS, in ref to local laws for security providers? | See first paragraph of Section H.15 of solicitation. |
| 55 | RFP C.3 (6) Force Protection and Security, pg 31 | What support can the Contractor expect when flying to an austere Forward Operating Location (FOL)? | This is far too broad. Please consult the RFP then re-submit questions with more specificity. |
| 56 | RFP C.3 (6) Force Protection and Security, pg 31 | Who provides Forward Air Control OCONUS? (please specify by country) | This is not germane to our requirements. |
| 57 | RFP H.31 Contractor Committements, Warranties and Representations, pg.78 | Per FAR 11.5, the application of liquidated damages are not intended to be punitive or negative performance incentives and should be a reasonable forecast of just compensation for harm caused by untimely performance. Later delivery. The identification of liquidated damages in clause H.31 neither specifies a liquidated damages rate or the criteria in which the liquidated damages would be assessed. The scope of this clause is very broad, especially the statement in H.31(3) that states "any modification or affirmation or representation as to the above which is made by the Contractor in or during the course of negotiation, whether or not incorporated into a formal amendment to the proposal." Any commitments or representation made verbally during negotiations or during the course of the contract would need to be memorialized and formally included in the contract via modification. Request the Government remove this clause and address any applicability of Liquidated Damages or penalties at the task order level when criteria can be firmly defined. | No, we will not tailor the clause. |
| 58 | RFP H.31 Contractor Committements, Warranties and Representations, pg.78 | If the Government will not remove the H.31 clause, request the Government remove the statement "any modification or affirmation or representation as to the above which is made by the Contractor in or during the course of negotiation, whether or not incorporated into a formal amendment to the proposal." | No, we will not tailor the clause. |
| 59 | RFP H.31 Contractor Committements, Warranties and Representations, pg.78 | If the Government will not remove the H.31 clause. Request the Government remove the statement "Failure of the Contractor to fulfill any such commitment shall render the Contractor liable for liquidated or other damages" and replace with "Failure of the Contractor to fulfill any such commitment shall require the Contractor to deliver the commitment at Contractor expense." | No, we will not tailor the clause. |
| 60 | RFP H.31 Contractor Committements, Warranties and Representations, pg.78 | If Government can not revise the language in H.31 regarding liquidated or other damages. Please provide the specifics on how liquidated damages will be assessed and the amount of the damages? Please confirm that the Government and Contractor will discuss any liquidated or other damages and will be mutually agreeable to the amount prior to Contractor being assessed any liquidated or other damages? | No, we will not tailor the clause. |
Liquidated damages will be determined prior to issuance of TO #1.
61 RFP L.3.3.5.4.1 DOS in its PPI for Aviation Logistics Management directs an offeror to provide “…a summary explaining the specific technologies, standards, and procedures you plan to utilize in aviation inventory and distribution management for CONUS and OCONUS locations.” Is the Government’s intent for the Offer to identify three critical areas for each of the three referenced topics (specific technologies, standards, and procedures) or a total of three critical areas for the complete group? Intent is that you select the 3 most critical elements from the PWS and discuss the specific technologies, standards, and procedures you propose to best meet those selected requirements.
INL/A will evaluate the three areas deemed most critical for their relevance, and the logic and reasoning behind their selection.
| 62 | General | Will the Government provide a list of all existing export licenses associated with this effort? | Yes, during transition. |
| 63 | General | Can the Government confirm all existing equipment and technical data currently located OCONUS has been properly approved for export? | Yes, to be confirmed during transition. |
| 64 | General | How many claims has the Government made against the incumbent for damage or loss of aircraft? | There have been no claims for loss or damage of aircraft however, numerous LDD actions for components or equipment are normal. |
| 65 | RFP/C.1 | We were unable to discern from our review of PWS C.1 a clear understanding of the Rules of Engagement – more specific, when they apply and the degree they apply. |
In what instances do the Rules of Engagement apply and to what degree?
| See PWS, 1.A.2.e for ROE. | |||
| 66 | RFP C.3 (6) Force Protection and Security, pg 31 | Who (or which positions) under this contract would be considered Mission Essential and be required to stay in the event DOS operations go to minimum essential manning status or the departure of all voluntary and non-essential personnel is announced? | Such determinations will be made by contractor and USG jointly, ahead of time in developing the Emergency Action Plan (EAP). |
| 67 | RFP C.3 (6) Force Protection and Security, pg 31 | 8.C.28.a states: Ensure "preventive measures" are taken to mitigate hostile actions in areas of operation, to include but not limited to MOB's FOL's, airfields, etc. for the safeguard of personnel, resources, facilities, and critical information. What are acceptable preventative measures? | Offeror must determine acceptable preventative measures capable of meeting AQL specified in the PWS. |
| 68 | RFP C.3 (6) Force Protection and Security, pg 31 | If a location is deemed unsecure by core functions or intelligence officers within the contract, what are the procedures for the Contractor to raise concern to the Government? | Offeror must determine acceptable communication plans capable of meeting AQL specified in the PWS. |
| 69 | RFP C.3 (6) Force Protection and Security, pg 31 | Please clarify the level of security and support required at the Main Operating Base at each location? | Offeror must determine acceptable level of security and support in order to meet AQL specified in the PWS. |
| 70 | RFP C.3 (6) Force Protection and Security, pg 31 | Please identify the MOBs, FOBs and FOLs in each county? | They are listed in the General Requirements (A.) in sections 3-10 of the PWS, specific to each country. |
| 71 | RFP C.3 (6) Force Protection and Security, pg 31 | For each county, please identify the maximum number of sites that will be operated at one time? | They are listed in the General Requirements (A.) in sections 3-10 of the PWS, specific to each country. |
However, there is no maximum (see contingency, surge, etc).
| 72 | RFP C.3 (6) Force Protection and Security, pg 31 | Indicates "The host nation normally provides physical security of facilities and personnel at forward operating locations (FOL's). The Contractor is primarily responsible for security of contractor personnel to include security training, briefings, etc..." Please provide specifics as to who is provide security in Iraq, Afghanistan and Pakistan? Is this local country police/military, US Embassy security, US military etc...) | Plan and propose as necessary to meet AQL specified in C.28 of sections 7,8, and 10 of the PWS. |
| 73 | RFP C.3 (6) Force Protection and Security, pg 31 | Given the dynamic nature of the security situation in country, would the Government consider making the force protection an unpredictable supply? | Contract modifications or Task Orders will accommodate such unpredictability. Plan and propose against data provided in this RFP. |
| 74 | RFP C.3 (6) Force Protection and Security, pg 31 | Indicates "The host nation normally provides physical security of facilities and personnel at forward operating locations (FOL's). The Contractor is primarily responsible for security of contractor personnel to include security training, briefings, etc..." Should the Contractor include pricing for Contractor provided security in Iraq, Afghanistan and Pakistan in the proposal? Where should this be proposed? | Afghanistan only, as required in 8.C.28 (a) of PWS. |
| 75 | RFP C.3 (6) Force Protection and Security, pg 31 | Please confirm that Contractor personnel will be embedded with Dept. of State personnel in OCONUS locations. | They are listed in the General Requirements (A.) in sections 3-10 of the PWS, specific to each country. |
| 76 | RFP C.3 (6) Force Protection and Security, pg 31 | If yes, please identify the locations where US Contractor personnel (US Expats) are embedded with DOS personnel. | They are listed in the General Requirements (A.) in sections 3-10 of the PWS, specific to each country. |
See Attachment J.6.3 for facilities provided.
| 77 | RFP C.3 (6) Force Protection and Security, pg 31 | Will Contractor be required to use a Commercially run Replacement Center or Deployment Center? | Not required, however, your approach will be considered for best value. |
| 78 | RFP C.3 (6) Force Protection and Security, pg 31 | Please provide an estimate by country of the number of VIP missions that will occur annually? | Not relevant, as such will be conducted with existing assets and within established country flight hour program |
| 79 | RFP C.3 (6) Force Protection and Security, pg 31 | When Contractor arrives in OCONUS countries such as Iraq, Afghanistan and Pakistan, how will Contractor personnel be transported from the airport to the facility? | Dependent on your approach to meeting AQL cited in the PWS. |
| 80 | RFP H.1 Ground and Flight Risk, pg.54 | Please confirm that all aircraft identified in Attachment J.21 covered under the Ground and Flight Risk Clause? | Yes, confirmed. |
| 81 | PWS (2.C.102.a(1)) | ||
| The PWS (2.C.102.a(1)) requires the Logistics Management Plan "Draft" to be submitted within 120 days from contract award for COR review. Question - Is there a time frame for submittal of the Quality Assurance Plan? | Quality Assurance plan will be submitted according to contractors' phase-in plan during transition phase, to meet AQL of 2.C.44 of the PWS. | ||
| 82 | 3.5.4.3 | ||
| This attachment ties to section 3.5.4.3 of the RFP where we are required to provide a BOM for scheduled maintenance of the listed aircraft. This attachment only provides data for three aircraft platforms, will the remaining platforms be posted to the technical library? | No. 3.5.4.3 is specific to aircraft and information identified in Attachment J.17. The BOM is for proposal evaluation purposes. |
The balance of data will be provided during transition phase.
| 83 | General |
| Due to the cancellation of the previous pillar aviation opportunities (Flight Ops, Logistics, and Maintenance) and release of an entirely new combined solicitation, we request the following: |
1. An industry day so that industry can understand the government reason for this dramatic change
2. A networking event for small business and large business to reformulate teams due to the dramatic changes in requirements
3. An extension of at least 4 months so that industry can properly prepare for what is a very large proposal response
| An industry/networking event is not planned for this solicitation. An extension of 30 days will be granted based upon input. Therefore proposals will be due October 2, 2014. | |||
| 84 | Attachment J.1 Task Order 1 (20) | Please confirm aviation products liability insurance is an unpredictable supply with respect to Sample Task 1 pricing | All Insurance costs should be priced. |
| 85 | Attachment J.1 Sample Task Order | Sample Task Order instructs offeror to price each item of the PWS in the Sample Task 1 price. Will the Government confirm the full price for the transition of the MIS to a new system should be included in the Sample Task in Table 9? This includes the price for licenses, installation of the system, migration of data to the new system and testing. | Yes, price the transition of the MIS in the Sample Task, Table 9. |
| 86 | Attachment J.1 Sample Task Order | Is it the Government's intent for contractors to price the MIS replacement for the AWIS system? If so, please confirm that the full price for the transition of the MIS to a new system should be included in the Sample Task in Table 9, including licenses, installation of the system, migration of data to the new system and testing. | Yes, price the transition of the MIS in the Sample Task, Table 9. |
| 87 | 2.C.45.a | Is there a documented INL/A Safety Manual, If so is it availble for review? | Yes. Attachment J.4. |
| 88 | General | ||
| Will the Government indemnify the Contractor for actions or inactions outside of the contractor control (i.e. fuel spills) | No, DOS cannot indemnify the Contractor. | ||
| 89 | General | Will the Government allow Contractor to bid future Firm Fixed Price Task Orders, in accordance with the Contractor's Government approved estimating system using most current indirect rates, cost and profit and not using the Fixed Fully Loaded Labor Rates. | No, the rates proposed in pricing tables (J.5) will apply to orders issued under this IDIQ contract. |
| 90 | General | Does completion of the sample task order occur upon completion of the flying hours identified in Attachment J.21 or at the end of the period of performance and delivery of associated reports? | Completion is based on the 12 month performance period. |
| 91 | General | ||
| If the flight hours identified in Attachment J.21 are exceeded prior to the end of the period of performance, will the Government modify the task order for additional flying hours? | Yes. | ||
| 92 | General | ||
| Given potential changing dynamics of the mission, potential operations in new countries, and other potential new non-counter-narcotics mission taskings for the Air Wing, would the Government consider changing the sample task to a Cost Plus Fixed Fee? | No. | ||
| 93 | General | Can the Contractor price PWS CLINs as Not Separately Priced (NSP)? | Yes. |
| 94 | General | ||
| Will the Government provide the technical data package (TDP) for all aircraft after award? | Yes. | ||
| 95 | General | Please confirm that acceptable quality levels, and performance standards will be defined upon release of each CPFF TORP and are not included as performance standards in the current PWS? | Confirmed; such will be included as part of subsequent, separate task orders. |
| 96 | General | The Government has provided estimated workload data in the PWS, please confirm that should that estimate workload data change, the Contractor will be entitled to an equitable adjustment to the task order price. | Yes, confirmed provided increase work exceeds contracted capacity. |
| 97 | RFP, G.4.2 Task Order Request for Proposal (TORP), page 41 | Will the Government accept a Contractor proposed CLIN structure for the sample task? If not, please provide. | Yes. |
| 98 | RFP, G.5.2 Expanded Invoice Instructions, pg. 47 | Many companies utilize an electronic web based timekeeping system that interfaces directly with the companies internal systems and do not utilize paper timecards. Will the USG allow electronic timesheets which contain an employee's specific ID to be used in lieu of a paper timecard with signature to support invoicing requirements? | Yes, as long as this is in conformance with your business practices. |
| 99 | RFP, H.1 Ground and Flight Risk, pg 54 | The GFR has a requirement that “Contractor’s Premises” be designated in the “Schedule” or in writing by the CO. Will the DOS sites be considered “Contractor’s premises” for purposes of the GFR clause? This is important since the GFR applies to Contractor’s premises. | It's both government's facilities and any contractor or subcontractor. |
| 100 | RFP, H.1 Ground and Flight Risk, pg 54 | The protection under the GFR does not extend to any aircraft that is transported by “rail or by conveyance on public streets, highways or waterways”. Will any of the aircraft be transported in this manner? If so, please confirm that Government assumes risk of loss. | Yes we have transported via public streeets, highways or waterways. Depends on proposed method of transportation or if the government provides transportation. Government does self-insure. |
| 101 | RFP, H.1 Ground and Flight Risk, pg 54 | Clause ‘g’ of the GFR states that extension of this clause to subcontractors requires Contracting Officer written approval but clause ‘m’ requires that the clause be incorporated into all subcontracts. Does flow down of the GFR to subcontractors require Contracting Officer written approval? | No. |
| 102 | RFP, H.9 Laws and Regulations, Pg 63 | Please confirm that the more stringent requirements are only applicable to local labor laws AND not applicable to various OSHA standards given the austere working conditions. | Comply with H.9. If there is a conflict between HN and U.S. standards the Contractor shall promptly advise the CO of the conflict and of the Contractor's proposed course of action for resolution by the CO. |
| 103 | RFP, H.9 Laws and Regulations, Pg 63 | Please confirm that all required safety equipment to meet OSHA standards will be provided by the USG AND should be defined as an unpredictable supply (i.e. not priced in our proposal at this time). | All safety equipment shall be provided during transition. Contractor's approach to maintaining and upgrading supplies shall be priced IAW approach. |
| 104 | RFP, L.2.3, FAR 52.234-3 Notice of Earned Value Management System | Is EVMS required for the IDIQ or only applicable at the task order and will be specified in the Task Order RFPs? | EVMS will be applicable to each task order issued against the IDIQ contract. |
| 105 | RFP/B.6 (K) | “(2) The contractor shall be responsible for obtaining any visas required for travel to foreign countries under this contract.”Reports suggest an exceptionally lengthy time for obtaining approved work visas for contractor employees to access Iraq, Afghanistan, and Pakistan – often exceeding six months from submittal to approval. |
Will DOS intervene and assist in expediting approvals for work visas in such countries as Iraq, Afghanistan and Pakistan?
| No, it is the contractor's requirement. | ||||
| 106 | RFP H.13.2; L.7.3.2 | The Instructions for Pricing Tables suggest Offerors include proposed internal labor categories. If the internal labor categories are position titles for key personnel that differ from those provided Section H.13.2, would the Government prefer we use Offeror-generated titles within our technical proposal or those titles listed in H.13.2? | Yes, offerors may add additional labor categories to support their approach (L.3.7.2). Also, they are not required to use all labor categories in J.11 for pricing the sample task order. | |
| 107 | RFP, Section 3.5.4. 2 Factor 2: Logistical Support to Air Wing Operations, pg 149 | Please advise on if/where referenced AQLs are posted in the solicitation and what constitutes an acceptable level of performance. “Identify the three (3) most critical areas of Facilities Management. Explain how you would successfully manage each of these to ensure acceptable quality levels (AQL) cited in the PWS.” | For AQL see attachment J.1.1, PWS. Specifically read sections 2-10, paragraphs C.3.103b. | |
| 108 | PWS Section: 2.C.40.a, Phase-in Planning and Execution | Will Transition Teammembers be required to to have a MRPT in place prior to accessing AWIS? | Yes. | |
| 109 | PWS 2.C.43.a Enterprise MIS Transition states "Support the existing MIS until transitition is complete." | Does "exisiting MIS" in this context indicate the AWIS system? | Yes. | |
| 110 | J.5_Pricing_Tables_1_throudh_10.xls, tab '5. Fixed Labor Rates' | Row 189, labor category Quality Assurance Specialist has the Transition Period CONUS cell shaded in gray, but all others periods (CONUS and OCONUS) for this title are not shaded. Are we to provide a rate for this cell (D189)? | No. The intent of the gray cells was to provide a visual que for rates that are not required. | |
| 111 | RFP Section 3.7.2 Price Proposal Instructions, Item 5) | RFP Section 3.7.2 Price Proposal Instructions, Item 5) states "Offerors shall not add, delete, or otherwise alter the existing format or content in Pricing Tables 1-10." | ||
| Attachment J.5_Pricing_Tables_1_through_10, tab '6. IDIQ Prices', row 329. The Grand Total Proposed Price line is only subtotaling the costs for ODCs/Materials. Is this formula correct, or are offerors to revise calculation to include the subtotals for labor, or is the Government going to provide a revised Attachment J.5? | Confirmed. A revised J.5 will be provided via a pending amendment. | |||
| 112 | J.5_Pricing_Tables_1_throudh_10.xls, tab '10 | J.5_Pricing_Tables_1_throudh_10.xls, tab '10. Overall Price' | ||
| In Pricing Table 10, are offerors to provide Grand Total Proposed Price by contract period or just total contract? | Tab 10 should include the sum of Tabs 6 and 9. A single total. | |||
| 113 | J.5 Pricing Table 1 through 10, Sheet 5 | Labor categories (Training Specialist, Data Entry Clerk, Quality Assurance Specialist and Safety Specialist) are listed more than once in Table 5. Please clarify if this was intentional and if so, what distinction should be made between the multiple entries aside from one CONUS and one OCONUS rate. | Confirmed. A revised J.5 will be provided via a pending amendment. | |
| 114 | J.5 Pricing Table 1 through 10, Sheet 5 and Sheet 6 | While offereors are required to ensure the proper linking of formulas for cells pulling data from Table 5 to Table 6, there are numerous rows within Table 6 that are pulling from either the wrong category in Table 5 or are pulling from a cell in Table 5 that is blank. The disconnect begins in row 69 and extends to the bottom of the sheet. Please determine if the offereor shall correct the formulas in Table 6 or if a new version will be provided. | Confirmed. A revised J.5 will be provided via a pending amendment. | |
| 115 | J.5 Pricing Table 1 through 10, Sheet 5 and Sheet 6 | There are certain labor categories that are listed in Table 6 but are not listed in Table 5. These categories need to be included in Table 5 in order to apply the rate to the hours given. The categories include "Program Mgr. (PM) Operations", "Country Site Manager", "FOL Site Manger", and "Manager, Country." Please clarify which labor category(s) within Table 5 that these would be matched with. | Confirmed. A revised J.5 will be provided via a pending amendment. | |
| 116 | J.5 Pricing Table 1 through 10, Sheet 5 and Sheet 6 | There is at least one category (Operations Manager) that is included in Table 5 but does not have any hours to apply in Table 6. Please confirm this was intentional. | Confirmed. A revised J.5 will be provided via a pending amendment. | |
| 117 | J.5 Pricing Table 1 through 10, Sheet 5 and Sheet 6 | In the draft Maintenance RFP the CLIN was provided for every labor category; however in the final RFP they have been removed. Will the sheets be updated to include the CLIN or is the offeror supposed to bid its own CLIN structure? | Confirmed. A revised J.5 will be provided via a pending amendment. | |
| 118 | J.5 Pricing Table 1 through 10, Sheet 5 and Sheet 6 | Tab 5 Fixed Labor Rates has the labor category SME 1 and SME 2, however those labor categories did not appear on Attachment J.11. Will the USG provide a job description or eliminate the labor category? | Confirmed. A revised J.5 and J.11 will be provided via a pending amendment. | |
| 119 | Attachment J.5 Pricing Tables 1 through 10, Table 5 Fixed Labor Rates. | The following labor categories are omitted from Table 5 for Fixed Labor Rates, but are listed in Table 6 for IDIQ Prices. Is this an oversight on behalf of the Government? Categories: Country Site Manager, FOL Site Manager, Prog Mgr Dep (DPM) Operations, Prog Mgr (PM) Operations, Computer Specialist, Data Entry Technician, Logistics Analyst, Manager Country, Quality Control Manager. | Confirmed. A revised J.5 will be provided via a pending amendment. |