S05_RFI Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx

DOCX document 33 KB Posted

Attached to
Z1DA--FY23 NRM-Tier 1 (PROJ 673-22-109) D/B: Install Fan Array in AHU OR2-7 and Replace Exhaust Fans
Solicitation number
36C24823R0068
Issued by

About this file

This document is a request for information tracking log for solicitation number 36C24823R0068 to install a fan array in AHU OR2-7 and replace exhaust fans at the James A. Haley Veterans Medical Center in Tampa, Florida. The log contains responses to nineteen questions from potential offerors seeking clarification on requirements. Key clarifications provided include confirming the site safety health officer must be full-time, new variable frequency drives are required for each new fan, as-built drawings were revised and attached, and a site walk will be scheduled in lieu of unavailable exhaust fan documentation.

View the file

Other files

File Type Posted
S05_RFI 3 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.pdf PDF
36C24823R0068 0008.docx DOCX document
S04_Site Visit 2 Sign in.pdf PDF
36C24823R0068 0007.docx DOCX document
P01_SOW_PN 673_22_109_Change of Scope Revision.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS_Install Fan Array_Updated.docx DOCX document
S05_RFI 2 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
P09_SOW 673_22_109 FINAL_RFI 2 Revision.docx DOCX document
S02_RFP Attachment_EF Mech Dwg.pdf PDF
S02_RFP Attachment_EF Schedule.pdf PDF
S04_Site Walk 1 Sign In.pdf PDF
36C24823R0068 0006.docx DOCX document
S02_RFP Attachment_EF Electrical Dwg.pdf PDF
36C24823R0068 0005.docx DOCX document
36C24823R0068 0004.docx DOCX document
36C24823R0068 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFO_Install Fan Array_10Feb2023.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built Drawings_Mechanicals.pdf PDF
36C24823R0068 0002.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built DrawingsAHU.pdf PDF
S02_RFP Attachment_23_74_13 Packaged Outdoor Central Station AHU REV.pdf PDF
P09_SOW 673_22_109 FINAL_RFI Revision.docx DOCX document
36C24823R0068 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Adopted Codes General Requirements - Appendix B.pdf PDF
S02_RFP Attachment_VA 01 00 00 Safety and Infection Control Guide General Requirements - Appendix D.pdf PDF
S02_RFP Attachment_VA 01 00 00 Contractor Work Plan Peer Review General Requirements.pdf PDF
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Fire Safety Inspection Checklist for Hot Work General Requirements.pdf PDF
S02_RFP Attachment_Architectural - Bldg 1 second.pdf PDF
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_VA 01 00 00 Facility Management Alerts General Requirements - Appendix C.pdf PDF
S02_RFP Attachment_SPEC 23 05 11 Common Work for HVAC.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Install Fan Array.docx DOCX document
S02_RFP 36C24823R0068_Final.pdf PDF
S02_RFP Attachment_VA 01 00 00 Approved OSHA Training Providers List General Requirements - Appendix A.pdf PDF
S02_RFP Attachment_SPEC 23 05 93 Testing Adjusting and Balancing for HVAC.pdf PDF
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Sprinkler Work Notifications General Requirements - Attachment 1a and 1b.pdf PDF
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_OR Reno As Built Drawings.pdf PDF
S02_RFP Attachment_SPEC 01 45 00 Quality Control.pdf PDF
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_Existing Panel Schedules.pdf PDF
S02_RFP Attachment_VA 01 00 00 VA Information and Information System General Requirements - Attachment 6.pdf PDF
S02_RFP Attachment_SPEC 01 42 19 Reference Standards.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Notification Of Hot Work General Requirements - Attachment 2.pdf PDF
S02_RFP Attachment_SPEC 23 34 00 HVAC Fans.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI)

D/B Install Fan Array AHU OR 2-7 & Replace Exhaust Fans Project 673-22-109

RFI NBR
Question/

Response

Company Submitted By
Dated Received
1.
Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
Blue Cord
9Jan23

VA Response: Please see safety requirements and updated evaluation factor. This has changed from original solicitation – the SSHO must be a separate competent person from the superintendent

2.
If no to the question above, will the SSHO need to be full-time for this project?
Blue Cord
9Jan23

VA Response: The SSHO shall be full-time due to the sensitive nature of the project serving the OR.

3.
Phase 1 - Factor 2: References Attachment 3 (specialized experience form) but this has not been provided. Please provide.
Blue Cord
9Jan23

VA Response: Available on SAM.gov

4.
The solicitation references an attached Experience Information Sheet, but one was not provided. Please provide.
Blue Cord
9Jan23

VA Response: Available on SAM.gov

5
Will PPQs dated within the last 12 months be acceptable, or will new questionnaires need to be provided?
Blue Cord
9Jan23

VA Response: PPQs within the last 12 months will be acceptable but must be signed by the person who filled out the form.

6
Regarding past project performance, the solicitation states that project must be completed within the last 5 years and within the last 7 years. Please clarify which duration is correct.
Blue Cord
9Jan23

VA Response: Within the last 5 years

7
Please provide the as-builts for the OR HVAC as the drawings provided consist of just the cover sheet.
Blue Cord
9Jan23

VA Response: Corrected version attached.

8
Please confirm if the contractor is to rework the pipework for the OR AHU.
Blue Cord
9Jan23

VA Response: Yes. This has been clarified in the scope.

9
The SOW states to tie the new fan wall into the existing 50 amp VFD. Will the VA want new individual VFDs for the new Fanwall instead of reusing the existing VFD’s?
Blue Cord
9Jan23

VA Response: Yes – new VFDs (per fan) shall be provided. This has been clarified in the scope.

10
Will the existing exhaust fan be replaced as part of this project?
Blue Cord
9Jan23

VA Response: Yes

11
Please provide as-builts/cut sheets for the existing 6 exhaust fans on the OR/LAB Roof.
Blue Cord
9Jan23

VA Response: This documentation is not available. In lieu of as-builts and cut sheets, a site walk will be scheduled for site investigation.

12
The supporting documentation labeled

“S02_RFPAttachment_ORRenoAsBuiltDrawings” has a single sheet consisting of page 1 - cover sheet (G-001).

1. Is the complete document available in order to confirm equipment sizes and types (i.e. OR Fans, exhaust fans, etc.) for the scope of work?

2. If the complete document is not available, please confirm the approximate size, equipment type, and locations.

KMK
9Jan23

VA Response: OR Mechanical as builts have been revised and attached. As-builts for exhaust fans are not available – a site walk will be scheduled for site investigation in lieu of these documents

13
In Attachment_Instruction to Offerors & Evaluation Information, PHASE ONE - FACTOR 2: TECHNICAL QUALIFICATIONS,

Definitions:

Size – A hospital renovation project for the installation of large high-tech medical equipment (HTME) with a contract value of $500K or greater. All submitted project experience must meet this requirement.

Scope – A project in which contemplates the design and construction to either repair or replace parking garage facilities or similar structures.

The actual SOW in the RFP states: replace the existing supply fan within AHU-OR2-7 with new fan arrays with individual VFD’s per fan and replace the six existing Exhaust Fans on OR lab roof.

RFI: Please clarify the Size and Scope for the PHASE ONE - FACTOR 2: TECHNICAL QUALIFICATIONS, relevant experience.

Polu Kai
9Jan23

VA Response:

Size: A hospital renovation project for HVAC renovations with a contract value of $500K or greater. All submitted project experience must meet this requirement.

Scope – A project in which contemplates the design and construction to conversion or installation of a fanwall system

14
PHASE ONE - FACTOR 3: PAST PERFORMANCE

RFI: Confirming the client is to return PPQs to the contractor to be submitted with their proposal.

Polu Kai
9Jan23

VA Response: The PPQs may be sent directly to the contracting officer or the contractor can forward them. However, all PPQs must be signed to be considered valid.

VA Response:

VA Response:

VA Response:

VA Response:

VA Response:

Attachment 2 RFI Tracking Log