S02_RFP Attachment_VA 01 00 00 Fire Safety Inspection Checklist for Hot Work General Requirements.pdf

PDF 83 KB Posted

Attached to
Z1DA--FY23 NRM-Tier 1 (PROJ 673-22-109) D/B: Install Fan Array in AHU OR2-7 and Replace Exhaust Fans
Solicitation number
36C24823R0068
Issued by

About this file

This document contains a fire safety inspection checklist for hot work operations and details for a federal contract opportunity to install a fan array and replace exhaust fans. The inspection checklist outlines safety requirements for hot work areas including ensuring floors are clean and wet down, combustible materials are removed or shielded, wall and floor openings are covered with suspended covers to collect sparks, and that a fire watch is provided during and for 30 minutes after hot work operations. The related federal contract opportunity is solicitation number 36C24823R0068 to install a fan array for Air Handling Unit OR2-7 and replace exhaust fans at the James A. Haley Veterans Affairs Medical Center in Tampa, Florida, with the point of contact being Amy Shaw and the contracting agency being the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.

View the file

Other files

File Type Posted
S05_RFI 3 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.pdf PDF
36C24823R0068 0008.docx DOCX document
S04_Site Visit 2 Sign in.pdf PDF
36C24823R0068 0007.docx DOCX document
P01_SOW_PN 673_22_109_Change of Scope Revision.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS_Install Fan Array_Updated.docx DOCX document
S05_RFI 2 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
P09_SOW 673_22_109 FINAL_RFI 2 Revision.docx DOCX document
S02_RFP Attachment_EF Mech Dwg.pdf PDF
S02_RFP Attachment_EF Schedule.pdf PDF
S04_Site Walk 1 Sign In.pdf PDF
36C24823R0068 0006.docx DOCX document
S02_RFP Attachment_EF Electrical Dwg.pdf PDF
36C24823R0068 0005.docx DOCX document
36C24823R0068 0004.docx DOCX document
36C24823R0068 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFO_Install Fan Array_10Feb2023.docx DOCX document
S05_RFI Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built Drawings_Mechanicals.pdf PDF
36C24823R0068 0002.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built DrawingsAHU.pdf PDF
S02_RFP Attachment_23_74_13 Packaged Outdoor Central Station AHU REV.pdf PDF
P09_SOW 673_22_109 FINAL_RFI Revision.docx DOCX document
36C24823R0068 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Adopted Codes General Requirements - Appendix B.pdf PDF
S02_RFP Attachment_VA 01 00 00 Safety and Infection Control Guide General Requirements - Appendix D.pdf PDF
S02_RFP Attachment_VA 01 00 00 Contractor Work Plan Peer Review General Requirements.pdf PDF
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_Architectural - Bldg 1 second.pdf PDF
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_VA 01 00 00 Facility Management Alerts General Requirements - Appendix C.pdf PDF
S02_RFP Attachment_SPEC 23 05 11 Common Work for HVAC.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Install Fan Array.docx DOCX document
S02_RFP 36C24823R0068_Final.pdf PDF
S02_RFP Attachment_VA 01 00 00 Approved OSHA Training Providers List General Requirements - Appendix A.pdf PDF
S02_RFP Attachment_SPEC 23 05 93 Testing Adjusting and Balancing for HVAC.pdf PDF
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Sprinkler Work Notifications General Requirements - Attachment 1a and 1b.pdf PDF
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_OR Reno As Built Drawings.pdf PDF
S02_RFP Attachment_SPEC 01 45 00 Quality Control.pdf PDF
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_Existing Panel Schedules.pdf PDF
S02_RFP Attachment_VA 01 00 00 VA Information and Information System General Requirements - Attachment 6.pdf PDF
S02_RFP Attachment_SPEC 01 42 19 Reference Standards.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Notification Of Hot Work General Requirements - Attachment 2.pdf PDF
S02_RFP Attachment_SPEC 23 34 00 HVAC Fans.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

Fire Safety Inspection Checklist for Hot Work

Operations Area

SECTION 01 00 00

GENERAL REQUIREMENTS

ATTACHMENT #3

FIRE SAFETY INSPECTION CHECKLIST FOR HOT WORK OPERATIONS AREA

PROJECT No. & TITLE:

DATE:

Floor swept clean of combustibles.

Floors wet down, covered with damp sand, metal or other shields.

Combustibles material or flammable liquids removed from area, whenever possible.

Combustibles and flammable liquids protected with covers, guards, or metal shields.

All wall and floor openings covered.

Covers suspended beneath work to collect sparks.

WORK BEING DONE ON WALLS OR CEILINGS

Ensure wall construction is noncombustible and is without combustible covering.

Move combustibles away from opposite side of wall.

WORK BEING DONE ON ENCLOSED EQUIPMENT-(TANKS, DUCTS, ETC.)

Remove all combustibles from enclosures.

Purge of flammable vapors. Ensure continuous purge so no vapors accumulate during work.

FIRE WATCH

To be provided during and until 30 minutes after operation.

Provide a 10-pound dry chemical or halon extinguisher and small hose.

Workers trained in use of equipment and in sounding fire alarm.

FINAL CHECK-UP

Conducted 30 minutes after completion of any operation, unless fire watch is provided.

Notify Safety Office (extension 7292) when work is complete. (Contractors - notify COR)

Notify Graphic Control Center (extension 7080), if any fire zones were by-passed

HOT WORK LOCATION:

NOTIFIERS SIGNATURE & DATE:

NAME & PHONE No.:

CONTRACTOR:

COR SIGNATURE & DATE:

Section 01 00 00, General Requirements – Attachment #3

Revised March 2018

Contract Information:
Project No:
and Title:
Date:
Check Box138: Off
Check Box139: Off
Check Box140: Off
Check Box142: Off
Check Box143: Off
Check Box145: Off
Check Box146: Off
Check Box147: Off
Check Box148: Off
Check Box149: Off
Check Box150: Off
Check Box151: Off
Check Box152: Off
Check Box153: Off
Check Box154: Off
Check Box155: Off
Hot Work Location:
Notifiers Name and Phone #:
Contractor Company Name:
Reset:
Print: