This document is a sample cost proposal template for cost-plus-fixed fee, lump sum, or firm fixed price contracts, specifically for design, engineering, and environmental studies projects. The template provides a comprehensive framework for consultants to document labor costs, indirect costs, fixed fees, and other direct costs for a hypothetical 5-year contract. The sample demonstrates how to calculate direct labor costs, anticipated salary increases, and total project expenses using a 2% annual escalation rate, with a total direct labor subtotal of $250,000 and an estimated total direct labor cost with escalation of $257,871.10.
The cost proposal template includes detailed calculations for hourly rates, estimated hours per year, and total costs, with specific guidelines for applying costs consistently across contracts. The document emphasizes compliance with various federal regulations, including Generally Accepted Accounting Principles (GAAP), Title 23 United States Code Section 112, and multiple Code of Federal Regulations parts related to contract cost principles. A certification section requires an executive or financial officer to verify that all direct costs are actual, reasonable, allowable, and allocable to the contract, with a warning that noncompliant costs are not eligible for reimbursement.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I
SAMPLE COST PROPOSAL
Sample Only - Required Cost Proposal Template To Be Determined By Agency
SAMPLE COST PROPOSAL 1
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark-ups are Not Allowed ☐ Prime Consultant ☐ Subconsultant ☐ 2nd Tier Subconsultant
Consultant __________________________________________________________
Project No. _______________________ Contract No. ____________________ Date ____________________
DIRECT LABOR
Classification/Title Name Hours Actual Hourly Rate Total
LABOR COSTS
a) Subtotal Direct Labor Costs _______________
b) Anticipated Salary Increases (see page 2 for calculation) _______________
c) TOTAL DIRECT LABOR COSTS [(a) + (b)] _______________
INDIRECT COSTS
d) Fringe Benefits (Rate: _____ ) e) Total Fringe Benefits [(c) x (d)] _______________
f) Overhead (Rate: _____ ) g) Overhead [(c) x (f)] _______________
h) General and Administrative (Rate: ___ __ ) i) Gen & Admin [(c) x (h)] _______________
j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] _______________
FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee ______ ] ______________
Description of Item Quantity Unit Unit Cost Total
l) TOTAL OTHER DIRECT COSTS
m) SUBCONSULTANTS’ COSTS (Add additi
l) CONSULTANT’S OTHER DIRECT COSTS (ODC) – ITEMIZE (Add additional pages if necessary) onal pages if necessary) Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
m) TOTAL SUBCONSULTANTS’ COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l)+(m)] ___________________
TOTAL COST [(c) + (j) + (k) + (n)] _____________________
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.
3. Anticipated salary increases calculation (page 2) must accompany.
Sample Only - Required Cost Proposal Template To Be Determined By Agency
SAMPLE COST PROPOSAL 1
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS
(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)
Direct Labor Total Hours per Avg 5Year Subtotal per Cost Cost Proposal Hourly Contract
Proposal Rate Duration
=$250,000.00 500 $50.00 Year 1 Avg Hourly Rate
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation%)
Avg Hourly Rate Proposed Escalation
Year 1 $50.00 + 2% = $51.00 Year 2 Avg Hourly Rate Year 2 $51.00 + 2% = $52.02 Year 3 Avg Hourly Rate Year 3 $52.02 + 2% = $53.06 Year 4 Avg Hourly Rate Year 4 $53.06 + 2% = $54.12 Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate% each year by total hours)
Estimated % Completed Total Hours per Cost Total Hours per Each Year Proposal Year
Year 1 20.0% 5000 = 1000 Estimated Hours Year 1 Year 2 400% 5000 = 2000 Estimated Hours Year 2 Year 3 15.0% 5000 = 750 Estimated Hours Year 3 Year 4 15.0% 5000 = 750 Estimated Hours Year 4 Years 100% 5000 = 500 Estimated Hours Year 5
Total 100% Total = 5000
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)
Avg Hourly Rate Estimated hours Cost per (calculated above) (calculated above) Year
Year 1 $50.00 1000 $50,000.00 Estimated Hours Year 1 = Year 2 $51.00 2000 $102,000.00 Estimated Hours Year 2 = Year 3 $52.02 750 $39,015.00 Estimated Hours Year 3 = Year 4 $53.06 750 $39,795.30 Estimated Hours Year 4 = Years $54.12 500 = $27,060.80 Estimated Hours Year 5
Total Direct Labor Cost with Escalation $257,871.10= Direct Labor Subtotal before Escalation = $250,000.00
Estimated total of Direct Labor Salary Transfer to Page 1 = Increase $7,871.10
NOTES:
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the# of years of the contract, and a breakdown of the labor to be performed each year.
2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the# of years is not acceptable.
(i e. $250,000 x 2% x 5 yrs= $25,000 is not an acceptable methodology)
3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.
4. Calculations for anticipated salary escalation must be provided.
Sample Only - Required Cost Proposal Template To Be Determined By Agency
SAMPLE COST PROPOSAL 1
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles {GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and
Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board {when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.
Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate{s).
Prime Consultant or Subconsultant Certifying:
Name:_______________ Title*:
Signature:_ _ _ _ __ _ __ __ Date of Certification {mm/dd/yyyy): _____
_______ Phone Number:Email: ______ _ _
Address:_________________________________
*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providinq under the proposed contract:
| RF: |
| C1: |
| D1: |
| DLN3: |
| DLN4: |
| DLH4: |
| DLAHR4: |
| DLT4: 0 |
| a: 0 |
| b: |
| c: 0 |
| h: |
| i: 0 |
| k: 0 |
| U2: |
| Q4: |
| U4: |
| SC33: |
| SC44: |
| m: 0 |
| n: 0 |
| TC: 0 |
| PC: Off |
| Sc: Off |
| 2TS: Off |
| CN: |
| H1PN: |
| DLCT1: |
| DLCT2: |
| DLCT3: |
| DLCT4: |
| DLN1: |
| DLN2: |
| DLH1: |
| DLH2: |
| DLH3: |
| DLAHR1: |
| DLAHR2: |
| DLAHR3: |
| DLT1: 0 |
| DLT2: 0 |
| DLT3: 0 |
| e: 0 |
| l: 0 |
| SC11: |
| SC1: |
| SC22: |
| SC2: |
| d: |
| f: |
| g: 0 |
| j: 0 |
| FFR: |
| I1: Mileage Costs |
| Q1: |
| U1: |
| UC1: |
| H1T1: 0 |
| I2: Equipment Rental and Supplies |
| Q2: |
| UC2: |
| H1T2: 0 |
| I3: Permit Fees |
| Q3: |
| U3: |
| UC3: |
| H1T3: 0 |
| I4: Plan Sheets |
| UC4: |
| H1T4: 0 |
| I5: Test |
| Q5: |
| U5: |
| UC5: |
| H1T5: 0 |
| SC3: |
| SC4: |
| N1: |
| T1: 0 |
| DOC: |
| Email: |
| PN: |
| Addr: |
| LS: |
File details come from the government source that posted it. Updated .