Sample-Cost-Proposal-1-For-Contracts-with-Cost-Plus-Fixed-Fee-or-Lump-Sum.pdf

PDF 2 MB Posted

Attached to
San Rafael Bridge Seismic Retrofit (BHLS-5064(101))
Solicitation number
2024-RFP-0637
Issued by
Los Angeles County, California

About this file

This document is a Sample Cost Proposal template for design, engineering, and environmental studies contracts, likely used by Caltrans or another state transportation agency. The template provides a standardized format for consultants to submit cost proposals, with sections for direct labor, indirect costs, fixed fees, and other direct costs. The sample demonstrates a five-year contract calculation method, showing how to estimate labor costs with a 2% annual escalation, and includes detailed worksheets for calculating anticipated salary increases across the contract duration.

The cost proposal includes comprehensive cost breakdowns with specific methodologies for calculating labor rates, estimated hours per year, and total costs with escalation. The template emphasizes compliance with various federal regulations, including Generally Accepted Accounting Principles (GAAP), Title 23 United States Code, and specific Code of Federal Regulations parts related to contract cost principles. A certification section requires an executive-level financial officer to verify that all direct costs are actual, reasonable, allowable, and allocable to the contract, with a warning that noncompliant costs are not eligible for reimbursement.

View the file

Other files

File Type Posted
San_Rafael_Bridge_Seismic_Retrofit_(BHLS-5064(101))_(Addendum_#1_Revision).pdf PDF
Federal_Wage_Determinations_-_02.21.25.pdf PDF
17F_-_Final_Report-Utilization_of_DBE_and_First-Tier_Subcontractors.pdf PDF
Form-W-9.pdf PDF
10-O2-Consultant-Contract-DBE-Commitment.pdf PDF
15H_-_Proposer_Good_Faith_Efforts.pdf PDF
10-O1-Consultant-Proposal-DBE-Commitment.pdf PDF
10-I-Notice_To_Proposers_DBE_Information_-_San_Rafael.pdf PDF
ca-safe-harbor-rate-form.pdf PDF
IG_Certification_Indirect_Costs_Financial_Management_System_v2.pdf PDF
Debarment_and_Suspension_Certification.pdf PDF
Unique_Entity_ID_(SAM).pdf PDF
10Q_-_Disclosure_of_Lobbying_Activities.pdf PDF
Sample-Cost-Proposal-1-For-Contracts-with-Cost-Plus-Fixed-Fee-or-Lump-Sum.pdf PDF
Insurance_Requirements_-_Professional_Services_(San_Rafael_Bridge_Seismic_Retrofit_Design)_2021.1.pdf PDF
Master_Services_Contract.pdf PDF
PROOF_OF_AUTHORITY.pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Title_VI_Assurances.pdf PDF
Consultant_Listing_and_Proposer_Certification.pdf PDF
IG_FDR_Request_Form.pdf PDF
Civil_Litigation_History_Certification.pdf PDF
Federal_Required_Certification.pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
Public_Contract_Code_Disclosures.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
As-built.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 1

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS

(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)

Note: Mark-ups are Not Allowed ☐ Prime Consultant ☐ Subconsultant ☐ 2nd Tier Subconsultant

Consultant __________________________________________________________

Project No. _______________________ Contract No. ____________________ Date ____________________

DIRECT LABOR

Classification/Title Name Hours Actual Hourly Rate Total

LABOR COSTS

a) Subtotal Direct Labor Costs _______________

b) Anticipated Salary Increases (see page 2 for calculation) _______________

c) TOTAL DIRECT LABOR COSTS [(a) + (b)] _______________

INDIRECT COSTS

d) Fringe Benefits (Rate: _____ ) e) Total Fringe Benefits [(c) x (d)] _______________

f) Overhead (Rate: _____ ) g) Overhead [(c) x (f)] _______________

h) General and Administrative (Rate: ___ __ ) i) Gen & Admin [(c) x (h)] _______________

j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] _______________

FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee ______ ] ______________

Description of Item Quantity Unit Unit Cost Total

l) TOTAL OTHER DIRECT COSTS

m) SUBCONSULTANTS’ COSTS (Add additi

l) CONSULTANT’S OTHER DIRECT COSTS (ODC) – ITEMIZE (Add additional pages if necessary) onal pages if necessary) Subconsultant 1:

Subconsultant 2:

Subconsultant 3:

Subconsultant 4:

m) TOTAL SUBCONSULTANTS’ COSTS

n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l)+(m)] ___________________

TOTAL COST [(c) + (j) + (k) + (n)] _____________________

NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.

3. Anticipated salary increases calculation (page 2) must accompany.

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 1

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS

(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)

1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)

Direct Labor Total Hours per Avg 5Year Subtotal per Cost Cost Proposal Hourly Contract

Proposal Rate Duration

=$250,000.00 500 $50.00 Year 1 Avg Hourly Rate

2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation%)

Avg Hourly Rate Proposed Escalation

Year 1 $50.00 + 2% = $51.00 Year 2 Avg Hourly Rate Year 2 $51.00 + 2% = $52.02 Year 3 Avg Hourly Rate Year 3 $52.02 + 2% = $53.06 Year 4 Avg Hourly Rate Year 4 $53.06 + 2% = $54.12 Year 5 Avg Hourly Rate

3. Calculate estimated hours per year (Multiply estimate% each year by total hours)

Estimated % Completed Total Hours per Cost Total Hours per Each Year Proposal Year

Year 1 20.0% 5000 = 1000 Estimated Hours Year 1 Year 2 400% 5000 = 2000 Estimated Hours Year 2 Year 3 15.0% 5000 = 750 Estimated Hours Year 3 Year 4 15.0% 5000 = 750 Estimated Hours Year 4 Years 100% 5000 = 500 Estimated Hours Year 5

Total 100% Total = 5000

4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)

Avg Hourly Rate Estimated hours Cost per (calculated above) (calculated above) Year

Year 1 $50.00 1000 $50,000.00 Estimated Hours Year 1 = Year 2 $51.00 2000 $102,000.00 Estimated Hours Year 2 = Year 3 $52.02 750 $39,015.00 Estimated Hours Year 3 = Year 4 $53.06 750 $39,795.30 Estimated Hours Year 4 = Years $54.12 500 = $27,060.80 Estimated Hours Year 5

Total Direct Labor Cost with Escalation $257,871.10= Direct Labor Subtotal before Escalation = $250,000.00

Estimated total of Direct Labor Salary Transfer to Page 1 = Increase $7,871.10

NOTES:

1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the# of years of the contract, and a breakdown of the labor to be performed each year.

2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the# of years is not acceptable.

(i e. $250,000 x 2% x 5 yrs= $25,000 is not an acceptable methodology)

3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.

4. Calculations for anticipated salary escalation must be provided.

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 1

Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

1. Generally Accepted Accounting Principles {GAAP)

2. Terms and conditions of the contract

3. Title 23 United States Code Section 112 - Letting of Contracts

4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and

Administration of Engineering and Design Related Service

6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board {when applicable)

All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate{s).

Prime Consultant or Subconsultant Certifying:

Name:_______________ Title*:

Signature:_ _ _ _ __ _ __ __ Date of Certification {mm/dd/yyyy): _____

_______ Phone Number:Email: ______ _ _

Address:_________________________________

*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providinq under the proposed contract:

RF:
C1:
D1:
DLN3:
DLN4:
DLH4:
DLAHR4:
DLT4: 0
a: 0
b:
c: 0
h:
i: 0
k: 0
U2:
Q4:
U4:
SC33:
SC44:
m: 0
n: 0
TC: 0
PC: Off
Sc: Off
2TS: Off
CN:
H1PN:
DLCT1:
DLCT2:
DLCT3:
DLCT4:
DLN1:
DLN2:
DLH1:
DLH2:
DLH3:
DLAHR1:
DLAHR2:
DLAHR3:
DLT1: 0
DLT2: 0
DLT3: 0
e: 0
l: 0
SC11:
SC1:
SC22:
SC2:
d:
f:
g: 0
j: 0
FFR:
I1: Mileage Costs
Q1:
U1:
UC1:
H1T1: 0
I2: Equipment Rental and Supplies
Q2:
UC2:
H1T2: 0
I3: Permit Fees
Q3:
U3:
UC3:
H1T3: 0
I4: Plan Sheets
UC4:
H1T4: 0
I5: Test
Q5:
U5:
UC5:
H1T5: 0
SC3:
SC4:
N1:
T1: 0
DOC:
Email:
PN:
Addr:
LS:

File details come from the government source that posted it. Updated .