This document contains answers to questions regarding an amendment to a solicitation for the construction of Phase II of the expansion of the Georgia National Cemetery.

The solicitation is for the construction of approximately 6,624 pre-placed double-depth crypts in 3'x8' plots, 362 oversized preplaced double-depth crypts in 5'x10' plots, 294 traditional full casket gravesites in 5'x10' plots, 6,944 in-ground cremation sites in 4'x4' plots, and 7,300 columbarium niches. Associated site and infrastructure work is also required. The solicitation number is 36C78622R0020 and was issued by the Department of Veterans Affairs National Cemetery Administration for work at the Georgia National Cemetery located at 25 Mount Carmel Church Ln, Canton, GA 30114.

The amendment answers clarify that OSHA 30 training is only required for supervisors and safety managers, while other trades must have OSHA 10 training. Additionally, the preliminary BMP plan provided can be used as the baseline for costs but will be reviewed, validated and any additional costs negotiated.

View the file

Other files

File Type Posted
Amendment 9 36C78622R0020 SF30 (10-18-2022).pdf PDF
Amendment 9 NCA 13 Georgia National Cemeta2021 Bridge inspection report_ 7 (10-18-2022).pdf PDF
Amendment 9 36C78622R0020 Georgia NC Expansion Ph 2 (10-18-2022).pdf PDF
Amendment 0008 SF30.pdf PDF
AMENDMENT 8 RESPONSES TO RFI QUESTIONS (36C78622P0020) Georgia National Cemetery 10112022.pdf PDF
Seismic Refraction Georgia NC Amendment 8 (10-12-2022).pdf PDF
AMENDMENT 0007 EXTENDING THE PROPOSAL DUE DATE 10-19-2022 (36C78622R0020).pdf PDF
36C78622R0020 Amendment 0006 (9-29-2022).pdf PDF
Amendment 005 36C78622R0020 Posting sign in sheet for site visit.pdf PDF
Amendment 005 Georgia National Cemetery Phase 2 Development RFP 36C78622R0020.pdf PDF
Amendement 4 METHODOLOGY 9-15-2022.pdf PDF
36C78622R0020 0004 METHODOLOGY (SF30).pdf PDF
36C78622R0020 Amendment 3 (SF30 RFI Responses with attachments posted 09-09-2022).pdf PDF
36C78622R0020 0002 8-18-2022.pdf PDF
922CM3006_GANC_Bid Documents_Plans_146-150.pdf PDF
922CM3006_GANC_Bid Documents_Plans_140-145.pdf PDF
922CM3006_GANC_Bid Documents_Plans_151-178.pdf PDF
922CM3006_GANC_Bid Documents_Plans_137-139.pdf PDF
922CM3006_GANC_Bid Documents_Plans_01-07.pdf PDF
Sample Cost estimate worksheet (2) (8-11-2022).xlsx XLSX spreadsheet
Sample Cost estimate worksheet (2) (8-11-2022).xls XLS spreadsheet
922CM3006_GANC_BOD For posting to FBO 8-11-22.pdf PDF
36C78622R0020 0001 Amendment (RFI).pdf PDF
922CM3006_GANC_Bid Documents_Plans_101-122.pdf PDF
Sample Cost estimate worksheet (1) (8-8-2022).xlsx XLSX spreadsheet
922CM3006_GANC_Bid Documents_Plans_59-79.pdf PDF
922CM3006_GANC_Bid Documents_Plans_20-35.pdf PDF
General Decision Number GA20220231 02-25-2022 6C78622R0020 Georgia.pdf PDF
PERFORMANCE QUESTIONNAIRE for 36C78622R0020 Georgia NC Expansion Ph 2 Construction 922CM3006(8-8-2022).pdf PDF
922CM3006_GANC_Bid Documents_Plans_123-133.pdf PDF
922CM3006_GANC_Bid Documents_Plans_93-100.pdf PDF
922CM3006_GANC_Basis of Design (BOD) For posting to FBO 8-8-2022 (1).pdf PDF
General Decision Number GA20220291 07-29-2022 (RFP 36C78622R0020).pdf PDF
Sample Cost estimate worksheet (3) (8-8-2022).xlsx XLSX spreadsheet
922CM3006_GANC_Bid Documents_Plans_08-19.pdf PDF
922CM3006_GANC_Bid_SPECS.pdf PDF
PERFORMANCE QUESTIONNAIRE for 36C78622R0020 Georgia NC Expansion Ph 2 Construction 922CM3006 (8-8-2022).docx DOCX document
922CM3006_GANC_Bid Documents_Plans_80-92.pdf PDF
36C78622R0020_3.docx DOCX document
922CM3006_GANC_Bid Documents_Plans_134-136.pdf PDF
922CM3006_GANC_Bid Documents_Plans_36-58.pdf PDF
Sample Cost estimate worksheet (2) (8-8-2022).xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C78622R0020 Georgia National Cemetery 09/29/2022 Amendment #6

Question:

1.1.G.1 of 01 00 02 General Requirements calls for all employees of general contractor and subs to have successfully completed OSHA 30 HR training. In the past the OSHA 30 has been a requirement for supervisors and general trade labor has completed OSHA 10 HR training. Please verify that all employees on jobsite are to have OSHA 30 HR training.

OSHA 30 HR Training is only a requirement for supervisors and safety managers. All other trade labor must have OSHA 10 HR training.

Question:

Sheet GC001 (Right Side of Drawing) Includes:

The note indicates that this is only a preliminary plan and that costs for deficiencies in this plan will be on the contractor to cover. Being this is not a design build project, will the VA allow this preliminary plan to be the baseline for BMPs and allow for reimbursement for any additional BMPs that our Level II Designer deems necessary to meet Georgia requirements?

We will allow the preliminary plan to be the baseline for BMPs and review/validate/negotiate any costs for additional BMP costs