Sample Cost estimate worksheet (3) (8-8-2022).xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Y1FE--36C78622R0020 | Georgia NC; Expansion Ph 2 Construction 922CM3006 (VA-21-00103342)
- Solicitation number
- 36C78622R0020
About this file
This cost estimate worksheet template provides a framework for estimating construction costs for a national cemetery expansion project. The template includes line items for site work and all building systems divided into 16 construction divisions. General requirements, sitework, concrete, masonry, metals, woods and plastics, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and transportation are accounted for at the division level with unit costs, quantities, and total costs to be provided by the offeror. Overhead, profit, bonding, and total estimated construction costs are also included at the bottom.
The related federal contract opportunity is a solicitation from the Department of Veterans Affairs National Cemetery Administration to construct expansion phase two at the Georgia National Cemetery. The project involves building approximately 6,624 pre-placed double-depth crypts, 362 oversized crypts, 294 traditional gravesites, 6,944 in-ground cremation sites, and 7,300 columbarium niches along with associated site and infrastructure work. Responses are due based on the listed solicitation number and opportunity details provided.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Description | Unit | Cost/Unit | # Units | Total Cost | Remarks |
| Offeror shall use and edit this document to fit the Project | |||||
| Division 01 - General Requirements | |||||
| $0.00 | 0 | $0.00 | |||
| $0.00 | 0 | $0.00 | |||
| $0.00 | 0 | $0.00 | |||
| $0.00 | 0 | $0.00 | |||
| $0.00 | 0 | $0.00 |
| Division 02 - Existing Conditions | |||
| $0.00 | 0 | $0.00 |
| Division 03 - Concrete | |||
| $0.00 | 0 | $0.00 | |
| $0.00 | 0 | $0.00 |
| Division 04 - Masonry | |||
| $0.00 | 0 | $0.00 | |
| $0.00 | 0 | $0.00 | |
| Division 05 - Metals | |||
| $0.00 | 0 | $0.00 |
| Division 06 - Wood, Plastics, and Composites | |||
| $0.00 | 0 | $0.00 |
| Division 07 -Thermal & Moisture Protection | |||
| $0.00 | 0 | $0.00 |
| Division 08 - Openings | |||
| $0.00 | 0 | $0.00 |
| Division 09 - Finishes | |||
| $0.00 | 0 | $0.00 |
| Division 10 - Specialties | |||
| $0.00 | 0 | $0.00 |
| Division 11 - Equipment | |||
| $0.00 | 0 | $0.00 |
| Division 12 - Furnishings | |||
| $0.00 | 0 | $0.00 |
| Division 13 - Special Construction | |||
| $0.00 | 0 | $0.00 |
| Division 14 - Conveying Equipment | |||
| $0.00 | 0 | $0.00 |
| Division 21 - Fire Suppression | |||
| $0.00 | 0 | $0.00 |
| Division 22 - Plumbing | |||
| $0.00 | 0 | $0.00 |
| Division 23 - HVAC | |||
| $0.00 | 0 | $0.00 |
| Division 25 - Intergrated Automation | |||
| $0.00 | 0 | $0.00 |
| Division 26 - Electrical | |||
| $0.00 | 0 | $0.00 |
| Division 27 - Communications | |||
| $0.00 | 0 | $0.00 |
| Division 28 - Electronic Safety and Security | |||
| $0.00 | 0 | $0.00 |
| Division 31 - Earthwork | |||
| $0.00 | 0 | $0.00 |
| Division 32 - Exterior Improvements | |||
| $0.00 | 0 | $0.00 |
| Division 33 - Utilities | |||
| $0.00 | 0 | $0.00 |
| Division 34 - Transportation | |||
| $0.00 | 0 | $0.00 |
| General Construction Subtotal | $0.00 |
| Mechanical, Electrical, Plumbing Subtotal | $0.00 |
Total Base Construction Cost $0.00
| Overhead | 0% | $0.00 |
| Profit | 0% | $0.00 |
| Bonding (If applicable) | 0% | $0.00 |
Total Estimated Construction Cost $0.00
&8B & J Multi Services
| Relace Water Main | &"Arial,Bold"Estimated Construction |
| Cost Worksheet | &8VA-528-07-RP-0135 |
Project # 528A8-04-808
File details come from the government source that posted it. Updated .