922CM3006_GANC_Bid Documents_Plans_20-35.pdf
PDF 14 MB Posted
- Attached to
- Y1FE--36C78622R0020 | Georgia NC; Expansion Ph 2 Construction 922CM3006 (VA-21-00103342)
- Solicitation number
- 36C78622R0020
About this file
This federal contract opportunity solicitation requests construction services for the expansion of the Georgia National Cemetery in Canton, Georgia. The solicitation seeks a contractor to construct approximately 6,624 pre-placed double-depth crypts in 3'x8' plots, 362 oversized preplaced double-depth crypts in 5'x10' plots, 294 traditional full casket gravesites in 5'x10' plots, 6,944 in-ground cremation sites in 4'x4' plots, and 7,300 columbarium niches. The solicitation also requires associated site and infrastructure work. The contracting agency is the Department of Veterans Affairs National Cemetery Administration. The solicitation number is 36C78622R0020 and offers are due on February 25, 2023.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLUMBARIUM
EX. FLOWER
WATERING
STATION (TYP.)
24" HDPE
24" HDPE
24" HDPE
24" HDPE
24"
HDPE
" H
DPE
18"
HDPE
18"
HDPE
18" HDPE
30" HDPE
18" HDPE
18" HDPE
24" HDPE
18" HDPE
18" HDPE
24" HDPE
24" HDPE
30" HDPE
CO
CO
8"
PVC UNDERDRAIN (T
YP.)
8"
PVC UNDERDRAIN (T
YP.)
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SECTION 13
(526 FULL
CASKET PLOTS)
SECTION 11
(1,746 PRE-PLACED
CRYPTS)
COMMITTAL
SHELTER #2
GARDEN
NICHE #3
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC UGC UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
C E
E
C E
C E
93+00
94+00
95+00
96+00
138+00
139+00
140+00
141+00
142+00
143+00
144+00
145+00
146+00 147+00
148+00
149+00
150+00
13+00
14+00
15+00
EX. FLOWER
WATERING
STATION (TYP.)
EX. WROUGHT
IRON FENCE/
GUARDRAIL (TYP.)
PC
: 9
3+
.05
PT: 95+56.80
PC: 96+59.88
PT: 13
8+16.
PC: 14
1+75.
EX. 8" D.I.P.
WATER MAIN
(TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
30" HDPE
4" PERFORATED PVC
UNDERDRAIN (TYP.)
47 25
HP
27 83
LP
22 20
LP
41 90
LP
42 54
HP
41 88
LP
44 39
HP
1156 1154
1148 1146
SECTION 15
2,146 PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
SECTION 14B
1,164 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 12B
528 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 14A
928 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 14D
1,276 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 14C
928 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 12A
512 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 12C
422 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SECTION 12D
1,186 IN-GROUND
CREMAIN SITES
(WITHIN 4'x4' PLOTS)
SEC
SEC
SEC
SEC
SEC
SEC
SEC
SEC
SE
C
SE
C
SE
C
SEC
SE
C
SE
C
SE
C
SE
C
SEC
SEC
113 0
113 4
113 4
113 2
113 8
114 2
114 2
113 4
114 0
113 2
113 6
113 6
1 1
3 2
3 0
114 2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
C8
C6
C7
C8
C9
12"
HDPE
12"
HDPE
12"
HDPE
12"
HDPE
E&S STRUCTURAL PRACTICES
A crushed stone pad located at the construction site exit to provide a place for removing mud from tires thereby protecting public streets.
A small temporary barrier or dam constructed across a swale, drainage ditch or area of concentrated flow.
Co CONSTRUCTION
EXIT
CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
Cd
Establishing a permanent vegetative cover such as trees, shrubs, vines, grasses, or legumes on disturbed areas.
Establishing a temporary vegetative cover with fast growing seedings on disturbed areas.
Establishing temporary protection for disturbed areas where seedlings may not have a suitable growing season to produce an erosion retarding cover.
Ds1
Ds3
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
DISTURBED AREA
STABILIZATION
(WITH TEMP
SEEDING)
Ds2
A basin created by excavation or a dam across a waterway. The surface water runoff is temporarily stored allowing the bulk of the sediment to drop out.
An impounding area created by excavating around a storm drain drop inlet. The excavated area will be filled and stabilized on completion of construction activities.
An earth channel or dike located above, below, or across a slope to divert runoff. This may be a temporary or permanent structure.
Di
Sd2
Sd3
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
(LABEL)
Sd3
A paved or short section of riprap channel at the outlet of a storm drain system preventing erosion from the concentrated runoff.
St
STORMDRAIN
OUTLET
PROTECTION
To protect desirable trees from injury during construction activity.
TREE
PROTECTIONTr
(DENOTE TREE CENTERS)
CHECKDAM
DIVERSION
A barrier to prevent sediment from leaving the construction site. It may be sandbags, bales of straw or hay, brush, logs and poles, gravel, or a silt fence.
Sd1 SEDIMENT
BARRIER
(TYPE C)
CE
DI
St
Ds3
Ds2
Ds1
DRAINAGE DIVIDE
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
3.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
MA
TC
HL
IN
E
SE
E
SH
EE
T
GC
GC110
EROSION & SEDIMENT CONTROL
PLAN PHASE 3
MA
TC
HL
IN
E
SE
E
SH
EE
T
GC
N
KEY MAP
(NOT TO SCALE)
321 4
WATERING
STATION (TYP.)
18" HDPE
18" HDPE
" H
DP
E
" H
DP
E
" H
DP
E
18" HDPE
" H
DPE
18"
HDPE
18"
HDPE
18" HDPE
" H
DP
E
30" HDPE
18" HDPE
EX. 6" PVC ROOF
DRAIN (TYP.)
EX. FLAG
SLEEVE (TYP.)
EX. CARILLON
CORTEGE
ASSEMBLY
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
EX. FIRE
HYDRANT
(TYP.)
SECTION 13
(526 FULL
CASKET PLOTS)
EX. SANITARY
SEWER SEPTIC
FIELD (TYP.)
VETERAN CEMETERY ROAD
PUBLIC
INFORMATION
CENTER
EX. ELECTRICAL
ESM'T (TYP.)
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UG
C
C
E
C
E
C
E
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC UGC
UGC
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
EX. TELEVISION
PEDESTAL (TYP.)
C
E
EX. ELECTRIC
TRANSFORMER
EM
EX. ELECTRIC
METER (TYP.)
TR
PUBLIC
INFORMATION
CENTER
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. SITE
SIGNAGE
(TYP.)
EX. UNDERGROUND
ELECTRICAL
CONDUIT (TYP.)
EX. UNDERGROUNDCOMMUNICATIONS
CONDUIT (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. DEPRESSED
MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. TRAFFIC
SIGNAGE
(TYP.)
EX. 8" D.I.P.
WATER
MAIN (TYP.)
EX. WATER
ESM'T (TYP.)
EX. 8" D.I.P. WATERMAIN (TYP.)
EX. FLAG
SLEEVE (TYP.)
EX. 1.5" PVC
SERVICE
LINE (TYP.)
EX. UNDERGROUND
ELECTRICAL
CONDUIT (TYP.)
EX. UNDERGROUND
COMMUNICATIONS
CONDUIT (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
E
C
C
88+00
89+00
90+00
91+00
92+00
93+00
94+00
95+00
150+00
+00
2+
3+
11+00
12+00
13+
14+00
15+00
16+00
17+00
18+00
11+00
12+00
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
EX. SITE
SIGNAGE
(TYP.)
EX. OVERHEAD
POWER LINES
(TYP.)
PC
: 9
3+
.05
PT: 152+25.80
EX. 8" D.I.P.
WATER MAIN
(TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
WALKWAY &
MONUMENT
EX. WATER
FOUNTAIN
EX. 4,000 GAL. SEPTICTANKS & 1,500 GAL.DOSING TANK
EX. ELECTRICAL
JUNCTION BOX (TYP.)
EX. ELECTRICAL
JUNCTION BOX /HAND HOLE (TYP.)
EX. SITE
SIGNAGE
(TYP.)
EX. 4" PVC SAN.
SEW. LATERAL
EX. SAN. SEW.
PRESSURE
DIST. VALVE
30" HDPE
EX. 1.5" PVC
SERVICE
LINE (TYP.)
EX. SEDIMENT
BASIN "L"
1160 1156
108810861084
1078107610741072 1068106610641062
52105
410421040
11681168
3+
4+
155+00
156+00
157+00
158+00
+00
160+00
161+00
PC: 153+63.69
PT
: 1
+9
1.4
PC
: 1
+9
8.4
PT: 158+91.69
PC: 159+18.87
SE
C
SEC
1138 1138
110211001098
1138 1138
"C"=
D.A.= AC.
TO STRC.12
0.88 0.37
"C"=
D.A.= AC.
TO STRC.13
0.15 0.77
"C"=
D.A.= AC.
TO STRC.11
0.21 0.38
"C"=
D.A.= AC.
TO STRC.10
0.76 0.34
"C"=
D.A.= AC.
TO STRC.9
0.21 0.43
"C"=
D.A.= AC.
TO STRC.19
0.03 0.90
"C"=
D.A.= AC.
TO STRC.18
0.04 0.90
"C"=
D.A.= AC.
TO STRC.17
0.05 0.90
"C"=
D.A.= AC.
TO STRC.16
0.12 0.53
"C"=
D.A.= AC.
TO STRC.8
0.30 0.39
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Ds3
Ds3
Ds3
Ds3
Ds3
Sd2
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
E&S STRUCTURAL PRACTICES
A crushed stone pad located at the construction site exit to provide a place for removing mud from tires thereby protecting public streets.
A small temporary barrier or dam constructed across a swale, drainage ditch or area of concentrated flow.
Co CONSTRUCTION
EXIT
CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
Cd
Establishing a permanent vegetative cover such as trees, shrubs, vines, grasses, or legumes on disturbed areas.
Establishing a temporary vegetative cover with fast growing seedings on disturbed areas.
Establishing temporary protection for disturbed areas where seedlings may not have a suitable growing season to produce an erosion retarding cover.
Ds1
Ds3
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
DISTURBED AREA
STABILIZATION
(WITH TEMP
SEEDING)
Ds2
A basin created by excavation or a dam across a waterway. The surface water runoff is temporarily stored allowing the bulk of the sediment to drop out.
An impounding area created by excavating around a storm drain drop inlet. The excavated area will be filled and stabilized on completion of construction activities.
An earth channel or dike located above, below, or across a slope to divert runoff. This may be a temporary or permanent structure.
Di
Sd2
Sd3
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
(LABEL)
Sd3
A paved or short section of riprap channel at the outlet of a storm drain system preventing erosion from the concentrated runoff.
St
STORMDRAIN
OUTLET
PROTECTION
To protect desirable trees from injury during construction activity.
TREE
PROTECTIONTr
(DENOTE TREE CENTERS)
CHECKDAM
DIVERSION
A barrier to prevent sediment from leaving the construction site. It may be sandbags, bales of straw or hay, brush, logs and poles, gravel, or a silt fence.
Sd1 SEDIMENT
BARRIER
(TYPE C)
CE
DI
St
Ds3
Ds2
Ds1
DRAINAGE DIVIDE
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
3.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
MA
TC
HL
IN
E
SE
E
SH
EE
T
GC
GC111
EROSION & SEDIMENT CONTROL
PLAN PHASE 3
MA
TC
HL
IN
E
SE
E
SH
EE
T
GC
N
KEY MAP
321 4
E&S STRUCTURAL PRACTICES
A crushed stone pad located at the construction site exit to provide a place for removing mud from tires thereby protecting public streets.
A small temporary barrier or dam constructed across a swale, drainage ditch or area of concentrated flow.
Co CONSTRUCTION
EXIT
CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
Cd
Establishing a permanent vegetative cover such as trees, shrubs, vines, grasses, or legumes on disturbed areas.
Establishing a temporary vegetative cover with fast growing seedings on disturbed areas.
Establishing temporary protection for disturbed areas where seedlings may not have a suitable growing season to produce an erosion retarding cover.
Ds1
Ds3
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
DISTURBED AREA
STABILIZATION
(WITH TEMP
SEEDING)
Ds2
A basin created by excavation or a dam across a waterway. The surface water runoff is temporarily stored allowing the bulk of the sediment to drop out.
An impounding area created by excavating around a storm drain drop inlet. The excavated area will be filled and stabilized on completion of construction activities.
An earth channel or dike located above, below, or across a slope to divert runoff. This may be a temporary or permanent structure.
Di
Sd2
Sd3
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
(LABEL)
Sd3
A paved or short section of riprap channel at the outlet of a storm drain system preventing erosion from the concentrated runoff.
St
STORMDRAIN
OUTLET
PROTECTION
To protect desirable trees from injury during construction activity.
TREE
PROTECTIONTr
(DENOTE TREE CENTERS)
CHECKDAM
DIVERSION
A barrier to prevent sediment from leaving the construction site. It may be sandbags, bales of straw or hay, brush, logs and poles, gravel, or a silt fence.
Sd1 SEDIMENT
BARRIER
(TYPE C)
CE
DI
St
Ds3
Ds2
Ds1
DRAINAGE DIVIDE
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION
UGE
UGE
UGE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
EX. WETLAND W3
00 1090
1100 1110
10521054105610581060
10621064
1066106810701072 107410761078
1080108210841086108810901092
109410961098
11001102
11041106
11081110111211141116111811201122112411261128
10981050
1118 1116
14 11
11681168
10421044
110811061104
8 1096
COLUMBARIUM D
4,100 GARDEN NICHES
160+00
161+00
162+00
163+00
PT: 158+91.69
PC: 159+18.87
PT
: 1
+1
2.6
SECTION 17
2,156 PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
164+00
165+00
166+00
167+00
PC
: 1
+7
4.2
PT: 166+62.86
+0
+0
12+00
13+00
14+00
15+00
15+81
PC: 10+97.88
PT
: 1
1+
.23
PC
: 1
4+
.49
PT: 14+67.24
COLUMBARIUM C
3,200 GARDEN NICHES
SEC
SEC
1114 11
1124 11
1 1 0 811
1 4
110 0
1118 1116
110211001098
28 11
26 11 24 11
22 11 20 11
18 11 16 11
1 1 161 1
2 0
12 11
111011121114
110 2
110 0 10 9 8
110 2 110 0
10 9 8
110 6
11001098
110 0
1114 1112
1108 1106
06 11
04 11 02 11 00 10
98 10 96 10
94 10 92 10
1118 1094
0 8
110 2
"C"=
D.A.= AC.
TO STRC.9
0.21 0.43
"C"=
D.A.= AC.
TO STRC.7
1.39 0.32
"C"=
D.A.= AC.
TO STRC.27
0.16 0.51
"C"=
D.A.= AC.
TO STRC.23
0.30 0.46
"C"=
D.A.= AC.
TO STRC. 14
0.61 0.44
"C"=
AC.
TO STRC.17
0.05
0.90
"C"=
D.A.= AC.
TO STRC.16
0.12 0.53
"C"=
D.A.= AC.
TO STRC.15
0.24 0.51
"C"=
D.A.= AC.
TO STRC.8
0.30 0.39
"C"=
D.A.= AC.
TO STRC.6
0.07 0.67
"C"=
D.A.= AC.
TO STRC.22
0.09 0.62
"C"=
D.A.= AC.
TO STRC.30
0.06 0.63
"C"=
D.A.= AC.
TO STRC.26
0.46 0.70
"C"=
D.A.= AC.
TO STRC.25
0.34 0.78
"C"=
D.A.= AC.
TO STRC. 31
0.16 0.56
"C"=
D.A.= AC.
TO STRC. 28
0.07 0.34
"C"=
D.A.= AC.
TO STRC.24
0.27 0.51
St
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2
Sd2 Sd2
Sd2
Sd2
Ds3
Ds3
Ds3
Ds3
Ds3
Ds3
Ds3
Ds3
Ds3
Ds3
Ds3
Sd2 Sd2
Sd2
Ds3
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
" H
DP
E
15" HDPE
18" HDPE
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
12" HDPE
12" HDPE
12" HDPE
12" HDPE
15"x12" TEE
8" HDPE
8" HDPE
DB2
26A
DB1
8" HDPE
C10
C11
C12
C13
18" HDPE
18" HDPE
18" HDPE
18" HDPE
18" HDPE
18" HDPE
8" HDPE
8" HDPE
8" HDPE 26B
14 11
COLUMBARIUM D
4,100 GARDEN NICHES
PC
: 1
4+
.49
1114 1112
0 6 11
Ds3Sd2 Sd2
Sd2
8" HDPE
26A
DB1
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
3.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
MA
TC
HL
IN
E
SE
E
SH
EE
T
GC
GC112
EROSION & SEDIMENT CONTROL
PLAN PHASE 3
N
KEY MAP
(NOT TO SCALE)
321 4
MATCHLINE
SEE BELOW
MATCHLINE
SEE BELOW
E&S STRUCTURAL PRACTICES
A crushed stone pad located at the construction site exit to provide a place for removing mud from tires thereby protecting public streets.
A small temporary barrier or dam constructed across a swale, drainage ditch or area of concentrated flow.
Co CONSTRUCTION
EXIT
CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
Cd
Establishing a permanent vegetative cover such as trees, shrubs, vines, grasses, or legumes on disturbed areas.
Establishing a temporary vegetative cover with fast growing seedings on disturbed areas.
Establishing temporary protection for disturbed areas where seedlings may not have a suitable growing season to produce an erosion retarding cover.
Ds1
Ds3
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
DISTURBED AREA
STABILIZATION
(WITH TEMP
SEEDING)
Ds2
A basin created by excavation or a dam across a waterway. The surface water runoff is temporarily stored allowing the bulk of the sediment to drop out.
An impounding area created by excavating around a storm drain drop inlet. The excavated area will be filled and stabilized on completion of construction activities.
An earth channel or dike located above, below, or across a slope to divert runoff. This may be a temporary or permanent structure.
Di
Sd2
Sd3
INLET
SEDIMENT
TRAP
TEMPORARY
SEDIMENT
BASIN
(LABEL)
Sd3
A paved or short section of riprap channel at the outlet of a storm drain system preventing erosion from the concentrated runoff.
St
STORMDRAIN
OUTLET
PROTECTION
To protect desirable trees from injury during construction activity.
TREE
PROTECTIONTr
(DENOTE TREE CENTERS)
CHECKDAM
DIVERSION
A barrier to prevent sediment from leaving the construction site. It may be sandbags, bales of straw or hay, brush, logs and poles, gravel, or a silt fence.
Sd1 SEDIMENT
BARRIER
(TYPE C)
Co
Di
St
Ds2
Ds1
DRAINAGE DIVIDE
LIMITS OF WORK
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION
LIMITS OF CLEARING
FAMILY ROOM
256 SF
155+00
PC: 153+63.69
PT
: 1
+9
1.4
PC
: 1
+9
8.4
18" HDPE
18" HDPE
18" HDPE
18" HDPE
EX. 6" PVC ROOF
DRAIN (TYP.)
EX. FLAG
SLEEVE (TYP.)
CORTEGE
ASSEMBLY
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
EX. FIRE
HYDRANT
(TYP.)
EX. SANITARY
SEWER SEPTIC
FIELD (TYP.)
VETERAN CEMETERY ROAD
PUBLIC
INFORMATION
CENTER
EX. SEGMENTAL RETAINING
WALL W/ ORNAMENTAL
PICKET FENCE ABOVE (TYP.)
EX. GUARD
RAIL (TYP.)
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UG
C
C
E
C
E
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
EX. TELEVISION
PEDESTAL (TYP.)C
E
EX. ELECTRIC
TRANSFORMER
EM
EX. ELECTRIC
METER (TYP.)
TR
PUBLIC
INFORMATION
CENTER
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. SITE
SIGNAGE
(TYP.)
EX. UNDERGROUND
ELECTRICAL
CONDUIT (TYP.)
EX. UNDERGROUND
COMMUNICATIONS
CONDUIT (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. DEPRESSED
MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. TRAFFIC
SIGNAGE
(TYP.)
EX. 8" D.I.P.
WATER
MAIN (TYP.)
EX. WATER
ESM'T (TYP.)
EX. 8" D.I.P. WATER
MAIN (TYP.)
EX. FLAG
SLEEVE (TYP.)
EX. 1.5" PVC
SERVICE
LINE (TYP.)
EX. UNDERGROUND
ELECTRICAL
CONDUIT (TYP.)
EX. UNDERGROUND
COMMUNICATIONS
CONDUIT (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
E
C
C
87+00
88+00
89+00
90+00
11+00
12+00
13+
14+00
15+0016+00
17+00
18+00
11+00
12+00
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
EX. SITE
SIGNAGE
(TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
WALKWAY &
MONUMENT
EX. WATER
FOUNTAIN
EX. 4,000 GAL. SEPTIC
TANKS & 1,500 GAL.
DOSING TANK
EX. ELECTRICAL
JUNCTION BOX (TYP.)
EX. ELECTRICAL
JUNCTION BOX /
HAND HOLE (TYP.)
EX. SITE
SIGNAGE
(TYP.)
EX. 4" PVC SAN.
SEW. LATERAL
EX. SAN. SEW.
PRESSURE
DIST. VALVE
EX. 1.5" PVC
SERVICE
LINE (TYP.)
11681168
FAMILY ROOM
256 SF
155+00
PC: 153+63.69
PT
: 1
+9
1.4
PC
: 1
+9
8.4
54 51
TOP
54 39
TOP
53 59
TOP
54 05
TOP
Di
Co
Di
Sd2
Sd2
Sd2
Sd1-NS
Sd1-NS
Sd1-NS
Sd1-NS
Sd1-NS
Sd2
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TPTPTP
TP
TP
TP
TP
Tr
Di
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
3.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
GC403
EROSION & SEDIMENT CONTROL PLAN
PHASE 3 - ADD ALTERNATE OPTION B
N
KEY MAP
(NOT TO SCALE)
P.I.C.
NORTH
GRAPHICAL SCALE: 1"=20'
20 10 0 20 40 60
GC501
EROSION & SEDIMENT CONTROL
DETAILS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
CoNOT TO SCALE
CRUSHED STONE CONSTRUCTION EXIT1
SILT FENCE - TYPE NON-SENSITIVE
SIDE VIEW
FLOW
18" MIN.
30" MIN. *
6"
2"
6' MAX. O.C.
FABRIC
TRENCH
6"
18" MIN.
30" MIN.
FRONT VIEW
NOTES:
1. USE STEEL POSTS AND WWF AS SPECIFIED BY THE EROSION, SEDIMENTATION, AND
POLLUTION CONTROL PLAN.
2. HEIGHT (*) IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN.
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND
CROWN FOR POSITIVE DRAINAGE.
3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE).
4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT
DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND
DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT
REMOVE MUD AND DIRT.
10.MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC
RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED
TO TRAP SEDIMENT.
6" MIN.
6" MIN.
50' MIN.
20' MIN.
FLOW
FLOW
ENTRANCE ELEVATION
(IF NEEDED)
NOTES:
1. DESIGN IS FOR SLOPES NO GREATER THAN 5%
(NOT DESIGNED FOR CONCENTRATED FLOWS).
2. THE STEEL POSTS SUPPORTING THE SILT FENCE
MATERIAL SHOULD BE SPACED EVENLY AROUND
THE PERIMETER OF THE INLET (MAXIMUM OF 3'
APART).
3. THE STEEL POSTS SHOULD BE SECURELY DRIVEN
AT LEAST 18" DEEP.
4. THE FABRIC SHOULD BE ENTRENCHED AT LEAST
12" AND THEN BACKFILLED WITH CRUSHED STONE
OR COMPACTED SOIL.
FABRIC WITH WIRE-BACKING SUPPORT
GATHER EXCESS AT CORNERS
WIRE-BACKING
*FABRIC ENTRENCHED AT
LEAST 12" AND BACKFILLED
WITH CRUSHED STONE OR
COMPACTED SOIL.
BURIED FABRIC
STAKE
CRUSHED STONE OR COMPACTED SOIL
DROP INLET WITH GRATE
FABRIC AND SUPPORTING FRAME FOR
STEEL FRAME AND SILT FENCE INSTALLATION
INLET PROTECTION
NOTE:
1. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 12 INCH OPENINGS SHALL BE FITTED OVER ALL
BLOCK OPENINGS TO HOLD GRAVEL IN PLACE.
2. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM
DRAIN. THE FIRST ROW OF BLOCKS WILL BE PLACED HERE FOR LATERAL SUPPORT.
3. ONE BLOCK (AS SHOWN) IS TO BE PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE
BOTTOM ROW TO ALLOW FOR POOL DRAINAGE.
FOUNDATION SET 2" BELOW
CREST OF STORM DRAIN
SEDIMENT DROP INLET
W/ GRATE
TEMPORARY
SEDIMENT POOL
GRAVEL
DEWATERING
RUNOFF WATER
WITH SEDIMENT
WIRE SCREEN
BLOCK AND GRAVEL SECTION
BLOCK AND GRAVEL DROP INLET PROTECTION
WIRE SCREEN
DROP INLET GRATE
GRAVEL FILTER SHOULD
HAVE SLOPE OF 2:1
CONCRETE BLOCK
DEWATERING
BLOCK AND GRAVEL PERSPECTIVE
RIPRAP APRON
AA
PIPE OUTLET TO WELL DEFINED CHANNEL
PLAN
RIPRAP APRON
SECTION A-A
PLAN
FILTER BLANKET
AA
FILTER
BLANKETSECTION A-A
PIPE OUTLET TO FLAT AREA -- NO WELL DEFINED CHANNEL
RIPRAP OUTLET PROTECTION
NOTES:
1. La IS THE LENGTH OF THE RIPRAP
APRON.
2. D = 1.5 TIMES THE MAXIMUM STONE
DIAMETER BUT NOT LESS THAN 6".
3. IN A WELL-DEFINED CHANNEL, EXTEND
THE APRON UP THE CHANNEL BANKS TO
AN ELEVATION OF 6" ABOVE THE
MAXIMUM TAILWATER DEPTH OR TO THE
TOP OF THE BANK (WHICHEVER IS LESS).
4. A FILTER BLANKET OR FILTER FABRIC
SHOULD BE INSTALLED BETWEEN THE
RIPRAP AND THE SOIL FOUNDATION.
TO BE SHOWN ON EROSION, SEDIMENTATION
AND POLLUTION CONTROL PLAN
2:1
2:1
GEOTEXTILE***,
POLYETHYLENE OR
GRASS LINER
2:1
2:1
2:1
2:1
GEOTEXTILE ALONE***
CLASS 1 RIP-RAP/SANDBAG
WITH GEOTEXTILE
* 6' MINIMUM OR WIDTH OF EXISTING STREAM (WHICHEVER IS GREATER)
** SEDIMENT BARRIER AND FILTER CLOTH SHOULD BE ENTRENCHED IN THE SAME TRENCH.
***GEOTEXTILE SHALL BE SPECIFIED IN ACCORDANCE WITH AASHTO M288-96 SECTION 7.5
TYPE A DIVERSION
TYPE B DIVERSION
TYPE C DIVERSION
DIVERSION STABILIZATION: CHANNELS SHALL BE STABILIZED IN ACCORDANCE WITH ITEM 5 OF THE
CONSTRUCTION SPECIFICATIONS.
Sd1-NSNOT TO SCALE SILT FENCE - TYPE NON-SENSITIVE (TYPE C)2 Sd2-BgNOT TO SCALE
INLET SEDIMENT TRAP (BLOCK & GRAVEL)3 Sd2-F
StNOT TO SCALE STORM DRAIN OUTLET PROTECTION5 DiNOT TO SCALE
DIVERSION6
NOT TO SCALE
INLET SEDIMENT TRAP (FILTER FABRIC)4
TREE PROTECTION
"SNOW" FENCE
PLAN
CROSS-SECTION
MIN. 4'
NOTES:
1. USE TRENCHER (I.E. DITCH WHICH) TO CUT A 4"-5" W X 18" D TRENCH ALONG
DRIP LINE (LIMIT OF CLEARING) AND BACKFILL WITH SAND AND LIGHTLY COMPACT.
2. SPACE STAKES AT INTERVALS SUFFICIENT TO MAINTAIN ALL FENCING OUT OF
DRIP LINE OR AS SHOWN BY ENGINEER (SET STAKES NO GREATER THAN 6 FEET
ON CENTER-REBAR IS NOT TO BE USED FOR STAKES).
3. MAINTAIN FENCE BY REPAIRING AND/OR REPLACING DAMAGED FENCE. DO NOT
REMOVE FENCING PRIOR TO LANDSCAPING OPERATIONS.
4. DO NOT STORE OR STACK MATERIALS, EQUIPMENT, OR VEHICLES WITHIN FENCED
AREA.
5. FENCE SHALL BE ORANGE VINYL "SNOW FENCE" 4' HIGH MINIMUM.
TrNOT TO SCALE
TREE PROTECTION (SNOW FENCE)7
GC502
EROSION & SEDIMENT CONTROL
DETAILS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
Ds3NOT TO SCALE
DISTURBED AREA STABILIZATION (PERM. VEGETATION)3
Ds1NOT TO SCALE DISTURBED AREA STABILIZATION (MULCHING)1 Ds2NOT TO SCALE
DISTURBED AREA STABILIZATION (TEMP. SEEDING)2
GC503
EROSION & SEDIMENT CONTROL
DETAILS
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\G C-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
TEMPORARY SEDIMENT TRAP
ROCK OUTLET
COURTESY OF CITY OF KNOXVILLE BMP EROSION AND SEDIMENT
RECOMMENDED MINIMUM RATIO
OF LENGTH-TO-WIDTH (L:W) IS 2:1
FLOW
MINIMUM DISTANCE 1.5' TO SPILLWAY INVERT
MAXIMUM DEPTH
MINIMUM TOP WIDTH = EMBANKMENT
HEIGHT (3 FOOT MINIMUM)
5.5' MIN.
TYPICAL WIDTH = 3 FEET
5.5' MAX.
SPILLWAY WIDTH
CROSS-SECTION
PROFILE THROUGH EMBANKMENT
FIRMLY "KEY EMBANKMENT
INTO NATURAL GROUND
TOP OF BERM
MAXIMUM TOP WIDTH ~3'
MAXIMUM SLOPES 2:1
EMERGENCY
SPILLWAY (MIN.
DEPTH = 1.5')
EXCAVATED MATERIAL WILL INCREASE
STORAGE VOLUME AND PROVIDE FILL
MATERIAL
MAXIMUM SLOPES 2:1
MAXIMUM SLOPE 2:1
SEE APPENDIX C FOR STONE SIZING
(67) CUBIC YARDS PER ACRE)
TYPICAL RIP-RAP DEPTH FOR
OVERFLOW WEIR = 2 FEET
ADDITIONAL VOLUME FOR SILT
STORAGE (OPTIONAL)
NATURAL GROUND
COMPACT FILL IN
MAXIMUM 6" LAYERS
GEOTEXTILE FABRIC BETWEEN
SOIL AND RIP-RAP
RIP-RAP
GEOTEXTILE FABRIC
(KEYED INTO GROUND)
Sd4NOT TO SCALE
TEMPORARY SEDIMENT TRAP (ROCK OUTLET)3
Ds4NOT TO SCALE DISTURBED AREA STABILIZATION (SODDING)1 DuNOT TO SCALE
DUST CONTROL ON DISTURBED AREAS2
24"
HDPE
18" HDPE
18" HDPE
" H
DP
E
18" HDPE
24" HDPE
" H
DP
E
" H
DP
E
" H
DP
E
" H
DP
E
30" HDPE
18" HDPE
18" HDPE
18" HDPE
18" HDPE
CO
CO
FLAG ASSEMBLY AREA
EX. MEMORIAL
WALKWAY
EX. POW
FLAG AREA
EX. MEMORIAL SECTIONS
INTERMENT AREA #3
SECTION 6
(1,360 FULL
CASKET PLOTS)
SECTION 5
(1,332 FULL CASKET
PLOTS)
SECTION 4
(1,252 FULL CASKET
PLOTS)
SECTION 2
(1,552 FULL CASKET
PLOTS)
SECTION 8
(1,746 PRE-PLACED
CRYPTS)
SECTION 9
(1,746 PRE-PLACED
CRYPTS)
SECTION 10
(1,746 PRE-PLACED
CRYPTS)
SCATTER
GARDEN
COMMITTAL
SHELTER #2
GARDEN
NICHE #3
GARDEN
NICHE #2
GARDEN
NICHE #1
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGEUGEUGEUGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
C
C
C E
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
128+00
129+00
130+00
+00
+00
133+00
134+00
135+00
136+00
137+00
138+00
139+00
140+00
11+00
12+00
13+00
14+00
15+00
EX. MOUNTABLE
CURB (TYP.)
EX. GRAVEL
MAINTENANCE.
DRIVE (TYP.)
EX. 8' CONC.
SIDEWALK (TYP.)
EX. 8' CONC.
SIDEWALK (TYP.)
EX. 10' CONC.
SIDEWALK (TYP.)
EX. WROUGHT
IRON FENCE/
GUARDRAIL (TYP.)
PT: 130+81.64
PC: 132+04.09
PT: 13
8+16.
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. SEDIMENT
35 21
LP
49 80
HP
47 25
HP
42 24
HP
41 90
LP
42 16
HP
41 90
LP
42 54
HP
41 88
LP
115 4
62 1154
REMOVE & DISPOSE OF (OR RECYCLE) EX. CONCRETE
SIDEWALK; INCLUDES AGGREGATE BASE COURSE.
REMOVE EX. CURB AND GUTTER
SAW CUT EX. CONCRETE
MILL & OVERLAY EX. CONCRETE PAVEMENT
TREE FENCING AND ARMOR
DEMOLITION LEGEND:
REMOVE EX. FEATURE
XX
EX. INTERMENT AREAS TO BE VACATED / REMOVED.
SH REMOVE EX. IRRIGATION SERVICE LINE &
ASSOCIATED SPRINKLER STRUCTURES
REMOVE EX. GRAVEL DRIVE
LIMITS OF WORK
TERMINATE DEMOLITION OF EX. UTILITY LINE
CAP EX. UTILITY LINE
REMOVE EX. VEGETATION
REMOVE EX. BURIAL SECTION MARKERS; INCLUDES ALL CONCRETE BASES
DEMOLITION KEYNOTE LEGEND:
DESCRIPTIONKEY
REMOVE EX. BURIAL SECTION GRID MONUMENTS ; INCLUDES ALL CONCRETE BASES
REMOVE EX. TREES AND/OR BUSHES
REMOVE EX. UTILITY ACCESS GATE & ALL ASSOCIATED HARDWARE
REMOVE EX. WATER SPIGOT (CAP OFF LINES) AND FLOWER WATERING STATION3
REMOVE EX. OVERHEAD UTILITY LINE & POLES (UNDER SEPARATE COVER) (N.I.C.)6
1. THE DEMOLITION PLAN IS A GENERAL GUIDE OF WHAT NEEDS TO BE
DEMOLISHED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY
ALL ITEMS THAT REQUIRE DEMOLITION TO COMPLETE THE PROPOSED
CONSTRUCTION.
2. SITE FEATURES SHOWN IN BOLD TO BE REMOVED.
3. THE LENGTH OF CURBING TO BE REMOVED SHALL BE CARRIED TO THE
NEAREST EXPANSION JOINT, OR SAW CUT IF THE JOINT IS LOCATED MORE THAN
FIVE FEET FROM THE END OF CURB REMOVAL.
4. SEE SITE SIGNAGE PLANS FOR SUMMARY OF EXISTING SIGNAGE TO BE
REMOVED / REPLACED.
5. BIDDERS ARE ENCOURAGE TO VISIT THE SITE, PRIOR TO BID, TO DETERMINE
THE LIMITS OF TREE REMOVAL AND DEPOSITION.
6. SEE SHEET CS100 FOR WHERE EXCESS SOIL/ROCK MAY BE DISPOSED. THE
CONTRACTOR IS REQUIRED TO PROVIDE EROSION AND SEDIMENT CONTROLS
AND STABILIZE SOIL IN ACCORDANCE WITH ALL LOCAL AND FEDERAL
REGULATIONS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A NATIONAL
POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT (NPDES) FROM THE
STATE OF GEORGIA PRIOR TO CONSTRUCTION.
DEMOLITION NOTES:
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\C D-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
CD101
DEMOLITION PLAN
N
KEY MAP
(NOT TO SCALE)
321 4
MA
TC
HL
IN
E
SE
E
SH
EE
T
CD
WATERING
STATION (TYP.)
24" HDPE
24" HDPE
24" HDPE
24" HDPE
24"
HDPE
" H
DPE
18"
HDPE
18"
HDPE
18" HDPE
30" HDPE
18" HDPE
18" HDPE
24" HDPE
18" HDPE
18" HDPE
24" HDPE
24" HDPE
30" HDPE
CO
CO
8"
PVC UNDERDRAIN (T
YP.)
8"
PVC UNDERDRAIN (T
YP.)
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SECTION 14
(1,658 FULL CASKET
PLOTS)
SECTION 15
(1,336 FULL CASKET
PLOTS)
SECTION 12
(1,746 FULL CASKET
PLOTS)
SECTION 13
(526 FULL
CASKET PLOTS)
SECTION 11
(1,746 PRE-PLACED
CRYPTS)
COMMITTAL
SHELTER #2
GARDEN
NICHE #3
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC UGC UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
C E
E
C E
C E
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
SH
93+00
94+00
95+00
96+00
138+00
139+00
140+00
141+00
142+00
143+00
144+00
145+00
146+00 147+00
148+00
149+00
150+00
13+00
14+00
15+00
EX. FLOWER
WATERING
STATION (TYP.)
EX. WROUGHT
IRON FENCE/
GUARDRAIL (TYP.)
PC
: 9
3+
.05
PT: 95+56.80
PC: 96+59.88
PT: 13
8+16.
PC: 14
1+75.
EX. 8" D.I.P.
WATER MAIN
(TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
30" HDPE
4" PERFORATED PVC
UNDERDRAIN (TYP.)
47 25
HP
27 83
LP
22 20
LP
41 90
LP
42 54
HP
41 88
LP
44 39
HP
1156 1154
1148 1146
REMOVE & DISPOSE OF (OR RECYCLE) EX. CONCRETE
SIDEWALK; INCLUDES AGGREGATE BASE COURSE.
REMOVE EX. CURB AND GUTTER
SAW CUT EX. CONCRETE
MILL & OVERLAY EX. CONCRETE PAVEMENT
TREE FENCING AND ARMOR
DEMOLITION LEGEND:
REMOVE EX. FEATURE
XX
EX. INTERMENT AREAS TO BE VACATED / REMOVED.
SH REMOVE EX. IRRIGATION SERVICE LINE &
ASSOCIATED SPRINKLER STRUCTURES
REMOVE EX. GRAVEL DRIVE
LIMITS OF WORK
TERMINATE DEMOLITION OF EX. UTILITY LINE
CAP EX. UTILITY LINE
REMOVE EX. VEGETATION
REMOVE EX. BURIAL SECTION MARKERS; INCLUDES ALL CONCRETE BASES
DEMOLITION KEYNOTE LEGEND:
DESCRIPTIONKEY
REMOVE EX. BURIAL SECTION GRID MONUMENTS ; INCLUDES ALL CONCRETE BASES
REMOVE EX. TREES AND/OR BUSHES
REMOVE EX. UTILITY ACCESS GATE & ALL ASSOCIATED HARDWARE
REMOVE EX. WATER SPIGOT (CAP OFF LINES) AND FLOWER WATERING STATION3
REMOVE EX. OVERHEAD UTILITY LINE & POLES (UNDER SEPARATE COVER) (N.I.C.)6
1. THE DEMOLITION PLAN IS A GENERAL GUIDE OF WHAT NEEDS TO BE
DEMOLISHED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY
ALL ITEMS THAT REQUIRE DEMOLITION TO COMPLETE THE PROPOSED
CONSTRUCTION.
2. SITE FEATURES SHOWN IN BOLD TO BE REMOVED.
3. THE LENGTH OF CURBING TO BE REMOVED SHALL BE CARRIED TO THE
NEAREST EXPANSION JOINT, OR SAW CUT IF THE JOINT IS LOCATED MORE THAN
FIVE FEET FROM THE END OF CURB REMOVAL.
4. SEE SITE SIGNAGE PLANS FOR SUMMARY OF EXISTING SIGNAGE TO BE
REMOVED / REPLACED.
5. BIDDERS ARE ENCOURAGE TO VISIT THE SITE, PRIOR TO BID, TO DETERMINE
THE LIMITS OF TREE REMOVAL AND DEPOSITION.
6. SEE SHEET CS100 FOR WHERE EXCESS SOIL/ROCK MAY BE DISPOSED. THE
CONTRACTOR IS REQUIRED TO PROVIDE EROSION AND SEDIMENT CONTROLS
AND STABILIZE SOIL IN ACCORDANCE WITH ALL LOCAL AND FEDERAL
REGULATIONS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A NATIONAL
POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT (NPDES) FROM THE
STATE OF GEORGIA PRIOR TO CONSTRUCTION.
DEMOLITION NOTES:
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\C D-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
CD102
DEMOLITION PLAN
N
KEY MAP
(NOT TO SCALE)
321 4
MA
TC
HL
IN
E
SE
E
SH
EE
T
CD
MA
TC
HL
IN
E
SE
E
SH
EE
T
CD
STATION (TYP.)
18" HDPE
18" HDPE
" H
DP
E
" H
DP
E
" H
DP
E
18" HDPE
" H
DPE
18"
HDPE
18"
HDPE
18" HDPE
" H
DP
E
30" HDPE
18" HDPE
EX. 6" PVC ROOF
DRAIN (TYP.)
EX. UTILITY
ACCESS GATE
EX. GRAVEL
TRAIL (TYP.)
EX. FLAG
SLEEVE (TYP.)
EX. CARILLON
CORTEGE
ASSEMBLY
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
EX. FIRE
HYDRANT
(TYP.)
SECTION 13
(526 FULL
CASKET PLOTS)
EX. SANITARY
SEWER SEPTIC
FIELD (TYP.)
VETERAN CEMETERY ROAD
PUBLIC
INFORMATION
CENTER
EX. ELECTRICAL
ESM'T (TYP.)
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UG
C
C
E
C
E
C
E
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC UGC
UGC
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
EX. TELEVISION
PEDESTAL (TYP.)
C
E
EX. ELECTRIC
TRANSFORMER
EM
EX. ELECTRIC
METER (TYP.)
TR
PUBLIC
INFORMATION
CENTER
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. SITE
SIGNAGE
(TYP.)
EX. UNDERGROUND
ELECTRICAL
CONDUIT (TYP.)
EX. UNDERGROUNDCOMMUNICATIONS
CONDUIT (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. DEPRESSED
MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. MOUNTABLE
CONCRETE CURB &
GUTTER (TYP.)
EX. TRAFFIC
SIGNAGE
(TYP.)
EX. 8" D.I.P.
WATER
MAIN (TYP.)
EX. WATER
ESM'T (TYP.)
EX. 8" D.I.P. WATERMAIN (TYP.)
EX. FLAG
SLEEVE (TYP.)
EX. 1.5" PVC
SERVICE
LINE (TYP.)
EX. UNDERGROUND
ELECTRICAL
CONDUIT (TYP.)
EX. UNDERGROUND
COMMUNICATIONS
CONDUIT (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
SH
SH
SH
EX. UTILITY
POLE (TYP.)
E
C
C
88+00
89+00
90+00
91+00
92+00
93+00
94+00
95+00
150+00
+00
2+
3+
11+00
12+00
13+
14+00
15+00
16+00
17+00
18+00
11+00
12+00
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
EX. SITE
SIGNAGE
(TYP.)
EX. GRAVEL
TRAIL (TYP.)
EX. OVERHEAD
POWER LINES
(TYP.)
PC
: 9
3+
.05
PT: 152+25.80
EX. 8" D.I.P.
WATER MAIN
(TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. 6" PVC
IRRIGATION
MAIN (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
SIDEWALK (TYP.)
EX. CONCRETE
WALKWAY &
MONUMENT
EX. WATER
FOUNTAIN
EX. 4,000 GAL. SEPTICTANKS & 1,500 GAL.DOSING TANK
EX. ELECTRICAL
JUNCTION BOX (TYP.)
EX. ELECTRICAL
JUNCTION BOX /HAND HOLE (TYP.)
EX. SITE
SIGNAGE
(TYP.)
EX. 4" PVC SAN.SEW. LATERAL
EX. SAN. SEW.
PRESSURE
DIST. VALVE
30" HDPE
EX. 1.5" PVC
SERVICE
LINE (TYP.)
EX. SEDIMENT
BASIN "L"
1160 1156
108810861084
1078107610741072 1068106610641062
52105
410421040
11681168
REMOVE & DISPOSE OF (OR RECYCLE) EX. CONCRETE
SIDEWALK; INCLUDES AGGREGATE BASE COURSE.
REMOVE EX. CURB AND GUTTER
SAW CUT EX. CONCRETE
MILL & OVERLAY EX. CONCRETE PAVEMENT
TREE FENCING AND ARMOR
DEMOLITION LEGEND:
REMOVE EX. FEATURE
XX
EX. INTERMENT AREAS TO BE VACATED / REMOVED.
SH REMOVE EX. IRRIGATION SERVICE LINE &
ASSOCIATED SPRINKLER STRUCTURES
REMOVE EX. GRAVEL DRIVE
LIMITS OF WORK
TERMINATE DEMOLITION OF EX. UTILITY LINE
CAP EX. UTILITY LINE
REMOVE EX. VEGETATION
REMOVE EX. BURIAL SECTION MARKERS; INCLUDES ALL CONCRETE BASES
DEMOLITION KEYNOTE LEGEND:
DESCRIPTIONKEY
REMOVE EX. BURIAL SECTION GRID MONUMENTS ; INCLUDES ALL CONCRETE BASES
REMOVE EX. TREES AND/OR BUSHES
REMOVE EX. UTILITY ACCESS GATE & ALL ASSOCIATED HARDWARE
REMOVE EX. WATER SPIGOT (CAP OFF LINES) AND FLOWER WATERING STATION3
REMOVE EX. OVERHEAD UTILITY LINE & POLES (UNDER SEPARATE COVER) (N.I.C.)6
1. THE DEMOLITION PLAN IS A GENERAL GUIDE OF WHAT NEEDS TO BE
DEMOLISHED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY
ALL ITEMS THAT REQUIRE DEMOLITION TO COMPLETE THE PROPOSED
CONSTRUCTION.
2. SITE FEATURES SHOWN IN BOLD TO BE REMOVED.
3. THE LENGTH OF CURBING TO BE REMOVED SHALL BE CARRIED TO THE
NEAREST EXPANSION JOINT, OR SAW CUT IF THE JOINT IS LOCATED MORE THAN
FIVE FEET FROM THE END OF CURB REMOVAL.
4. SEE SITE SIGNAGE PLANS FOR SUMMARY OF EXISTING SIGNAGE TO BE
REMOVED / REPLACED.
5. BIDDERS ARE ENCOURAGE TO VISIT THE SITE, PRIOR TO BID, TO DETERMINE
THE LIMITS OF TREE REMOVAL AND DEPOSITION.
6. SEE SHEET CS100 FOR WHERE EXCESS SOIL/ROCK MAY BE DISPOSED. THE
CONTRACTOR IS REQUIRED TO PROVIDE EROSION AND SEDIMENT CONTROLS
AND STABILIZE SOIL IN ACCORDANCE WITH ALL LOCAL AND FEDERAL
REGULATIONS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A NATIONAL
POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT (NPDES) FROM THE
STATE OF GEORGIA PRIOR TO CONSTRUCTION.
DEMOLITION NOTES:
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\C D-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
CD103
DEMOLITION PLAN
N
KEY MAP
(NOT TO SCALE)
321 4
MA
TC
HL
IN
E
SE
E
SH
EE
T
CD
MA
TC
HL
IN
E
SE
E
SH
EE
T
CD
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OH
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE
OHE
OHE
OHE
OHE
OHE
UGE
UGE
UGE
EX. UTILITY
POLE (TYP.)
EX. GUY
WIRE (TYP.)
EX. COMM.
POLE (TYP.)
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
EX. GRAVEL
TRAIL (TYP.)
EX. GRAVEL
TRAIL (TYP.)
EX. WETLAND W3
00 1090
1100 1110
10521054105610581060
10621064
1066106810701072 107410761078
1080108210841086108810901092
109410961098
11001102
11041106
11081110111211141116111811201122112411261128
10981050
1118 1116
14 11
11681168
10421044
110811061104
8 1096
REMOVE & DISPOSE OF (OR RECYCLE) EX. CONCRETE
SIDEWALK; INCLUDES AGGREGATE BASE COURSE.
REMOVE EX. CURB AND GUTTER
SAW CUT EX. CONCRETE
MILL & OVERLAY EX. CONCRETE PAVEMENT
TREE FENCING AND ARMOR
DEMOLITION LEGEND:
REMOVE EX. FEATURE
XX
EX. INTERMENT AREAS TO BE VACATED / REMOVED.
SH REMOVE EX. IRRIGATION SERVICE LINE &
ASSOCIATED SPRINKLER STRUCTURES
REMOVE EX. GRAVEL DRIVE
LIMITS OF WORK
TERMINATE DEMOLITION OF EX. UTILITY LINE
CAP EX. UTILITY LINE
REMOVE EX. VEGETATION
REMOVE EX. BURIAL SECTION MARKERS; INCLUDES ALL CONCRETE BASES
DEMOLITION KEYNOTE LEGEND:
DESCRIPTIONKEY
REMOVE EX. BURIAL SECTION GRID MONUMENTS ; INCLUDES ALL CONCRETE BASES
REMOVE EX. TREES AND/OR BUSHES
REMOVE EX. UTILITY ACCESS GATE & ALL ASSOCIATED HARDWARE
REMOVE EX. WATER SPIGOT (CAP OFF LINES) AND FLOWER WATERING STATION3
REMOVE EX. OVERHEAD UTILITY LINE & POLES (UNDER SEPARATE COVER) (N.I.C.)6
1. THE DEMOLITION PLAN IS A GENERAL GUIDE OF WHAT NEEDS TO BE
DEMOLISHED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY
ALL ITEMS THAT REQUIRE DEMOLITION TO COMPLETE THE PROPOSED
CONSTRUCTION.
2. SITE FEATURES SHOWN IN BOLD TO BE REMOVED.
3. THE LENGTH OF CURBING TO BE REMOVED SHALL BE CARRIED TO THE
NEAREST EXPANSION JOINT, OR SAW CUT IF THE JOINT IS LOCATED MORE THAN
FIVE FEET FROM THE END OF CURB REMOVAL.
4. SEE SITE SIGNAGE PLANS FOR SUMMARY OF EXISTING SIGNAGE TO BE
REMOVED / REPLACED.
5. BIDDERS ARE ENCOURAGE TO VISIT THE SITE, PRIOR TO BID, TO DETERMINE
THE LIMITS OF TREE REMOVAL AND DEPOSITION.
6. SEE SHEET CS100 FOR WHERE EXCESS SOIL/ROCK MAY BE DISPOSED. THE
CONTRACTOR IS REQUIRED TO PROVIDE EROSION AND SEDIMENT CONTROLS
AND STABILIZE SOIL IN ACCORDANCE WITH ALL LOCAL AND FEDERAL
REGULATIONS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A NATIONAL
POLLUTION DISCHARGE ELIMINATION SYSTEM PERMIT (NPDES) FROM THE
STATE OF GEORGIA PRIOR TO CONSTRUCTION.
DEMOLITION NOTES:
14 11
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
CHEROKEE COUNTY, GEORGIA
922CM3006
FEBRUARY 28, 2022 DCW MAC Dwg. of 178
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS SUBMISSIONVA FORM 08 - 6231
321 4 5 6 7 8 9
GEORGIA NATIONAL CEMETERY
CONSTRUCTION DOCUMENTS
FOR PHASE 2
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\E
NG
IN
\33
\08
\P
LA
NS
\C D2
\C D-
1.D
W G
Gordon
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
PROGRAMMING AND PLANNING
CIVIL ENGINEERING
LANDSCAPE ARCHITECTURE
SURVEY AND MAPPING
SECURITY CONSULTING
The LA Group
(518) 587-8100
BID DOCUMENTS
RVi
(512) 480-0032
Leo A Daly
(402) 391-8111
Aqua Engineering
(970) 372-6104
NORTH
GRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
CD104
DEMOLITION PLAN
N
KEY MAP
(NOT TO SCALE)
321 4
MA
TC
HL
IN
E
SE
E
SH
EE
T
CD
MATCHLINE
SEE BELOW
MATCHLINE
SEE ABOVE
18" HDPE
18" HDPE
18" HDPE
18" HDPE
EX. 6" PVC ROOF
DRAIN (TYP.)
EX. FLAG
SLEEVE (TYP.)
CORTEGE
ASSEMBLY
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
EX. FIRE
HYDRANT
(TYP.)
EX. SANITARY
SEWER SEPTIC
FIELD (TYP.)
VETERAN CEMETERY ROAD
PUBLIC
INFORMATION
CENTER
EX. SEGMENTAL RETAINING
WALL W/ ORNAMENTAL
PICKET FENCE ABOVE (TYP.)
EX. GUARD
RAIL (TYP.)
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
OHE
OH
E
OH
E
OH
E
OH
E
OH
E
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UG
C
C
E
C
E
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .