S02_RFP Attachment_VA 01 00 00 Contractor Work Plan Peer Review General Requirements.pdf
PDF 477 KB Posted
- Attached to
- Z1DA--FY23 NRM-Tier 1 (PROJ 673-22-109) D/B: Install Fan Array in AHU OR2-7 and Replace Exhaust Fans
- Solicitation number
- 36C24823R0068
About this file
This document contains two attachments related to contractor work plans and peer reviews for federal construction projects. Attachment 5A outlines requirements for contractor work plans, including listing tools and equipment needed, personal protective equipment, names of employees performing the work, supervisor information, work schedule details, procedures for before, during and after the work, and notification to the COR. Attachment 5B outlines the peer review process, including signature requirements from various departments and a meeting sign-in sheet to document coordination and approvals from relevant stakeholders. The related federal contract opportunity is to install a new fan array in Air Handling Unit OR2-7 and replace exhaust fans at the James A. Haley Veterans Affairs Medical Center in Tampa, Florida, with a performance period to be determined.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachments 5a & 5b
Contractor Work Plan & Peer Review
SECTION 01 00 00
GENERAL REQUIREMENTS
ATTACHMENT #5 - A
CONTRACTOR WORK PLAN / PEER REVIEW REQUEST
PROJECT No. & TITLE:
DESCRIPTION OF WORK:
TOOLS & EQUIPMENT TO PERFORM WORK:
PERSONAL PROTECTIVE EQUIPMENT FOR WORK:
NAME(S) OF EMPLOYEE(S) PERFORMING WORK:
SUPERVISOR / WORK LEADER NAME (PRINTED):
SUPERVISOR / WORK LEADER SIGNATURE:
DATE:
Section 01 00 00, General Requirements – Attachment #5 - A
Revised Mar 2019
Su M T W Th F Sa DATE: @ TIME: START DATE:
END DATE: DATE: @ TIME:
ESTIMATED DURATION OF WORK:
LOCATION OF WORK:
HOURS
ARC CAL: PPE LEVEL 1 2 3 4
Su M T W Th F Sa
PROCEDURE(S):
All maintenance and repair work must have a written procedure prepared by the maintenance person performing the task.
BEFORE:
DURING:
AFTER:
Section 01 00 00, General Requirements – Attachment #5 - A
Revised Mar 2019
DATE AND TIME COR NOTIFIED:
GENERAL CONTRACTOR’S NOTIFYING PERSON:
NOTIFYING PERSON’S SIGNATURE:
GENERAL CONTRACTOR COMPANY:
PHONE NUMBER(S) –
OFFICE:
CELL:
Section 01 00 00, General Requirements – Attachment #5 - A
SECTION 01 00 00
GENERAL REQUIREMENTS
PEER REVIEW #5 – B
PROJECT No. & TITLE:
* - Designates signature required.
Section 01 00 00, General Requirements – Attachment #5 – B
Revised Mar 2019
Name Signature Title / Service Date
*COR / FMS
*Elec Supv / FMS
*AC Supv / FMS
*Plumb Supv / FMS
*CEP / FMS
*M&O Supv / FMS
*Projects Supv / FMS
*Safety / FMS
*BioMed / FMS
*Chief / FMS
*Infect Ctrl / MED
*Logistics
*SPD/SPS
*Police
*AFGE
*NNU
Power Plant / FMS
*OI&T
Section 01 00 00, General Requirements – Attachment #5 – B
Revised Mar 2019
AREA IMPACTED REPRESENTRATIVE SIGN OFF / MEETING SIGN IN SHEET
PROJECT No. & TITLE:
MEETING DAY/DATE/TIME:
PLEASE PRINT AND SIGN YOUR NAME
AND PROVIDE BEST CONTACT INFO:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Print Name: Signature:
Dept/Company: Phone/Ext:
Check all that apply:
Notification of Live Electrical Work Mitigation Plan
Enclosed Space Permit Contingency Plan
Burn Permit (Hot Work) Utility Shutdown required?
Safety Review (ILSM) Coordination Meeting Required?
Infection Controls Review (ICRA) Utility Shutdown / Closure Notice
Above Ceiling Permit Utility Shutdown & Start Up Procedures
Drawings Enclosed Shutdown Checklist and Flow Chart
RESET PRINT
Section 01 00 00, General Requirements – Attachment #5 - B
| 2019-Feb-07 VA 01 00 00 General Requirements - Attachment 5a and 5b.pdf |
| Attachment5-Page2.pdf |
| PROJECT No TITLE: |
| TIME: |
| TIME_2: |
| LOCATION OF WORK: |
| DESCRIPTION OF WORK: |
| TOOLS EQUIPMENT TO PERFORM WORK: |
| PERSONNAL PROTECTIVE EQUIPMENT FOR WORK: |
| NAMES OF EMPLOYEES PERFORMING WORK: |
| SUPERVISOR WORK LEADER NAME PRINTED: |
| Supervisr/Work Leader Signed: |
| Date_Supervisor/work leader signed: |
| Group17: Off |
| Group18: Off |
| Duration: |
| Start Date: |
| End Date: |
| Group1: Off |
| ArcCal: |
| PROCEDURES: |
| BEFORE: |
| DURING: |
| AFTER: |
| DATE AND TIME COR NOTIFIED: |
| GENERAL CONTRACTORS NOTIFYING PERSON: |
| GENERAL CONTRACTOR COMPANY: |
| OFFICE: |
| CELL: |
| PROJECT No TITLE_2: |
| NameRow1: |
| SignatureRow1: |
| DateCOR FMS: |
| NameRow2: |
| SignatureRow2: |
| DateElec Supv FMS: |
| NameRow3: |
| SignatureRow3: |
| DateAC Supv FMS: |
| NameRow4: |
| SignatureRow4: |
| DatePlumb Supv FMS: |
| NameRow5: |
| SignatureRow5: |
| DateCEP FMS: |
| NameRow6: |
| SignatureRow6: |
| DateMO Supv FMS: |
| NameRow7: |
| SignatureRow7: |
| DateProjects Supv FMS: |
| NameRow8: |
| SignatureRow8: |
| DateSafety FMS: |
| NameRow9: |
| SignatureRow9: |
| DateBioMed FMS: |
| NameRow10: |
| SignatureRow10: |
| DateChief FMS: |
| NameRow11: |
| SignatureRow11: |
| DateInfect Ctrl MED: |
| NameRow12: |
| SignatureRow12: |
| DateLogistics: |
| NameRow13: |
| SignatureRow13: |
| DateSPDSPS: |
| NameRow14: |
| SignatureRow14: |
| DatePOLICE: |
| NameRow15: |
| SignatureRow15: |
| DateAFGE: |
| NameRow16: |
| SignatureRow16: |
| DateNNU: |
| NameRow17: |
| SignatureRow17: |
| DatePower Plant: |
| NameRow18: |
| SignatureRow18: |
| DateOI&T: |
| NameRow19: |
| SignatureRow19: |
| Title_Service_Row_1: |
| DateRow19: |
| NameRow20: |
| SignatureRow20: |
| Title_Service_Row_2: |
| DateRow20: |
| NameRow21: |
| SignatureRow21: |
| Title_Service_Row_3: |
| DateRow21: |
| NameRow22: |
| SignatureRow22: |
| Title_Service_Row_4: |
| DateRow22: |
| NameRow23: |
| SignatureRow23: |
| Title_Service_Row_5: |
| DateRow23: |
| Section 01 00 00: |
| DateRow24: |
| DateRow25: |
| TitleServiceRow6: |
| TitleServiceRow7: |
| SignatureRow24: |
| SignatureRow25: |
| NameRow24: |
| NameRow25: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Reset: |
| Print: |
| Project Title: |
File details come from the government source that posted it. Updated .