S02_RFP Attachment_Price Matrix.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Z1DA--FY23 NRM-Tier 1 (PROJ 673-22-109) D/B: Install Fan Array in AHU OR2-7 and Replace Exhaust Fans
Solicitation number
36C24823R0068
Issued by

About this file

This document contains a price matrix attachment for a request for proposal related to a federal contract opportunity to install a fan array in an air handling unit and replace exhaust fans at a Department of Veterans Affairs medical center. The price matrix lists line item descriptions for various construction divisions with columns for labor costs, material costs, and total costs. It requests the offeror provide their name, address, and total proposed price at the bottom. The related federal contract opportunity provides additional details including the solicitation number, brief description of installing a fan array and replacing exhaust fans at the James A. Haley VA Medical Center in Tampa, Florida, along with the contracting agency and point of contact information.

View the file

Other files

File Type Posted
S05_RFI 3 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.pdf PDF
36C24823R0068 0008.docx DOCX document
S04_Site Visit 2 Sign in.pdf PDF
36C24823R0068 0007.docx DOCX document
P01_SOW_PN 673_22_109_Change of Scope Revision.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS_Install Fan Array_Updated.docx DOCX document
S05_RFI 2 Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
P09_SOW 673_22_109 FINAL_RFI 2 Revision.docx DOCX document
S02_RFP Attachment_EF Mech Dwg.pdf PDF
S02_RFP Attachment_EF Schedule.pdf PDF
S04_Site Walk 1 Sign In.pdf PDF
36C24823R0068 0006.docx DOCX document
S02_RFP Attachment_EF Electrical Dwg.pdf PDF
36C24823R0068 0005.docx DOCX document
36C24823R0068 0004.docx DOCX document
36C24823R0068 0003.docx DOCX document
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFO_Install Fan Array_10Feb2023.docx DOCX document
S05_RFI Tracking Log 673_22_109 DB Install Fan Array AHU OR 2_7_Final.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built Drawings_Mechanicals.pdf PDF
36C24823R0068 0002.docx DOCX document
S02_RFP Attachment_Pages from 8_As_Built DrawingsAHU.pdf PDF
S02_RFP Attachment_23_74_13 Packaged Outdoor Central Station AHU REV.pdf PDF
P09_SOW 673_22_109 FINAL_RFI Revision.docx DOCX document
36C24823R0068 0001.docx DOCX document
Experience Information Sheet.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Adopted Codes General Requirements - Appendix B.pdf PDF
S02_RFP Attachment_VA 01 00 00 Safety and Infection Control Guide General Requirements - Appendix D.pdf PDF
S02_RFP Attachment_VA 01 00 00 Contractor Work Plan Peer Review General Requirements.pdf PDF
S02_RFP Attachment_SPEC 01 35 26_Safety Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Fire Safety Inspection Checklist for Hot Work General Requirements.pdf PDF
S02_RFP Attachment_Architectural - Bldg 1 second.pdf PDF
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_VA 01 00 00 Facility Management Alerts General Requirements - Appendix C.pdf PDF
S02_RFP Attachment_SPEC 23 05 11 Common Work for HVAC.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Install Fan Array.docx DOCX document
S02_RFP 36C24823R0068_Final.pdf PDF
S02_RFP Attachment_VA 01 00 00 Approved OSHA Training Providers List General Requirements - Appendix A.pdf PDF
S02_RFP Attachment_SPEC 23 05 93 Testing Adjusting and Balancing for HVAC.pdf PDF
S02_RFP Attachment_SPEC 01 00 00_General Requirements 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Sprinkler Work Notifications General Requirements - Attachment 1a and 1b.pdf PDF
S02_RFP Attachment_OR Reno As Built Drawings.pdf PDF
S02_RFP Attachment_SPEC 01 45 00 Quality Control.pdf PDF
S02_RFP Attachment_EMR.pdf PDF
S02_RFP Attachment_SPEC 01 32 16 16_Network Analysis Schedule_Design-Build Only.docx DOCX document
S02_RFP Attachment_Existing Panel Schedules.pdf PDF
S02_RFP Attachment_VA 01 00 00 VA Information and Information System General Requirements - Attachment 6.pdf PDF
S02_RFP Attachment_SPEC 01 42 19 Reference Standards.pdf PDF
S02_RFP Attachment_SPEC 01 33 23_Shop Drawings 673-22-107.docx DOCX document
S02_RFP Attachment_VA 01 00 00 Notification Of Hot Work General Requirements - Attachment 2.pdf PDF
S02_RFP Attachment_SPEC 23 34 00 HVAC Fans.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 1Design Requirements
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-