Sample Cost estimate worksheet (2) (8-8-2022).xlsx
XLSX spreadsheet 306 KB Posted
- Attached to
- Y1FE--36C78622R0020 | Georgia NC; Expansion Ph 2 Construction 922CM3006 (VA-21-00103342)
- Solicitation number
- 36C78622R0020
About this file
This is a cost estimate worksheet for the Georgia National Cemetery Gravesite Improvements project in Cherokee County, Georgia. The project includes constructing approximately 6,624 pre-placed double-depth crypts in 3'x8' plots, 362 oversized preplaced double-depth crypts in 5'x10' plots, 294 traditional full casket gravesites in 5'x10' plots, 6,944 in-ground cremation sites in 4'x4' plots, and 7,300 columbarium niches. The project also requires associated site and infrastructure work. The cost estimate provides unit costs and extended costs for various line items including sitework, buildings, utilities, and landscaping. It includes costs for proposed alternates such as an administration and maintenance building, public information center building, facility condition assessment improvements, additional columbarium, and service emblem replacement. The Department of Veterans Affairs National Cemetery Administration is the agency for the Georgia National Cemetery expansion project.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
Georgia National Cemetery Gravesite Improvements
Cherokee County, GA
BID DOCUMENTS COST ESTIMATE
PROJECT SUMMARY
ELEMENT TOTAL COST
01. SITEWORK $0
TOTAL CONSTRUCTION COST $0
CRYPT PURCHASE
01. ADD ALT A - ADMIN AND MAINTENANCE BUILDING $0
02. ADD ALT B - PIC BUILDING $0
03. ADD ALT C - FCA IMPROVEMENTS $0
04. ADD ALT D -COLUMBARIUM D $0
05. ADD ALT E - SERVICE EMBLEM REPLACEMENT $0
TOTAL CONSTRUCTION COST (INCLUDING ALTERNATES) $0
Georgia National Cemetery Gravesite Improvements
Cherokee County, GA
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
DETAILED PROJECT SUMMARY
ELEMENT TOTAL COST
01. SITEWORK $0
TOTAL NET DIRECT COST $0
GENERAL MARKUPS
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| INSURANCE AND BONDS | 0.00% | $0 |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL CONSTRUCTION COST $0
&"Calibri,Regular"&10 Sheet &P of &N
SITE
| Georgia National Cemetery Gravesite Improvements |
| SITEWORK |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
SITE SUMMARY
ELEMENT TOTAL COST
G. BUILDING SITEWORK $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
| TOTAL SITE COST | $0 |
| Georgia National Cemetery Gravesite Improvements | |
| SITEWORK | |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
DETAILED SITE SUMMARY
ELEMENT TOTAL COST
| G10 SITE PREPARATION | $0 |
| G20 SITE IMPROVEMENTS | $0 |
| G30 SITE MECHANICAL UTILITIES | $0 |
| G40 SITE ELECTRICAL UTILITIES | $0 |
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL SITE COST $0
| Georgia National Cemetery Gravesite Improvements |
| SITEWORK |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT RATE ESTIMATED COST
| G. BUILDING SITEWORK | |
| G10 SITE PREPARATION | |
| G1010 SITE CLEARING | $0 |
| G1020 SITE DEMOLITION AND RELOCATIONS | $0 |
| G1030 SITE EARTHWORK | $0 |
| $0 | |
| G20 SITE IMPROVEMENTS | |
| G2010 ROADWAYS | $0 |
| G2020 PARKING LOTS | $0 |
| G2040 SITE DEVELOPMENT | $0 |
| G2050 LANDSCAPING | $0 |
| $0 | |
| G30 SITE MECHANICAL UTILITIES | |
| G3010 WATER SUPPLY | $0 |
| G3030 STORM SEWER | $0 |
| $0 | |
| G40 SITE ELECTRICAL UTILITIES | |
| G4090 OTHER SITE ELECTRICAL UTILITIES | $0 |
| $0 |
| G. BUILDING SITEWORK TOTAL | $0 | ||
| G. BUILDING SITEWORK | |||
| G10 SITE PREPARATION | 0.00 | $0 | |
| G1010 SITE CLEARING | 0.00 | $0 | |
| Clearing and grubbing | ACRE | 0.00 | $0 |
| Erosion and Sediment Control | 0.00 | $0 | |
| Construction entrance/exit | SF | 0.00 | $0 |
| Silt fence, Type C | LF | 0.00 | $0 |
| Inlet sediment trap | EA | 0.00 | $0 |
| Concrete washout | SF | 0.00 | $0 |
| Tree protection | LF | 0.00 | $0 |
| Rip-rap | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G1020 SITE DEMOLITION AND RELOCATIONS | 0.00 | $0 | |
| Information/regulation sign | EA | 0.00 | $0 |
| Post & panel sign | EA | 0.00 | $0 |
| Gravel drive, remove | SF | 0.00 | $0 |
| Burial section marker | EA | 0.00 | $0 |
| Section marker | EA | 0.00 | $0 |
| Grid monuments, remove and salvage | EA | 0.00 | $0 |
| Remove tree, medium | EA | 0.00 | $0 |
| Utility access gate, remove | EA | 0.00 | $0 |
| Protect signage, existing | LS | 0.00 | $0 |
| Wetland protection, Allowance | ACRE | 0.00 | $0 |
| Irrigation mainline, remove | LF | 0.00 | $0 |
| Hauling, off-site, including disposal | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| Construction trailer, including utilities | MO | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G1030 SITE EARTHWORK | 0.00 | $0 | |
| Grading, Allowance | ACRE | 0.00 | $0 |
| 0.00 | $0 | ||
| Excavation and fill | 0.00 | $0 | |
| Cut, site including compact for new pavement and crypts | CY | 0.00 | $0 |
| Spread and backfill, including compact site cut | CY | 0.00 | $0 |
| Hauling, on-site, including disposal | CY | 0.00 | $0 |
| Boulder/rock removal and breaking, including premium | CY | 0.00 | $0 |
| and disposal, Allowance | 0.00 | $0 | |
| 0.00 | $0 | ||
| $0 |
G10 SITE PREPARATION TOTAL $0
| G20 SITE IMPROVEMENTS | 0.00 | $0 | |
| G2010 ROADWAYS | 0.00 | $0 | |
| Pavement, asphalt, standard duty | 0.00 | $0 | |
| Subgrade, including compaction | SF | 0.00 | $0 |
| Base, 6", graded aggregate | SF | 0.00 | $0 |
| Asphalt base, 2.5", binder course | SF | 0.00 | $0 |
| Asphalt paving, 1.5", wearing course | SF | 0.00 | $0 |
| Pavement, concrete | 0.00 | $0 | |
| Subgrade, including compaction | SF | 0.00 | $0 |
| Base, 4", stone, stailized | SF | 0.00 | $0 |
| Concrete paving, 5", broom finish | SF | 0.00 | $0 |
| Expansion/Control joint | LF | 0.00 | $0 |
| Curb and gutter, mountable | LF | 0.00 | $0 |
| Temporary gravel access drive | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G2020 PARKING LOTS | 0.00 | $0 | |
| Paving specialties | 0.00 | $0 | |
| Striped parking stall | EA | 0.00 | $0 |
| ADA symbol, painted, Allowance | EA | 0.00 | $0 |
| Pole mounted sign, Allowance | EA | 0.00 | $0 |
| White strip, 4" | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G2040 SITE DEVELOPMENT | 0.00 | $0 | |
| Interment area | 0.00 | $0 | |
| Crypts, pre-placed, double depth, 6,624, 3'x8' | 0.00 | $0 | |
| Bedding, stone | CY | 0.00 | $0 |
| Crypt, OFCI, installation labor only | EA | 0.00 | $0 |
| Sand, fill and cover | CY | 0.00 | $0 |
| Crypts, pre-placed, oversized double depth, 362, 5'x10' | 0.00 | $0 | |
| Bedding, stone | CY | 0.00 | $0 |
| Crypt, OFCI, installation labor only | EA | 0.00 | $0 |
| Sand, fill and cover | CY | 0.00 | $0 |
| Private vaults, traditional in plots, 294, 5'x10', ground preparation | NOTE | 0.00 | $0 |
| included in earthwork | 0.00 | $0 | |
| In-ground cremain sites, 6,944, 4'x4', ground preparation | NOTE | 0.00 | $0 |
| included in earthwork | 0.00 | $0 | |
| Underdrain pipe, 4", HDPE | LF | 0.00 | $0 |
| Cleanout | EA | 0.00 | $0 |
| Columbarium wall, 5 - Niche high free standing | 0.00 | $0 | |
| Concrete footings, stem, pedestal and piers, includes | CY | 0.00 | $0 |
| excavation and reinforcement | 0.00 | $0 | |
| Drainage and waterproofing, includes membrane, | LF | 0.00 | $0 |
| drip strip, perforated pipe and filter fabric | 0.00 | $0 | |
| Finishes | 0.00 | $0 | |
| Granite base, 3" | LF | 0.00 | $0 |
| Modular brick, including 3/8" grout | SF | 0.00 | $0 |
| Limestone cap, including at intermediate and end piers | LF | 0.00 | $0 |
| Marble filler strip | SF | 0.00 | $0 |
| Bronze ID letters and numbers | EA | 0.00 | $0 |
| Niche | 0.00 | $0 | |
| Pre-cast concrete columbarium unit | EA | 0.00 | $0 |
| Niche cover, OFCI, install only | EA | 0.00 | $0 |
| Rosettes, CFCI | EA | 0.00 | $0 |
| Concrete, light duty | 0.00 | $0 | |
| Granular fill, compacted | SF | 0.00 | $0 |
| Base, 4", stone, stabilized | SF | 0.00 | $0 |
| Concrete paving, 5", broom finish, with | SF | 0.00 | $0 |
| reinforcement | 0.00 | $0 | |
| Expansion/Control joint | LF | 0.00 | $0 |
| Decorative scoring, premium, Allowance | SF | 0.00 | $0 |
| Ramp, concrete | SF | 0.00 | $0 |
| Vehicle access gate, 20' wide | EA | 0.00 | $0 |
| Vehicular guardrail | LF | 0.00 | $0 |
| Retaining wall, Assembly | SF | 0.00 | $0 |
| Guardrail on retaining wall, wrought iron | LF | 0.00 | $0 |
| Wall panels and caps, curved, at Committal Shelter#1, including | LF | 0.00 | $0 |
| remove and replace | 0.00 | $0 | |
| Miscellaneous | 0.00 | $0 | |
| Bench, metal, 8'0" wide | EA | 0.00 | $0 |
| Flower watering station/trash receptacle | EA | 0.00 | $0 |
| Handrail, floor mounted | LF | 0.00 | $0 |
| Chain link fence | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| Shade structure | 0.00 | $0 | |
| Metal roofing | SF | 0.00 | $0 |
| Metal post | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| Site signage | 0.00 | $0 | |
| Post & panel sign | EA | 0.00 | $0 |
| Information/regulation sign | EA | 0.00 | $0 |
| Gravesite grid monument and monument marker | EA | 0.00 | $0 |
| Flag street sign | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 | |||
| 0.00 | $0 | ||
| G2050 LANDSCAPING | 0.00 | $0 | |
| Planting area, including shrubs and mulch | SF | 0.00 | $0 |
| Groundcover | 0.00 | $0 | |
| Sodding, turf | SF | 0.00 | $0 |
| Seeding | SF | 0.00 | $0 |
| Trees | 0.00 | $0 | |
| Large | EA | 0.00 | $0 |
| Ornamental | EA | 0.00 | $0 |
| Miscellaneous | 0.00 | $0 | |
| Soil amending | SF | 0.00 | $0 |
| Maintenance of landscape 90 days | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| Irrigation | 0.00 | $0 | |
| Controller | EA | 0.00 | $0 |
| Lateral piping, PVC 200, including trenching and backfill | 0.00 | $0 | |
| 1" | LF | 0.00 | $0 |
| 1.25" | LF | 0.00 | $0 |
| 1.5" | LF | 0.00 | $0 |
| 2" | LF | 0.00 | $0 |
| 2.5" | LF | 0.00 | $0 |
| 3" | LF | 0.00 | $0 |
| Valves | 0.00 | $0 | |
| Air vacuum relief valve, Assembly | EA | 0.00 | $0 |
| Isolation gate valve, Assembly | EA | 0.00 | $0 |
| Remote control valve assembly | EA | 0.00 | $0 |
| Quick coupling valve assembly | EA | 0.00 | $0 |
| Nozzle | 0.00 | $0 | |
| Rain bird stream bubbler | EA | 0.00 | $0 |
| Mainline piping, PVC 200, including trenching and backfill | 0.00 | $0 | |
| 3" | LF | 0.00 | $0 |
| 4" | LF | 0.00 | $0 |
| 6" | LF | 0.00 | $0 |
| Sleeve | LF | 0.00 | $0 |
| Disconnect and remove existing 6" mainline, Allowance | LS | 0.00 | $0 |
| Bioretention including media, stone, mulch and | SF | 0.00 | $0 |
| underdrain, hydro dynamic separator | 0.00 | $0 | |
| 0.00 | $0 | ||
| $0 |
G20 SITE IMPROVEMENTS TOTAL $0
| G30 SITE MECHANICAL UTILITIES | 0.00 | $0 | |
| G3010 WATER SUPPLY | 0.00 | $0 | |
| Irrigation system connection, Allowance | LS | 0.00 | $0 |
| Hose bibs including services, Allowance | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G3030 STORM SEWER | 0.00 | $0 | |
| Storm water service | 0.00 | $0 | |
| Connect to existing storm structure | EA | 0.00 | $0 |
| Drain basin, 12" | EA | 0.00 | $0 |
| Drop inlets, Type IV | EA | 0.00 | $0 |
| Storm structure, concrete | EA | 0.00 | $0 |
| Pipe and fittings, RCP, incl. trench and backfill, 24" | 0.00 | $0 | |
| 8" | LF | 0.00 | $0 |
| 12" | LF | 0.00 | $0 |
| 15" | LF | 0.00 | $0 |
| 18" | LF | 0.00 | $0 |
| 24" | LF | 0.00 | $0 |
| Head wall system | LS | 0.00 | $0 |
| Filterra internal bypass curb inlet structures | 0.00 | $0 | |
| 6'x4' | EA | 0.00 | $0 |
| 8'x6' | EA | 0.00 | $0 |
| 10'x6' | EA | 0.00 | $0 |
| 50'x 20' | EA | 0.00 | $0 |
| Trenching, over haul | CY | 0.00 | $0 |
| Filter stone | CY | 0.00 | $0 |
| Clean fill | CY | 0.00 | $0 |
| Miscellaneous | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G30 SITE MECHANICAL UTILITIES TOTAL $0
| G40 SITE ELECTRICAL UTILITIES | 0.00 | $0 | |
| G4090 OTHER SITE ELECTRICAL UTILITIES | 0.00 | $0 | |
| Irrigation system power, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G40 SITE ELECTRICAL UTILITIES TOTAL $0
G. BUILDING SITEWORK TOTAL $0
ALT A -ADMIN & MAINTENANCE BLDG
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT A - ADMIN AND MAINTENANCE BUILDING |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
BUILDING SUMMARY
ELEMENT TOTAL COST
C. INTERIORS $0
D. SERVICES $0
F. SPECIAL CONSTRUCTION AND DEMOLITION $0
| NET DIRECT BUILDING COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
| TOTAL BUILDING COST | $0 |
| Georgia National Cemetery Gravesite Improvements | |
| ADD ALT A - ADMIN AND MAINTENANCE BUILDING | |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
DETAILED SUMMARY
ELEMENT TOTAL COST
| C10 INTERIOR CONSTRUCTION | $0 |
| C30 INTERIOR FINISHES | $0 |
| D20 PLUMBING | $0 |
| D30 HVAC | $0 |
| D50 ELECTRICAL | $0 |
| F20 SELECTIVE BUILDING DEMOLITION | $0 |
| NET DIRECT BUILDING COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL BUILDING COST $0
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT A - ADMIN AND MAINTENANCE BUILDING |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
DESCRIPTION QUANTITY UNIT UNIT RATE ESTIMATED COST
| C. INTERIORS | |
| C10 INTERIOR CONSTRUCTION | |
| C1010 PARTITIONS | $0 |
| C1020 INTERIOR DOORS | $0 |
| C1030 FITTINGS | $0 |
| $0 | |
| C30 INTERIOR FINISHES | |
| C3010 WALL FINISHES | $0 |
| C3020 FLOOR FINISHES | $0 |
| C3030 CEILING FINISHES | $0 |
| $0 |
C. INTERIORS TOTAL $0
| D. SERVICES | |
| D20 PLUMBING | |
| D2010 PLUMBING FIXTURES | $0 |
| $0 | |
| D30 HVAC | |
| D3040 DISTRIBUTION SYSTEMS | $0 |
| D3070 SYSTEMS TESTING AND BALANCE | $0 |
| $0 | |
| D50 ELECTRICAL | |
| D5020 LIGHTING AND BRANCH WIRING | $0 |
| D5030 COMMUNICATIONS AND SECURITY | $0 |
| D5090 OTHER ELECTRICAL SERVICES | $0 |
| $0 |
D. SERVICES TOTAL $0
| F. SPECIAL CONSTRUCTION AND DEMOLITION | |
| F20 SELECTIVE BUILDING DEMOLITION | |
| F2010 BUILDING ELEMENTS DEMOLITION | $0 |
| $0 |
| F. SPECIAL CONSTRUCTION AND DEMOLITION TOTAL | $0 | ||
| C. INTERIORS | |||
| C10 INTERIOR CONSTRUCTION | 0.00 | $0 | |
| C1010 PARTITIONS | 0.00 | $0 | |
| Framing, metal stud | 0.00 | $0 | |
| 3-5/8" | SF | 0.00 | $0 |
| Insulation, batt | 0.00 | $0 | |
| 4" | SF | 0.00 | $0 |
| Gypsum board | 0.00 | $0 | |
| Taped and finished | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| Interior windows | 0.00 | $0 | |
| Aluminum | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| C1020 INTERIOR DOORS | 0.00 | $0 | |
| Wood including frame and hardware | 0.00 | $0 | |
| Single, 3'0" wide | EA | 0.00 | $0 |
| Double, 6'0" wide | PR | 0.00 | $0 |
| Miscellaneous | 0.00 | $0 | |
| Closer | EA | 0.00 | $0 |
| Glazing | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| C1030 FITTINGS | 0.00 | $0 | |
| Miscellaneous | 0.00 | $0 | |
| Signage | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| Miscellaneous Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
C10 INTERIOR CONSTRUCTION TOTAL $0
| C30 INTERIOR FINISHES | 0.00 | $0 | |
| C3010 WALL FINISHES | 0.00 | $0 | |
| Paint | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| C3020 FLOOR FINISHES | 0.00 | $0 | |
| Carpet tile | SF | 0.00 | $0 |
| Base | 0.00 | $0 | |
| Rubber | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| C3030 CEILING FINISHES | 0.00 | $0 | |
| ACT, including grid system, 2' 0" x 2' 0" | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
C30 INTERIOR FINISHES TOTAL $0
C. INTERIORS TOTAL $0
| D. SERVICES | |||
| D20 PLUMBING | 0.00 | $0 | |
| D2010 PLUMBING FIXTURES | 0.00 | $0 | |
| Service to existing emergency shower and eye wash | 0.00 | $0 | |
| Ball valve, 1" | EA | 0.00 | $0 |
| Thermostatic mixing valve, 1-1/4", TMV-1 | EA | 0.00 | $0 |
| Pipe with fittings and sypports | 0.00 | $0 | |
| 1" | LF | 0.00 | $0 |
| 1-1/4" | LF | 0.00 | $0 |
| Cut and patch wall as necessary | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
D20 PLUMBING TOTAL $0
| D30 HVAC | 0.00 | $0 | |
| D3040 DISTRIBUTION SYSTEMS | 0.00 | $0 | |
| Air distribution | 0.00 | $0 | |
| Connect to existing | 0.00 | $0 | |
| Main | EA | 0.00 | $0 |
| Branch | EA | 0.00 | $0 |
| Sheet metal ductwork | LF | 0.00 | $0 |
| Diffuser, supply | EA | 0.00 | $0 |
| Register, transfer | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D3050 TERMINAL AND PACKAGE UNITS | 0.00 | $0 | |
| Equipment, existing is adequate for proposed remodel | NOTE | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D3070 SYSTEMS TESTING AND BALANCE | 0.00 | $0 | |
| Balance new inlets and outlets | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
D30 HVAC TOTAL $0
| D50 ELECTRICAL | |||
| D502001 BRANCH WIRING | |||
| Convenience power system | |||
| Receptacle | |||
| Duplex | EA | 0.00 | $0 |
| Wall mounted Junction box for door hardware | EA | 0.00 | $0 |
| Double duplex | EA | 0.00 | $0 |
| Conduit and wire | LF | 0.00 | $0 |
| Circuit breakers, 10kaic, bolt-on inside existing panel | 0.00 | $0 | |
| 20a/1p | EA | 0.00 | $0 |
| Remove and reinstall ceilings to install home runs, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D502002 LIGHTING EQUIPMENT | |||
| Intercept and connect to existing home run / controls | LS | 0.00 | $0 |
| Light fixture | 0.00 | $0 | |
| Type "D1", 4" down light | EA | 0.00 | $0 |
| Type "B1" | EA | 0.00 | $0 |
| Dimmer switch | EA | 0.00 | $0 |
| Occupancy sensor | EA | 0.00 | $0 |
| Conduit and wire | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D503001 FIRE ALARM SYSTEMS | 0.00 | $0 | |
| Fire alarm devices, conduit and wire, connect to existing | EA | 0.00 | $0 |
| system | 0.00 | $0 | |
| Miscellaneous, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D503002 TELECOMMUNICATION SYSTEMS | |||
| Telephone and data system | |||
| Outlets | |||
| 4 port face plate - 2 data/2 voice | EA | 0.00 | $0 |
| Conduit and wire | 0.00 | $0 | |
| Conduit up to accessible ceiling - 1-1/4" Conduit | LF | 0.00 | $0 |
| Cabling including terminations - Cat 6 Cable | LF | 0.00 | $0 |
| Telephone and data system miscellaneous, Allowance | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 | |||
| D503008 SECURITY SYSTEMS | |||
| Security system | |||
| Access control | |||
| Equipment, Allowance | |||
| Intercom station | EA | 0.00 | $0 |
| Devices | 0.00 | $0 | |
| Card reader | EA | 0.00 | $0 |
| DS | EA | 0.00 | $0 |
| Backbox | EA | 0.00 | $0 |
| Conduit and wire | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D5090 OTHER ELECTRICAL SERVICES | 0.00 | $0 | |
| Miscellaneous, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
D50 ELECTRICAL TOTAL $0
D. SERVICES TOTAL $0
| F. SPECIAL CONSTRUCTION AND DEMOLITION | |||
| F20 SELECTIVE BUILDING DEMOLITION | 0.00 | $0 | |
| F2010 BUILDING ELEMENTS DEMOLITION | 0.00 | $0 | |
| Remove diffuser and associated duct as necessary | EA | 0.00 | $0 |
| Remove 1-1/4" pipe, cap as necessary | LS | 0.00 | $0 |
| Removing light fixture in the conference and office room | LS | 0.00 | $0 |
| Miscellaneous demolition | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
F20 SELECTIVE BUILDING DEMOLITION TOTALS $0
F. SPECIAL CONSTRUCTION AND DEMOLITION TOTAL $0
ALT B - PUBLIC INFO CENTER BLDG
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT B - PIC BUILDING |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
BUILDING SUMMARY
ELEMENT TOTAL COST
A. SUBSTRUCTURE $0
B. SHELL $0
C. INTERIORS $0
D. SERVICES $0
E. EQUIPMENT AND FURNISHINGS $0
F. SPECIAL CONSTRUCTION AND DEMOLITION $0
G. BUILDING SITEWORK $0
| NET DIRECT BUILDING COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
| TOTAL BUILDING COST | $0 |
| Georgia National Cemetery Gravesite Improvements | |
| ADD ALT B - PIC BUILDING | |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
DETAILED SUMMARY
ELEMENT TOTAL COST
| A10 FOUNDATIONS | $0 |
| B10 SUPERSTRUCTURE | $0 |
| B20 EXTERIOR ENCLOSURE | $0 |
| B30 ROOFING | $0 |
| C10 INTERIOR CONSTRUCTION | $0 |
| C30 INTERIOR FINISHES | $0 |
| D20 PLUMBING | $0 |
| D30 HVAC | $0 |
| D50 ELECTRICAL | $0 |
| E20 FURNISHINGS | $0 |
| F20 SELECTIVE BUILDING DEMOLITION | $0 |
| G10 SITE PREPARATION | $0 |
| G20 SITE IMPROVEMENTS | $0 |
| NET DIRECT BUILDING COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL BUILDING COST $0
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT B - PIC BUILDING |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT RATE ESTIMATED COST
| A. SUBSTRUCTURE | |
| A10 FOUNDATIONS | |
| A1010 STANDARD FOUNDATIONS | $0 |
| A1030 SLAB ON GRADE | $0 |
| $0 |
A. SUBSTRUCTURE TOTAL $0
| B. SHELL | |
| B10 SUPERSTRUCTURE | |
| B1020 ROOF CONSTRUCTION | $0 |
| $0 | |
| B20 EXTERIOR ENCLOSURE | |
| B2010 EXTERIOR WALLS | $0 |
| B2020 EXTERIOR WINDOWS | $0 |
| B2030 EXTERIOR DOORS | $0 |
| $0 |
| B30 ROOFING | |
| B3010 ROOF COVERINGS | $0 |
| $0 |
B. SHELL TOTAL $0
| C. INTERIORS | |
| C10 INTERIOR CONSTRUCTION | |
| C1010 PARTITIONS | $0 |
| C1020 INTERIOR DOORS | $0 |
| C1030 FITTINGS | $0 |
| $0 |
| C30 INTERIOR FINISHES | |
| C3010 WALL FINISHES | $0 |
| $0 |
C. INTERIORS TOTAL $0
| D. SERVICES | |
| D20 PLUMBING | |
| D2090 OTHER PLUMBING SYSTEMS | $0 |
| $0 |
| D30 HVAC | |
| D3040 DISTRIBUTION SYSTEMS | $0 |
| D3050 TERMINAL AND PACKAGE UNITS | $0 |
| D3060 CONTROLS AND INSTRUMENTATION | $0 |
| D3070 SYSTEMS TESTING AND BALANCE | $0 |
| $0 | |
| $0 | |
| D50 ELECTRICAL | $0 |
| D5020 LIGHTING AND BRANCH WIRING | $0 |
| D5030 COMMUNICATIONS AND SECURITY | $0 |
| D5090 OTHER ELECTRICAL SERVICES | $0 |
| $0 |
D. SERVICES TOTAL $0
| E. EQUIPMENT AND FURNISHINGS | ||
| E20 FURNISHINGS | 0.00 | $0 |
| E2010 FIXED FURNISHINGS | $0 | |
| $0 |
E. EQUIPMENT AND FURNISHINGS TOTAL $0
| F. SPECIAL CONSTRUCTION AND DEMOLITION | |
| F20 SELECTIVE BUILDING DEMOLITION | |
| F2010 BUILDING ELEMENTS DEMOLITION | $0 |
| $0 |
F. SPECIAL CONSTRUCTION AND DEMOLITION TOTAL $0
| G. BUILDING SITEWORK | |
| G10 SITE PREPARATION | |
| G1020 SITE DEMOLITION AND RELOCATIONS | $0 |
| $0 |
| G20 SITE IMPROVEMENTS | |
| G2010 ROADWAYS | $0 |
| G2020 PARKING LOTS | $0 |
| G2040 SITE DEVELOPMENT | $0 |
| $0 |
| G. BUILDING SITEWORK TOTAL | $0 | ||
| A. SUBSTRUCTURE | |||
| A10 FOUNDATIONS | 0.00 | $0 | |
| A1010 STANDARD FOUNDATIONS | 0.00 | $0 | |
| Concrete footing | CY | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| A1030 SLAB ON GRADE | 0.00 | $0 | |
| Slab on grade, 4" | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
A10 FOUNDATIONS TOTAL $0
A. SUBSTRUCTURE TOTAL $0
| B. SHELL | |||
| B10 SUPERSTRUCTURE | 0.00 | $0 | |
| B1020 ROOF CONSTRUCTION | 0.00 | $0 | |
| Structural steel | TON | 0.00 | $0 |
| Truss | LF | 0.00 | $0 |
| Metal deck | SF | 0.00 | $0 |
| Structural connection, underpinning, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
B10 SUPERSTRUCTURE TOTAL $0
| B2010 EXTERIOR WALLS | 0.00 | $0 | |
| Masonry | 0.00 | $0 | |
| Patch and repair exterior wall | LS | 0.00 | $0 |
| CMU, precision block filled and reinforced | 0.00 | $0 | |
| 8" thick | SF | 0.00 | $0 |
| Air barrier | SF | 0.00 | $0 |
| Rigid insulation, 1" | SF | 0.00 | $0 |
| Furring | SF | 0.00 | $0 |
| Insulation, batt | 0.00 | $0 | |
| 4" | SF | 0.00 | $0 |
| Gypsum board | 0.00 | $0 | |
| Taped and finished | SF | 0.00 | $0 |
| Finishes | 0.00 | $0 | |
| Paint | SF | 0.00 | $0 |
| Decorative marble veneer, 4" | SF | 0.00 | $0 |
| EIFS | SF | 0.00 | $0 |
| Bullnose cast stone | LF | 0.00 | $0 |
$0
| B2020 EXTERIOR WINDOWS | 0.00 | $0 | |
| Storefront | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| B2030 EXTERIOR DOORS | 0.00 | $0 | |
| Hollow metal including frame and hardware | 0.00 | $0 | |
| Single, 3'0" wide | EA | 0.00 | $0 |
| Miscellaneous | 0.00 | $0 | |
| Closer | EA | 0.00 | $0 |
| Glazing | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
B20 EXTERIOR CLOSURE TOTAL $0
| B30 ROOFING | 0.00 | $0 | |
| B3010 ROOF COVERINGS | 0.00 | $0 | |
| Standing seam metal roof | SF | 0.00 | $0 |
| Tapered insulation | SF | 0.00 | $0 |
| Roof sheathing, 5/8" | SF | 0.00 | $0 |
| Expansion joint, 2" | LF | 0.00 | $0 |
| Flashing and sheet metal | 0.00 | $0 | |
| Gutter | LF | 0.00 | $0 |
| Flashing | LF | 0.00 | $0 |
| Downspout | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
B30 ROOFING TOTAL $0
B. SHELL TOTAL $0
| C. INTERIORS | |||
| C10 INTERIOR CONSTRUCTION | 0.00 | $0 | |
| C1010 PARTITIONS | 0.00 | $0 | |
| Framing, metal stud | 0.00 | $0 | |
| 4" | SF | 0.00 | $0 |
| Insulation, batt | 0.00 | $0 | |
| 4" | SF | 0.00 | $0 |
| Gypsum board | 0.00 | $0 | |
| Taped and finished | SF | 0.00 | $0 |
$0
| C1020 INTERIOR DOORS | 0.00 | $0 | |
| Wood including frame and hardware | 0.00 | $0 | |
| Single, 3'0" wide | EA | 0.00 | $0 |
| Miscellaneous | 0.00 | $0 | |
| Closer | EA | 0.00 | $0 |
| Glazing | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| C1030 FITTINGS | 0.00 | $0 | |
| Miscellaneous | 0.00 | $0 | |
| Signage | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
C10 INTERIOR CONSTRUCTION TOTAL $0
| C30 INTERIOR FINISHES | 0.00 | $0 | |
| C3010 WALL FINISHES | 0.00 | $0 | |
| Porcelain tile | SF | 0.00 | $0 |
| Paint | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| C3020 FLOOR FINISHES | 0.00 | $0 | |
| Porcelain tile | SF | 0.00 | $0 |
| Base | 0.00 | $0 | |
| Porcelain tile | LF | 0.00 | $0 |
| C3030 CEILING FINISHES | 0.00 | $0 | |
| Hard lid | SF | 0.00 | $0 |
| Metal ceiling | SF | 0.00 | $0 |
| Paint | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
C30 INTERIOR FINISHES TOTAL $0
C. INTERIORS TOTAL $0
| D. SERVICES | |||
| D20 PLUMBING | 0.00 | $0 | |
| D2090 OTHER PLUMBING SYSTEMS | 0.00 | $0 | |
| Condensate drain system | 0.00 | $0 | |
| Connect to AC unit | EA | 0.00 | $0 |
| Pipe with fittings and support | LF | 0.00 | $0 |
| Dry well | LA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
D20 PLUMBING TOTAL $0
| D30 HVAC | 0.00 | $0 | |
| D3040 DISTRIBUTION SYSTEMS | 0.00 | $0 | |
| Refrigeration piping system | 0.00 | $0 | |
| Specialties | LS | 0.00 | $0 |
| Pipe with fitting and insulation | LF | 0.00 | $0 |
| Charge refrigerant and testing | LS | 0.00 | $0 |
| Air distribution | 0.00 | $0 | |
| Outside air duct, 4" | LF | 0.00 | $0 |
| Manual volume damper | EA | 0.00 | $0 |
| Gooseneck and roof fittings | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 | |||
| D3050 TERMINAL AND PACKAGE UNITS | 0.00 | $0 | |
| VRF system including condensing unit and two fan coil | LS | 0.00 | $0 |
| units, CU-1 / AC-1 & AC-2,18 MBH | 0.00 | $0 | |
| 0.00 | $0 | ||
| $0 |
| D3060 CONTROLS AND INSTRUMENTATION | 0.00 | $0 | |
| Programmable thermostat controls including conduit | EA | 0.00 | $0 |
| and wiring | 0.00 | $0 | |
| $0 |
| D3070 SYSTEMS TESTING AND BALANCE | 0.00 | $0 | |
| Test and commissioning | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
D30 HVAC TOTAL $0
| D50 ELECTRICAL | |||
| D502001 BRANCH WIRING | |||
| Air conditioning units | |||
| Connection including disconnect switch and junction box | |||
| Split system indoor, AC-1 & AC-2 | EA | 0.00 | $0 |
| Split system outdoor, CU-1 | EA | 0.00 | $0 |
| Conduit and wire | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| Convenience power system | 0.00 | $0 | |
| Receptacle | 0.00 | $0 | |
| Duplex | EA | 0.00 | $0 |
| Duplex, WP | EA | 0.00 | $0 |
| Double duplex | EA | 0.00 | $0 |
| Conduit and wire | LF | 0.00 | $0 |
| Circuit breakers, 10kaic, bolt-on inside existing panel | 0.00 | $0 | |
| 20a/1p | EA | 0.00 | $0 |
| Remove and reinstall ceilings to install home runs, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D502002 LIGHTING EQUIPMENT | 0.00 | $0 | |
| Intercept and connect to existing home run / controls | LS | 0.00 | $0 |
| Light fixture | 0.00 | $0 | |
| Type "D1", 4" down light | EA | 0.00 | $0 |
| Exit sign, Type "X1" | EA | 0.00 | $0 |
| Type "D2", 10" exterior down light | EA | 0.00 | $0 |
| Type "D3",10" down light, exterior retrofit | EA | 0.00 | $0 |
| Battery back-up | EA | 0.00 | $0 |
| Dimmer switch, 3 way | EA | 0.00 | $0 |
| Occupancy sensor | EA | 0.00 | $0 |
| Conduit and wire | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 | |||
| D503001 FIRE ALARM SYSTEMS | 0.00 | $0 | |
| Fire alarm devices, conduit and wire, connect to existing | EA | 0.00 | $0 |
| system | 0.00 | $0 | |
| Miscellaneous, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| D503002 TELECOMMUNICATION SYSTEMS | 0.00 | $0 | |
| Telephone and data system | 0.00 | $0 | |
| Outlets | 0.00 | $0 | |
| 4 port face plate - 2 data/2 voice | EA | 0.00 | $0 |
| Conduit and wire | 0.00 | $0 | |
| Conduit up to accessible ceiling - 1-1/4" Conduit | LF | 0.00 | $0 |
| Cabling including terminations - Cat 6 Cable | LF | 0.00 | $0 |
| Telephone and data system miscellaneous, Allowance | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 | |||
| D5090 OTHER ELECTRICAL SERVICES | 0.00 | $0 | |
| Miscellaneous, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
D50 ELECTRICAL TOTAL $0
D. SERVICES TOTAL $0
| E. EQUIPMENT AND FURNISHINGS | |||
| E20 FURNISHINGS | 0.00 | $0 | |
| E2010 FIXED FURNISHINGS | 0.00 | $0 | |
| Mecho shades | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
E20 FURNISHINGS TOTAL $0
E. EQUIPMENT AND FURNISHINGS TOTAL $0
| F. SPECIAL CONSTRUCTION AND DEMOLITION | |||
| F20 SELECTIVE BUILDING DEMOLITION | 0.00 | $0 | |
| F2010 BUILDING ELEMENTS DEMOLITION | 0.00 | $0 | |
| Storefront | SF | 0.00 | $0 |
| Curb | LF | 0.00 | $0 |
| Exterior CMU wall | SF | 0.00 | $0 |
| Gutter | LF | 0.00 | $0 |
| Metal seam roof | SF | 0.00 | $0 |
| Bullnose cast stone | LF | 0.00 | $0 |
| Marble veneer | SF | 0.00 | $0 |
| Miscellaneous demolition | LS | 0.00 | $0 |
| Protect existing, Allowance | SF | 0.00 | $0 |
| Hauling, off-site, including disposal | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
F20 SELECTIVE BUILDING DEMOLITION TOTALS $0
F. SPECIAL CONSTRUCTION AND DEMOLITION TOTAL $0
| G. BUILDING SITEWORK | |||
| G10 SITE PREPARATION | 0.00 | $0 | |
| G1020 SITE DEMOLITION AND RELOCATIONS | 0.00 | $0 | |
| Concrete sidewalk | SF | 0.00 | $0 |
| Concrete curb and gutter | LF | 0.00 | $0 |
| Remove tree, small | EA | 0.00 | $0 |
| Remove tree, medium | EA | 0.00 | $0 |
| Concrete pavement, mill and overlay | SF | 0.00 | $0 |
| Post & panel sign | EA | 0.00 | $0 |
| Sawcut concrete | LF | 0.00 | $0 |
| Remove light fixture, patch opening to match existing | LS | 0.00 | $0 |
| Hauling, off-site, including disposal | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G10 SITE PREPARATION TOTAL $0
| G20 SITE IMPROVEMENTS | 0.00 | $0 | |
| G2010 ROADWAYS | 0.00 | $0 | |
| Pavement, asphalt, standard duty | 0.00 | $0 | |
| Subgrade, including compaction | SF | 0.00 | $0 |
| Base, 6", graded aggregate | SF | 0.00 | $0 |
| Asphalt base, 2.5", binder course | SF | 0.00 | $0 |
| Asphalt paving, 1.5", wearing course | SF | 0.00 | $0 |
| Pavement, concrete | 0.00 | $0 | |
| Subgrade, including compaction | SF | 0.00 | $0 |
| Base, 4", stone, stailized | SF | 0.00 | $0 |
| Concrete paving, 5", broom finish | SF | 0.00 | $0 |
| Curb and gutter | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G2020 PARKING LOTS | 0.00 | $0 | |
| Paving specialties | 0.00 | $0 | |
| Striped parking stall | EA | 0.00 | $0 |
| ADA symbol, painted, Allowance | EA | 0.00 | $0 |
| Pole mounted sign, Allowance | EA | 0.00 | $0 |
| White strip, 4" | LF | 0.00 | $0 |
| Pavement symbols, painted | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G2040 SITE DEVELOPMENT | 0.00 | $0 | |
| Concrete stoop | SF | 0.00 | $0 |
| Chain link fence, 8'0" high | LF | 0.00 | $0 |
| Site Signage | 0.00 | $0 | |
| Post and panel sign, Assembly | EA | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G20 SITE IMPROVEMENTS TOTAL $0
G. BUILDING SITEWORK TOTAL $0
ALT C - FCA IMPROVEMENTS
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT C - FCA IMPROVEMENTS |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
SITE SUMMARY
ELEMENT TOTAL COST
G. BUILDING SITEWORK $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
| TOTAL SITE COST | $0 |
| Georgia National Cemetery Gravesite Improvements | |
| ADD ALT C - FCA IMPROVEMENTS | |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DETAILED SITE SUMMARY
ELEMENT TOTAL COST
G20 SITE IMPROVEMENTS $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL SITE COST $0
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT C - FCA IMPROVEMENTS |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT RATE ESTIMATED COST
| G. BUILDING SITEWORK | |
| G20 SITE IMPROVEMENTS | |
| G2040 SITE DEVELOPMENT | $0 |
| $0 |
| G. BUILDING SITEWORK TOTAL | $0 | ||
| G. BUILDING SITEWORK | |||
| G20 SITE IMPROVEMENTS | 0.00 | $0 | |
| G2040 SITE DEVELOPMENT | 0.00 | $0 | |
| Retaining wall, repair, near columbarium B | 0.00 | $0 | |
| Caulking, including seal behind wall | LF | 0.00 | $0 |
| Cap, stone, remove and replace | LF | 0.00 | $0 |
| Granite veneer replacement, committal shelter #1 | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G20 SITE IMPROVEMENTS TOTAL $0
G. BUILDING SITEWORK TOTAL $0
ALT D -COLUMBARIUM D
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT D -COLUMBARIUM D |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
SITE SUMMARY
ELEMENT TOTAL COST
G. BUILDING SITEWORK $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
| TOTAL SITE COST | $0 |
| Georgia National Cemetery Gravesite Improvements | |
| ADD ALT D -COLUMBARIUM D | |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DETAILED SITE SUMMARY
ELEMENT TOTAL COST
G20 SITE IMPROVEMENTS $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL SITE COST $0
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT D -COLUMBARIUM D |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT RATE ESTIMATED COST
| G. BUILDING SITEWORK | |
| G20 SITE IMPROVEMENTS | |
| G2010 ROADWAYS | $0 |
| G2040 SITE DEVELOPMENT | $0 |
| $0 |
| G. BUILDING SITEWORK TOTAL | $0 | ||
| G. BUILDING SITEWORK | |||
| G20 SITE IMPROVEMENTS | 0.00 | $0 | |
| G2010 ROADWAYS | 0.00 | $0 | |
| Pavement, concrete | 0.00 | $0 | |
| Subgrade, including compaction | SF | 0.00 | $0 |
| Base, 4", stone, stailized | SF | 0.00 | $0 |
| Concrete paving, 5", broom finish | SF | 0.00 | $0 |
| Expansion/Control joint | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
| G2040 SITE DEVELOPMENT | 0.00 | $0 | |
| Columbarium wall, 5 - Niche high free standing | 0.00 | $0 | |
| Concrete footings, stem, pedestal and piers, includes | CY | 0.00 | $0 |
| excavation and reinforcement | 0.00 | $0 | |
| Drainage and waterproofing, includes membrane, | LF | 0.00 | $0 |
| drip strip, perforated pipe and filter fabric | 0.00 | $0 | |
| Finishes | 0.00 | $0 | |
| Granite base, 3" | LF | 0.00 | $0 |
| Modular brick, including 3/8" grout | SF | 0.00 | $0 |
| Limestone cap, including at intermediate and end piers | LF | 0.00 | $0 |
| Marble filler strip | SF | 0.00 | $0 |
| Bronze ID letters and numbers | EA | 0.00 | $0 |
| Niche | 0.00 | $0 | |
| Pre-cast concrete columbarium unit | EA | 0.00 | $0 |
| Niche cover, OFCI, install only | EA | 0.00 | $0 |
| Rosettes, CFCI | EA | 0.00 | $0 |
| Concrete, light duty | 0.00 | $0 | |
| Granular fill, compacted | SF | 0.00 | $0 |
| Base, 4", stone, stabilized | SF | 0.00 | $0 |
| Concrete paving, 5", broom finish, with | SF | 0.00 | $0 |
| reinforcement | 0.00 | $0 | |
| Expansion/Control joint | LF | 0.00 | $0 |
| Decorative scoring, premium, Allowance | SF | 0.00 | $0 |
| Ramp, concrete | SF | 0.00 | $0 |
| 0.00 | $0 | ||
| Miscellaneous | 0.00 | $0 | |
| Bench, metal, 8'0" wide | EA | 0.00 | $0 |
| Flower watering station/trash receptacle | EA | 0.00 | $0 |
| Handrail, floor mounted | LF | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G20 SITE IMPROVEMENTS TOTAL $0
G. BUILDING SITEWORK TOTAL $0
ALT E - SERVICE EMBLEM REPLACEM
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT E - SERVICE EMBLEM REPLACEMENT |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
SITE SUMMARY
ELEMENT TOTAL COST
G. BUILDING SITEWORK $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
| TOTAL SITE COST | $0 |
| Georgia National Cemetery Gravesite Improvements | |
| ADD ALT E - SERVICE EMBLEM REPLACEMENT | |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE OCMI JOB #: 21253.000 | 25 February 2022
DETAILED SITE SUMMARY
ELEMENT TOTAL COST
G20 SITE IMPROVEMENTS $0
| NET DIRECT SITE COST | $0 | |
| ESCALATION TO MIDPOINT 03/2023 | 0.00% | $0 |
| SUBTOTAL | $0 | |
| GENERAL CONDITIONS/REQUIREMENTS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| CONTRACTOR OVERHEAD AND PROFIT | 0.00% | $0 |
| SUBTOTAL | $0 | |
| INSURANCE AND BONDS | 0.00% | $0 |
| SUBTOTAL | $0 | |
| RESTRICTIVE BIDDING/MARKET CONDITIONS | 0.00% | $0 |
TOTAL SITE COST $0
| Georgia National Cemetery Gravesite Improvements |
| ADD ALT E - SERVICE EMBLEM REPLACEMENT |
| Cherokee County, GA |
BID DOCUMENTS COST ESTIMATE
DESCRIPTION QUANTITY UNIT UNIT RATE ESTIMATED COST
| G. BUILDING SITEWORK | |
| G20 SITE IMPROVEMENTS | |
| G2040 SITE DEVELOPMENT | $0 |
| $0 |
| G. BUILDING SITEWORK TOTAL | $0 | ||
| G. BUILDING SITEWORK | |||
| G20 SITE IMPROVEMENTS | 0.00 | $0 | |
| G2040 SITE DEVELOPMENT | 0.00 | $0 | |
| Space force service emblem, 12" dia | EA | 0.00 | $0 |
| Granite circle, replace | EA | 0.00 | $0 |
| Stone anchor, new | EA | 0.00 | $0 |
| Bas-relief 40" dia seals | EA | 0.00 | $0 |
| Clean walls and caps, Allowance | LS | 0.00 | $0 |
| Parch and repair, Allowance | LS | 0.00 | $0 |
| 0.00 | $0 | ||
| $0 |
G20 SITE IMPROVEMENTS TOTAL $0
G. BUILDING SITEWORK TOTAL $0
File details come from the government source that posted it. Updated .