S05_RFI 3 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.pdf

PDF 134 KB Posted

Attached to
Z1DA--FY23 NRM-Tier 1 (PROJ 673-22-109) D/B: Install Fan Array in AHU OR2-7 and Replace Exhaust Fans
Solicitation number
36C24823R0068
Issued by

About this file

This document contains a tracking log of questions and responses related to a request for information (RFI) for a construction project at a Veterans Affairs medical center. The project involves installing a new fan array in air handling unit OR2-7 and replacing exhaust fans at the James A. Haley VA Medical Center in Tampa, Florida. The solicitation number for this project is 36C24823R0068. Questions addressed in the log relate to the use of variable frequency drives, coordination of work with hospital services, staging areas, required testing, access and security procedures, disposal of old equipment, utility shutdown coordination, crane access plans, treatment of any additional necessary scope discovered after bidding, and consideration of alternative solutions. Responses provide details on allowable work hours and downtimes, temporary HVAC needs, required testing and balancing, key and access provisions, expectations for equipment disposal and unforeseen conditions, and openness to alternative approaches.

View the file

Other files

File Type Posted
36C24823R0068 0008.docx DOCX document
S04_Site Visit 2 Sign in.pdf PDF
36C24823R0068 0007.docx DOCX document
P01_SOW_PN 673_22_109_Change of Scope Revision.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS_Install Fan Array_Updated.docx DOCX document
S05_RFI 2 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
P09_SOW 673_22_109 FINAL_RFI 2 Revision.docx DOCX document
S02_RFP Attachment_EF Mech Dwg.pdf PDF
S02_RFP Attachment_EF Schedule.pdf PDF
S04_Site Walk 1 Sign In.pdf PDF
36C24823R0068 0006.docx DOCX document
S02_RFP Attachment_EF Electrical Dwg.pdf PDF
36C24823R0068 0005.docx DOCX document
36C24823R0068 0004.docx DOCX document
36C24823R0068 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFO_Install Fan Array_10Feb2023.docx DOCX document
S05_RFI Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built Drawings_Mechanicals.pdf PDF
36C24823R0068 0002.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built DrawingsAHU.pdf PDF
S02_RFP Attachment_23_74_13 Packaged Outdoor Central Station AHU REV.pdf PDF
P09_SOW 673_22_109 FINAL_RFI Revision.docx DOCX document
36C24823R0068 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Adopted Codes General Requirements - Appendix B.pdf PDF
S02_RFP Attachment_VA 01 00 00 Safety and Infection Control Guide General Requirements - Appendix D.pdf PDF
S02_RFP Attachment_VA 01 00 00 Contractor Work Plan Peer Review General Requirements.pdf PDF
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Fire Safety Inspection Checklist for Hot Work General Requirements.pdf PDF
S02_RFP Attachment_Architectural - Bldg 1 second.pdf PDF
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_VA 01 00 00 Facility Management Alerts General Requirements - Appendix C.pdf PDF
S02_RFP Attachment_SPEC 23 05 11 Common Work for HVAC.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Install Fan Array.docx DOCX document
S02_RFP 36C24823R0068_Final.pdf PDF
S02_RFP Attachment_VA 01 00 00 Approved OSHA Training Providers List General Requirements - Appendix A.pdf PDF
S02_RFP Attachment_SPEC 23 05 93 Testing Adjusting and Balancing for HVAC.pdf PDF
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Sprinkler Work Notifications General Requirements - Attachment 1a and 1b.pdf PDF
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_OR Reno As Built Drawings.pdf PDF
S02_RFP Attachment_SPEC 01 45 00 Quality Control.pdf PDF
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_Existing Panel Schedules.pdf PDF
S02_RFP Attachment_VA 01 00 00 VA Information and Information System General Requirements - Attachment 6.pdf PDF
S02_RFP Attachment_SPEC 01 42 19 Reference Standards.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Notification Of Hot Work General Requirements - Attachment 2.pdf PDF
S02_RFP Attachment_SPEC 23 34 00 HVAC Fans.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI) #3

D/B Install Fan Array AHU OR 2-7 & Replace Exhaust Fans Project 673-22-109

Attachment 2 RFI Tracking Log

RFI NBR Question/ Response

Company Submitted By

Dated Received

1. Multiple VFD’s were mentioned. Should we plan for one per fan or is additional redundancy desired?

Milicon 5/15/23

VA Response: One per fan

2. Will the space served by the air handler require temporary air conditioning while the fans are being replaced?

Milicon 5/15/23

VA Response: No. Downtime on the unit must only occur on nights/weekends, which will avoid the need for temp air.

3. Will the General Contractor be able to work on nights and weekends?

Milicon 5/15/23

VA Response: Yes. All work affecting the usability of the Unit (or crane lifts that will require evacuation of areas flown over) must be done on off hours.

4. Does this project overlap with other projects throughout the hospital that require additional coordination?

Milicon 5/15/23

VA Response: No – coordination will be needed with the affected services but no other construction will interfere.

5 Will there be a staging area (Material storage, dumpster, etc.) Milicon 5/15/23

VA Response: Yes. Will be addressed at kickoff

6 When installing the Fans what is the desire schedule to work for the VA?

Milicon 5/15/23

VA Response: All work affecting the usability of the Unit (or crane lifts that will require evacuation of areas flown over) must be done on off hours. Unit must be back in service by Monday morning following any weekend downtime

7 Will the GC need to provide temporary air conditioning while work is going on? or will the area shut down during the installation process?

Milicon 5/15/23

VA Response: See answer to #2

8 Will the GC need to do a pre-construction Test and Balance on the affected areas? or will this not be required?

Milicon 5/15/23

VA Response: Yes, Pre- and Post- TAB must be conducted by contractor

9 Will the VA provide specialized keys and fobs, or would we need a VA Chaperone all the times?

Milicon 5/15/23

VA Response: Construction keys will be provided to Project Manager, Superintendent, and SSHO. Access and use of loading dock must be coordinated with CORs

10 Would this project allow to work on weekends and at nighttime? Milicon 5/15/23

VA Response: Yes. All work affecting the usability of the Unit (or crane lifts that will require evacuation of areas flown over) must be done on off hours.

Request for Information (RFI) #3

D/B Install Fan Array AHU OR 2-7 & Replace Exhaust Fans Project 673-22-109

Attachment 2 RFI Tracking Log

11 What are we doing with the old equipment? Are they garbage or do we have to turn them in to the hospital?

Milicon 5/15/23

VA Response: Acknowledgement from COR for any disposed equipment.

12 Does the VA expect to have electrical hot work, or will the GC need to coordinate any electrical shutdowns?

Milicon 5/15/23

VA Response: GC will need to coordinate all shutdowns through COR using Utility Shutdown procedures and workplan coordination

13 If needed, does the VA have a preferred staging plan for a crane to fly out / in equipment from the roof? If so, which is it?

Milicon 5/15/23

VA Response: Contractor is responsible for submitting plan to COR for location approval. All occupied areas flown over must be vacated so most minimal affect to the facility should be considered.

14 If it is discovered during the design phase that any of the deleted scope of work in Phase II of the bid needs to be performed during the project's construction phase, will this be considered as an unforeseen situation and qualify for future economic adjustment?

Milicon 5/15/23

VA Response: Any work discovered and deemed necessary to the success of the project will be considered by CORs and CO for a modification

15 Does the VA expect any unforeseen condition that were found after or during this bid time that needs to be considered?

Milicon 5/15/23

VA Response: The VA does not expect any unforeseen conditions. However, any conditions that contractor sees prior to project award shall be brought to the attention of the VA via RFI and/or in the contractor’s proposal to avoid any contract modifications post-award.

16 Will you accept alternate solutions? OST 5/10/23

VA Response: Yes, alternate ideas will be considered assuming they at a minimum, meet the requirements to fulfill the project intent.