PERFORMANCE QUESTIONNAIRE for 36C78622R0020 Georgia NC Expansion Ph 2 Construction 922CM3006(8-8-2022).pdf

PDF 174 KB Posted

Attached to
Y1FE--36C78622R0020 | Georgia NC; Expansion Ph 2 Construction 922CM3006 (VA-21-00103342)
Solicitation number
36C78622R0020
Issued by

About this file

This performance questionnaire requests feedback on a contractor's past performance on a construction project. It solicits ratings and comments on quality, performance, schedule, technical requirements, cost control, customer satisfaction, and overall assessment for a contract to construct approximately 6,624 pre-placed double-depth crypts, 362 oversized preplaced double-depth crypts, 294 traditional full casket gravesites, 6,944 in-ground cremation sites, and 7,300 columbarium niches at the Georgia National Cemetery. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs National Cemetery Administration to conduct expansion Phase II construction work at the Georgia National Cemetery location for $922CM3006.

View the file

Other files

File Type Posted
Amendment 9 36C78622R0020 SF30 (10-18-2022).pdf PDF
Amendment 9 NCA 13 Georgia National Cemeta2021 Bridge inspection report_ 7 (10-18-2022).pdf PDF
Amendment 9 36C78622R0020 Georgia NC Expansion Ph 2 (10-18-2022).pdf PDF
Amendment 0008 SF30.pdf PDF
AMENDMENT 8 RESPONSES TO RFI QUESTIONS (36C78622P0020) Georgia National Cemetery 10112022.pdf PDF
Seismic Refraction Georgia NC Amendment 8 (10-12-2022).pdf PDF
AMENDMENT 0007 EXTENDING THE PROPOSAL DUE DATE 10-19-2022 (36C78622R0020).pdf PDF
36C78622R0020 Amendment 0006 (9-29-2022).pdf PDF
Amendment 6 RFI Answers (SAM post).pdf PDF
Amendment 005 36C78622R0020 Posting sign in sheet for site visit.pdf PDF
Amendment 005 Georgia National Cemetery Phase 2 Development RFP 36C78622R0020.pdf PDF
Amendement 4 METHODOLOGY 9-15-2022.pdf PDF
36C78622R0020 0004 METHODOLOGY (SF30).pdf PDF
36C78622R0020 Amendment 3 (SF30 RFI Responses with attachments posted 09-09-2022).pdf PDF
36C78622R0020 0002 8-18-2022.pdf PDF
922CM3006_GANC_Bid Documents_Plans_146-150.pdf PDF
922CM3006_GANC_Bid Documents_Plans_140-145.pdf PDF
922CM3006_GANC_Bid Documents_Plans_151-178.pdf PDF
922CM3006_GANC_Bid Documents_Plans_137-139.pdf PDF
922CM3006_GANC_Bid Documents_Plans_01-07.pdf PDF
Sample Cost estimate worksheet (2) (8-11-2022).xlsx XLSX spreadsheet
Sample Cost estimate worksheet (2) (8-11-2022).xls XLS spreadsheet
922CM3006_GANC_BOD For posting to FBO 8-11-22.pdf PDF
36C78622R0020 0001 Amendment (RFI).pdf PDF
922CM3006_GANC_Bid Documents_Plans_101-122.pdf PDF
Sample Cost estimate worksheet (1) (8-8-2022).xlsx XLSX spreadsheet
922CM3006_GANC_Bid Documents_Plans_59-79.pdf PDF
922CM3006_GANC_Bid Documents_Plans_20-35.pdf PDF
General Decision Number GA20220231 02-25-2022 6C78622R0020 Georgia.pdf PDF
922CM3006_GANC_Bid Documents_Plans_123-133.pdf PDF
922CM3006_GANC_Bid Documents_Plans_93-100.pdf PDF
922CM3006_GANC_Basis of Design (BOD) For posting to FBO 8-8-2022 (1).pdf PDF
General Decision Number GA20220291 07-29-2022 (RFP 36C78622R0020).pdf PDF
Sample Cost estimate worksheet (3) (8-8-2022).xlsx XLSX spreadsheet
922CM3006_GANC_Bid Documents_Plans_08-19.pdf PDF
922CM3006_GANC_Bid_SPECS.pdf PDF
PERFORMANCE QUESTIONNAIRE for 36C78622R0020 Georgia NC Expansion Ph 2 Construction 922CM3006 (8-8-2022).docx DOCX document
922CM3006_GANC_Bid Documents_Plans_80-92.pdf PDF
36C78622R0020_3.docx DOCX document
922CM3006_GANC_Bid Documents_Plans_134-136.pdf PDF
922CM3006_GANC_Bid Documents_Plans_36-58.pdf PDF
Sample Cost estimate worksheet (2) (8-8-2022).xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comments (for any ratings of E, G, M, or U, please provide some brief comments about strengths & weaknesses you observed in this contractor that help us understand your rating.

Feel free to provide additional pages if necessary):

PERFORMANCE QUESTIONNAIRE

Your assistance is requested in support of a source selection.

Please complete this Questionnaire and return it via email to: Kellyann Bruno (Kellyann.bruno@va.gov)

Desired Response Date: _________________

When complete, the information on this form is SOURCE SELECTION SENSITIVE INFORMATION (41 U.S.C. 423) and shall be protected accordingly.

TO BE COMPLETED BY OFFEROR

1a. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO.:

3. CONTRACT AWARD DATE:

4. COMPLETION DATE:

5. CONTRACT VALUE (with options): $ 1b. NAME OF PRIME CONTRACTOR (If this questionnaire is for a team member)

6. TYPE OF CONTRACT:

7. PROJECT TITLE, LOCATION, AND DESCRIPTION (AND TOTAL CONSTRUCTION VALUE AT PROJECT COMPLETION):

Please add a continuation page if additional space necessary.

TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE

8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:

b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:

Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.

E = Exceptional S = Satisfactory U = Unacceptable G = Very Good M = Marginal N/O = Not Observed

A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).

E G S M U N/O

B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.

E G S M U N/O

C. Schedule – Assess the timeliness of contractor against the schedule of activities.

E G S M U N/O

D. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.

E G S M U N/O

E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.

E G S M U N/O

F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”.

E G S M U N/O

G. Overall Assessment.

E G S M U N/O