922CM3006_GANC_Bid_SPECS.pdf

PDF 7 MB Posted

Attached to
Y1FE--36C78622R0020 | Georgia NC; Expansion Ph 2 Construction 922CM3006 (VA-21-00103342)
Solicitation number
36C78622R0020
Issued by

About this file

This document outlines requirements for a construction project at the Georgia National Cemetery. The project involves expanding burial space through the construction of approximately 6,624 pre-placed double-depth crypts, 362 oversized pre-placed double-depth crypts, 294 traditional full casket gravesites, 6,944 in-ground cremation sites, and 7,300 columbarium niches, along with associated site and infrastructure work. The construction documents provide specifications and drawings for the project located at 2025 Mount Carmel Church Ln, Canton, GA 30114. Bids are due by the date specified in the solicitation number 36C78622R0020 issued by the Department of Veterans Affairs National Cemetery Administration.

View the file

Other files

File Type Posted
Amendment 9 36C78622R0020 SF30 (10-18-2022).pdf PDF
Amendment 9 NCA 13 Georgia National Cemeta2021 Bridge inspection report_ 7 (10-18-2022).pdf PDF
Amendment 9 36C78622R0020 Georgia NC Expansion Ph 2 (10-18-2022).pdf PDF
Amendment 0008 SF30.pdf PDF
AMENDMENT 8 RESPONSES TO RFI QUESTIONS (36C78622P0020) Georgia National Cemetery 10112022.pdf PDF
Seismic Refraction Georgia NC Amendment 8 (10-12-2022).pdf PDF
AMENDMENT 0007 EXTENDING THE PROPOSAL DUE DATE 10-19-2022 (36C78622R0020).pdf PDF
36C78622R0020 Amendment 0006 (9-29-2022).pdf PDF
Amendment 6 RFI Answers (SAM post).pdf PDF
Amendment 005 36C78622R0020 Posting sign in sheet for site visit.pdf PDF
Amendment 005 Georgia National Cemetery Phase 2 Development RFP 36C78622R0020.pdf PDF
Amendement 4 METHODOLOGY 9-15-2022.pdf PDF
36C78622R0020 0004 METHODOLOGY (SF30).pdf PDF
36C78622R0020 Amendment 3 (SF30 RFI Responses with attachments posted 09-09-2022).pdf PDF
36C78622R0020 0002 8-18-2022.pdf PDF
922CM3006_GANC_Bid Documents_Plans_146-150.pdf PDF
922CM3006_GANC_Bid Documents_Plans_140-145.pdf PDF
922CM3006_GANC_Bid Documents_Plans_151-178.pdf PDF
922CM3006_GANC_Bid Documents_Plans_137-139.pdf PDF
922CM3006_GANC_Bid Documents_Plans_01-07.pdf PDF
Sample Cost estimate worksheet (2) (8-11-2022).xlsx XLSX spreadsheet
Sample Cost estimate worksheet (2) (8-11-2022).xls XLS spreadsheet
922CM3006_GANC_BOD For posting to FBO 8-11-22.pdf PDF
36C78622R0020 0001 Amendment (RFI).pdf PDF
922CM3006_GANC_Bid Documents_Plans_101-122.pdf PDF
Sample Cost estimate worksheet (1) (8-8-2022).xlsx XLSX spreadsheet
922CM3006_GANC_Bid Documents_Plans_59-79.pdf PDF
922CM3006_GANC_Bid Documents_Plans_20-35.pdf PDF
General Decision Number GA20220231 02-25-2022 6C78622R0020 Georgia.pdf PDF
PERFORMANCE QUESTIONNAIRE for 36C78622R0020 Georgia NC Expansion Ph 2 Construction 922CM3006(8-8-2022).pdf PDF
922CM3006_GANC_Bid Documents_Plans_123-133.pdf PDF
922CM3006_GANC_Bid Documents_Plans_93-100.pdf PDF
922CM3006_GANC_Basis of Design (BOD) For posting to FBO 8-8-2022 (1).pdf PDF
General Decision Number GA20220291 07-29-2022 (RFP 36C78622R0020).pdf PDF
Sample Cost estimate worksheet (3) (8-8-2022).xlsx XLSX spreadsheet
922CM3006_GANC_Bid Documents_Plans_08-19.pdf PDF
PERFORMANCE QUESTIONNAIRE for 36C78622R0020 Georgia NC Expansion Ph 2 Construction 922CM3006 (8-8-2022).docx DOCX document
922CM3006_GANC_Bid Documents_Plans_80-92.pdf PDF
36C78622R0020_3.docx DOCX document
922CM3006_GANC_Bid Documents_Plans_134-136.pdf PDF
922CM3006_GANC_Bid Documents_Plans_36-58.pdf PDF
Sample Cost estimate worksheet (2) (8-8-2022).xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCA MASTER

SPECIFICATIONS

BID DOCUMENTS

GEORGIA NATIONAL CEMETERY

CANTON, CHEROKEE COUNTY, GEORGIA

PROJECT NO. 922CM3006

CONSTRUCTION DOCUMENTS FOR PHASE 2

Prepared for:

United States Department of Veterans Affairs

February 28, 2022

THIS PAGE WAS INTENTIONALLY LEFT BLANK FOR DOUBLE SIDED PRINTING

Georgia National Cemetery Bid Documents Submission Construction Documents for Phase 2 February 28, 2022 Project No. 922CM3006

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

NCA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 05-10 00 31 32 Geotechnical Data

DIVISION 01 - GENERAL REQUIREMENTS

01 00 02 General Requirements (Minor NCA Projects) 06-14 01 32 17 Network Analysis Schedules (Microsoft Project Gantt

Chart) 10-10

01 33 23 Shop Drawings, Product Data, and Samples 06-14 01 42 19 Reference Standards 06-14 01 45 29 Testing Laboratory Services 06-14 01 45 33 Code-Required Special Inspections 01 57 19 Temporary Environmental Controls 06-14 01 74 19 Construction Waste Management 06-14 01 81 13 Sustainable Construction Requirements 08-16

DIVISION 02 – EXISTING CONDITIONS

02 41 10 Demolition and Site Clearing 06-14

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 06-14 03 48 21 Precast Concrete Burial Crypts (Double Depth Lawn

Crypt) 06-14

03 48 24 Precast Concrete Columbarium Units 06-14

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring and Grouting 04 20 00 Unit Masonry 06-14 04 40 10 Cut Stone Assemblies 04 72 00 Cast Stone Masonry 06-14 04 73 00 Columbarium Niche Covers 06-14

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 06-14 05 31 00 Steel Decking 06-14 05 40 00 Cold-Formed Metal Framing 06-14

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

00 01 10-2

06 10 00 Rough Carpentry 12-15

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 12-15 07 22 00 Roof and Deck Insulation 06-14 07 27 26 Fluid-Applied Membrane Air Barriers 07 41 13 Standing Seam Metal Roofing 06-14 07 42 93 Fascia and Soffit Panels 07 60 00 Flashing and Sheet Metal 06-14 07 92 00 Joint Sealants 06-14

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 06-14 08 14 00 Interior Wood Doors 12-15 08 41 13 Aluminum-Framed Entrances and Storefronts 06-14 08 71 00 Door Hardware 06-14 08 71 13.11 Low Energy Power Assist Door Operators 06-14 08 80 00 Glazing 06-14

DIVISION 09 – FINISHES

09 06 00 Schedule for Finishes 06-14 09 22 16 Non-Structural Metal Framing 06-14 09 29 00 Gypsum Board 06-14 09 30 13 Tiling 06-14 09 51 00 Acoustical Ceilings 06-14 09 65 13 Resilient Base and Accessories 06-14 09 68 00 Carpeting 06-14 09 91 00 Painting 06-14

DIVISION 10 – SPECIALTIES

10 14 00 Exterior Signage 06-14

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 11-16 22 05 23 General-Duty Valves for Plumbing Piping 11-16 22 07 11 Plumbing Insulation 22 11 00 Facility Water Distribution

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 11-16 23 05 12 General Motor Requirements for HVAC Equipment 11-16 23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment 11-16

23 05 93 Testing, Adjusting, and Balancing for HVAC 11-16

00 01 10-3

23 07 11 HVAC Insulation 11-16 23 21 13 Hydronic Piping 11-16 23 31 00 HVAC Ducts and Casings 11-16 23 37 00 Air Outlets and Inlets 11-16 23 81 00 Unitary HVAC Equipment 11-16

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 07-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-17 26 05 26 Grounding and Bonding for Electrical Systems 07-17 26 05 33 Raceway and Boxes for Electrical Systems 07-17 26 08 00 Commissioning of Electrical Systems 12-15 26 27 26 Wiring Devices 07-17 26 29 21 Enclosed Switches and Circuit Breakers 07-17 26 51 00 Interior Lighting 07-17 26 56 00 Exterior Lighting 07-17

DIVISION 27 – COMMUNICATIONS

27 05 00 Common Work Results for Communications 11-16 27 05 26 Grounding and Bonding for Communications Systems 11-16 27 05 33 Conduits and Backboxes for Communications Systems 11-16 27 08 00 Commissioning of Communication Systems 12-15 27 10 00 Structured Cabling 11-16

DIVISION 31 – EARTHWORK

31 20 00 Earth Moving 11-16 31 23 19 Dewatering 11-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 11-16 32 12 16 Asphalt Paving 11-16 32 17 23 Pavement Markings 11-16 32 31 19 Decorative Metal Fences and Gates 11-16 32 33 00 Site Furnishings 01-17 32 84 00 Planting Irrigation 01-17 32 90 00 Planting 11-16

DIVISION 33 – UTILITIES

33 40 00 Storm Sewer Utilities 11-16

ADDENDUMS

Geotechnical Report - Georgia National Cemetery

Expansion Phase II – by ECS Southeast 1/25/2022

Project No. 922CM3006

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

SITE/CIVIL

1 GI001 COVER SHEET

2 GI002 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

3 VL100 OVERALL EXISTING CONDITIONS PLAN

4 BL100 BORING LOCATION PLAN

5 CS001 FACILITIES CONDITIONS ASSESSMENT

6 CS100 OVERALL SITE DEVELOPMENT PLAN

7 CI100 SITE CIRCULATION & PHASING PLAN

8 GC001 EROSION & SEDIMENT CONTROL NOTES

9 GC101 EROSION & SEDIMENT CONTROL PLAN PHASE 1

10 GC102 EROSION & SEDIMENT CONTROL PLAN PHASE 1

11 GC103 EROSION & SEDIMENT CONTROL PLAN PHASE 1

12 GC104 EROSION & SEDIMENT CONTROL PLAN PHASE 1

13 GC401 EROSION & SEDIMENT CONTROL PLAN PHASE 1 ‐ ADD ALTERNATE B

14 GC105 EROSION & SEDIMENT CONTROL PLAN PHASE 2

15 GC106 EROSION & SEDIMENT CONTROL PLAN PHASE 2

16 GC107 EROSION & SEDIMENT CONTROL PLAN PHASE 2

17 GC108 EROSION & SEDIMENT CONTROL PLAN PHASE 2

18 GC402 EROSION & SEDIMENT CONTROL PLAN PHASE 2 ‐ ADD ALTERNATE B

19 GC109 EROSION & SEDIMENT CONTROL PLAN PHASE 3

20 GC110 EROSION & SEDIMENT CONTROL PLAN PHASE 3

21 GC111 EROSION & SEDIMENT CONTROL PLAN PHASE 3

22 GC111 EROSION & SEDIMENT CONTROL PLAN PHASE 3

23 GC403 EROSION & SEDIMENT CONTROL PLAN PHASE 3 ‐ ADD ALTERNATE B

24 GC501 EROSION & SEDIMENT CONTROL DETAILS

25 GC502 EROSION & SEDIMENT CONTROL DETAILS

26 GC503 EROSION & SEDIMENT CONTROL DETAILS

27 CD101 DEMOLITION PLAN

28 CD102 DEMOLITION PLAN

29 CD103 DEMOLITION PLAN

30 CD104 DEMOLITION PLAN

31 CD400 DEMOLITION PLAN ‐ ADD ALTERNATE B

32 CS101 SITE LAYOUT PLAN

33 CS102 SITE LAYOUT PLAN

34 CS103 SITE LAYOUT PLAN

35 CS104 SITE LAYOUT PLAN

36 CS104 SITE LAYOUT PLAN ‐ ADD ALTERNATE D

37 CS400 SITE LAYOUT PLAN ‐ ADD ALTERNATE B

38 CS110 BURIAL SECTION NUMBERING PLAN SECTION 5

Project No. 922CM3006

00 01 15 - 2

39 CS111 BURIAL SECTION NUMBERING PLAN SECTION 4

40 CS112 BURIAL SECTION NUMBERING PLAN SECTION 15

41 CS113 BURIAL SECTION NUMBERING PLAN SECTIONS 15 & 14A

42 CS114 BURIAL SECTION NUMBERING PLAN SECTION 14B

43 CS115 BURIAL SECTION NUMBERING PLAN SECTION 14C

44 CS116 BURIAL SECTION NUMBERING PLAN SECTION 14D

45 CS117 BURIAL SECTION NUMBERING PLAN SECTION 12A‐12C

46 CS118 BURIAL SECTION NUMBERING PLAN SECTION 12D

47 CS119 BURIAL SECTION NUMBERING PLAN SECTION 17

48 CS120 BURIAL SECTION NUMBERING PLAN SECTION 17

49 CG101 GRADING & DRAINAGE PLAN

50 CG102 GRADING & DRAINAGE PLAN

51 CG103 GRADING & DRAINAGE PLAN

52 CG104 GRADING & DRAINAGE PLAN

53 CG105 GRADING & DRAINAGE PLAN ‐ ADD ALTERNATE D

54 CG400 GRADING & DRAINAGE PLAN ‐ ADD ALTERNATE B

55 CG110 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 5

56 CG111 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 4

57 CG112 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 15

58 CG113 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 14A

59 CG114 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 14B

60 CG115 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 14C

61 CG116 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 14D

62 CG117 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 12A‐12C

63 CG118 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 12D

64 CG119 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 17

65 CG120 BURIAL SECTION GRADING ENLARGEMENT PLAN SECTION 17

66 CT201 ROADWAY CENTERLINE PROFILE

67 CT202 COLUMBARIUM ROADWAY CENTERLINE PROFILE

68 BK201 SEGMENTAL RETAINING WALL PROFILE

69 CJ100 STORMWATER MANAGEMENT PLAN

70 CJ500 STORMWATER MANAGEMENT NOTES AND DETAILS

71 CJ501 STORMWATER MANAGEMENT NOTES AND DETAILS

72 CJ502 STORMWATER MANAGEMENT NOTES AND DETAILS

73 CJ503 STORMWATER MANAGEMENT NOTES AND DETAILS

74 CJ504 STORMWATER MANAGEMENT NOTES AND DETAILS

75 CJ505 STORMWATER MANAGEMENT NOTES AND DETAILS

76 CU260 STORM SEWER PROFILES

77 CU261 STORM SEWER PROFILES

78 CU265 STORM SEWER COMPUTATIONS

79 DT501 CRYPT AND BURIAL SECTION DETAILS

80 DT502 CRYPT AND BURIAL SECTION DETAILS

81 DT503 CRYPT AND BURIAL SECTION DETAILS

Project No. 922CM3006

00 01 15 - 3

82 DT504 ROADWAY DETAILS

83 DT505 VEHICULAR GUARDRAIL DETAILS

84 DT506 STORM DRAINAGE DETAILS

85 CS410 COLUMBARIUM 'C' SITE LAYOUT PLAN: BASE BID

86 CS411 COLUMBARIUM 'C' AND 'D' SITE LAYOUT PLAN: ADD ALTERNATE B

87 CG410 COLUMBARIUM 'C' SITE GRADING PLAN: BASE BID

88 CG411 COLUMBARIUM 'C' SITE DRAINAGE PLAN: BASE BID

89 CG413 COLUMBARIUM 'C' AND 'D' SITE GRADING PLAN: ADD ALTERNATE B

90 CG411 COLUMBARIUM 'C' AND 'D' SITE DRAINAGE PLAN: ADD ALTERNATE B

91 CI100 EXISTING SIGN INVENTORY PLAN

92 CI101 EXISTING SIGN INVENTORY IMAGES 1

93 CI102 EXISTING SIGN INVENTORY IMAGES 2

94 CI103 EXISTING SIGN INVENTORY IMAGES 3

95 CD110 EXISTING SIGNAGE DEMOLITION PLAN

96 CI110 SITE SIGNAGE PLAN 1

97 CI111 SITE SIGNAGE PLAN 2

98 CI112 SITE SIGNAGE PLAN 3

99 CI600 SITE SIGNAGE SCHEDULE

100 CI120 SITE FURNISHING PLAN 1

101 CI121 SITE FURNISHING PLAN 2

102 CI122 SITE FURNISHING PLAN 3

103 CI501 SIGNAGE DETAILS 1

104 CI502 SIGNAGE DETAILS 2

105 CI503 SIGNAGE DETAILS 3

106 CI504 SIGNAGE DETAILS 4

107 CI505 SIGNAGE DETAILS 5

108 CI520 SITE FURNISHING DETAILS 1

109 CI521 SITE FURNISHING DETAILS 2

110 CI522 SITE FURNISHING DETAILS 3

111 CI523 SITE FURNISHING DETAILS 4

112 CI700 COLUMBARIUM 'C' AND 'D' WALL NUMBERING PLAN

113 CI701 TYPICAL COLUMBARIUM ELEVATIONS

114 CI702 COLUMBARIUM 'C' ELEVATIONS 1

115 CI703 COLUMBARIUM 'C' ELEVATIONS 2

116 CI704 COLUMBARIUM 'C' ELEVATIONS 3

117 CI705 COLUMBARIUM 'D' ELEVATIONS 1: ADD ALTERNATE B

118 CI706 COLUMBARIUM 'D' ELEVATIONS 1: ADD ALTERNATE B

119 CI707 COLUMBARIUM 'D' ELEVATIONS 2: ADD ALTERNATE B

120 CI708 COLUMBARIUM 'D' ELEVATIONS 3: ADD ALTERNATE B

121 CI709 COLUMBARIUM 'D' ELEVATIONS 4: ADD ALTERNATE B

122 CI710 COLUMBARIUM 'D' ELEVATIONS 4: ADD ALTERNATE B

123 CI711 COLUMBARIUM 'D' ELEVATIONS 5: ADD ALTERNATE B

124 CI712 COLUMBARIUM 'D' ELEVATIONS 6: ADD ALTERNATE B

Project No. 922CM3006

00 01 15 - 4

125 CI713 COLUMBARIUM DETAILS 1

126 CI714 COLUMBARIUM DETAILS 2

127 CI715 COLUMBARIUM DETAILS 3

128 CI716 COLUMBARIUM DETAILS 4

129 CI717 COLUMBARIUM DETAILS 5

130 CI718 COLUMBARIUM DETAILS 6

131 CI719 COLUMBARIUM RAMP DETAILS

132 CI750

COMMITAL SERVICE SHELTER SERVICE EMBLEM REPLACEMENT DETAILS: ADD

ALTERNATE E

133 CI751 MEMORIAL WALL SERVICE EMBLEM REPLACEMENT DETAILS: ADD ALTERNATE E

LANDSCAPE

134 L‐100 OVERALL LANDSCAPE PLAN

135 L‐101 LANDSCAPE PLAN

136 L‐102 LANDSCAPE PLAN

137 L‐103 LANDSCAPE PLAN

138 L‐104 LANDSCAPE PLAN

139 L‐105 LANDSCAPE PLAN

140 L‐106 LANDSCAPE PLAN

141 L‐107 LANDSCAPE PLAN

142 L‐108 LANDSCAPE PLAN ENLARGEMENT

143 L‐501 PLANTING SCHEDULE AND DETAILS

IRRIGATION

144 LI100 IRRIGATION NOTES AND LEGEND

145 LI101 OVERALL IRRIGATION PLAN

146 LI102 IRRIGATION PLAN

147 LI103 IRRIGATION PLAN

148 LI104 IRRIGATION PLAN

149 LI105 IRRIGATION PLAN

150 LI501 IRRIGATION DETAILS

151 LI502 IRRIGATION DETAILS

152 LI503 IRRIGATION DETAILS

GENERAL STRUCTURAL & ARCHITECTURAL

153 G‐001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

154 G‐002 LIFE SAFETY PLAN (ADD ALTERNATE)

STRUCTURAL

155 S‐001 STRUCTURAL GENERAL NOTES

156 SB100 FOUNDATION PLAN AND DETAILS (ADD ALTERNATE)

157 SB101 FOUNDATION DETAILS

Project No. 922CM3006

00 01 15 - 5

158 SF200 FRAMING PLAN AND DETAILS (ADD ALTERNATE)

ARCHITECTURAL

159 AD101

PUBLIC INFORMATION CENTER ‐ DEMOLITION PLAN AND ELEVATION (ADD

ALTERNATE B)

160 AE101

PUBLIC INFORMATION CENTER ‐ FLOOR PLAN, ROOF PLAN AND REFLECTED

CEILING PLAN (ADD ALTERNATE B)

161 AE102

PUBLIC INFORMATION CENTER ‐ ELEVATIONS AND SECTIONS (ADD ALTERNATE

B)

162 AE110

ADMIN/MAINTENANCE BUILDING ‐ PARTIAL FLOOR PLAN AND REFLECTED

CEILING PLAN (ADD ALTERNATE A)

163 AE301 WALL SECTIONS (ADD ALTERNATE)

164 AE501 DETAILS (ADD ALTERNATE)

165 AE601 PARTITION TYPES, SCHEDULES AND DETAILS (ADD ALTERNATE)

MECHANICAL

166 M‐001 MECHANICAL NOTES, SYMBOLS AND ABBREVIATIONS

167 MD101 MECHANICAL DEMOLITION PLANS (ADD ALTERNATE)

168 M‐101 MECHANICAL PLANS (ADD ALTERNATE)

169 M‐701 MECHANICAL SCHEDULES AND DETAILS (ADD ALTERNATE)

PLUMBING

170 P‐001 PLUMBING NOTES, SYMBOLS AND ABBREVIATIONS

171 P‐101 PLUMBING PLANS, SCHEDULES AND DETAILS (ADD ALTERNATE A)

ELECTRICAL

172 E‐001 ELECTRICAL SYMBOLS AND GENERAL NOTES

173 ED101 ELECTRICAL DEMOLITIONS PLANS (ADD ALTERNATE)

174 EP101 POWER PLANS

175 EL101 LIGHTING PLANS (ADD ALTERNATE)

176 ET101 SYSTEMS PLANS (ADD ALTERNATE)

177 E‐601 ELECTRICAL DETAILS (ADD ALTERNATE)

178 E‐701 ELECTRICAL SCHEDULES (ADD ALTERNATE)

GEOTECHNICAL DATA

00 31 32 - 1

SECTION 00 31 32

GEOTECHNICAL DATA

1.1 GEOTECHNICAL DATA

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations.

They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. A geotechnical investigation report for Project, prepared by ECS Southeast, LLP titled ‘Georgia National Cemetery Expansion Phase II’ is available for viewing as appended to this Document.

- - - E N D - - -

GENERAL REQUIREMENTS

01 00 02 - 1

SECTION 01 00 02

GENERAL REQUIREMENTS (MINOR NCA PROJECTS)

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor, materials, equipment, and services and perform and complete all work for Georgia National Cemetery Construction Documents for Phase 2 as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Cemetery Director.

C. Offices of William H. Gordon Associates, as Architect-Engineers (A/E), may render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Resident Engineer/Contracting

Officers Representative (RE/COR) or his duly authorized representative.

D. All Testing Laboratory services will be retained and paid for by the

Contractor (see Spec Section 01 45 29, Testing Laboratory Services).

However, the Department of Veterans Affairs may elect to retain its own

Testing Laboratory for any purpose. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the RE/COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the RE/COR.

E. All employees of general contractor and subcontractors shall comply with security requirements as established by the RE/COR, be identified by name and employer. They shall be restricted from unauthorized access.

F. Prior to commencing work, general contractor shall provide proof that an OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

G. Training:

1. All employees of general contractor or subcontractors shall, at the minimum, have successfully completed the 30-hour OSHA certified

01 00 02 - 2

Construction Safety course and/or other relevant competency training, as determined by VA CP.

2. Submit OSHA training records of all employees for approval before the start of work.

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Installation of all work shown on the plans and described in the specifications including but not limited to:

demolition of existing asphalt pavement and subbase materials, existing curb & gutter, existing storm drain infrastructure, and existing vegetation. Other improvements include gravesite expansion (pre-placed crypts, traditional caskets, in-ground cremains sites, columbarium niches), construction of columbarium walls, parking area expansion, cortege bypass lane, administration building renovation, PIC expansion, roads, signage, site furnishings, landscaping, and irrigation system.

B. ALTERNATE NO. A: Administrative Building Renovations

C. ALTERNATE NO. B: PIC Additions/Renovations (includes building addition, new cortege lane and all associated improvements shown on drawings)

D. ALTERNATE NO. C: FCA Improvements (Sheet CS001)

E. ALTERNATE NO. D: Columbarium D

F. ALTERNATE NO. E: Service Emblem Replacement

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, one (1) bond paper set(s) of specifications and drawings will be furnished.

B. Additional sets of drawings may be made by the Contractor, at

Contractor's expense, from digital files furnished by the Issuing

Office.

1.4 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the site without following the procedures approved by the RE/COR. They may also be

01 00 02 - 3 subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days’ notice to the RE/COTR so that appropriate arrangements can be provided for the Cemetery employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the RE/COTR.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the RE/COR.

C. Guards:

1. The General Contractor shall provide unarmed guards at the project site when theft or vandalism warrants.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the RE/COR for the purpose of security inspections of every area of project including tool boxes and parked machines, and to take any necessary emergency action.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the RE/COR upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of RE/COR.

01 00 02 - 4

5. Notify RE/COR immediately when there is a loss or compromise of

“sensitive information”.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this

Article to the extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-2009a Surface Burning Characteristics of Building

Materials

2. National Fire Protection Association (NFPA):

10-2010 Standard for Portable Fire Extinguishers

30-2008 Flammable and Combustible Liquids Code

51B-2009 Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2008 National Electrical Code

241-2009 Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to RE/COR/Cemetery Director for review for compliance with contract requirements in accordance with Section 01 33

23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to any worker for the contractor or subcontractor’s beginning work, they shall undergo a safety briefing provided by the General Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of NCA equipment, etc.

01 00 02 - 5

Documentation shall be provided to the RE/COR that individuals have undergone the Contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Temporary Construction Partitions:

1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or treated plywood

(flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs.

Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install

Class C, ¾ hour fire/smoke rated doors with self-closing devices.

2. Install temporary construction partitions as shown on drawings to maintain integrity of existing exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, and opening enclosures.

3. Close openings in smoke barriers and fire-rated construction to maintain fire ratings. Seal penetrations with listed through-penetration firestop materials.

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with

RE/COR/Cemetery Director.

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to

RE/COR.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA

241 and NFPA 10.

01 00 02 - 6

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

K. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with RE/COTR. All existing or temporary fire protection systems (fire alarms) located in construction areas shall be tested as coordinated with the Cemetery. Parameters for the testing and results of any tests performed shall be recorded by the Cemetery and copies provided to the RE/COR.

L. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with RE/COTR.

M. Hot Work: Perform and safeguard hot work operations in accordance with

NFPA 241 and NFPA 51B. Coordinate with RE/COR.

N. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to RE/COR.

O. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

P. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily and site weekly.

Q. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the RE/COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage trailers, office trailers) and utilities may be erected by the Contractor only with the approval of the RE/COR and shall be built with labor and materials furnished by the

Contractor without expense to the Government. The temporary buildings

01 00 02 - 7 and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work.

C. The Contractor shall, under regulations prescribed by the RE/COR, use only established roadways, or use temporary roadways constructed by the

Contractor when and as authorized by the RE/COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the RE/COR with agreement of the Cemetery. Contractor parking will be only in areas and on roadways designated and agreed to by the RE/COR in agreement of the Cemetery.

E. Workmen are subject to rules of the Cemetery applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Cemetery as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Provide unobstructed access to the Cemetery areas required to remain in operation.

3. Where access by Cemetery personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing: To ensure such executions, the Contractor shall furnish the

RE/COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, the Contractor shall notify the RE/COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the Cemetery Director, RE/COR and

Contractor.

01 00 02 - 8

I. Construction Fence: Before construction operations begin, the

Contractor shall provide a chain link construction fence, seven feet minimum height, around the limits of construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. The temporary fencing shall encompass the construction work area(s) to serve as a pedestrian barrier to alert cemetery patrons of the construction site. Remove the fence when directed by RE/COR.

J. When a building is turned over to Contractor, Contractor shall accept entire responsibility, therefore.

1. The Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. The Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, the Contractor shall make arrangements for pre-inspection of the site with Fire Department or Company (Department of Veterans

Affairs or municipal) whichever will be required to respond to an alarm from the Contractor's employee.

K. Utilities Services: Maintain existing utility services for the Cemetery at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by RE/COR. All such actions shall be coordinated with the Utility Company involved.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of RE/COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the

RE/COR, and Cemetery Director’s prior knowledge and written

01 00 02 - 9 approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS for additional requirements.

2. The Contractor shall submit a request to interrupt any such services to both RE/COR and the Cemetery Director in writing, 48 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. The Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of the Cemetery. Interruption time approved by the Cemetery and RE/COR may occur at other than

Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the RE/COR.

5. In case of a contract construction emergency, service will be interrupted on approval of RE/COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Cemetery traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.

01 00 02 - 10

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the RE/COR.

N. Coordinate the work for this contract with other construction operations as directed by RE/COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

O. Coordination of Construction with Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the RE/COR, in arranging construction schedule to cause the least possible interference with

Cemetery activities in actual burial areas. Construction noise during the committal services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period.

1. The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.

2. Cleaning up shall include the removal of all equipment, tools, materials, and debris and leaving the areas in a clean, neat condition.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the RE/COR of areas in which alterations occur and furnish a signed report, to the Contracting Officer. This report shall list:

1. Existing condition and types of resilient flooring, doors, windows, walls, and other surfaces not required to be altered throughout affected areas.

2. Existence and conditions of items required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and RE/COR.

01 00 02 - 11

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of

RE/COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by the Contractor with new items in accordance with specifications which will be furnished by the Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR

52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and RE/COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing surfaces as compared with conditions of same as noted in first condition survey report.

1. Re-survey report shall also list any damage caused by the Contractor to such flooring and other surfaces, despite protection measures;

and will form the basis for determining extent of repair work required of the Contractor to restore damage caused by the

Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protect the interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, any indicated surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 ENVIRONMENTAL CONTROLS

A. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by RE/COR. Block

01 00 02 - 12 off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

B. Vacuum and wet mop all transition areas from construction to the occupied Cemetery buildings at the end of each workday.

C. Final Cleanup:

1. Upon completion of the project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.

2. All new air ducts shall be cleaned prior to final inspection.

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by

RE/COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Cemetery.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the

01 00 02 - 13 careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the RE/COR.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the RE/COR may have the necessary work performed and charge the cost to the

Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate NCA

Central/Cemetery) office. The contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

1. Designating areas for equipment maintenance and repair;

2. Providing waste receptacles at convenient locations and provide regular collection of wastes;

01 00 02 - 14

3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

5. Providing adequately maintained sanitary facilities.

1.11 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, water/irrigation or electric work without approval of the RE/COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the

RE/COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, landscape stone, lawns, paving, roads, walks, etc.)

disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At the Contractor's own expense, the Contractor shall immediately restore to service and repair any damage caused by the Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services, fire protection systems, communications systems

(including telephone), irrigation system control and power which are indicated on drawings and which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.12 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for

01 00 02 - 15 any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by William H.

Gordon Associates Inc. through aerial survey, field run survey, site reconnaissance and review of existing construction documents.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration conducted by ECS are shown in

Specifications Section 31 20 00 Earth Moving.

C. A copy of the geotechnical investigation is an Appendix to

Specifications Section 31 20 00 Earth Moving and shall be considered part of the contract documents.

D. The Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine the site of work and logs of borings and, after investigation, decide for themselves the character of materials and make their bids accordingly. Upon proper application to the Department of Veterans Affairs, including approved scheduling bidders will be permitted to make subsurface explorations of their own at site.

1.13 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.14 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at the Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the RE/COR. The Contractor shall also be responsible

01 00 02 - 16 for maintaining and preserving all stakes and other marks established by the RE/COR until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the RE/COR may replace them and deduct the expense of the replacement from any amounts due or to become due to the

Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and/or addition to each existing building, lines for each gravesite control monument, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, gravesite control monuments, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. The

Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities, and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the RE/COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, the Contractor shall have lines, grades, locations and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the

RE/COR before any major items of concrete work are placed. In addition, furnish to the RE/COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

01 00 02 - 17

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

4. Lines of grave plot documentation.

5. Lines of elevations of all swales and interment areas.

6. Lines and elevations of roads, streets and parking lots.

7. Lines and elevations of top of pre-placed crypts//within their respective plots.

8. Lines and elevations of grade over pre-placed crypts.

9. Northing/Easting coordinate locations and elevation depth below finished grade of all water, sanitary, storm, gas and irrigation structures, directional fittings, control wire and lines.

10. Northing/Easting coordinate locations and elevation for each gravesite grid monument.

E. Upon completion of the work, the Contractor shall furnish the RE/COR with reproducible drawings, in AutoCAD form, at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.15 AS-BUILT DRAWINGS

A. The Contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, which will include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the RE/COR's review, as often as requested.

C. The Contractor shall deliver two approved completed sets of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .